Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

No

Description

WTG

SEPTEMBER
16
23

30

OCTOBER
14
21

28

NOVEMBER
11
18

25

DECEMBER
16

23

30

Piling
1 Offspec Tank
2 Equalisation Tank
3 UNIT 6350 - Sanitary Waste Water Treatment Unit
4 UNIT 6360 - Sludge Treatment Unit
5 UNIT 6370 - Vapour Recovery Unit
6 UNIT 6380 - Slop Oil Handling Unit
7 UNIT 6390 - ETP Interconnecting Unit
Substructure
1 FAR Building
2 Bio Tower
3 Secondary Clarifier
4 Equalisation Tank
5 Substation 631
6 Substation 632
7 Duct bank
8 Observation Pond
9 Offspec Tank 6300
10 Aeration Tank
Superstructure
1 FAR Building
2 Bio Tower
3 Equalisation Tank
4 Secondary Clarifier
5 Substation 631
6 Substation 632
7 Duct bank
8 Observation Pond
9 Offspec Tank
10 Aeration Tank

28/6

15/8

24/8

15/2

0.48
0.26
0.26
0.1
0.44
0.43

0.48
0.13
0.13

0.08
0.67
0.34

0.34

1.09
1.07
0.37
0.13
0.83
0.78

1.09
1.07
0.37
0.13
0.83
0.78

0.3
0.08
0.17

0.3
0.08
0.17

0.13
0.13
0.5
0.22

0.5
0.22
0.22
0.04
0.34

0.2

0.74

1.18
3.69

0.2
0.25

1.77

0.21
0.04
0.33
0.08

0.08

0.09

0.09

0.23
0.25
0.07

0.23
0.29
0.07

0.23
0.28
0.07
0.03

0.08
0.03

0.41

0.42
0.36

0.42

1.62

1.09
4.39

1.06

0.62

0.08
0.04

0.12

0.03

0.07
0.02
0.04
0.16
0.56

0.07
0.02
0.04
0.13

0.08
0.02
0.05
0.15

0.08
0.02
0.04
0.14

0
0.14