WTG
SEPTEMBER
16
23
30
OCTOBER
14
21
28
NOVEMBER
11
18
25
DECEMBER
16
23
30
Piling
1 Offspec Tank
2 Equalisation Tank
3 UNIT 6350 - Sanitary Waste Water Treatment Unit
4 UNIT 6360 - Sludge Treatment Unit
5 UNIT 6370 - Vapour Recovery Unit
6 UNIT 6380 - Slop Oil Handling Unit
7 UNIT 6390 - ETP Interconnecting Unit
Substructure
1 FAR Building
2 Bio Tower
3 Secondary Clarifier
4 Equalisation Tank
5 Substation 631
6 Substation 632
7 Duct bank
8 Observation Pond
9 Offspec Tank 6300
10 Aeration Tank
Superstructure
1 FAR Building
2 Bio Tower
3 Equalisation Tank
4 Secondary Clarifier
5 Substation 631
6 Substation 632
7 Duct bank
8 Observation Pond
9 Offspec Tank
10 Aeration Tank
28/6
15/8
24/8
15/2
0.48
0.26
0.26
0.1
0.44
0.43
0.48
0.13
0.13
0.08
0.67
0.34
0.34
1.09
1.07
0.37
0.13
0.83
0.78
1.09
1.07
0.37
0.13
0.83
0.78
0.3
0.08
0.17
0.3
0.08
0.17
0.13
0.13
0.5
0.22
0.5
0.22
0.22
0.04
0.34
0.2
0.74
1.18
3.69
0.2
0.25
1.77
0.21
0.04
0.33
0.08
0.08
0.09
0.09
0.23
0.25
0.07
0.23
0.29
0.07
0.23
0.28
0.07
0.03
0.08
0.03
0.41
0.42
0.36
0.42
1.62
1.09
4.39
1.06
0.62
0.08
0.04
0.12
0.03
0.07
0.02
0.04
0.16
0.56
0.07
0.02
0.04
0.13
0.08
0.02
0.05
0.15
0.08
0.02
0.04
0.14
0
0.14