FOR
PLUGGING OF REDUNDANT HOLES
IN STRUCTURAL MEMBERS
Job Number
Document No
2
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Department:
Location:
Quality Management
Jamnagar
Revision Number
E
00
Date
16.06.2013
Prepared
By
MM
Reviewed
By
Approved
By
TD
CPB
SSS
SNS
Hard copy of this procedure shall be treated as uncontrolled if not signed by approver
For latest revision please check with soft copy in network.
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
CONTENTS
1. INTRODUCTION
2. PURPOSE
3. SCOPE
4. ABBREVIATIONS & DEFINITIONS
5. RESPONSIBILITY AND AUTHORITY
6. REFERENCE
7. FLOW CHART
8. WORK INSTRUCTION
9. RECORDS
Page 2 of 5
Quality Management Department
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
1.
INTRODUCTION
RIL Fabrication division is providing construction service for various projects. Based on
design requirements, structural steel components are provided with a number of holes on
flange/web of beam or column for bolting purpose. Due to revision in fabrication drawings or
due to fabrication mistake, sometimes holes in structural members becomes redundant and new
holes are required to be drilled at new locations. In order to avoid of wastage of material,
redundant holes are required to be plugged by welding and new holes are drilled at new
locations. During plugging, a step by step control mechanism is required to be followed so as
to ascertain soundness of plugged area.
2.
PURPOSE
The purpose of this work instruction is to provide step by step instruction for plugging of
redundant hole in structural members by welding.
3.
SCOPE
The scope of this work instruction is limited to plugging of redundant holes by welding in
statically loaded Structural members only.
For cyclically loaded structure, SER shall be raised and approval shall be obtained from
engineering on a case to case basis.
4.
HOD
Head of Department
QMD
SER
WPS
5.
Respective Area construction Manager is responsible for the implementation of this procedure
in his area.
6.
REFERENCE
7.
FLOW CHART
Nil
Page 3 of 5
Quality Management Department
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
8.
WORK INSTRUCTION
8.1.
8.2.
Backing strip material of same grade/type with minimum thickness of 5 mm shall be provided
to ensure complete penetration (as shown in sketch). Shall be verified by Reliance execution
prior to welding.
8.3.
Before welding, dirt, oil and grease etc. shall be completely removed from hole.
8.4.
Root pass welding shall be carried out by 2.5 electrodes. Subsequent passes shall be welded
with 3.15 electrodes. Inter pass cleaning shall be carried out. After welding completion,
weld shall be flush ground.
8.5
Backing strip shall be removed by grinding. In case of any minor damage during removal of
strip, affected area shall be checked by PT and filled up by welding using the same procedure.
8.6
8.7
Page 4 of 5
Quality Management Department
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
9. RECORDS
Structural steel Fabrication Inspection Report (FORM NO: 2 QA FMT ME 003).