Professional Documents
Culture Documents
Disaster Recovery Procedures Manual Sample
Disaster Recovery Procedures Manual Sample
Disaster Recovery
Procedures for Business
Continuity Management
US$ 595.00
Includes seven (7) modules:
1. Introduction and Table of
Contents
2. Guide to preparing a well written
manual
3. Disaster Recovery Action plan
covering common requirements
and practices
4. 29 Policies and corresponding
forms
5. Sample forms + correspondence
6. Workplace Violence Supplement
7. Complete Index
sales@bizmanualz.com
How to Order:
Online:
www.bizmanualz.com
By Phone: 314-863-5079
800-466-9953
By Fax:
314-863-6571
Bonus Sections
Action Plan:
Special section providing detail
steps that are recommended
to assist in developing a
Disaster Management Plan.
Document ID
DMP103
Revision
0.0
Effective Date
mm/dd/yyyy
Title
Centers of Operation
Prepared By
(name, title)
Reviewed By
(name, title)
Approved By
(name, title)
www.bizmanualz.com
Print Date
mm/dd/yyyy
Date Prepared
mm/dd/yyyy
Date Reviewed
mm/dd/yyyy
Date Approved
mm/dd/yyyy
Policy:
The Company will provide for a primary and secondary centers of operation
equipped with appropriate supplies and equipment.
Purpose:
Scope:
Procedure:
1.0
Current full copy of the company's Disaster Management Plan and operations
procedures for each branch, department, facility and function.
Building plans for each facility, including primary control points for all utilities, if
applicable.
Complete and current list of all personnel, including names, addresses, and phone
numbers. Current position descriptions indicating routine duties and
responsibilities shall be included.
Complete and current list of all equipment and serial numbers; replacement
information; names and phone numbers of designated vendors; and service
agreement information.
Complete and current list of all emergency services, community resources and
related agencies within each county, or other geographic region, serviced by the
company.
Master keys, alarm access codes and other security information for each branch,
facility and the other Centers of Operations.
Sample Procedure
Page 2 of 3
2.0
www.bizmanualz.com
Chronological log forms to document all actions taken during the emergency.
Any other items considered appropriate during the initial and annual review
process.
STORAGE SITE
In addition to the primary and secondary Centers of Operations, a storage site may be
maintained at a location distant from those Centers. This storage site may contain items
acquired in addition or in place of the items stored at the Centers of Operations. These
items are to be determined by the Disaster Management Team Coordinators. This storage
site is:
Address:
City:
State:
ZIP:
Phone:
FAX:
Space #:
Keys are maintained by:
Sample Procedure
Page 3 of 3