REFERENCES:
ACI 318-95
AISC 9TH EDITION
ASTM A706
RA 9184
DRAWING NO.
FOOTINGS
CF-1
fps (kPa)
fps (psf)
fc' (Mpa)
fc' (psi)
COMPRESSION FACE (B
COMPRESSION FACE (B
TENSION FACE (BAR X
TENSION FACE (BAR Y)
96
96
96
96
2000
2000
2000
2000
27.6
27.6
27.6
27.6
4000
4000
4000
4000
COMPRESSION FACE (B
COMPRESSION FACE (B
TENSION FACE (BAR X
TENSION FACE (BAR Y)
96
96
96
96
2000
2000
2000
2000
27.6
27.6
27.6
27.6
4000
4000
4000
4000
LONGITUDINAL
TRANSVERSE
96
96
2000
2000
27.6
27.6
4000
4000
LONGITUDINAL
TRANSVERSE
96
96
2000
2000
27.6
27.6
4000
4000
F-3
WF-1
WF-2
COLUMNS
FDN to GF
C-1
main
ties
C-2
main
ties
C-3
main
ties
GF to 2F
C-1
main
ties
C-2
main
ties
C-3
main
ties
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
2F to 3F
C-1
main
ties
C-2
main
ties
C-3
main
ties
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
27.6
27.6
4000
4000
3F to 4F
C-1
main
ties
C-2
main
ties
C-3
main
ties
4F to RF
C-1
main
ties
C-2
main
ties
C-3
main
ties
SLABS
GF
short span
continuous
top
bottom
mid span
top
bottom
discontinuous
top
bottom
long span
continuous
top
bottom
mid span
top
96
96
2000
2000
27.6
27.6
4000
4000
96
96
2000
2000
27.6
27.6
4000
4000
96
96
2000
2000
27.6
27.6
4000
4000
96
96
2000
2000
27.6
27.6
4000
4000
96
2000
27.6
4000
bottom
discontinuous
top
bottom
96
2000
27.6
4000
96
96
2000
2000
27.6
27.6
4000
4000
96
2000
27.6
27.6
4000
4000
96
96
2000
2000
27.6
27.6
4000
4000
96
96
2000
2000
27.6
27.6
4000
4000
96
96
2000
2000
27.6
27.6
4000
4000
96
96
2000
2000
27.6
27.6
4000
4000
96
96
2000
2000
27.6
27.6
4000
4000
2F
short span
continuous
top
bottom
mid span
top
bottom
discontinuous
top
bottom
long span
continuous
top
bottom
mid span
top
bottom
discontinuous
top
bottom
BEAMS
GIRDERS
CONCRETE SLABS
fy (Mpa)
fy (ksi)
275
275
275
275
40
40
40
40
20
20
20
20
100
100
100
100
75
75
75
75
275
275
275
275
40
40
40
40
20
20
20
20
100
100
100
100
75
75
75
75
275
275
40
40
20
20
100
100
75
75
275
275
40
40
20
20
100
100
75
75
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
40
20
100
40
275
40
20
100
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
20
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
275
275
40
40
20
20
100
100
40
40
6
6
6
6
7
7
7
7
1
1
1
1
(24
(24
(24
(24
hrs)
hrs)
hrs)
hrs)
6
6
6
6
7
7
7
7
1
1
1
1
(24
(24
(24
(24
hrs)
hrs)
hrs)
hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
21
21
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
8
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
6
6
7
7
1 (24 hrs)
1 (24 hrs)
segregation
vibration
NONE
NONE
NONE
NONE
REQUIRED
REQUIRED
REQUIRED
REQUIRED
16
16
20
20
400
400
500
500
NONE
NONE
NONE
NONE
REQUIRED
REQUIRED
REQUIRED
REQUIRED
16
16
20
20
400
400
500
500
NONE
NONE
REQUIRED
REQUIRED
12
12
300
300
NONE
NONE
REQUIRED
REQUIRED
12
12
300
300
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
20
12
500
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
20
12
500
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
20
12
500
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
25
12
625
-
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
REQUIRED
10
300
NONE
REQUIRED
10
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
NONE
NONE
REQUIRED
REQUIRED
10
10
300
300
250
250
300
300
(90
(90
(90
(90
deg)
deg)
deg)
deg)
100
150
100
150
250
250
300
300
(90
(90
(90
(90
deg)
deg)
deg)
deg)
150
150
150
150
65 (180 deg)
65 (180 deg)
150
150
65 (180 deg)
65 (180 deg)
150
150
102
100
161
100
152
100
92
100, 150
149
100, 150
141
100, 150
92
100, 150
141
100, 150
141
100, 150
92
100, 150
141
100, 150
141
100, 150
92
100, 150
107
100, 150
107
100, 150
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
FDN to GF
C-1
0
500
1500
-1.5
500
435
102
GF to 2F
C-1
3.2
500
533.33
3200
2133.33
3200
2133.33
533.33
500
92
400
2F to 3F
C-1
3.2
500
533.33
3200
2133.33
533.33
500
400
92
3F to 4F
C-1
3.2
500
533.33
3200
2133.33
533.33
0
500
400
92
4F to RF
C-1
3.2
500
533.33
3200
2133.33
533.33
500
92
400
FDN TO GF
1
435.00
250.00
450.00
15 pcs
C-2
12
100 mm spacing
610
GF to 2F
1
400.00
533.33
450.00
5 pcs
C-2
12
100 mm spacing
14 pcs
12
150 mm spacing
5 pcs
12
100 mm spacing
575
2F to 3F
1
400.00
533.33
450.00
5 pcs
C-2
12
100 mm spacing
14 pcs
12
150 mm spacing
5 pcs
12
100 mm spacing
550
3F to 4F
1
400.00
533.33
450.00
5 pcs
C-2
12
100 mm spacing
14 pcs
12
150 mm spacing
5 pcs
12
100 mm spacing
550
4F to RF
1
400.00
533.33
450.00
C-2
5 pcs
12
100 mm spacing
14 pcs
12
150 mm spacing
5 pcs
12
100 mm spacing
450
FDN TO GF
610.00
250.00
450.00
C-3
500
15 pcs
12
100 mm spacing
1500
-1.5
500
160.3333
GF to 2F
3.2
575.00
533.33
450.00
C-3
500
575.00
5 pcs
12
100 mm spacing
3200
2050.00
3200
2050.00
13 pcs
12
150 mm spacing
575.00
5 pcs
0
12
100 mm spacing
500
148.6667
2F to 3F
3.2
550.00
533.33
450.00
C-3
500
550.00
5 pcs
12
100 mm spacing
3200
2100.00
13 pcs
150 mm spacing
550.00
5 pcs
0
12
12
100 mm spacing
500
140.3333
3F to 4F
3.2
550.00
533.33
450.00
C-3
500
550.00
5 pcs
12
100 mm spacing
3200
2100.00
13 pcs
12
150 mm spacing
550.00
5 pcs
0
12
100 mm spacing
500
140.3333
4F to RF
3.2
450.00
533.33
450.00
C-3
500
533.33
5 pcs
12
100 mm spacing
3200
2133.33
14 pcs
150 mm spacing
533.33
5 pcs
0
12
100 mm spacing
500
107
12
585.00
250.00
450.00
500
15 pcs
100 mm spacing
1500
-1.5
500
585
152
3.2
550.00
533.33
450.00
500
550.00
5 pcs
100 mm spacing
3200
2100.00
3200
2100.00
13 pcs
150 mm spacing
550.00
5 pcs
0
100 mm spacing
500
550
140.3333
3.2
550.00
533.33
450.00
500
550.00
5 pcs
100 mm spacing
3200
2100.00
13 pcs
150 mm spacing
550.00
5 pcs
0
100 mm spacing
500
550
140.3333
3.2
550.00
533.33
450.00
500
550.00
5 pcs
100 mm spacing
3200
2100.00
13 pcs
150 mm spacing
550.00
5 pcs
0
100 mm spacing
500
550
140.3333
3.2
450.00
533.33
450.00
500
533.33
5 pcs
100 mm spacing
3200
2133.33
533.33
150 mm spacing
5 pcs
0
100 mm spacing
500
450
14 pcs
107
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
12
mm spacing
holdpoints
Reference ACI 318-95
3 Materials
3.2 Cement
(+,- 1% of mass)
a Specification for Portland Cement - ASTM C150
b Specification for Blended Hydraulic Cements (excluding Types S and SA) - ASTM C595
c Specification for Expanded Hydraulic Cement - ASTM C845
d ASTM C1157
3.3 Aggregates
(+,- 2% mass)
Specification for Concrete Aggregates (ASTM C33)
Specification for Lightweight Aggregates for Structural Concrete (ASTM C330)
Specification for Heavyweight Aggregate for Structural Concrete (ASTM C637)
Exception: approved aggregates
Max aggregate size:
a 1/5 narrowest dimension between sides of forms
b 1/3 depth of slabs
c 3/4 the minimum clear spacing between individu
Exception: if honeycombs and voids can be prevented
3.4 Water
(+,-1 % volume)
free from:
C109 and C191
oils
acids
alkalis
salts
organic materials
deleterious substances
chloride ion (for prestressed concret
3.5 Steel Reinforcement
Deformed reinforcement
AASHTO T26
cement type
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.5 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.5 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.45 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.4 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.4 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.4 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.4 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.5 I(SM)(MS)
II, IP(MS),
IS(MS), P(MS),
I(PM)(MS),
0.5 I(SM)(MS)
0.45 V
V plus
approved
compatible
0.45 pozzolan
at least 5 sets
5.6.2.1
5.6.2.2
5.6.2.2
OK if
b
c
6 Forms of prestressed concrete members shall be
Dia (mm)
6
10
12
16
180
64
64
64
64
6
7
8
9
10
11
14
18
20
22
25
28
32
36
42
56
80
88
100
112
128
144
168
224
+,+,-
0.5
1
+,+,-
2.5
3.5
+,+,-
0.5
1
SPLICES ON REBARS
6 to 36 mm
larger than 36 mm
+,+,-
1
2
0.25
0.375
0.5
1
+,-
+,+,-
0.5
0.25
+,+,-
1
0.5
EMBEDDED ITEMS
+,-
SLUMP
+,-
1.5
FOUNDATIONS
Drilled piers
Vertical alignment
A. Normal (Unreinforced) +,B. Stiff soil (Unreinforced)+,C. Reinforced
+,Lateral alignment
+,Level alignment
+,Relative alignment
+,Cross-sectional dimension+,Footings
Lateral alignment
+,Level alignment
+,Relative alignment
+,Cross-sectional dimension+,CAST IN PLACE CONCRETE
Vertical alignment
100 ft (30 m)
lines, surfaces +,corners
+,More than 100 ft. (30 m)
lines, surfaces and arises
corners
Lateral alignment
Slabs
Other
0.5
1
0.5
1
0.5
+,+,-
0.5
1
+,+,-
0.5
0.75
Level alignment
Lintels, Sills, Parapets,
Horizontal Grooves
Other
1 ft
3 ft
more 3 ft
0.25
0.25
0.75
Risers
Treads
+,+,-
0.125
0.25
+,+,+,-
0.125
0.25
0.25
+,+,+,+,-
0.125
0.25
0.5
1
+,+,+,-
0.5
0.25
0.125
+,+,-
1
0.5
+,-
0.25
Grooves
2"
More than 2"
Surface Slope
Offset of formwork face
A
B
C
D
Surface Tolerance
A
B
C
Openings
Size
Location of Centerline
MASONRY
0.125
0.125
0.25
0.25
0.5
Lateral alignment
60 '
over 60 '
+,+,-
0.25
0.5
Camber variation
Prestressed
Non-prestressed
+,+,-
0.125
0.25
Surface Irregularities
with topping
without topping
steering surfaces
from a 10 ft straightedge
+,0.5
+,0.25
+,0.125
+,-
2
0.25
0.125
0.125
0.25
0.0625
0.5
0.125
0.25
0.125
0.25
0.25
0.125
0.5
1
0.5
1
1
0.0625
+,+,-
2
1
8
4
1
2
0.5
+,-
0.25
MASS CONCRETE
Vertical alignment
Visible surfaces+,Concealed surfa+,Watertight struc+,-
1.25
2.5
0.25
Lateral alignment
Visible surfaces+,Concealed surfa+,Watertight struc+,-
1.25
2.5
0.25
0.5
1
0.25
Relative alignment
Visible surfaces+,Concealed surfac
+,-
0.25
0.5
0.5
1
CANAL LINING
Lateral alignment
Tangents
+,Curves
+,width at any he+,-
1.25
2.5
10%
Level alignment
Profile grade
Invert
Side slope
Height
+,+,+,+,-
1
0.25
0.5
+,+,-
10%
MONOLITHIC SIPHON
Lateral alignment
Centerline
Inner
Increase
Decrease
+
-
0.50
0.25
Level alignment
Profile grade
Invert
Side slope
+,+,+,-
1
0.25
0.5
0.75
1.5
Lateral alignment
Centerline
+,-
Level alignment
Profile grade +,Visible surfaces+,Concealed surfa+,Pavements
+,-
1
0.75
1.5
0.25
0.125
0.25
0.5
0.5
1
0.25
0.5
+,-
Level alignment
Pavements
+,Other than pav +,-
0.125
0.25
+,-
+,-
10 in
+,greater than 10+,-
0.25
0.5
0.5
0.75
1
Diameter
Inside
+,-
95%
Wall thickness
+,-
Surface Indentations
+,-
0.5
ch design conforms
gth of concrete
m clear spacing between individual reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts
Deformed Bars and Plain Billet-Steel Bars for Concrete Reinforcement (ASTM A615)
Rail-Steel Deformed and Plain Bars for Concrete Reinforcement (ASTM A616 including S1)
Axle Steel Deformed and Plain Bars for Concrete Reinforcement (ASTM A617)
Low-Alloy Steel Deformed Bars for Concrete Reinforcement (ASTM A706)
it corresponds to the fy in a strain of 0.35
Steel Welded Wire Fabric, Plain for Concrete Reinforcement (ASTM A497)
Epoxy Coated Steel Wire and Welded Wire Fabric for Concrete Reinforcement (ASTM A 884)
Deformed Bars and Plain Billet-Steel Bars for Concrete Reinforcement (ASTM A615)
Rail-Steel Deformed and Plain Bars for Concrete Reinforcement (ASTM A616 including S1)
Axle Steel Deformed and Plain Bars for Concrete Reinforcement (ASTM A617)
Steel Wire, Plain for Concrete Reinforcement (ASTM A82)
Pipe, Steel, Black and Hot Dipped, Zinc Coated Welded and Seamless (ASTM A53)
Cold Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes (ASTM A500)
Hot Formed Welded and Seamless Carbon Steel Structural Tubing (ASTM A501)
sed concrete, concrete with embedded aluminum, concrete cast againt stay in place galvanized steel forms)
Fly Ash and Raw or Calcinized Natural Pozzolan for Use as a Mineral Admixture in Portlan Cement Concrete (
Ground Granulated Blast Furnace Slag for Use in Concrete and Mortars (ASTM C989)
Silica Fume for Use in Hydraulic -Cement Concrete and Mortar (ASTM C1240)
5.5
5.5
7.5
5.5
4.5
4.5
5.5
4.5
5.5
3.5
4.5
4.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
erage required strength is (fc' + 1000) for less than 3000 psi; (fc' + 1200) for 3000 to 5000 psi; (fc' + 1400)
r each proportion then interpolate proportion for average required strength (fc' + 1000) for less than 3000 ps
mix with different proportions (either water to cement ratio or cementitious material proportion), plot average
2
2
2
C 172) (at 15% and 85% of load) (max interval of 15 minutes) (1 ft3 per sample), Slump (C143) (+,- 1.5 in fo
470) and Curing (ASTM C 31, C 617 and C 511) (fill every layer based on ASTM C 31, tap sides with mallet 1
specimen
for each failed specimen on the representative area on the actual concrete poured
e dry during its service condition, cores will be air dried (temperature 60 to 80 F, relative humidity less than
e more than superficially wet during service condition, cores shall be immersed in water for at least 40 hrs. A
ed adequate if average of three cores is equal to or greater than 85% of fc' and if no single core is less than 7
occupied by concrete
shall be well drenched
ys if normal concrete
t in a final structure that conforms to shapes, lines, and dimensions of the members as required by the desig
ubstantial and sufficiently tight to prevent leakage of mortar
roperly braced or tied together to maintain position and shape
support shall be designed so as not to damage previously placed structure
orks shall include consideration of the following
ssed concrete members shall be desgined and constructed to permit movement of the member without dam
es and reshoring
oads exceeding the combination of superimposed dead load plus specified live load shall be supported on an
r prestressed concrete shall not be removed until sufficient prestressing has been applied to enable prestres
d to resist the the effects of the material, pressure and temperature to which they will be subjected
eeding 50 psi or temperature exceeding 90 F shall be placed in the pipes until concrete has achieved its desi
r radiant heating or snow melting, shall be placed between top and bottom reinforcement
hall not be less than 1.5 in for concrete exposed to earth or weather nor 0.75 in. For concrete not exposed to
ith an area not less than 0.002 times the area of concrete section shall be provided normal to piping
cated and installed that cutting, bending , or displacement of reinforcement from tis proper location will not b
MINIMUM HOOK
MAIN
90
72
120
144
192
240
264
300
336
384
432
504
672
240
264
300
336
384
432
504
672
mm
12
25
60
80
12
25
25
50
5 shall
10 shall
12 shall
25 shall
not
not
not
not
exceed
exceed
exceed
exceed
12
5
25
12
25
40
0
0
0
0
25
0
12
25
12
25
12
not more than
not more than
12
25
12
20
5
5
20
3
5
3
5
5 in every 3m.
3
5
12
25
12
5
3
25
12
5 in every 3m.
3
3
5
5
12
5
12
3 per 3 m
5 per 3 m
aightedge
12
5
3
50
5
3
aightedge
3
5
3
5
1
12 but not greater than
3
5
3
5
5
3
12
25
12
25 but not greater than
25 but not greater than
15
5
15
1
50
25
200
100
25
50
12
5
30
55
5
30
55
5
12
25
5
5
12
12
25
30
55
not greater than
10%
25
5
12
not greater than
25
10%
25
5
12
15
30
25
25
15
30
5 done with a 10 ft straightedge
3
5
12
5 in every 3 m
12 in every 3 m
3 in every 3 m
12
25
3
5 done with a 10 ft straightedge
5
12
12
15
25
(ASTM A934)
STM A421)
M C1017)
STM C1240)
25
25
25
8.5
25
7.5
25
7.5
25
25
7.5
25
25
6.5
25
25
25
25
25
25
25
25
25
25
25
d strength (fc' + 1000) for less than 3000 psi; (fc' + 1200) for 3000 to 5000 psi; (fc' + 1400) for over 5000 ps
entitious material proportion), plot averages for each proportion then interpolate for average required streng
for 7 days
for 14 days
for 28 days
ft3 per sample), Slump (C143) (+,- 1.5 in for slump 3 and below; +,- 2.5 in. For slump greater than 3) (take 1
ased on ASTM C 31, tap sides with mallet 10 to 15 times, roll tamping rod on the top of mold, mark molds to
l concrete poured
ture 60 to 80 F, relative humidity less than 60 %) then tested dry after 7 days of air drying
be immersed in water for at least 40 hrs. And be tested wet
5% of fc' and if no single core is less than 75% of fc'
by building official
mit movement of the member without damage during application of prestressing force
specified live load shall be supported on any unshored portion of the structure under construction, unless an
ressing has been applied to enable prestressed members to carry their dead load and anticipated constructi
bs, beams, and girders. Joints in girders shall be offset a minimum distance of two times the width of interse
ted until concrete in the vertical support member is no longer plastic
y as part of a slab system, unless otherwise shown in design drawings or specifications.
MINIMUM BEND
ND STIRRUPS
135
36
60
72
96
36
60
72
96
120
132
150
168
192
216
252
336
120
132
150
224
256
288
420
560
e permitted
except for prestressing tendons
mm
CC
0
mm
2.5
60
SHAFT DIAMETER
SHAFT DIAMETER
30
0
150
200
LENGTH in meters
0
WIDTH
25
HEIGHT
25
DIMENSION
0
THICKNESS
0
0
0
DIAMETER
25
DIAMETER
25
max % of total cementitious material weight (cement plus the following materials)
slag
silica fume
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
50
10
+,- 2.5 in. For slump greater than 3) (take 1 ft3 sample, fill mold every one third layer, tamp 25 times every
ping rod on the top of mold, mark molds to easily identify them) (store at a level ground surface to 1/4 in pe
n of prestressing force
the structure under construction, unless analysis indicates adequate strength to support such additional loa
y their dead load and anticipated construction loads
ings or specifications.
SPLICES
SECTION
SHAFT LENGTH
HEIGHT
30000
g materials)
combination of the three types
chloride content
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
50
0.06
50
0.15
50
50
0.3
50
0.3
50
0.3
50
0.3
50
0.3
psi; (fc' + 1200) for 3000 to 5000 psi; (fc' + 1400) for over 5000 psi
rd layer, tamp 25 times every layer, last layer filled fully, roll rod on top surface of mold), Temperature (C 10
vel ground surface to 1/4 in per ft., from 60 to 80 F, initial curing for up to 48 hrs.) (after 8 hrs, transport mol
uring at 73 F +,- 3 F)
12.77778
131
55
32.22222
194
90
10
122
50
35
203
95
INSPECTION AND
CONTRACT NO.
DISCIPLINE
1.00
N/A
2.00
Method of Statement
N/A
3.00
N/A
4.00
5.00
SITE PREPARATION
Visual
Visual
Structure Excavation
Survey
Survey
6.00
LEAN CONCRETE
Survey
Penetrometer
Check soil bearing capacity
7.00
Visual + Sampling
GRAVEL BEDDING
Penetrometer
Check soil bearing capacity
B
8.00
Monitor concreting
Visual + Sampling
Curing of Concrete
Visual
9.00
Visual
MASONRY WORKS
Check plastering
10.00
Test
CEILING WORKS
Visual
11.00
PAINTING WORKS
12.00
TILING WORKS
13.00
FIXTURES
Doors
Windows
Handrails
13.00
ROOF STRUCTURE (TRUSS, SAGRODS, CROSS BRACING, PURLINS, FLASHING SUPPORTS, ROOFING, FLASHING)
Check Grouting
Visual
E
14.00
Commissioning
15.00
ELECTRICAL WORKS
Commisioning
16.00
Visual
EMBANKMENT
Survey
DISCIPLINE
METHOD OF VERIFICATION
REFERENCE DOCUMENTS
STAGE / FREQUENCY
ACCEPTANCE CRITERIA
PHESCO
DPWH
OTHERS
N/A
Approval by client
Prepared by
PHESCO
N/A
Approval by client
Prepared by
PHESCO
N/A
Approval by client
Prepared by
PHESCO
Approval by client
H+I
Prepared by
PHESCO
Per Area
Approval by client
Contractor Crew
Per Location
Approval by client
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
& PHESCO
Survey
Per Location
IFC Drawings
H+I
Contractor Crew
& PHESCO
Survey
Per Location
H+I
PHESCO
Per Location
IFC Drawings
H+I
Contractor Crew
Per Location
Contractor Crew
Per Location
H+I
PHESCO
Per Location
IFC Drawings
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
Contractor Crew
Per Location
Approval by client
Contractor Crew
Per Location
Contractor Crew
Per Location
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
G)
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
Approval by client
H+I
Third Party
Per Location
Approval by client
H+I
Contractor Crew
& PHESCO
Survey
In-progress
In-progress
In-progress
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
DPWH HPR
INSPECTION AND
CONTRACT NO.
DISCIPLINE
1.00
N/A
2.00
Method of Statement
N/A
3.00
N/A
4.00
5.00
SITE PREPARATION
Visual
Visual
Structure Excavation
Survey
Survey
6.00
LEAN CONCRETE
Survey
Penetrometer
Check soil bearing capacity
7.00
Visual + Sampling
GRAVEL BEDDING
Penetrometer
Check soil bearing capacity
B
8.00
Monitor concreting
Visual + Sampling
Curing of Concrete
Visual
9.00
MASONRY WORKS
Test
Visual
Check plastering
10.00
Visual
CEILING WORKS
11.00
PAINTING WORKS
12.00
TILING WORKS
13.00
FIXTURES
Doors
Windows
Handrails
13.00
ROOF STRUCTURE (TRUSS, SAGRODS, CROSS BRACING, PURLINS, FLASHING SUPPORTS, ROOFING, FLASHING)
Check Grouting
14.00
Commissioning
Visual
Visual + Material Approval
ELECTRICAL WORKS
Commisioning
16.00
PLUMBING WORKS
15.00
Visual
EMBANKMENT
Survey
DISCIPLINE
METHOD OF VERIFICATION
REFERENCE DOCUMENTS
STAGE / FREQUENCY
ACCEPTANCE CRITERIA
PHESCO
CLIENT
OTHERS
N/A
Approval by client
Prepared by
PHESCO
N/A
Approval by client
Prepared by
PHESCO
N/A
Approval by client
Prepared by
PHESCO
Approval by client
H+I
Prepared by
PHESCO
Per Area
Approval by client
Contractor Crew
Per Location
Approval by client
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
& PHESCO
Survey
Per Location
IFC Drawings
H+I
Contractor Crew
& PHESCO
Survey
Per Location
H+I
PHESCO
Per Location
IFC Drawings
H+I
Contractor Crew
Per Location
Contractor Crew
Per Location
H+I
PHESCO
Per Location
IFC Drawings
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
Contractor Crew
Per Location
Approval by client
Contractor Crew
Per Location
Contractor Crew
Per Location
Contractor Crew
G)
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
Per Location
Approval by client
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
H+I
Contractor Crew
Per Location
Approval by client
H+I
Third Party
Per Location
Approval by client
H+I
Contractor Crew
& PHESCO
Survey
In-progress
In-progress
In-progress
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR
CLIENT HPR