Professional Documents
Culture Documents
Banyu Urip Project: P&I Diagram (P&Id) & Connection List
Banyu Urip Project: P&I Diagram (P&Id) & Connection List
:
:
:
:
:
:
:
:
IDBC-BO-VDPID-NW0683-451
IDBC-TS-MXXER-C00683-32
4500100486/ IDBC-TS-MXXER-C00683-32P
WATER DEAERATOR PACKAGE
0683
V688530
WATER DEAERATOR PACKAGE
N/A
With Comment
Reviewed
Resubmit
This approval or review does not relieve the vendor / subcontractor of his
responsibilities to meet all requirements of the purchase order
Originator
Checked
Appd (PRJ)
Approved
Sign
Date
50
3
2
1
0
D
C
B
A
Rev
28-Aug-2014
14-May-2014
23-Jan-2014
26-Jul-2013
27-May-2013
28-Jan-2013
20-Nov-2012
15-Oct-2012
06-Sep-2012
Rev Date
As-built
Re-Issued For Construction
Re-Issued For Construction
Re-Issued For Construction
Issued For Construction
Re-Issued For Review
Re-Issued For Review
Issued For Review
Issued For Internal Review
Description
C. I.
C. I.
A.D.
A.D.
A.D.
S.C.
S.C.
S.C.
S.C.
Prepared By
W. T.
W. T.
W. T.
W. T.
W. T.
W. T.
W. T.
W. T.
W. T.
Reviewed By
A.C.
A.C.
A.C.
A.C.
A.C.
W.T.
W.T.
W.T.
W.T.
Approved By
BANYU URIP
PROJECT
Revision
Section
Description
All
All
All
All
All
All
All
All
50
All
As-built
IDBC-BO-VDPID-NW0683-451
28-Aug-2014
Rev 50
2 of 3