Corrective Action Request (Car) Log - External/Internal: One Icc & Two Icc
Corrective Action Request (Car) Log - External/Internal: One Icc & Two Icc
Date : 25/10/2016
Contract No: D09
Auditee Agreed or
Planned Closing Date
Not Agreed
S.No.
CAR Type
Date Notified
Issued To
D09-PMC-CAR-01
External
20-May-15
L&T
Agreed
D09-PMC-CAR-02
External
20-May-15
L&T
Agreed
19-Jun-15
17-Jun-15
Closed
19-Jun-15
17-Jun-15
Closed
New CAR)
Remarks
RMC
RMC
D09-PMC-CAR-03
External
20-May-15
L&T
No calibration has been performed for concrete cube moulds, sieves..etc. GC to verify all
the laboratory equipments and ensures the calibration process in completed.
Agreed
19-Jun-15
17-Jun-15
Closed
Agreed
19-Jun-15
8-Jul-15
-19
Closed
RMC
D09-PMC-CAR-04
External
20-May-15
L&T
Inspection & Test Plan for RMC Production GC shall resubmit incorporating the PMC
comments for final approval.
D09-PMC-CAR-05
External
20-May-15
L&T
Routine tests were not performed fully in accordance with the approved ITP. No records
available.
Agreed
19-Jun-15
3-Jul-15
-14
Closed
D09-PMC-CAR-06
External
20-May-15
L&T
Contingency plan for material supply and mechanical breakdown of the plant is not
available for review.
Agreed
19-Jun-15
5-Aug-15
-47
Closed
a. No documented evidence that master list of codes and standards is being verified.
b. PMC Approved Project Quality Plan (Rev.01) Controlled copy is not available.
c. IMTE Calibration log is available, however the calibration due dates are expired. Log to
be verified on typos/actual status of the validity.
d. Filing system is not being maintained, No proper identification, file indexing with file
labels.
e. Controlled copies of Project specification for Concrete works are not being maintained.
f. PMC issued Technical Memos related to the Concrete works are not being maintained.
Agreed
RMC
RMC
23
D09-PMC-CAR-23
External
28-Nov-15
L&T
RMC
28-Dec-15
2-Apr-16
-96
Closed
RMC
24
D09-PMC-CAR-24
External
28-Nov-15
L&T
Agreed
28-Dec-15
13-Feb-16
-47
Closed
RMC
25
D09-PMC-CAR-25
External
28-Nov-15
L&T
a. Fine & Coarse Aggregates No test records available for Alkali aggregate reactivity
tests.
Cementitious Materials (Flyash/Microsilica/GGBS) Compressive strength data for 28 D
test is not available from 3rd party testing agency.
Agreed
28-Dec-15
23-Feb-16
-57
Closed
RMC
29
D09-PMC-CAR-30
External
19-Apr-16
L&T
Agreed
19-May-16
4-May-16
15
Closed
RMC
33
D09-PMC-CAR-34
External
9-Sep-16
HILL
As per approved Contingency plan for RMC Concrete, GC shall have a Backup
arrangement from the External RMC Suppliers as mentioned in the plan. GC is yet to
establish the mix designs for future works from the External RMC Suppliers.
34
D09-PMC-CAR-35
External
9-Sep-16
HILL
Up-to-date Concrete Trial Mix Design Schedule is not available. 3rd Party Agency (Global
lab) has vetted the Trial Mixes, However the approved /vetted mix design copies are not
fully available to match with the Trial mix design schedule and as obtained approved from
PMC.
Page 1 of 1
Agreed
9-Oct-16
Open
RMC
Agreed
9-Oct-16
Open
RMC