Enmas O & M Services Private Limited

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

ENMAS O & M SERVICES PRIVATE

LIMITED
TULSYAN NEC POWER LIMITED GUMMIDIPOONDI
2*35 MW CAPTIVE POWER PLANTS
TRIP /BREAK DOWN REPORT ON 16/04/2015
Name of the equipment Tripped/Break
down
Date of Trip /Break down

TG
16.04.15

Time of Trip/ Break down

10:40 Hrs

Re- Start/ Synchronizing time

14:40 Hrs

Loss time

04:00 Hrs

Reason for Trip/Break down

Plant tripped due to EB disturbance (SS-2 jumper failure), at the same time
OG UNIT-1 breaker tripped due to over current

Analysis

At 10.50Am electrical power given ,then turbine rolled and reached full
speed, but 86 B1,B2 Relay not resetted, so we are checked the DC supply
and found that WTP 6.6KV panel closing circuit line MCB output some
problems, so to be checked in shut down
Conclusion

At 02.45 Pm Plant synchronized with grid, WTP 6.6KV panel closing


circuit MCB in OFF condition