TULSYAN NEC POWER LIMITED GUMMIDIPOONDI
2*35 MW CAPTIVE POWER PLANTS
TRIP /BREAK DOWN REPORT ON 16/04/2015
Name of the equipment Tripped/Break
down
Date of Trip /Break down
TG
16.04.15
10:40 Hrs
14:40 Hrs
Loss time
04:00 Hrs
Plant tripped due to EB disturbance (SS-2 jumper failure), at the same time
OG UNIT-1 breaker tripped due to over current
Analysis
At 10.50Am electrical power given ,then turbine rolled and reached full
speed, but 86 B1,B2 Relay not resetted, so we are checked the DC supply
and found that WTP 6.6KV panel closing circuit line MCB output some
problems, so to be checked in shut down
Conclusion