ENMAS O & M SERVICES PRIVATE

LIMITED
TULSYAN NEC POWER LIMITED GUMMIDIPOONDI
2*35 MW CAPTIVE POWER PLANTS
TRIP /BREAK DOWN REPORT ON 17/10/2014
Name of the equipment Tripped/Break
down
Date of Trip /Break down

TG
17.10.14

Time of Trip/ Break down

20:30 Hrs

Re- Start/ Synchronizing time

23:00 Hrs

Loss time

02:30 Hrs

Reason for Trip/Break down

Plant tripped for Switchyard line breaker tripped due to vector surge relay
operated (O/V), station incomer U/V alarm, Bus PT U/V trip, station BRPT
U/V alarm, REG 670 turbine trip & Generator trip.

Analysis
Vector surge relay not resetting ,so K201-9-D2 wire removed from relay
Conclusion

At 11.00 PM plant synchronized with grid, Vector surge relay setting


changed under voltage from 95 V to 94 V, over voltage setting 117 V to 123
V instructions from customer side .but now Vector surge relay not taken in
line.