PT.

Nusareka Prima Engineering


Location
Drawing Number
Line Class
No.

Joint No.

:____________________________
:____________________________
:____________________________
WPS No.

Spool
No.

TYPE of WELD

FIT-UP WELDING INSPECTION REPORT


PROJECT No.
PROJECT NAME

Size
Dia.

THK

MAT"L

Heat No.1 Heat No.2

CHECKED BY ROOT WELDER


NPE CLIENT W1
W2

FIT UP
DATE

WELD
DATE

CHECKED BY
CAPPING WELDER
NPE CLIENT
W1
W2

:
:
:
WELD
DATE

FINAL VISUAL CHECKED


NPE
CLIENT

NOTE
DURING FIT UP JOINTS SHALL BE FREE FROM RUST
PIPE INTERNAL CLEANLINESS CHECKED
ONLY QUALIFIED WELDER WILL BE USED
FILLER WIRE/ELECTRODA BATCH
INTERPASS TEMPERATURE MAINTAINED

Date
Report No.
Prepared By

:______________________________
:______________________________
FIT UP GAP(mm)
A
B
C
D

QA/QC TEAM

:________________________
:________________________
:________________________
:________________________
:________________________

CHECKED BY NPE WELDING INSPECTOR


NAME
:____________________________
SIGNATURE :____________________________
DATE
:____________________________

REVIEW & APPROVED BY:


NAME
:___________________________
SIGNATURE
:___________________________
DATE
:___________________________