TIME SHEET
PROJECT NAME: BASILAN CIRCUMFERENTIAL ROAD PROJECT
BASILAN PROVINCE
LOCATION:
NO.
NAME
PAYROLL PERIOD:
POSITION
SIGNATURE
PAGE:
OF
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
10
Ao, Ederlina C.
Computer Operator
Pavement Inspector
Galicinao, Gino C.
Pacillos, Renato T.
Materials Engineer
Paulo, Jebbie G.
Utility
Computer Operator
7
8
9
10
11
12
13
14
15
16
17
18
LEGEND: X PRESENT
A ABSENT
PREPARED BY:
L ON LEAVE
S SATURDAY/SUNDAY
H HOLIDAY
CHECKED BY:
APPROVED BY:
GINO C. GALICINAO
LEONARDO R. ENRIQUEZ
Computer Operator