How To Test Slope of 7SD522 87L Protection - 2
How To Test Slope of 7SD522 87L Protection - 2
How To Test Slope of 7SD522 87L Protection - 2
Relay 1
1000A
1A
1.00
5.0%
15.0%
0,3A
Relay 2
1000A
1A
1.00
5.0%
15.0%
0,3A
Examples:
1. Slope 1 check Istab calculated X measured
measured:
When current line is 800 A in primary side, in secondary side is:
IRelay1 = 800*1/1000 = 0,8 A,
IRelay2 = 800*1/1000 = 0,8 A,
Istab calculated at relay 1 or 2:
Differential current:
Stab current:
ID = 0 A
IStab = 0,3 A + 0,05*0,8 + 0,05*0,8 + 1,4% * 1 A = 0,394 A, or
IStab(%) = 0,394A/1A*10
0,394A/1A*100 = 39,4%
OBS**** : Even with the current B or C = 0 A, this value (31,4%) stabilization is appearing
appearing.
Why? Because: Istab = 0,3+0*0,05+0*0,05+0,014*1
*0,05+0,014*1 = 0,314 A, or 0,314/1*100 = 31,4%
2. Slope 2 check Istab calculated X measured
measured:
When current line is 2.000 A in primary side, in secondary side is:
IRelay1 = 2000*1/1000 = 2 A,
IRelay2 = 200*1/1000 = 2 A,
Measuring expected at relay 1 or 2:
Differential current:
Stab current:
ID = 0 A
IStab = 0,3
,3 A + 0,15*2 + 0,15*2 + 1,4% * 1 A = 0,914 A
IStab(%) = 0,914A/1A*100=91,4%
3. Trip Test: