Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Date: 24.09.

15

Minutes of meeting held between M/S Tulsyan and M/S Lamco


Industrial (P) Ltd at Tulsyan site on 24/09/15 regarding
troubleshooting in 110 KV current transformer (New)
M/S Lamco Engineer Mr K.Srinivasan attended M/S Tulsyan site
on 24/09/15 for current transformer trouble shooting. C.T SI.NOCD3822
Following activities were carried out:
1. Tested that CT IR value in the CT (300/1A, 3 core & 600/1A, 2
core)
2. In CT core No-5 IR value is Low.
3. Replaced the secondary terminal bushing for core No-5
4. After replaced the bushing the IR value is ok (), Resistance
value-2.66
5. Another one New CT (Purchased before 2 Years) oil leak
observed and secondary terminals tightened .CT oil leak is
observation CT SI NO-CD 3511, 200/1A-3 Core, 600/1A-2 Core
PO.No PO/ CWPP11/1213/0220 Date: 06/03/2013.

TULSYAN
LAMCO

ENMAS O & M

You might also like