Professional Documents
Culture Documents
Calc. Found. For Pipe Rack
Calc. Found. For Pipe Rack
Calc. Found. For Pipe Rack
Civil Works
REV.
0
1
DATE
REVISION DETAILS
21-Apr-11
Issued For Review
Reviewed
with
Comments as per MOM No.
10-Jan-12
WIKA-ICA-MOM-0046-11, Revised as
Marked & Re-IFR
ORIGINATOR
Arswirasti
Agung H
Civil Works
Contents
1
GENERAL .....
4
1.1 OUTLINE OF STRUCTURE .
4
1.2 APPLICABLE SPECIFICATIONS, CODES AND STANDARD
4
1.3 ALLOWABLE STRESS AND UNIT WEIGHT OF MATERIAL
4
1.4 STABILITY PARAMETER ...
4
1.5 UNIT OF MEASUREMENT ...
5
1.6 COMPUTER SOFTWARE ....
5
STABILITY CHECK
21
4.1 PILE FOUNDATION CHECK .
21
4.2 PHT MOMENT CAPACITY CHECK
21
4.3 SETTLEMENT CHECK .
21
REINFORCEMENT DESIGN
24
6.1 FOOTING REINFORCEMENT DESIGN
24
6.2 PEDESTAL REINFORCEMENT DESIGN
24
ATTACHMENTS
1. OUTPUT REPORT CALCULATION BY AFES
2. STAAD PRO INPUT AND OUTPUT REPORT
3. FOUNDATION LOADING DATA
4. DRAWING
Civil Works
1. GENERAL
1.1 OUTLINE OF STRUCTURE
Project
: INDONESIA CHEMICAL ALUMINA PROJECT
Client
: PT. INDONESIA CHEMICAL ALUMINA
Location
: TAYAN - WEST KALIMANTAN
Equipment
: PIPERACK SECTION W-16,20 & S-1
Foundation Type
: PILE FOUNDATION
1.2 APPLICABLE SPECIFICATIONS, CODES AND STANDARD
1) Project Specification
E-X-W-2001-001
: Design Specification for Civil and Structural
2) Codes and Standards
SNI-03-1727-1989
SNI-03-1726-2002
SNI-03-2847-2002
ACI-318-2002
3) Reference Documents
B-P-W-2201-018~021 : Standard Drawing for Concrete Reinforcement
E-X-S-3302-001
: Calculation for Piperack Section W-16,20 & S-1
C-X-W-2201-002
: Foundation Plan & Detail of Piperack Sect. 1-1 (W-16,20 & S-1) sheet 1/2
C-X-W-2201-003
: Foundation Plan & Detail of Piperack Sect. 1-1 (W-16,20 & S-1) sheet 2/2
C-X-W-2201-004
: Piling Plan & Schedule of Piperack Sect. 1-1 (W-16,20 & S-1)
: f'c
250 kg/cm
: fy
3900 kg/cm
: c
3
2400 kg/m
: s
1700 kg/m
: w
1000 kg/m
3
3
Pile (mm)
Pile Length
(m)
Axial
Uplift
Lateral
Settlement
(mm)
PS-12
300
12
58.02
13.39
4.0
0 (see calc.)
Axial Test
Test Load
100% (ton)
Settlement
(mm)
No
Ra (ton)
AX1
81.00
2.16
TP-29
69.95
PDA Test
Civil Works
- Microsoft Excel
- AFES
2. OUTLINE OF FOUNDATION
2.1 GENERAL DESCRIPTION
This calculation is prepared to explain the detail design for Foundation of Piperack Section W-16,20 & S-1
The Foundation of Piperack Section W-16,20 & S-1 Structure is supported by pile foundation
2.2 DIMENSIONS
2.2.1 STRUCTURE LAYOUT
Civil Works
Civil Works
ea
mm
mm
mm
mm
590
590
700
400
mm
mm
mm
750
750
600
A
L1
L2
hs
W1
h2
W2
Unit
h1
- Foundation Type F2
Footing Desain
Unit
Pile Data
RC Pile dia. 300mm
Pedestal Dimension
L2
W2
h2
hs
Footing Dimension :
L1
W1
h1
ea
mm
mm
mm
mm
360
240
700
400
mm
mm
mm
750
750
600
A
L1
L2
hs
W1
h2
W2
Civil Works
h1
Unit
ea
mm
mm
mm
mm
590
590
700
400
mm
mm
mm
mm
mm
1650
750
600
900
375
hs
h2
L1
L2
W2
W1
- Foundation Type F3
Footing Desain
Pile Data
RC Pile dia. 300mm
Pedestal Dimension
L2
W2
h2
hs
Footing Dimension :
L1
W1
h1
a
b
Civil Works
h1
Civil Works
3. LOADING DATA
Loading data is obtain from extraction of SAP
3.1 DEAD LOAD
Force-Z
Mton
Moment-X
kNm
Moment-Y
kNm
Moment-Z
kNm
0.065
-0.020
0.002
-0.002
0.048
-0.092
0.002
-0.003
0.084
0.067
0.051
0.002
0.002
0.066
0.066
0.057
0.057
-0.067
-0.051
-0.002
-0.002
-0.066
-0.066
-0.056
-0.058
-0.040
0.042
0.068
0.073
0.073
0.020
-0.042
-0.068
-0.073
-0.073
-0.064
0.061
0.002
-0.061
-0.002
-0.460
-0.588
-0.691
-0.679
-0.797
-0.742
-0.693
-0.677
-0.776
-0.845
-0.469
-2.853
-1.867
-0.829
-0.833
-1.914
-1.952
-0.847
-0.712
-2.461
-2.096
-0.834
-0.830
-1.929
-1.934
-0.883
-0.403
-0.693
-0.750
-0.751
-0.502
-0.403
-0.693
-0.749
-0.750
-0.442
-2.104
-2.196
-2.116
-2.183
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0.068
0.080
0.068
0.067
0.056
0.047
-0.068
-0.066
-0.052
0.001
-0.001
0.016
-0.013
0.002
0.001
0.005
-0.009
0.000
-0.002
0.007
-0.011
-0.003
-0.001
0.004
-0.008
-0.065
0.008
0.002
0.002
0.000
-0.068
0.008
0.002
0.002
0.000
-0.059
0.003
-0.014
0.003
-0.013
Civil Works
Node
L/C
Force-X
Mton
Force-Y
Mton
Force-Z
Mton
Moment-X
kNm
Moment-Y
kNm
Moment-Z
kNm
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Civil Works
Node
L/C
Force-X
Mton
Force-Y
Mton
Force-Z
Mton
Moment-X
kNm
Moment-Y
kNm
Moment-Z
kNm
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
0.007
-0.002
0.000
0.000
0.007
-0.012
0.000
0.000
0.013
0.013
0.008
0.001
0.001
0.013
0.012
0.007
0.007
-0.013
-0.008
-0.001
-0.001
-0.013
-0.012
-0.007
-0.007
-0.009
0.004
0.007
0.008
0.008
0.003
-0.004
-0.007
-0.008
-0.008
-0.008
0.006
0.001
-0.006
-0.001
0.015
0.016
0.008
0.008
0.008
0.007
-0.008
-0.008
-0.011
0.000
-0.001
0.003
-0.003
0.000
0.000
0.000
-0.001
0.000
-0.001
0.001
-0.002
-0.001
0.000
0.000
-0.001
-0.012
0.001
0.001
0.000
0.000
-0.009
0.001
0.001
0.000
0.000
-0.008
0.000
-0.003
0.000
-0.002
-0.086
-0.103
-0.082
-0.082
-0.112
-0.105
-0.084
-0.082
-0.186
-0.210
-0.103
-0.519
-0.314
-0.206
-0.205
-0.359
-0.374
-0.211
-0.159
-0.426
-0.350
-0.207
-0.204
-0.363
-0.370
-0.198
-0.041
-0.080
-0.089
-0.089
-0.071
-0.041
-0.080
-0.089
-0.089
-0.063
-0.330
-0.394
-0.333
-0.391
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Civil Works
Node
L/C
Force-X
Force-Y
Force-Z
Moment-X
Moment-Y
Moment-Z
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
0.150
-0.046
0.004
-0.004
0.136
-0.234
0.003
-0.005
0.268
0.256
0.158
0.020
0.021
0.251
0.249
0.142
0.143
-0.257
-0.156
-0.021
-0.020
-0.251
-0.249
-0.138
-0.147
-0.177
0.074
0.145
0.161
0.162
0.061
-0.074
-0.145
-0.161
-0.162
-0.154
0.127
0.020
-0.128
-0.021
0.301
0.327
0.155
0.154
0.152
0.131
-0.155
-0.153
-0.212
0.004
-0.012
0.067
-0.053
0.006
0.002
0.010
-0.028
0.000
-0.017
0.026
-0.039
-0.013
-0.008
0.005
-0.025
-0.247
0.016
0.012
-0.001
0.007
-0.187
0.016
0.012
-0.001
0.007
-0.166
0.001
-0.052
0.004
-0.048
-1.728
-2.069
-1.643
-1.643
-2.237
-2.098
-1.674
-1.644
-3.723
-4.203
-2.054
-10.377
-6.275
-4.113
-4.096
-7.188
-7.484
-4.211
-3.180
-8.521
-6.997
-4.134
-4.083
-7.255
-7.403
-3.951
-0.825
-1.603
-1.788
-1.790
-1.421
-0.825
-1.604
-1.787
-1.788
-1.254
-6.600
-7.874
-6.655
-7.816
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Civil Works
Node
L/C
Force-X
Force-Y
Force-Z
Moment-X
Moment-Y
Moment-Z
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
0.210
-0.065
0.006
-0.006
0.190
-0.328
0.004
-0.007
0.375
0.358
0.221
0.028
0.029
0.351
0.348
0.199
0.201
-0.359
-0.219
-0.030
-0.029
-0.352
-0.348
-0.194
-0.206
-0.248
0.104
0.203
0.226
0.226
0.086
-0.104
-0.203
-0.226
-0.226
-0.215
0.178
0.028
-0.179
-0.030
0.421
0.458
0.216
0.215
0.213
0.183
-0.217
-0.215
-0.296
0.005
-0.017
0.094
-0.074
0.009
0.002
0.013
-0.039
0.000
-0.024
0.037
-0.055
-0.018
-0.011
0.008
-0.034
-0.346
0.023
0.017
-0.002
0.010
-0.261
0.023
0.017
-0.002
0.010
-0.232
0.002
-0.072
0.005
-0.067
-2.419
-2.897
-2.301
-2.300
-3.132
-2.937
-2.343
-2.301
-5.213
-5.884
-2.876
-14.527
-8.784
-5.758
-5.734
-10.064
-10.478
-5.896
-4.452
-11.929
-9.796
-5.788
-5.716
-10.157
-10.364
-5.532
-1.155
-2.244
-2.503
-2.506
-1.989
-1.155
-2.245
-2.501
-2.503
-1.756
-9.241
-11.024
-9.318
-10.943
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
-1.184
-1.185
-0.025
-0.026
-1.010
-1.031
-0.037
-0.035
-1.659
-1.656
-1.724
-1.656
-1.668
-1.710
-1.650
-1.715
-1.681
-1.658
-1.725
-1.656
-1.668
-1.712
-1.651
-1.715
-1.681
-1.654
-2.189
-2.189
-2.190
-2.183
-1.334
-2.193
-2.193
-2.194
-2.187
-1.359
-1.715
-1.661
-1.715
-1.661
Civil Works
Force-Y
Mton
Force-Z
Mton
Moment-X
kNm
Moment-Y
kNm
Moment-Z
kNm
-0.374
0.322
0.046
-0.030
-0.297
0.328
-0.045
0.031
0.218
0.001
0.001
0.001
-0.001
-0.001
0.000
-0.002
-0.002
-0.001
-0.001
0.000
0.002
0.001
0.001
0.003
0.003
-0.176
0.000
0.000
0.001
0.003
0.296
0.000
0.000
-0.001
-0.003
-0.325
-0.004
-0.003
0.004
0.003
3.409
-3.070
-0.305
0.296
3.697
-4.000
-0.703
0.384
4.617
6.372
6.458
6.575
6.406
6.551
6.334
6.617
6.468
-6.370
-6.444
-6.599
-6.396
-6.551
-6.334
-6.616
-6.469
-3.945
10.185
10.199
10.176
10.113
4.718
-10.185
-10.198
-10.177
-10.114
-5.097
6.601
6.389
-6.601
-6.389
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
-0.220
0.239
0.001
0.000
-0.101
0.089
-0.001
0.000
0.216
0.001
-0.026
0.000
0.000
0.000
0.000
-0.002
0.002
-0.001
0.027
0.000
0.000
0.000
0.000
0.002
-0.002
-0.235
0.000
-0.001
0.001
-0.008
0.109
0.000
0.001
-0.001
0.008
-0.096
-0.002
0.000
0.002
0.000
Civil Works
Force-Y
Mton
Force-Z
Mton
Moment-X
kNm
Moment-Y
kNm
Moment-Z
kNm
-1.124
-1.122
-0.116
-0.115
-0.381
-0.381
-0.117
-0.115
-1.118
-0.015
-0.031
-0.071
-0.075
-0.039
-0.041
-0.082
-0.084
-0.016
-0.031
-0.072
-0.075
-0.040
-0.041
-0.082
-0.084
-1.116
-0.010
-0.011
-0.011
-0.011
-0.390
-0.010
-0.011
-0.011
-0.011
-0.391
-0.084
-0.082
-0.084
-0.082
4.483
4.494
0.562
0.547
1.378
1.350
-0.562
-0.548
-4.429
-0.023
0.444
-0.353
-0.111
0.003
-0.001
0.091
-0.090
-0.023
0.405
-0.289
-0.136
0.002
-0.001
0.088
-0.087
-4.441
0.003
0.010
-0.012
0.090
-1.469
0.003
0.010
-0.012
0.090
-1.441
0.096
-0.110
0.095
-0.108
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
-1.136
-1.047
-0.109
-0.110
-1.094
-1.108
-0.112
-0.109
-1.330
-2.041
-2.036
-3.121
-3.105
-2.055
-1.987
-2.987
-2.810
-2.043
-2.027
-3.121
-3.105
-2.057
-1.988
-2.986
-2.811
-1.418
-0.746
-1.388
-1.353
-1.355
-0.978
-0.747
-1.390
-1.355
-1.357
-0.990
-2.888
-3.252
-2.888
-3.252
Civil Works
Force-Y
Mton
Force-Z
Mton
Moment-X
kNm
Moment-Y
kNm
Moment-Z
kNm
-0.562
0.069
0.032
-0.009
-0.321
0.330
-0.021
0.028
-0.121
-0.004
-0.008
-0.019
-0.015
-0.008
-0.008
-0.019
-0.015
-0.003
-0.005
-0.011
-0.019
-0.010
-0.011
-0.021
-0.028
-0.315
-0.006
-0.006
-0.004
-0.004
0.143
0.006
0.006
0.004
0.004
-0.170
-0.022
-0.016
-0.023
-0.030
3.927
-1.875
-0.214
0.184
3.915
-4.103
-0.376
0.225
2.200
6.777
6.798
10.624
10.558
6.826
6.575
10.188
9.522
-6.785
-6.635
-10.755
-10.599
-6.825
-6.575
-10.149
-9.560
-3.649
2.865
5.815
5.643
5.668
2.828
-2.865
-5.814
-5.643
-5.668
-3.044
9.839
11.076
-9.801
-11.120
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1
3
5
7
9
11
17
19
44
46
48
52
54
56
58
60
66
70
72
74
76
78
80
82
84
88
90
92
94
96
98
100
102
104
106
108
191
193
195
196
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
-0.639
0.477
0.002
0.001
-0.240
0.412
-0.002
-0.001
0.626
0.011
-0.047
0.000
0.000
0.000
0.000
-0.009
0.009
0.004
0.045
0.000
0.000
0.000
0.000
-0.003
0.003
-0.473
0.002
0.001
-0.002
-0.021
0.255
0.002
-0.003
0.003
0.026
-0.442
-0.003
-0.046
0.002
-0.046
Civil Works
Force-Y
Mton
Force-Z
Mton
Moment-X
kNm
Moment-Y
kNm
Moment-Z
kNm
-2.735
-3.132
-1.504
-1.461
-1.748
-1.185
-1.506
-1.463
-2.723
-0.125
-0.157
-0.244
-0.253
-0.177
-0.180
-0.268
-0.273
-0.130
-0.165
-0.261
-0.268
-0.186
-0.188
-0.281
-0.286
-3.121
-0.126
-0.127
-0.127
-0.128
-1.780
-0.116
-0.116
-0.115
-0.116
-1.208
-0.273
-0.270
-0.286
-0.282
10.496
11.637
6.120
5.907
5.495
4.093
-6.123
-5.908
-10.381
-0.072
0.745
-0.635
-0.146
0.001
-0.001
0.157
-0.150
-0.028
0.732
-0.584
-0.190
0.003
-0.001
0.121
-0.117
-11.539
-0.007
-0.018
0.017
0.309
-5.782
0.010
-0.034
0.030
0.209
-4.320
0.101
0.043
0.104
-0.292
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Civil Works
Empty Condition:
101. Empty
102. Empty + LL
103. Empty + Wind
104. Empty + Wind
105. Empty + Wind + LL
106. Empty + Wind + LL
107. Empty + Wind
108. Empty + Wind
:
:
:
:
:
:
:
:
SW + Empty
SW + Empty + LL
SW + Empty + WLx
SW + Empty + WLy
SW + Empty + 0.75 WLx + 0.75 LL
SW + Empty + 0.75 WLy + 0.75 LL
0.6 SW + 0.6 Empty + WLx
0.6 SW + 0.6 Empty + WLy
Operation Condition
109. Operation
110. Operation + LL
111. Operation + Wind
112. Operation + Wind
113. Operation + Wind + LL
114. Operation + Wind + LL
115. Operation + Wind
116. Operation + Wind
117. Operation + Seismic
118. Operation + Seismic
119. Operation + Seismic + LL
120. Operation + Seismic + LL
121. Operation + Seismic
122. Operation + Seismic
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SW + Operation
SW + Operation + LL
SW + Operation + WLx
SW + Operation + WLy
SW + Operation + 0.75 WLx + 0.75 LL
SW + Operation + 0.75 WLy + 0.75 LL
0.6 SW + 0.6 Operation + WLx
0.6 SW + 0.6 Operation + WLy
SW + Operation + 0.7 EQx
SW + Operation + 0.7 EQy
SW + Operation + 0.525 EQx + 0.75 LL
SW + Operation + 0.525 EQy + 0.75 LL
0.6 SW + 0.6 Operation + 0.7 EQx
0.6 SW + 0.6 Operation + 0.7 EQy
Test Condition:
123. Test
124. Test + LL
125. Test + Wind
126. Test + Wind
127. Test + Wind + LL
128. Test + Wind + LL
129. Test + Wind
130. Test + Wind
:
:
:
:
:
:
:
:
SW + Test
SW + Test + LL
SW + Test + WLx
SW + Test + WLy
SW + Test + 0.75 WLx + 0.75 LL
SW + Test + 0.75 WLy + 0.75 LL
0.6 SW + 0.6 Test + WLx
0.6 SW + 0.6 Test + WLy
Civil Works
Empty Condition:
201. Empty
202. Empty + LL
203. Empty + Wind
204. Empty + Wind
205. Empty + Wind + LL
206. Empty + Wind + LL
207. Empty + Wind
208. Empty + Wind
:
:
:
:
:
:
:
:
Operation Condition
209. Operation
210. Operation + LL
211. Operation + Wind
212. Operation + Wind
213. Operation + Wind + LL
214. Operation + Wind + LL
215. Operation + Wind
216. Operation + Wind
217. Operation + Seismic + LL
218. Operation + Seismic + LL
219. Operation + Seismic
220. Operation + Seismic
:
:
:
:
:
:
:
:
:
:
:
:
Test Condition:
221. Test
222. Test + LL
223. Test + Wind
224. Test + Wind
225. Test + Wind + LL
226. Test + Wind + LL
227. Test + Wind
228. Test + Wind
:
:
:
:
:
:
:
:
Where,
D
Empty
Operation
Test
WX+
WXEQ1
EQ2
:
:
:
:
:
:
:
:
Dead Load
Piping Empty Load
Piping Operation Load
Piping Test Load
Wind Load x +
Wind Load x Seismic Load x-dir
Seismic Load y-dir
Civil Works
4. STABILITY CHECK
FDN. GROUP
Type F1
Type F2
Type F3
Ru
L/C
Uf
L/C
Hmax
L/C
Ra
Ua
Ha
26.7
14.6
8.1
125
101
123
0
0
3.95
101
101
107
3.236
3.074
1.636
125
108
125
58.0
58.0
58.0
13.4
13.4
13.4
4.0
4.0
4.0
REMARK
OK
OK
OK
With the assumption that immediate settlement will be finished during construction period,
consolidation settlement of cohesive soil will be analyzed using following expression. (Bowles, 1988).
Note: Elastic settlement is literally neglected, only the consolidation phase counts
Normally consolidated clay :
H 0(i ) =
Cc (i ) H (i )
1 + e0(i )
P0(i ) + P0(i )
log
P0(i )
C R (i ) H (i )
1 + e0 ( i )
P0 ( i ) + P0 ( i )
log
P0 ( i )
2. If upper structures loads combined with overburden pressure > preconsolidation pressure
P0(i ) + P0(i ) Pc( i)
H 0(i ) =
CR (i ) H (i )
1 + e0(i )
log
Pc(i )
P0(i )
Cc(i ) H (i )
1 + e( i )
log1 +
Pc(i)
Where :
=
H0
=
H0
=
Cc
=
CR
=
eo
=
e
=
H
=
P0
=
P0
=
Pc
Civil Works
The soil formation figure based on the geotechnical investigation data from WIKA :
z = 68
12 m
SILTY CLAY
2m
SILTY CLAY
2m
SILTY CLAY
2m
SILTY CLAY
4m
SILTY SAND
2m
BOULDER
Only the clay portion will be subjected to consolidation, where in this case, the bottom layer is silty
sand and boulder, therefore if the pile axial capacity is sufficient to support the equipment load, there
arent any pile group settlement in this case.
Civil Works
FDN
GROUP
DIRECTION
X
Y
X
Type F2
Y
X
Type F3
Y
NOTE : if Vc > Vu then OK
Type F1
20.925
20.326
20.925
20.326
46.034
20.326
REMARK
201
201
201
201
201
201
OK
OK
OK
OK
OK
OK
FDN
GROUP
Type F1
Type F2
Type F3
0.00
83.70
83.70
0
0
7.559
NOTE : if Vc > Vu then OK
228
202
225
REMARK
OK
OK
OK
FDN
GROUP
Type F1
36.282
130.359
Type F2
19.656
130.359
Type F3
18.673
130.359
NOTE : if Vc > Vu then OK
225
201
225
REMARK
OK
OK
OK
Civil Works
6. REINFORCEMENT DESIGN
Detail of reinforcement design of foundation shall be provided by AFES (Attachment-1)
Minimum Spacing
According to SNI-03-1726-2002 chapter 9.6.(1) :
The clear spacing between the parallel reinforcement bar in the same layer of reinforcement, shall not
be less than the diameter of bar or 25 mm
The minimum spacing in our design: 100 mm
Maximum Spacing
According to SNI-03-1726-2002 chapter 9.6.(5) :
For the wall and the floor plate, the space of flexural reinforcement bar should not be greater than 3
times of the thickness of the wall/floor plate, or 500mm
The maximum spacing in our design: 200 mm
a. Bottom Rebar
ITEM
Type F1
Type F2
Type F3
As Req'd
X DIRECTION
As Prov'd
Using Bar
As Req'd
4.05 cm2
4.05 cm2
8.91 cm2
5.07 cm2
5.07 cm2
11.40 cm2
D13 - 200
D13 - 200
D13 - 200
4.05 cm2
4.05 cm2
4.05 cm2
As Req'd
X DIRECTION
As Prov'd
Using Bar
As Req'd
4.05 cm2
4.05 cm2
8.91 cm2
5.07 cm2
5.07 cm2
11.40 cm2
D13 - 200
D13 - 200
D13 - 200
4.05 cm2
4.05 cm2
4.05 cm2
Y DIRECTION
As Prov'd
5.07 cm2
5.07 cm2
5.07 cm2
Using Bar
D13 - 200
D13 - 200
D13 - 200
b. Top Rebar
ITEM
Type F1
Type F2
Type F3
Y DIRECTION
As Prov'd
5.07 cm2
5.07 cm2
5.07 cm2
Using Bar
D13 - 200
D13 - 200
D13 - 200
PEDESTAL
SIZE (mm)
590 x 590
360 x 240
590 x 590
REINFORCEMENT DESIGN
As req'd
As Prov'd Using Bar
1.12
0.79
1.12
1.99
1.27
1.99
D16-16
D16- 6
D16-16
Civil Works
Minimum Spacing
According to SNI-03-1726-2002 chapter 9.6.(1) :
The clear spacing between the parallel reinforcement bar in the same layer of reinforcement, shall not be less than
the diameter of bar or 25 mm
The minimum spacing in our design: 100 mm
Maximum Spacing
According to SNI-03-1726-2002 chapter 9.6.(5) :
For the wall and the floor plate, the space of flexural reinforcement bar should not be greater than 3 times of the
thickness of the wall/floor plate, or 500mm
The maximum spacing in our design: 200 mm
Section
Location
Size
Top Bar
Bottom Bar
Web Bar
Stirrups
3-D16
3-D16
2-D13
d10-200
3-D16
3-D16
2-D13
d10-200
ATTACHMENT - 1
OUTPUT REPORT CALCULATION BY AFES
AFES CALCULATION
FOOTING FOR FOUNDATION TYPE F1
TITLE
DESCRIPTION
PROJECT/JOB NO.
09-JC-15 (AL-1)
PROJECT/JOB NAME
ICA PROJECT
CLIENT NAME
ICA
SITE NAME
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME
DATE
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
FOUNDATION LISTS
Group Name
F1
No.
Description
No.
Description
F21
F22
F23
F24
F25
F26
F27
F28
F29
10
F31
Page 1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
CONTENTS
1. GENERAL
1.1 MATERIALS & UNIT WEIGHT
1.2 SUBSOIL CONDITION & SAFETY FACTORS
1.3 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE
Page 2
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
1. GENERAL
1.1 MATERIALS & UNIT WEIGHT
Items
Value
250.000 kgf/cm2
150.000 kgf/cm2
3900.000 kgf/cm2
3900.000 kgf/cm2
1.700 ton/m3
2.400 ton/m3
250998.000 kgf/cm2
- Pile Capacity
Items
Value
Pile Name
Footing List
F21, F22, F23, F24, F25, F26, F27, F28, F29, F31
Diameter
300 mm
Length
12 m
Thick
9 mm
Shape
Circle
Capacity ( Ha , Ua , Va )
4 , 13.4 , 58 tonf
Description
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
1.7
Friction factor ()
0.3
Page 3
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
1.3 LOAD COMBINATION
Index
SW
SELF WEIGHT
Empty
EMPTY LOAD
DL
DEAD LOAD
Operation
OPERATION LOAD
Test
TEST LOAD
Wlx
Wly
SLx2
SLy2
10
LL
LIVE LOAD
Comb . ID
101
1.0 SW + 1.0 DL
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
.6 SW + .6 DL + .6 Operation + .7 SLx2
122
.6 SW + .6 DL + .6 Operation + .7 SLy2
123
124
125
126
127
128
129
130
Page 4
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Comb . ID
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
Page 5
2. DRAWING
REFERENCE DWGS
A06
A01A02 A03 A04 A05
3000
6000
6440
16
NO.
DWG NO.
DWG TITLE
2000
6000
11500
38
F8940
F90
5000
15
6000
11
10
16
F2324
F27
15
F7323
F77
6000
12
NOTES
* OUTPUT UNIT : mm
6000
13
37
F2939
F31
17
F2425
F28
10000
14
14
F7222
F76
08
07
8000
06
05
02
01
6000
8000
03
11
F7119
F75
10
F7018
F74
9F6926
F78
1F652F66
7F63
3F61
8F64
4F62
31
36
F83
F88
5F67
6F68
30
35
F82
F87
6000
04
12
F2120
F25
29
34
F81
F86
28
33
F80
F85
09
2000
6000
6000
5500
13000
13
F2221
F26
PROCESS PIPING
VESSELS STRUCT.
ELEC.
INST.
27
32
F79
F84
SCALE
AS SHOWN
JOB NO.
09-JC-15 (AL-1)
MICROFILM NO.
OUTPUT UNIT : mm
REFERENCE DWGS
750
TOP
DWG TITLE
D13@200
750
375x2
D13@200
375
375
CL FOOTING
BOTTOM
DWG NO.
75
TYP.
NO.
NOTES
* PILE
1-300 PS-12 D.300 12M
* ANCHOR BOLT
1X4-M24 ANC. BOLTS (TYPE TYPE L)
375x2
D13@200
* OUTPUT UNIT : mm
D13@200
590
195
220
50
TYP.
150
D10
SQUAD CHECK
220
590
600
75
100
D16
195
200
D10
@200
300
700
120 PROJ.
25 GR.
FOUNDATION PLAN
(10 EA)
16-D16
150
PEDESTAL
PROCESS PIPING
SECTION
SCALE
REV.
DATE
DESCRIPTION
AS SHOWN
VESSELS STRUCT.
JOB NO.
09-JC-15 (AL-1)
ELEC.
INST.
MICROFILM NO.
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 9
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name
750
750
590 590
F21
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F21
All Direct
0.338 m3
0.064 m3
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.109 tonf
1.505 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
590 590
Page 10
F22
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F22
All Direct
0.338 m3
0.064 m3
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.109 tonf
1.505 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
590 590
F23
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 11
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F23
All Direct
0.338 m
0.064 m
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.109 tonf
1.505 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
590 590
F24
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F24
All Direct
0.338 m
0.064 m
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.109 tonf
1.505 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
590 590
Page 12
F25
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F25
All Direct
0.338 m3
0.064 m3
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.109 tonf
1.505 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
590 590
F26
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 13
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F26
All Direct
0.338 m
0.064 m
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.109 tonf
1.505 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
590 590
F27
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F27
All Direct
0.338 m
0.064 m
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.109 tonf
1.505 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
590 590
Page 14
F28
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F28
All Direct
0.338 m3
0.064 m3
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.109 tonf
1.505 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
590 590
F29
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 15
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F29
All Direct
0.338 m
0.064 m
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.109 tonf
1.505 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
590 590
F31
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.064 m3
Soil Weight
0.109 tonf
Buoyancy
Not Consider
0.920 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F31
All Direct
0.338 m
0.064 m
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.109 tonf
1.505 tonf
Ft.Name
Pr.Name
Shape
Pw
Ph
F21
12
Rectangle
590.000
Pl
590.000
700.000
Area
0.348
Weight
0.585
Off X
0.000
Off Y
0.000
F22
13
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
F23
16
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
F24
17
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
F25
20
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
F26
21
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
F27
24
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 16
F28
25
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
F29
37
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
F31
39
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch)
are based on the right hand rule.
My
Fx
Mx
Index
SW
SELF WEIGHT
Empty
EMPTY LOAD
DL
DEAD LOAD
Operation
OPERATION LOAD
Test
TEST LOAD
Wlx
Wly
SLx2
SLy2
10
LL
LIVE LOAD
Ft.Name
F21
Pr.Name
Load Case
12
2
3
16
Mx
My
-0.58
-0.52
0.02
-2.85
0.02
0.07
-10.38
0.03
0.09
-14.53
-3.12
-0.02
10.62
-0.24
-0.63
-1.66
6.57
-0.07
-0.35
0.000
0.000
-0.920
0.000
0.000
-0.58
-0.31
-0.01
-1.87
0.02
-0.05
-6.28
0.03
-0.07
-8.78
-3.11
-0.01
10.56
-0.25
-0.15
-1.67
6.41
-0.08
-0.11
10
0.000
0.000
-0.920
0.000
0.000
-0.58
0.01
-0.36
0.06
-1.91
0.14
0.01
-7.19
Footing SW
F23
Fz
0
10
13
Fy
Footing SW
F22
Fx
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
17
20
F26
0.2
0.01
-10.06
-0.02
10.19
-0.01
-0.27
0.16
-1.72
6.62
-0.08
0.09
10
0.000
0.000
-0.920
0.000
0.000
-0.58
0.01
-0.37
0.06
-0.01
-1.95
0.14
-0.03
-7.48
0.2
-0.04
-10.48
-2.81
-0.01
9.52
0.01
-0.27
-0.15
-1.68
6.47
-0.08
-0.09
10
0.000
0.000
-0.920
0.000
0.000
-0.58
-0.43
0.01
-2.46
-0.02
0.03
-8.52
-0.03
0.04
-11.93
-3.12
-0.01
-10.76
-0.26
-0.58
-1.66
-6.6
-0.07
-0.29
10
0.000
0.000
-0.920
0.000
0.000
-0.58
-0.35
-0.01
-2.1
-0.02
-0.04
-7
-0.03
-0.05
-9.8
-3.11
-0.02
-10.6
-0.27
-0.19
-1.67
-6.4
-0.08
-0.14
10
0.000
0.000
-0.920
0.000
0.000
-0.58
-0.01
-0.36
-0.06
-1.93
-0.14
-7.26
-0.19
0.01
-10.16
-2.99
-0.02
-10.15
-0.28
0.12
-1.72
-6.62
-0.08
0.09
10
Footing SW
F27
24
Footing SW
F28
25
Page 17
-2.99
Footing SW
21
Client : ICA
Footing SW
F25
Footing SW
F24
0.000
0.000
-0.920
0.000
0.000
-0.58
-0.01
-0.37
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Client : ICA
Page 18
-0.06
-0.01
-1.93
-0.15
-0.03
-7.4
-0.21
-0.03
-10.36
-2.81
-0.03
-9.56
-0.29
-0.12
-1.68
-6.47
-0.08
-0.09
10
0.000
0.000
-0.920
0.000
0.000
-0.58
0.01
-0.33
0.06
-2.1
0.13
-6.6
0.18
-9.24
-2.89
-0.02
9.84
-0.27
0.1
-1.72
6.6
-0.08
0.1
10
0.000
0.000
-0.920
0.000
0.000
-0.58
-0.01
-0.33
-0.06
-2.12
-0.13
-6.66
-0.18
-9.32
-2.89
-0.02
-9.8
-0.29
0.1
-1.72
-6.6
-0.08
0.09
10
0.000
0.000
-0.920
0.000
0.000
37
Footing SW
39
F31
Footing SW
F29
Footing SW
In Footing Bottom
In Footing Bottom Center
with Pier Self Weight,
with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing
Fx
Fy
Fz
Mx
My
0.002
0.016
-2.853
0.000
0.000
102
0.003
0.019
-3.372
0.000
0.000
103
-3.118
0.000
7.252
0.000
0.000
104
0.003
-0.225
-4.007
0.000
0.000
105
-2.338
0.005
4.596
0.000
0.000
Pr.Name L.Comb.
101
F21
12
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 19
106
0.003
-0.164
-3.848
0.000
0.000
107
-3.119
-0.008
8.601
0.000
0.000
108
0.002
-0.233
-2.658
0.000
0.000
109
0.022
0.083
-13.230
0.000
0.000
110
0.022
0.083
-13.230
0.000
0.000
111
-3.099
0.064
-2.606
0.000
0.000
112
0.022
-0.161
-13.865
0.000
0.000
113
-2.319
0.069
-5.262
0.000
0.000
114
0.022
-0.100
-13.706
0.000
0.000
115
-3.108
0.031
2.686
0.000
0.000
116
0.013
-0.194
-8.573
0.000
0.000
117
-1.137
0.084
-8.627
0.000
0.000
118
0.022
0.033
-13.477
0.000
0.000
119
-0.847
0.084
-9.778
0.000
0.000
120
0.022
0.046
-13.415
0.000
0.000
121
-1.146
0.051
-3.336
0.000
0.000
122
0.013
0.000
-8.185
0.000
0.000
123
0.030
0.110
-17.380
0.000
0.000
124
0.030
0.110
-17.380
0.000
0.000
125
-3.091
0.091
-6.756
0.000
0.000
126
0.030
-0.134
-18.015
0.000
0.000
127
-2.311
0.096
-9.412
0.000
0.000
128
0.030
-0.073
-17.856
0.000
0.000
129
-3.103
0.047
0.196
0.000
0.000
130
0.018
-0.178
-11.063
0.000
0.000
201
0.004
0.027
-4.721
0.000
0.000
202
0.004
0.023
-4.046
0.000
0.000
203
-2.493
0.008
4.453
0.000
0.000
204
0.004
-0.172
-4.554
0.000
0.000
205
-4.990
-0.008
12.952
0.000
0.000
206
0.004
-0.368
-5.062
0.000
0.000
207
-4.991
-0.013
13.964
0.000
0.000
208
0.003
-0.373
-4.051
0.000
0.000
209
0.031
0.116
-18.522
0.000
0.000
210
0.026
0.100
-15.876
0.000
0.000
211
-2.470
0.084
-7.377
0.000
0.000
212
0.026
-0.096
-16.384
0.000
0.000
213
-4.967
0.069
1.122
0.000
0.000
214
0.026
-0.291
-16.892
0.000
0.000
215
-4.974
0.044
5.091
0.000
0.000
216
0.020
-0.316
-12.923
0.000
0.000
217
-2.458
0.101
-6.014
0.000
0.000
218
0.026
-0.007
-16.406
0.000
0.000
219
-2.464
0.076
-2.044
0.000
0.000
220
0.020
-0.032
-12.436
0.000
0.000
221
0.042
0.154
-24.332
0.000
0.000
222
0.036
0.132
-20.856
0.000
0.000
223
-2.461
0.117
-12.357
0.000
0.000
224
0.036
-0.063
-21.364
0.000
0.000
225
-4.958
0.102
-3.858
0.000
0.000
226
0.036
-0.258
-21.872
0.000
0.000
227
-4.967
0.069
1.356
0.000
0.000
228
0.027
-0.291
-16.658
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F22
13
Page 20
101
0.002
-0.013
-1.867
0.000
0.000
102
0.003
-0.016
-2.181
0.000
0.000
103
-3.102
-0.031
8.377
0.000
0.000
104
0.003
-0.269
-2.327
0.000
0.000
105
-2.326
-0.027
5.737
0.000
0.000
106
0.003
-0.206
-2.290
0.000
0.000
107
-3.103
-0.025
9.249
0.000
0.000
108
0.002
-0.263
-1.455
0.000
0.000
109
0.023
-0.066
-8.142
0.000
0.000
110
0.023
-0.066
-8.142
0.000
0.000
111
-3.082
-0.081
2.416
0.000
0.000
112
0.023
-0.319
-8.288
0.000
0.000
113
-2.306
-0.077
-0.224
0.000
0.000
114
0.023
-0.256
-8.252
0.000
0.000
115
-3.091
-0.055
5.673
0.000
0.000
116
0.014
-0.293
-5.031
0.000
0.000
117
-1.145
-0.067
-3.658
0.000
0.000
118
0.023
-0.119
-8.220
0.000
0.000
119
-0.853
-0.067
-4.779
0.000
0.000
120
0.023
-0.105
-8.200
0.000
0.000
121
-1.154
-0.040
-0.401
0.000
0.000
122
0.014
-0.092
-4.963
0.000
0.000
123
0.031
-0.087
-10.651
0.000
0.000
124
0.031
-0.087
-10.651
0.000
0.000
125
-3.074
-0.102
-0.093
0.000
0.000
126
0.031
-0.340
-10.797
0.000
0.000
127
-2.298
-0.098
-2.733
0.000
0.000
128
0.031
-0.277
-10.760
0.000
0.000
129
-3.086
-0.067
4.167
0.000
0.000
130
0.019
-0.305
-6.537
0.000
0.000
201
0.004
-0.022
-3.053
0.000
0.000
202
0.004
-0.019
-2.617
0.000
0.000
203
-2.480
-0.031
5.829
0.000
0.000
204
0.004
-0.222
-2.734
0.000
0.000
205
-4.964
-0.043
14.276
0.000
0.000
206
0.004
-0.424
-2.851
0.000
0.000
207
-4.965
-0.038
14.930
0.000
0.000
208
0.003
-0.419
-2.197
0.000
0.000
209
0.032
-0.092
-11.399
0.000
0.000
210
0.028
-0.079
-9.770
0.000
0.000
211
-2.456
-0.091
-1.324
0.000
0.000
212
0.028
-0.282
-9.887
0.000
0.000
213
-4.940
-0.103
7.122
0.000
0.000
214
0.028
-0.484
-10.004
0.000
0.000
215
-4.947
-0.083
9.565
0.000
0.000
216
0.021
-0.464
-7.561
0.000
0.000
217
-2.474
-0.081
-0.161
0.000
0.000
218
0.028
-0.192
-9.937
0.000
0.000
219
-2.481
-0.061
2.281
0.000
0.000
220
0.021
-0.172
-7.494
0.000
0.000
221
0.043
-0.122
-14.911
0.000
0.000
222
0.037
-0.104
-12.781
0.000
0.000
223
-2.447
-0.116
-4.335
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F23
16
Page 21
224
0.037
-0.307
-12.898
0.000
0.000
225
-4.931
-0.128
4.112
0.000
0.000
226
0.037
-0.509
-13.015
0.000
0.000
227
-4.940
-0.102
7.307
0.000
0.000
228
0.028
-0.483
-9.819
0.000
0.000
101
0.057
0.005
-1.914
0.000
0.000
102
0.064
0.005
-2.273
0.000
0.000
103
-2.923
-0.014
7.915
0.000
0.000
104
0.055
-0.263
-2.116
0.000
0.000
105
-2.176
-0.009
5.368
0.000
0.000
106
0.057
-0.196
-2.155
0.000
0.000
107
-2.949
-0.016
8.824
0.000
0.000
108
0.029
-0.265
-1.207
0.000
0.000
109
0.199
0.015
-9.102
0.000
0.000
110
0.199
0.015
-9.102
0.000
0.000
111
-2.788
-0.004
1.086
0.000
0.000
112
0.190
-0.253
-8.945
0.000
0.000
113
-2.041
0.001
-1.461
0.000
0.000
114
0.192
-0.186
-8.984
0.000
0.000
115
-2.868
-0.010
4.727
0.000
0.000
116
0.110
-0.259
-5.304
0.000
0.000
117
-1.002
0.014
-4.470
0.000
0.000
118
0.198
-0.042
-9.038
0.000
0.000
119
-0.701
0.014
-5.628
0.000
0.000
120
0.198
-0.028
-9.054
0.000
0.000
121
-1.081
0.008
-0.829
0.000
0.000
122
0.118
-0.048
-5.398
0.000
0.000
123
0.256
0.018
-11.978
0.000
0.000
124
0.256
0.018
-11.978
0.000
0.000
125
-2.731
-0.001
-1.790
0.000
0.000
126
0.247
-0.250
-11.821
0.000
0.000
127
-1.984
0.004
-4.337
0.000
0.000
128
0.249
-0.183
-11.860
0.000
0.000
129
-2.833
-0.008
3.001
0.000
0.000
130
0.145
-0.257
-7.030
0.000
0.000
201
0.090
0.007
-3.182
0.000
0.000
202
0.077
0.006
-2.728
0.000
0.000
203
-2.313
-0.009
5.423
0.000
0.000
204
0.070
-0.208
-2.602
0.000
0.000
205
-4.702
-0.024
13.573
0.000
0.000
206
0.062
-0.423
-2.476
0.000
0.000
207
-4.722
-0.026
14.255
0.000
0.000
208
0.043
-0.424
-1.795
0.000
0.000
209
0.279
0.021
-12.743
0.000
0.000
210
0.239
0.018
-10.922
0.000
0.000
211
-2.151
0.003
-2.772
0.000
0.000
212
0.232
-0.196
-10.797
0.000
0.000
213
-4.540
-0.012
5.378
0.000
0.000
214
0.224
-0.411
-10.671
0.000
0.000
215
-4.600
-0.017
8.109
0.000
0.000
216
0.165
-0.415
-7.941
0.000
0.000
217
-2.334
0.015
-0.997
0.000
0.000
218
0.236
-0.105
-10.786
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F24
17
Page 22
219
-2.393
0.010
1.734
0.000
0.000
220
0.176
-0.110
-8.055
0.000
0.000
221
0.358
0.025
-16.769
0.000
0.000
222
0.307
0.022
-14.374
0.000
0.000
223
-2.082
0.006
-6.223
0.000
0.000
224
0.300
-0.193
-14.248
0.000
0.000
225
-4.472
-0.009
1.927
0.000
0.000
226
0.293
-0.407
-14.122
0.000
0.000
227
-4.549
-0.014
5.521
0.000
0.000
228
0.216
-0.413
-10.529
0.000
0.000
101
0.057
-0.009
-1.952
0.000
0.000
102
0.064
-0.010
-2.326
0.000
0.000
103
-2.746
-0.025
7.196
0.000
0.000
104
0.073
-0.283
-2.476
0.000
0.000
105
-2.043
-0.021
4.816
0.000
0.000
106
0.071
-0.215
-2.438
0.000
0.000
107
-2.772
-0.021
8.126
0.000
0.000
108
0.047
-0.279
-1.546
0.000
0.000
109
0.200
-0.037
-9.436
0.000
0.000
110
0.200
-0.037
-9.436
0.000
0.000
111
-2.610
-0.052
0.086
0.000
0.000
112
0.209
-0.310
-9.586
0.000
0.000
113
-1.907
-0.048
-2.294
0.000
0.000
114
0.207
-0.242
-9.549
0.000
0.000
115
-2.690
-0.037
3.860
0.000
0.000
116
0.129
-0.295
-5.812
0.000
0.000
117
-0.977
-0.038
-4.908
0.000
0.000
118
0.201
-0.096
-9.499
0.000
0.000
119
-0.683
-0.038
-6.040
0.000
0.000
120
0.201
-0.081
-9.483
0.000
0.000
121
-1.057
-0.024
-1.134
0.000
0.000
122
0.121
-0.081
-5.725
0.000
0.000
123
0.258
-0.048
-12.430
0.000
0.000
124
0.258
-0.048
-12.430
0.000
0.000
125
-2.552
-0.063
-2.908
0.000
0.000
126
0.267
-0.321
-12.580
0.000
0.000
127
-1.849
-0.059
-5.288
0.000
0.000
128
0.265
-0.253
-12.542
0.000
0.000
129
-2.655
-0.044
2.064
0.000
0.000
130
0.164
-0.302
-7.608
0.000
0.000
201
0.090
-0.014
-3.256
0.000
0.000
202
0.077
-0.012
-2.791
0.000
0.000
203
-2.171
-0.024
4.826
0.000
0.000
204
0.084
-0.230
-2.911
0.000
0.000
205
-4.419
-0.036
12.444
0.000
0.000
206
0.091
-0.449
-3.031
0.000
0.000
207
-4.438
-0.033
13.142
0.000
0.000
208
0.072
-0.446
-2.333
0.000
0.000
209
0.280
-0.052
-13.210
0.000
0.000
210
0.240
-0.044
-11.323
0.000
0.000
211
-2.008
-0.056
-3.706
0.000
0.000
212
0.247
-0.263
-11.443
0.000
0.000
213
-4.256
-0.068
3.912
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F25
20
Page 23
214
0.254
-0.481
-11.563
0.000
0.000
215
-4.316
-0.057
6.743
0.000
0.000
216
0.194
-0.470
-8.732
0.000
0.000
217
-2.281
-0.047
-1.621
0.000
0.000
218
0.243
-0.170
-11.458
0.000
0.000
219
-2.342
-0.036
1.210
0.000
0.000
220
0.183
-0.159
-8.627
0.000
0.000
221
0.361
-0.067
-17.402
0.000
0.000
222
0.310
-0.058
-14.916
0.000
0.000
223
-1.938
-0.070
-7.298
0.000
0.000
224
0.317
-0.276
-15.036
0.000
0.000
225
-4.186
-0.082
0.319
0.000
0.000
226
0.324
-0.494
-15.156
0.000
0.000
227
-4.264
-0.067
4.048
0.000
0.000
228
0.247
-0.480
-11.427
0.000
0.000
101
-0.002
0.007
-2.461
0.000
0.000
102
-0.003
0.008
-2.887
0.000
0.000
103
-3.124
-0.003
-13.642
0.000
0.000
104
-0.003
-0.253
-3.471
0.000
0.000
105
-2.344
0.000
-10.953
0.000
0.000
106
-0.003
-0.188
-3.325
0.000
0.000
107
-3.123
-0.006
-12.487
0.000
0.000
108
-0.002
-0.256
-2.316
0.000
0.000
109
-0.023
0.033
-10.982
0.000
0.000
110
-0.023
0.033
-10.982
0.000
0.000
111
-3.144
0.022
-21.737
0.000
0.000
112
-0.023
-0.228
-11.566
0.000
0.000
113
-2.364
0.025
-19.048
0.000
0.000
114
-0.023
-0.163
-11.420
0.000
0.000
115
-3.135
0.009
-17.344
0.000
0.000
116
-0.014
-0.241
-7.173
0.000
0.000
117
-1.182
0.033
-15.601
0.000
0.000
118
-0.023
-0.017
-11.184
0.000
0.000
119
-0.892
0.033
-14.446
0.000
0.000
120
-0.023
-0.005
-11.134
0.000
0.000
121
-1.173
0.020
-11.208
0.000
0.000
122
-0.014
-0.031
-6.792
0.000
0.000
123
-0.032
0.044
-14.390
0.000
0.000
124
-0.032
0.044
-14.390
0.000
0.000
125
-3.153
0.033
-25.145
0.000
0.000
126
-0.032
-0.217
-14.974
0.000
0.000
127
-2.373
0.036
-22.456
0.000
0.000
128
-0.032
-0.152
-14.828
0.000
0.000
129
-3.140
0.015
-19.389
0.000
0.000
130
-0.019
-0.235
-9.218
0.000
0.000
201
-0.004
0.011
-4.042
0.000
0.000
202
-0.004
0.010
-3.464
0.000
0.000
203
-2.500
0.001
-12.068
0.000
0.000
204
-0.004
-0.199
-3.932
0.000
0.000
205
-4.997
-0.008
-20.672
0.000
0.000
206
-0.004
-0.408
-4.399
0.000
0.000
207
-4.996
-0.010
-19.806
0.000
0.000
208
-0.003
-0.410
-3.533
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F26
21
Page 24
209
-0.032
0.046
-15.375
0.000
0.000
210
-0.028
0.040
-13.178
0.000
0.000
211
-2.524
0.031
-21.782
0.000
0.000
212
-0.028
-0.169
-13.646
0.000
0.000
213
-5.021
0.022
-30.386
0.000
0.000
214
-0.028
-0.378
-14.113
0.000
0.000
215
-5.014
0.012
-27.092
0.000
0.000
216
-0.021
-0.388
-10.818
0.000
0.000
217
-2.512
0.040
-23.077
0.000
0.000
218
-0.028
-0.068
-13.612
0.000
0.000
219
-2.505
0.030
-19.782
0.000
0.000
220
-0.021
-0.078
-10.317
0.000
0.000
221
-0.045
0.062
-20.146
0.000
0.000
222
-0.038
0.053
-17.268
0.000
0.000
223
-2.535
0.044
-25.872
0.000
0.000
224
-0.038
-0.156
-17.735
0.000
0.000
225
-5.032
0.035
-34.476
0.000
0.000
226
-0.038
-0.365
-18.202
0.000
0.000
227
-5.022
0.022
-30.159
0.000
0.000
228
-0.029
-0.378
-13.885
0.000
0.000
101
-0.002
-0.011
-2.096
0.000
0.000
102
-0.003
-0.013
-2.446
0.000
0.000
103
-3.108
-0.032
-13.045
0.000
0.000
104
-0.003
-0.281
-2.636
0.000
0.000
105
-2.332
-0.027
-10.395
0.000
0.000
106
-0.003
-0.214
-2.588
0.000
0.000
107
-3.107
-0.027
-12.067
0.000
0.000
108
-0.002
-0.276
-1.658
0.000
0.000
109
-0.022
-0.050
-9.093
0.000
0.000
110
-0.022
-0.050
-9.093
0.000
0.000
111
-3.127
-0.069
-19.692
0.000
0.000
112
-0.022
-0.318
-9.283
0.000
0.000
113
-2.351
-0.064
-17.042
0.000
0.000
114
-0.022
-0.251
-9.236
0.000
0.000
115
-3.118
-0.049
-16.055
0.000
0.000
116
-0.013
-0.298
-5.646
0.000
0.000
117
-1.190
-0.049
-13.570
0.000
0.000
118
-0.022
-0.102
-9.188
0.000
0.000
119
-0.898
-0.049
-12.451
0.000
0.000
120
-0.022
-0.089
-9.164
0.000
0.000
121
-1.181
-0.029
-9.933
0.000
0.000
122
-0.013
-0.083
-5.551
0.000
0.000
123
-0.031
-0.066
-11.892
0.000
0.000
124
-0.031
-0.066
-11.892
0.000
0.000
125
-3.136
-0.085
-22.491
0.000
0.000
126
-0.031
-0.334
-12.082
0.000
0.000
127
-2.360
-0.080
-19.841
0.000
0.000
128
-0.031
-0.267
-12.034
0.000
0.000
129
-3.124
-0.059
-17.734
0.000
0.000
130
-0.019
-0.308
-7.325
0.000
0.000
201
-0.004
-0.018
-3.424
0.000
0.000
202
-0.004
-0.016
-2.935
0.000
0.000
203
-2.488
-0.031
-11.414
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F27
24
Page 25
204
-0.004
-0.230
-3.087
0.000
0.000
205
-4.972
-0.046
-19.894
0.000
0.000
206
-0.004
-0.444
-3.239
0.000
0.000
207
-4.971
-0.042
-19.160
0.000
0.000
208
-0.003
-0.441
-2.505
0.000
0.000
209
-0.031
-0.070
-12.730
0.000
0.000
210
-0.026
-0.060
-10.912
0.000
0.000
211
-2.510
-0.075
-19.391
0.000
0.000
212
-0.026
-0.274
-11.064
0.000
0.000
213
-4.994
-0.090
-27.870
0.000
0.000
214
-0.026
-0.489
-11.216
0.000
0.000
215
-4.988
-0.075
-25.142
0.000
0.000
216
-0.020
-0.474
-8.488
0.000
0.000
217
-2.528
-0.057
-20.506
0.000
0.000
218
-0.026
-0.173
-11.116
0.000
0.000
219
-2.522
-0.042
-17.778
0.000
0.000
220
-0.020
-0.157
-8.388
0.000
0.000
221
-0.043
-0.092
-16.649
0.000
0.000
222
-0.037
-0.079
-14.270
0.000
0.000
223
-2.521
-0.094
-22.750
0.000
0.000
224
-0.037
-0.294
-14.422
0.000
0.000
225
-5.005
-0.110
-31.229
0.000
0.000
226
-0.037
-0.508
-14.574
0.000
0.000
227
-4.996
-0.090
-27.661
0.000
0.000
228
-0.028
-0.488
-11.007
0.000
0.000
101
-0.056
0.004
-1.929
0.000
0.000
102
-0.063
0.004
-2.292
0.000
0.000
103
-3.049
-0.017
-12.441
0.000
0.000
104
-0.066
-0.277
-2.171
0.000
0.000
105
-2.303
-0.012
-9.904
0.000
0.000
106
-0.065
-0.207
-2.201
0.000
0.000
107
-3.024
-0.019
-11.524
0.000
0.000
108
-0.041
-0.279
-1.254
0.000
0.000
109
-0.194
0.009
-9.184
0.000
0.000
110
-0.194
0.009
-9.184
0.000
0.000
111
-3.180
-0.012
-19.333
0.000
0.000
112
-0.197
-0.272
-9.063
0.000
0.000
113
-2.434
-0.007
-16.796
0.000
0.000
114
-0.196
-0.202
-9.093
0.000
0.000
115
-3.102
-0.016
-15.659
0.000
0.000
116
-0.119
-0.276
-5.389
0.000
0.000
117
-1.395
0.011
-13.815
0.000
0.000
118
-0.193
-0.048
-9.122
0.000
0.000
119
-1.094
0.011
-12.657
0.000
0.000
120
-0.193
-0.034
-9.138
0.000
0.000
121
-1.317
0.008
-10.142
0.000
0.000
122
-0.115
-0.052
-5.449
0.000
0.000
123
-0.250
0.012
-12.086
0.000
0.000
124
-0.250
0.012
-12.086
0.000
0.000
125
-3.236
-0.009
-22.235
0.000
0.000
126
-0.253
-0.269
-11.965
0.000
0.000
127
-2.490
-0.004
-19.698
0.000
0.000
128
-0.252
-0.199
-11.995
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F28
25
Page 26
129
-3.136
-0.014
-17.401
0.000
0.000
130
-0.153
-0.274
-7.131
0.000
0.000
201
-0.088
0.006
-3.209
0.000
0.000
202
-0.076
0.005
-2.750
0.000
0.000
203
-2.464
-0.012
-10.870
0.000
0.000
204
-0.078
-0.220
-2.654
0.000
0.000
205
-4.853
-0.029
-18.989
0.000
0.000
206
-0.080
-0.445
-2.557
0.000
0.000
207
-4.834
-0.030
-18.301
0.000
0.000
208
-0.061
-0.446
-1.869
0.000
0.000
209
-0.272
0.013
-12.858
0.000
0.000
210
-0.233
0.011
-11.021
0.000
0.000
211
-2.622
-0.006
-19.140
0.000
0.000
212
-0.235
-0.214
-10.924
0.000
0.000
213
-5.010
-0.023
-27.259
0.000
0.000
214
-0.238
-0.439
-10.827
0.000
0.000
215
-4.952
-0.025
-24.504
0.000
0.000
216
-0.179
-0.441
-8.072
0.000
0.000
217
-2.805
0.015
-20.945
0.000
0.000
218
-0.230
-0.112
-10.889
0.000
0.000
219
-2.747
0.013
-18.190
0.000
0.000
220
-0.172
-0.115
-8.134
0.000
0.000
221
-0.350
0.017
-16.920
0.000
0.000
222
-0.300
0.014
-14.503
0.000
0.000
223
-2.689
-0.002
-22.622
0.000
0.000
224
-0.302
-0.210
-14.406
0.000
0.000
225
-5.078
-0.019
-30.742
0.000
0.000
226
-0.305
-0.435
-14.310
0.000
0.000
227
-5.003
-0.023
-27.116
0.000
0.000
228
-0.230
-0.439
-10.684
0.000
0.000
101
-0.058
-0.008
-1.934
0.000
0.000
102
-0.065
-0.009
-2.304
0.000
0.000
103
-2.876
-0.037
-11.864
0.000
0.000
104
-0.062
-0.295
-2.421
0.000
0.000
105
-2.173
-0.030
-9.474
0.000
0.000
106
-0.063
-0.224
-2.392
0.000
0.000
107
-2.850
-0.033
-10.942
0.000
0.000
108
-0.036
-0.291
-1.499
0.000
0.000
109
-0.205
-0.033
-9.337
0.000
0.000
110
-0.205
-0.033
-9.337
0.000
0.000
111
-3.016
-0.061
-18.897
0.000
0.000
112
-0.202
-0.319
-9.454
0.000
0.000
113
-2.313
-0.054
-16.507
0.000
0.000
114
-0.203
-0.248
-9.425
0.000
0.000
115
-2.934
-0.048
-15.162
0.000
0.000
116
-0.120
-0.306
-5.719
0.000
0.000
117
-1.382
-0.031
-13.865
0.000
0.000
118
-0.206
-0.092
-9.398
0.000
0.000
119
-1.088
-0.031
-12.733
0.000
0.000
120
-0.206
-0.077
-9.383
0.000
0.000
121
-1.300
-0.018
-10.130
0.000
0.000
122
-0.124
-0.079
-5.663
0.000
0.000
123
-0.264
-0.042
-12.298
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F29
37
Page 27
124
-0.264
-0.042
-12.298
0.000
0.000
125
-3.075
-0.070
-21.858
0.000
0.000
126
-0.261
-0.328
-12.415
0.000
0.000
127
-2.372
-0.063
-19.468
0.000
0.000
128
-0.262
-0.257
-12.386
0.000
0.000
129
-2.969
-0.053
-16.939
0.000
0.000
130
-0.155
-0.311
-7.496
0.000
0.000
201
-0.091
-0.013
-3.226
0.000
0.000
202
-0.078
-0.011
-2.765
0.000
0.000
203
-2.327
-0.033
-10.413
0.000
0.000
204
-0.076
-0.240
-2.858
0.000
0.000
205
-4.576
-0.056
-18.061
0.000
0.000
206
-0.073
-0.468
-2.952
0.000
0.000
207
-4.556
-0.053
-17.370
0.000
0.000
208
-0.054
-0.466
-2.261
0.000
0.000
209
-0.287
-0.046
-13.072
0.000
0.000
210
-0.246
-0.040
-11.204
0.000
0.000
211
-2.495
-0.062
-18.852
0.000
0.000
212
-0.244
-0.268
-11.298
0.000
0.000
213
-4.744
-0.084
-26.500
0.000
0.000
214
-0.241
-0.497
-11.392
0.000
0.000
215
-4.682
-0.075
-23.699
0.000
0.000
216
-0.180
-0.487
-8.590
0.000
0.000
217
-2.767
-0.035
-20.908
0.000
0.000
218
-0.249
-0.166
-11.335
0.000
0.000
219
-2.706
-0.025
-18.107
0.000
0.000
220
-0.188
-0.156
-8.534
0.000
0.000
221
-0.370
-0.059
-17.217
0.000
0.000
222
-0.317
-0.050
-14.758
0.000
0.000
223
-2.566
-0.073
-22.406
0.000
0.000
224
-0.314
-0.279
-14.851
0.000
0.000
225
-4.814
-0.095
-30.054
0.000
0.000
226
-0.312
-0.508
-14.945
0.000
0.000
227
-4.735
-0.083
-26.364
0.000
0.000
228
-0.233
-0.495
-11.255
0.000
0.000
101
0.061
0.003
-2.104
0.000
0.000
102
0.067
0.003
-2.434
0.000
0.000
103
-2.821
-0.019
7.405
0.000
0.000
104
0.064
-0.270
-2.333
0.000
0.000
105
-2.099
-0.013
4.945
0.000
0.000
106
0.065
-0.202
-2.358
0.000
0.000
107
-2.848
-0.020
8.379
0.000
0.000
108
0.037
-0.271
-1.359
0.000
0.000
109
0.188
0.004
-8.704
0.000
0.000
110
0.188
0.004
-8.704
0.000
0.000
111
-2.700
-0.018
1.135
0.000
0.000
112
0.185
-0.269
-8.603
0.000
0.000
113
-1.978
-0.012
-1.325
0.000
0.000
114
0.186
-0.201
-8.628
0.000
0.000
115
-2.775
-0.020
4.617
0.000
0.000
116
0.110
-0.271
-5.121
0.000
0.000
117
-1.013
0.001
-4.083
0.000
0.000
118
0.187
-0.055
-8.637
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F31
39
Page 28
119
-0.712
0.002
-5.238
0.000
0.000
120
0.187
-0.040
-8.654
0.000
0.000
121
-1.088
0.000
-0.602
0.000
0.000
122
0.111
-0.056
-5.155
0.000
0.000
123
0.239
0.005
-11.345
0.000
0.000
124
0.239
0.005
-11.345
0.000
0.000
125
-2.649
-0.017
-1.506
0.000
0.000
126
0.236
-0.268
-11.244
0.000
0.000
127
-1.927
-0.012
-3.966
0.000
0.000
128
0.237
-0.200
-11.269
0.000
0.000
129
-2.745
-0.019
3.032
0.000
0.000
130
0.140
-0.270
-6.706
0.000
0.000
201
0.094
0.004
-3.408
0.000
0.000
202
0.080
0.004
-2.921
0.000
0.000
203
-2.230
-0.014
4.950
0.000
0.000
204
0.078
-0.215
-2.840
0.000
0.000
205
-4.540
-0.032
12.822
0.000
0.000
206
0.076
-0.433
-2.759
0.000
0.000
207
-4.561
-0.032
13.552
0.000
0.000
208
0.055
-0.434
-2.029
0.000
0.000
209
0.263
0.006
-12.186
0.000
0.000
210
0.226
0.005
-10.445
0.000
0.000
211
-2.085
-0.013
-2.574
0.000
0.000
212
0.223
-0.214
-10.364
0.000
0.000
213
-4.395
-0.030
5.298
0.000
0.000
214
0.221
-0.432
-10.283
0.000
0.000
215
-4.452
-0.032
7.909
0.000
0.000
216
0.164
-0.433
-7.672
0.000
0.000
217
-2.347
-0.001
-0.543
0.000
0.000
218
0.223
-0.121
-10.301
0.000
0.000
219
-2.403
-0.002
2.068
0.000
0.000
220
0.166
-0.122
-7.690
0.000
0.000
221
0.335
0.007
-15.883
0.000
0.000
222
0.287
0.006
-13.614
0.000
0.000
223
-2.024
-0.012
-5.743
0.000
0.000
224
0.284
-0.212
-13.533
0.000
0.000
225
-4.334
-0.029
2.128
0.000
0.000
226
0.282
-0.431
-13.452
0.000
0.000
227
-4.406
-0.031
5.532
0.000
0.000
228
0.210
-0.432
-10.049
0.000
0.000
101
-0.061
0.003
-2.116
0.000
0.000
102
-0.067
0.003
-2.449
0.000
0.000
103
-2.955
-0.020
-12.250
0.000
0.000
104
-0.065
-0.283
-2.345
0.000
0.000
105
-2.233
-0.014
-9.800
0.000
0.000
106
-0.065
-0.212
-2.371
0.000
0.000
107
-2.928
-0.021
-11.270
0.000
0.000
108
-0.038
-0.284
-1.365
0.000
0.000
109
-0.189
0.007
-8.771
0.000
0.000
110
-0.189
0.007
-8.771
0.000
0.000
111
-3.077
-0.016
-18.572
0.000
0.000
112
-0.187
-0.279
-8.667
0.000
0.000
113
-2.355
-0.010
-16.122
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 29
114
-0.188
-0.208
-8.693
0.000
0.000
115
-3.001
-0.019
-15.064
0.000
0.000
116
-0.111
-0.282
-5.159
0.000
0.000
117
-1.390
0.010
-13.392
0.000
0.000
118
-0.188
-0.052
-8.705
0.000
0.000
119
-1.089
0.009
-12.237
0.000
0.000
120
-0.188
-0.037
-8.721
0.000
0.000
121
-1.314
0.007
-9.883
0.000
0.000
122
-0.112
-0.055
-5.196
0.000
0.000
123
-0.240
0.008
-11.434
0.000
0.000
124
-0.240
0.008
-11.434
0.000
0.000
125
-3.128
-0.015
-21.235
0.000
0.000
126
-0.238
-0.278
-11.330
0.000
0.000
127
-2.406
-0.009
-18.785
0.000
0.000
128
-0.239
-0.207
-11.356
0.000
0.000
129
-3.032
-0.018
-16.661
0.000
0.000
130
-0.142
-0.281
-6.756
0.000
0.000
201
-0.094
0.004
-3.429
0.000
0.000
202
-0.080
0.004
-2.939
0.000
0.000
203
-2.391
-0.015
-10.780
0.000
0.000
204
-0.079
-0.225
-2.856
0.000
0.000
205
-4.701
-0.033
-18.620
0.000
0.000
206
-0.077
-0.454
-2.772
0.000
0.000
207
-4.681
-0.034
-17.886
0.000
0.000
208
-0.057
-0.455
-2.038
0.000
0.000
209
-0.265
0.010
-12.279
0.000
0.000
210
-0.227
0.008
-10.525
0.000
0.000
211
-2.537
-0.010
-18.366
0.000
0.000
212
-0.225
-0.220
-10.442
0.000
0.000
213
-4.848
-0.028
-26.207
0.000
0.000
214
-0.224
-0.449
-10.359
0.000
0.000
215
-4.791
-0.031
-23.576
0.000
0.000
216
-0.167
-0.451
-7.727
0.000
0.000
217
-2.799
0.014
-20.427
0.000
0.000
218
-0.224
-0.118
-10.383
0.000
0.000
219
-2.743
0.012
-17.795
0.000
0.000
220
-0.167
-0.120
-7.751
0.000
0.000
221
-0.336
0.011
-16.008
0.000
0.000
222
-0.288
0.010
-13.721
0.000
0.000
223
-2.598
-0.009
-21.562
0.000
0.000
224
-0.286
-0.219
-13.638
0.000
0.000
225
-4.909
-0.027
-29.402
0.000
0.000
226
-0.285
-0.448
-13.554
0.000
0.000
227
-4.837
-0.030
-25.972
0.000
0.000
228
-0.213
-0.450
-10.124
0.000
0.000
Fy
Fz
Mx
My
0.002
0.016
-3.438
-0.021
0.003
102
0.003
0.019
-3.957
-0.025
0.004
103
-3.118
0.000
6.667
0.000
-4.053
104
0.003
-0.225
-4.592
0.293
0.004
101
F21
12
Fx
Pr.Name L.Comb.
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 30
105
-2.338
0.005
4.011
-0.006
106
0.003
-0.164
-4.433
0.213
-3.039
0.004
107
-3.119
-0.008
8.250
0.010
-4.055
108
0.002
-0.233
-3.009
0.302
0.002
109
0.022
0.083
-13.815
-0.108
0.029
110
0.022
0.083
-13.815
-0.108
0.029
111
-3.099
0.064
-3.191
-0.083
-4.029
112
0.022
-0.161
-14.450
0.209
0.029
113
-2.319
0.069
-5.847
-0.089
-3.014
114
0.022
-0.100
-14.291
0.130
0.029
115
-3.108
0.031
2.335
-0.040
-4.040
116
0.013
-0.194
-8.924
0.252
0.017
117
-1.137
0.084
-9.212
-0.109
-1.478
118
0.022
0.033
-14.062
-0.043
0.029
119
-0.847
0.084
-10.363
-0.109
-1.102
120
0.022
0.046
-14.000
-0.059
0.029
121
-1.146
0.051
-3.686
-0.066
-1.490
122
0.013
0.000
-8.536
0.000
0.017
123
0.030
0.110
-17.965
-0.143
0.039
124
0.030
0.110
-17.965
-0.143
0.039
125
-3.091
0.091
-7.341
-0.118
-4.018
126
0.030
-0.134
-18.600
0.174
0.039
127
-2.311
0.096
-9.997
-0.124
-3.004
128
0.030
-0.073
-18.441
0.095
0.039
129
-3.103
0.047
-0.155
-0.061
-4.034
130
0.018
-0.178
-11.414
0.231
0.023
201
0.004
0.027
-5.540
-0.035
0.005
202
0.004
0.023
-4.748
-0.030
0.005
203
-2.493
0.008
3.751
-0.010
-3.241
204
0.004
-0.172
-5.256
0.224
0.005
205
-4.990
-0.008
12.250
0.010
-6.487
206
0.004
-0.368
-5.764
0.478
0.005
207
-4.991
-0.013
13.437
0.017
-6.488
208
0.003
-0.373
-4.577
0.485
0.004
209
0.031
0.116
-19.341
-0.151
0.040
210
0.026
0.100
-16.578
-0.129
0.034
211
-2.470
0.084
-8.079
-0.110
-3.212
212
0.026
-0.096
-17.086
0.124
0.034
213
-4.967
0.069
0.421
-0.090
-6.457
214
0.026
-0.291
-17.594
0.378
0.034
215
-4.974
0.044
4.565
-0.058
-6.466
216
0.020
-0.316
-13.449
0.410
0.026
217
-2.458
0.101
-6.715
-0.131
-3.195
218
0.026
-0.007
-17.107
0.009
0.034
219
-2.464
0.076
-2.571
-0.099
-3.203
220
0.020
-0.032
-12.963
0.041
0.026
221
0.042
0.154
-25.151
-0.200
0.055
222
0.036
0.132
-21.558
-0.172
0.047
223
-2.461
0.117
-13.059
-0.152
-3.199
224
0.036
-0.063
-22.066
0.082
0.047
225
-4.958
0.102
-4.559
-0.132
-6.445
226
0.036
-0.258
-22.574
0.336
0.047
227
-4.967
0.069
0.830
-0.089
-6.457
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F22
13
Page 31
228
0.027
-0.291
-17.184
0.379
0.035
101
0.002
-0.013
-2.452
0.017
0.003
102
0.003
-0.016
-2.766
0.021
0.004
103
-3.102
-0.031
7.792
0.040
-4.033
104
0.003
-0.269
-2.912
0.350
0.004
105
-2.326
-0.027
5.153
0.035
-3.023
106
0.003
-0.206
-2.875
0.267
0.004
107
-3.103
-0.025
8.899
0.032
-4.034
108
0.002
-0.263
-1.805
0.341
0.002
109
0.023
-0.066
-8.727
0.086
0.030
110
0.023
-0.066
-8.727
0.086
0.030
111
-3.082
-0.081
1.831
0.105
-4.007
112
0.023
-0.319
-8.873
0.415
0.030
113
-2.306
-0.077
-0.808
0.100
-2.997
114
0.023
-0.256
-8.836
0.332
0.030
115
-3.091
-0.055
5.322
0.071
-4.019
116
0.014
-0.293
-5.382
0.380
0.018
117
-1.145
-0.067
-4.243
0.087
-1.488
118
0.023
-0.119
-8.805
0.154
0.030
119
-0.853
-0.067
-5.364
0.086
-1.109
120
0.023
-0.105
-8.785
0.137
0.030
121
-1.154
-0.040
-0.752
0.052
-1.500
122
0.014
-0.092
-5.314
0.120
0.018
123
0.031
-0.087
-11.236
0.113
0.040
124
0.031
-0.087
-11.236
0.113
0.040
125
-3.074
-0.102
-0.678
0.133
-3.996
126
0.031
-0.340
-11.382
0.442
0.040
127
-2.298
-0.098
-3.317
0.128
-2.987
128
0.031
-0.277
-11.345
0.360
0.040
129
-3.086
-0.067
3.817
0.087
-4.012
130
0.019
-0.305
-6.887
0.397
0.024
201
0.004
-0.022
-3.872
0.029
0.005
202
0.004
-0.019
-3.319
0.025
0.005
203
-2.480
-0.031
5.127
0.041
-3.225
204
0.004
-0.222
-3.436
0.288
0.005
205
-4.964
-0.043
13.574
0.056
-6.454
206
0.004
-0.424
-3.553
0.551
0.005
207
-4.965
-0.038
14.404
0.050
-6.455
208
0.003
-0.419
-2.723
0.545
0.004
209
0.032
-0.092
-12.218
0.120
0.042
210
0.028
-0.079
-10.472
0.103
0.036
211
-2.456
-0.091
-2.026
0.119
-3.193
212
0.028
-0.282
-10.589
0.366
0.036
213
-4.940
-0.103
6.421
0.134
-6.423
214
0.028
-0.484
-10.706
0.629
0.036
215
-4.947
-0.083
9.039
0.108
-6.431
216
0.021
-0.464
-8.088
0.603
0.027
217
-2.474
-0.081
-0.863
0.105
-3.217
218
0.028
-0.192
-10.639
0.249
0.036
219
-2.481
-0.061
1.755
0.079
-3.226
220
0.021
-0.172
-8.021
0.223
0.027
221
0.043
-0.122
-15.730
0.158
0.056
222
0.037
-0.104
-13.483
0.136
0.048
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F23
16
Page 32
223
-2.447
-0.116
-5.037
0.151
224
0.037
-0.307
-13.600
0.399
-3.181
0.048
225
-4.931
-0.128
3.410
0.167
-6.410
226
0.037
-0.509
-13.717
0.662
0.048
227
-4.940
-0.102
6.781
0.133
-6.422
228
0.028
-0.483
-10.346
0.628
0.036
101
0.057
0.005
-2.499
-0.007
0.074
102
0.064
0.005
-2.858
-0.007
0.083
103
-2.923
-0.014
7.330
0.018
-3.800
104
0.055
-0.263
-2.701
0.342
0.072
105
-2.176
-0.009
4.783
0.012
-2.829
106
0.057
-0.196
-2.740
0.255
0.074
107
-2.949
-0.016
8.473
0.021
-3.833
108
0.029
-0.265
-1.558
0.345
0.038
109
0.199
0.015
-9.687
-0.020
0.259
110
0.199
0.015
-9.687
-0.020
0.259
111
-2.788
-0.004
0.501
0.005
-3.624
112
0.190
-0.253
-9.530
0.329
0.247
113
-2.041
0.001
-2.046
-0.001
-2.654
114
0.192
-0.186
-9.569
0.242
0.250
115
-2.868
-0.010
4.376
0.013
-3.728
116
0.110
-0.259
-5.655
0.337
0.144
117
-1.002
0.014
-5.055
-0.018
-1.302
118
0.198
-0.042
-9.623
0.055
0.257
119
-0.701
0.014
-6.213
-0.018
-0.912
120
0.198
-0.028
-9.639
0.036
0.257
121
-1.081
0.008
-1.180
-0.010
-1.405
122
0.118
-0.048
-5.748
0.063
0.153
123
0.256
0.018
-12.563
-0.023
0.333
124
0.256
0.018
-12.563
-0.023
0.333
125
-2.731
-0.001
-2.375
0.001
-3.550
126
0.247
-0.250
-12.406
0.325
0.321
127
-1.984
0.004
-4.922
-0.005
-2.580
128
0.249
-0.183
-12.445
0.238
0.324
129
-2.833
-0.008
2.650
0.011
-3.683
130
0.145
-0.257
-7.381
0.334
0.188
201
0.090
0.007
-4.001
-0.009
0.116
202
0.077
0.006
-3.429
-0.008
0.100
203
-2.313
-0.009
4.721
0.012
-3.007
204
0.070
-0.208
-3.304
0.271
0.090
205
-4.702
-0.024
12.871
0.032
-6.113
206
0.062
-0.423
-3.178
0.550
0.081
207
-4.722
-0.026
13.729
0.034
-6.138
208
0.043
-0.424
-2.321
0.552
0.056
209
0.279
0.021
-13.562
-0.027
0.362
210
0.239
0.018
-11.624
-0.023
0.310
211
-2.151
0.003
-3.474
-0.004
-2.796
212
0.232
-0.196
-11.499
0.255
0.301
213
-4.540
-0.012
4.677
0.016
-5.903
214
0.224
-0.411
-11.373
0.534
0.292
215
-4.600
-0.017
7.583
0.022
-5.980
216
0.165
-0.415
-8.467
0.540
0.214
217
-2.334
0.015
-1.699
-0.020
-3.034
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F24
17
Page 33
218
0.236
-0.105
-11.488
0.137
0.307
219
-2.393
0.010
1.207
-0.014
-3.111
220
0.176
-0.110
-8.582
0.142
0.229
221
0.358
0.025
-17.588
-0.033
0.466
222
0.307
0.022
-15.075
-0.028
0.399
223
-2.082
0.006
-6.925
-0.008
-2.707
224
0.300
-0.193
-14.950
0.251
0.390
225
-4.472
-0.009
1.225
0.011
-5.814
226
0.293
-0.407
-14.824
0.529
0.381
227
-4.549
-0.014
4.994
0.018
-5.913
228
0.216
-0.413
-11.055
0.536
0.281
101
0.057
-0.009
-2.537
0.012
0.074
102
0.064
-0.010
-2.911
0.013
0.083
103
-2.746
-0.025
6.611
0.032
-3.570
104
0.073
-0.283
-3.061
0.368
0.095
105
-2.043
-0.021
4.231
0.028
-2.657
106
0.071
-0.215
-3.023
0.279
0.092
107
-2.772
-0.021
7.776
0.027
-3.603
108
0.047
-0.279
-1.896
0.363
0.062
109
0.200
-0.037
-10.021
0.048
0.260
110
0.200
-0.037
-10.021
0.048
0.260
111
-2.610
-0.052
-0.499
0.068
-3.393
112
0.209
-0.310
-10.171
0.403
0.272
113
-1.907
-0.048
-2.879
0.063
-2.480
114
0.207
-0.242
-10.133
0.314
0.269
115
-2.690
-0.037
3.510
0.048
-3.497
116
0.129
-0.295
-6.162
0.384
0.168
117
-0.977
-0.038
-5.493
0.050
-1.270
118
0.201
-0.096
-10.084
0.125
0.262
119
-0.683
-0.038
-6.625
0.049
-0.887
120
0.201
-0.081
-10.068
0.105
0.261
121
-1.057
-0.024
-1.485
0.031
-1.374
122
0.121
-0.081
-6.075
0.105
0.158
123
0.258
-0.048
-13.015
0.062
0.335
124
0.258
-0.048
-13.015
0.062
0.335
125
-2.552
-0.063
-3.493
0.082
-3.318
126
0.267
-0.321
-13.165
0.417
0.347
127
-1.849
-0.059
-5.873
0.077
-2.404
128
0.265
-0.253
-13.127
0.329
0.344
129
-2.655
-0.044
1.713
0.057
-3.452
130
0.164
-0.302
-7.959
0.392
0.213
201
0.090
-0.014
-4.075
0.018
0.116
202
0.077
-0.012
-3.493
0.016
0.100
203
-2.171
-0.024
4.125
0.031
-2.823
204
0.084
-0.230
-3.613
0.300
0.109
205
-4.419
-0.036
11.742
0.047
-5.745
206
0.091
-0.449
-3.733
0.583
0.119
207
-4.438
-0.033
12.615
0.043
-5.770
208
0.072
-0.446
-2.860
0.580
0.094
209
0.280
-0.052
-14.029
0.067
0.364
210
0.240
-0.044
-12.025
0.058
0.312
211
-2.008
-0.056
-4.407
0.073
-2.610
212
0.247
-0.263
-12.145
0.342
0.321
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F25
20
Page 34
213
-4.256
-0.068
3.210
0.089
214
0.254
-0.481
-12.265
0.626
-5.533
0.331
215
-4.316
-0.057
6.216
0.074
-5.611
216
0.194
-0.470
-9.259
0.611
0.253
217
-2.281
-0.047
-2.323
0.062
-2.966
218
0.243
-0.170
-12.160
0.222
0.316
219
-2.342
-0.036
0.683
0.047
-3.044
220
0.183
-0.159
-9.154
0.207
0.238
221
0.361
-0.067
-18.221
0.087
0.470
222
0.310
-0.058
-15.618
0.075
0.402
223
-1.938
-0.070
-8.000
0.090
-2.520
224
0.317
-0.276
-15.738
0.359
0.412
225
-4.186
-0.082
-0.383
0.106
-5.442
226
0.324
-0.494
-15.858
0.643
0.421
227
-4.264
-0.067
3.522
0.087
-5.543
228
0.247
-0.480
-11.953
0.624
0.321
101
-0.002
0.007
-3.046
-0.009
-0.003
102
-0.003
0.008
-3.472
-0.010
-0.004
103
-3.124
-0.003
-14.227
0.004
-4.061
104
-0.003
-0.253
-4.056
0.329
-0.004
105
-2.344
0.000
-11.538
0.000
-3.047
106
-0.003
-0.188
-3.910
0.244
-0.004
107
-3.123
-0.006
-12.838
0.008
-4.060
108
-0.002
-0.256
-2.667
0.333
-0.002
109
-0.023
0.033
-11.567
-0.043
-0.030
110
-0.023
0.033
-11.567
-0.043
-0.030
111
-3.144
0.022
-22.322
-0.029
-4.087
112
-0.023
-0.228
-12.151
0.296
-0.030
113
-2.364
0.025
-19.633
-0.032
-3.073
114
-0.023
-0.163
-12.005
0.212
-0.030
115
-3.135
0.009
-17.695
-0.011
-4.075
116
-0.014
-0.241
-7.524
0.314
-0.018
117
-1.182
0.033
-16.186
-0.043
-1.537
118
-0.023
-0.017
-11.769
0.023
-0.030
119
-0.892
0.033
-15.031
-0.043
-1.160
120
-0.023
-0.005
-11.719
0.006
-0.030
121
-1.173
0.020
-11.559
-0.026
-1.525
122
-0.014
-0.031
-7.142
0.040
-0.018
123
-0.032
0.044
-14.975
-0.057
-0.042
124
-0.032
0.044
-14.975
-0.057
-0.042
125
-3.153
0.033
-25.730
-0.043
-4.099
126
-0.032
-0.217
-15.559
0.282
-0.042
127
-2.373
0.036
-23.041
-0.046
-3.085
128
-0.032
-0.152
-15.413
0.197
-0.042
129
-3.140
0.015
-19.740
-0.020
-4.082
130
-0.019
-0.235
-9.569
0.305
-0.025
201
-0.004
0.011
-4.861
-0.015
-0.005
202
-0.004
0.010
-4.166
-0.012
-0.005
203
-2.500
0.001
-12.770
-0.001
-3.251
204
-0.004
-0.199
-4.633
0.259
-0.005
205
-4.997
-0.008
-21.374
0.010
-6.496
206
-0.004
-0.408
-5.101
0.530
-0.005
207
-4.996
-0.010
-20.333
0.014
-6.495
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F26
21
Page 35
208
-0.003
-0.410
-4.059
0.534
-0.004
209
-0.032
0.046
-16.194
-0.060
-0.042
210
-0.028
0.040
-13.880
-0.051
-0.036
211
-2.524
0.031
-22.484
-0.040
-3.282
212
-0.028
-0.169
-14.347
0.220
-0.036
213
-5.021
0.022
-31.088
-0.029
-6.528
214
-0.028
-0.378
-14.815
0.491
-0.036
215
-5.014
0.012
-27.618
-0.016
-6.519
216
-0.021
-0.388
-11.345
0.504
-0.027
217
-2.512
0.040
-23.779
-0.051
-3.265
218
-0.028
-0.068
-14.314
0.089
-0.036
219
-2.505
0.030
-20.309
-0.039
-3.256
220
-0.021
-0.078
-10.844
0.102
-0.027
221
-0.045
0.062
-20.965
-0.080
-0.058
222
-0.038
0.053
-17.970
-0.069
-0.050
223
-2.535
0.044
-26.574
-0.057
-3.296
224
-0.038
-0.156
-18.437
0.203
-0.050
225
-5.032
0.035
-35.178
-0.046
-6.542
226
-0.038
-0.365
-18.904
0.474
-0.050
227
-5.022
0.022
-30.685
-0.029
-6.529
228
-0.029
-0.378
-14.412
0.491
-0.037
101
-0.002
-0.011
-2.681
0.014
-0.003
102
-0.003
-0.013
-3.031
0.017
-0.004
103
-3.108
-0.032
-13.630
0.042
-4.040
104
-0.003
-0.281
-3.221
0.365
-0.004
105
-2.332
-0.027
-10.980
0.035
-3.031
106
-0.003
-0.214
-3.173
0.278
-0.004
107
-3.107
-0.027
-12.417
0.035
-4.039
108
-0.002
-0.276
-2.008
0.359
-0.002
109
-0.022
-0.050
-9.678
0.065
-0.029
110
-0.022
-0.050
-9.678
0.065
-0.029
111
-3.127
-0.069
-20.277
0.090
-4.065
112
-0.022
-0.318
-9.868
0.413
-0.029
113
-2.351
-0.064
-17.627
0.084
-3.056
114
-0.022
-0.251
-9.820
0.326
-0.029
115
-3.118
-0.049
-16.406
0.064
-4.054
116
-0.013
-0.298
-5.997
0.387
-0.017
117
-1.190
-0.049
-14.155
0.063
-1.546
118
-0.022
-0.102
-9.773
0.133
-0.029
119
-0.898
-0.049
-13.036
0.064
-1.167
120
-0.022
-0.089
-9.749
0.116
-0.029
121
-1.181
-0.029
-10.284
0.037
-1.535
122
-0.013
-0.083
-5.902
0.107
-0.017
123
-0.031
-0.066
-12.477
0.086
-0.040
124
-0.031
-0.066
-12.477
0.086
-0.040
125
-3.136
-0.085
-23.076
0.111
-4.077
126
-0.031
-0.334
-12.667
0.434
-0.040
127
-2.360
-0.080
-20.426
0.104
-3.068
128
-0.031
-0.267
-12.619
0.347
-0.040
129
-3.124
-0.059
-18.085
0.076
-4.061
130
-0.019
-0.308
-7.676
0.400
-0.024
201
-0.004
-0.018
-4.243
0.024
-0.005
202
-0.004
-0.016
-3.637
0.020
-0.005
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F27
24
Page 36
203
-2.488
-0.031
-12.116
0.040
-3.234
204
-0.004
-0.230
-3.789
0.299
-0.005
205
-4.972
-0.046
-20.595
0.060
-6.463
206
-0.004
-0.444
-3.941
0.578
-0.005
207
-4.971
-0.042
-19.686
0.055
-6.462
208
-0.003
-0.441
-3.032
0.573
-0.004
209
-0.031
-0.070
-13.549
0.091
-0.040
210
-0.026
-0.060
-11.613
0.078
-0.034
211
-2.510
-0.075
-20.093
0.098
-3.264
212
-0.026
-0.274
-11.765
0.357
-0.034
213
-4.994
-0.090
-28.572
0.118
-6.493
214
-0.026
-0.489
-11.917
0.635
-0.034
215
-4.988
-0.075
-25.668
0.098
-6.484
216
-0.020
-0.474
-9.014
0.616
-0.026
217
-2.528
-0.057
-21.207
0.074
-3.287
218
-0.026
-0.173
-11.817
0.224
-0.034
219
-2.522
-0.042
-18.304
0.055
-3.278
220
-0.020
-0.157
-8.914
0.205
-0.026
221
-0.043
-0.092
-17.468
0.120
-0.056
222
-0.037
-0.079
-14.972
0.103
-0.048
223
-2.521
-0.094
-23.451
0.123
-3.278
224
-0.037
-0.294
-15.124
0.382
-0.048
225
-5.005
-0.110
-31.931
0.142
-6.507
226
-0.037
-0.508
-15.276
0.660
-0.048
227
-4.996
-0.090
-28.188
0.117
-6.495
228
-0.028
-0.488
-11.533
0.635
-0.036
101
-0.056
0.004
-2.514
-0.005
-0.073
102
-0.063
0.004
-2.877
-0.005
-0.082
103
-3.049
-0.017
-13.026
0.022
-3.964
104
-0.066
-0.277
-2.756
0.360
-0.086
105
-2.303
-0.012
-10.489
0.015
-2.993
106
-0.065
-0.207
-2.786
0.269
-0.085
107
-3.024
-0.019
-11.875
0.024
-3.931
108
-0.041
-0.279
-1.605
0.362
-0.053
109
-0.194
0.009
-9.769
-0.012
-0.252
110
-0.194
0.009
-9.769
-0.012
-0.252
111
-3.180
-0.012
-19.918
0.016
-4.134
112
-0.197
-0.272
-9.648
0.354
-0.256
113
-2.434
-0.007
-17.381
0.009
-3.164
114
-0.196
-0.202
-9.678
0.262
-0.255
115
-3.102
-0.016
-16.010
0.020
-4.033
116
-0.119
-0.276
-5.740
0.358
-0.155
117
-1.395
0.011
-14.400
-0.014
-1.813
118
-0.193
-0.048
-9.707
0.063
-0.250
119
-1.094
0.011
-13.242
-0.014
-1.423
120
-0.193
-0.034
-9.723
0.044
-0.251
121
-1.317
0.008
-10.492
-0.010
-1.712
122
-0.115
-0.052
-5.800
0.068
-0.150
123
-0.250
0.012
-12.671
-0.016
-0.325
124
-0.250
0.012
-12.671
-0.016
-0.325
125
-3.236
-0.009
-22.820
0.012
-4.207
126
-0.253
-0.269
-12.550
0.350
-0.329
127
-2.490
-0.004
-20.283
0.005
-3.236
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F28
25
Page 37
128
-0.252
-0.199
-12.580
0.258
-0.328
129
-3.136
-0.014
-17.751
0.018
-4.077
130
-0.153
-0.274
-7.481
0.356
-0.199
201
-0.088
0.006
-4.028
-0.007
-0.115
202
-0.076
0.005
-3.452
-0.006
-0.098
203
-2.464
-0.012
-11.571
0.016
-3.204
204
-0.078
-0.220
-3.355
0.286
-0.101
205
-4.853
-0.029
-19.691
0.037
-6.309
206
-0.080
-0.445
-3.259
0.578
-0.105
207
-4.834
-0.030
-18.828
0.039
-6.285
208
-0.061
-0.446
-2.396
0.580
-0.080
209
-0.272
0.013
-13.676
-0.016
-0.353
210
-0.233
0.011
-11.723
-0.014
-0.303
211
-2.622
-0.006
-19.842
0.008
-3.408
212
-0.235
-0.214
-11.626
0.278
-0.306
213
-5.010
-0.023
-27.961
0.030
-6.514
214
-0.238
-0.439
-11.529
0.570
-0.309
215
-4.952
-0.025
-25.030
0.033
-6.438
216
-0.179
-0.441
-8.598
0.574
-0.233
217
-2.805
0.015
-21.647
-0.020
-3.647
218
-0.230
-0.112
-11.591
0.146
-0.299
219
-2.747
0.013
-18.716
-0.016
-3.571
220
-0.172
-0.115
-8.660
0.149
-0.223
221
-0.350
0.017
-17.739
-0.022
-0.455
222
-0.300
0.014
-15.205
-0.019
-0.390
223
-2.689
-0.002
-23.324
0.003
-3.495
224
-0.302
-0.210
-15.108
0.274
-0.393
225
-5.078
-0.019
-31.443
0.025
-6.601
226
-0.305
-0.435
-15.011
0.566
-0.396
227
-5.003
-0.023
-27.642
0.030
-6.503
228
-0.230
-0.439
-11.210
0.570
-0.299
101
-0.058
-0.008
-2.519
0.010
-0.075
102
-0.065
-0.009
-2.889
0.012
-0.084
103
-2.876
-0.037
-12.449
0.048
-3.739
104
-0.062
-0.295
-3.006
0.384
-0.081
105
-2.173
-0.030
-10.059
0.039
-2.825
106
-0.063
-0.224
-2.977
0.291
-0.082
107
-2.850
-0.033
-11.293
0.043
-3.705
108
-0.036
-0.291
-1.850
0.379
-0.047
109
-0.205
-0.033
-9.922
0.043
-0.267
110
-0.205
-0.033
-9.922
0.043
-0.267
111
-3.016
-0.061
-19.482
0.079
-3.921
112
-0.202
-0.319
-10.039
0.415
-0.263
113
-2.313
-0.054
-17.092
0.070
-3.007
114
-0.203
-0.248
-10.010
0.322
-0.264
115
-2.934
-0.048
-15.513
0.062
-3.814
116
-0.120
-0.306
-6.070
0.398
-0.156
117
-1.382
-0.031
-14.450
0.040
-1.796
118
-0.206
-0.092
-9.983
0.119
-0.268
119
-1.088
-0.031
-13.318
0.041
-1.414
120
-0.206
-0.077
-9.967
0.100
-0.268
121
-1.300
-0.018
-10.481
0.023
-1.690
122
-0.124
-0.079
-6.014
0.102
-0.162
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F29
37
Page 38
123
-0.264
-0.042
-12.883
0.055
-0.343
124
-0.264
-0.042
-12.883
0.055
-0.343
125
-3.075
-0.070
-22.443
0.091
-3.998
126
-0.261
-0.328
-13.000
0.426
-0.339
127
-2.372
-0.063
-20.053
0.082
-3.084
128
-0.262
-0.257
-12.971
0.333
-0.340
129
-2.969
-0.053
-17.290
0.069
-3.860
130
-0.155
-0.311
-7.847
0.405
-0.202
201
-0.091
-0.013
-4.044
0.016
-0.118
202
-0.078
-0.011
-3.467
0.014
-0.101
203
-2.327
-0.033
-11.115
0.043
-3.025
204
-0.076
-0.240
-3.560
0.311
-0.098
205
-4.576
-0.056
-18.763
0.072
-5.948
206
-0.073
-0.468
-3.654
0.609
-0.095
207
-4.556
-0.053
-17.896
0.069
-5.923
208
-0.054
-0.466
-2.787
0.605
-0.070
209
-0.287
-0.046
-13.891
0.060
-0.373
210
-0.246
-0.040
-11.906
0.051
-0.320
211
-2.495
-0.062
-19.554
0.081
-3.243
212
-0.244
-0.268
-12.000
0.349
-0.317
213
-4.744
-0.084
-27.202
0.110
-6.167
214
-0.241
-0.497
-12.093
0.646
-0.314
215
-4.682
-0.075
-24.226
0.097
-6.087
216
-0.180
-0.487
-9.117
0.633
-0.234
217
-2.767
-0.035
-21.610
0.046
-3.598
218
-0.249
-0.166
-12.037
0.215
-0.324
219
-2.706
-0.025
-18.633
0.033
-3.518
220
-0.188
-0.156
-9.060
0.202
-0.244
221
-0.370
-0.059
-18.036
0.076
-0.480
222
-0.317
-0.050
-15.459
0.066
-0.412
223
-2.566
-0.073
-23.107
0.095
-3.335
224
-0.314
-0.279
-15.553
0.363
-0.409
225
-4.814
-0.095
-30.755
0.124
-6.259
226
-0.312
-0.508
-15.647
0.660
-0.406
227
-4.735
-0.083
-26.891
0.107
-6.156
228
-0.233
-0.495
-11.782
0.644
-0.303
101
0.061
0.003
-2.689
-0.004
0.079
102
0.067
0.003
-3.019
-0.004
0.087
103
-2.821
-0.019
6.820
0.025
-3.667
104
0.064
-0.270
-2.918
0.351
0.083
105
-2.099
-0.013
4.360
0.018
-2.729
106
0.065
-0.202
-2.943
0.262
0.084
107
-2.848
-0.020
8.028
0.026
-3.702
108
0.037
-0.271
-1.710
0.353
0.048
109
0.188
0.004
-9.289
-0.005
0.244
110
0.188
0.004
-9.289
-0.005
0.244
111
-2.700
-0.018
0.550
0.023
-3.510
112
0.185
-0.269
-9.188
0.350
0.241
113
-1.978
-0.012
-1.910
0.016
-2.571
114
0.186
-0.201
-9.213
0.261
0.241
115
-2.775
-0.020
4.266
0.025
-3.608
116
0.110
-0.271
-5.472
0.352
0.143
117
-1.013
0.001
-4.668
-0.002
-1.316
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F31
39
Page 39
118
0.187
-0.055
-9.222
0.071
0.243
119
-0.712
0.002
-5.823
-0.002
-0.926
120
0.187
-0.040
-9.238
0.052
0.243
121
-1.088
0.000
-0.953
0.001
-1.414
122
0.111
-0.056
-5.506
0.073
0.145
123
0.239
0.005
-11.930
-0.007
0.311
124
0.239
0.005
-11.930
-0.007
0.311
125
-2.649
-0.017
-2.091
0.022
-3.444
126
0.236
-0.268
-11.829
0.348
0.307
127
-1.927
-0.012
-4.551
0.015
-2.505
128
0.237
-0.200
-11.854
0.260
0.308
129
-2.745
-0.019
2.681
0.025
-3.568
130
0.140
-0.270
-7.057
0.351
0.183
201
0.094
0.004
-4.226
-0.005
0.122
202
0.080
0.004
-3.623
-0.005
0.105
203
-2.230
-0.014
4.249
0.018
-2.899
204
0.078
-0.215
-3.542
0.279
0.101
205
-4.540
-0.032
12.120
0.041
-5.903
206
0.076
-0.433
-3.461
0.563
0.098
207
-4.561
-0.032
13.025
0.042
-5.929
208
0.055
-0.434
-2.555
0.564
0.072
209
0.263
0.006
-13.004
-0.007
0.342
210
0.226
0.005
-11.147
-0.006
0.293
211
-2.085
-0.013
-3.275
0.017
-2.710
212
0.223
-0.214
-11.066
0.278
0.290
213
-4.395
-0.030
4.596
0.040
-5.714
214
0.221
-0.432
-10.985
0.562
0.287
215
-4.452
-0.032
7.382
0.041
-5.787
216
0.164
-0.433
-8.198
0.563
0.214
217
-2.347
-0.001
-1.245
0.002
-3.051
218
0.223
-0.121
-11.003
0.158
0.289
219
-2.403
-0.002
1.542
0.003
-3.124
220
0.166
-0.122
-8.216
0.159
0.216
221
0.335
0.007
-16.702
-0.009
0.435
222
0.287
0.006
-14.316
-0.008
0.373
223
-2.024
-0.012
-6.445
0.015
-2.631
224
0.284
-0.212
-14.235
0.276
0.370
225
-4.334
-0.029
1.427
0.038
-5.634
226
0.282
-0.431
-14.154
0.560
0.367
227
-4.406
-0.031
5.006
0.040
-5.727
228
0.210
-0.432
-10.575
0.562
0.273
101
-0.061
0.003
-2.701
-0.004
-0.079
102
-0.067
0.003
-3.034
-0.004
-0.087
103
-2.955
-0.020
-12.835
0.026
-3.842
104
-0.065
-0.283
-2.930
0.368
-0.085
105
-2.233
-0.014
-10.385
0.019
-2.903
106
-0.065
-0.212
-2.956
0.275
-0.085
107
-2.928
-0.021
-11.621
0.028
-3.807
108
-0.038
-0.284
-1.716
0.369
-0.050
109
-0.189
0.007
-9.356
-0.009
-0.246
110
-0.189
0.007
-9.356
-0.009
-0.246
111
-3.077
-0.016
-19.157
0.021
-4.000
112
-0.187
-0.279
-9.252
0.363
-0.243
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 40
113
-2.355
-0.010
-16.707
0.013
-3.062
114
-0.188
-0.208
-9.278
0.270
-0.244
115
-3.001
-0.019
-15.414
0.024
-3.902
116
-0.111
-0.282
-5.509
0.366
-0.145
117
-1.390
0.010
-13.977
-0.013
-1.806
118
-0.188
-0.052
-9.289
0.067
-0.244
119
-1.089
0.009
-12.821
-0.012
-1.416
120
-0.188
-0.037
-9.306
0.048
-0.244
121
-1.314
0.007
-10.234
-0.009
-1.708
122
-0.112
-0.055
-5.547
0.071
-0.146
123
-0.240
0.008
-12.019
-0.010
-0.312
124
-0.240
0.008
-12.019
-0.010
-0.312
125
-3.128
-0.015
-21.820
0.020
-4.066
126
-0.238
-0.278
-11.915
0.361
-0.309
127
-2.406
-0.009
-19.370
0.012
-3.128
128
-0.239
-0.207
-11.941
0.268
-0.310
129
-3.032
-0.018
-17.012
0.024
-3.942
130
-0.142
-0.281
-7.107
0.366
-0.185
201
-0.094
0.004
-4.247
-0.005
-0.122
202
-0.080
0.004
-3.641
-0.005
-0.105
203
-2.391
-0.015
-11.481
0.019
-3.108
204
-0.079
-0.225
-3.557
0.293
-0.102
205
-4.701
-0.033
-19.322
0.043
-6.112
206
-0.077
-0.454
-3.474
0.590
-0.100
207
-4.681
-0.034
-18.412
0.044
-6.085
208
-0.057
-0.455
-2.564
0.591
-0.074
209
-0.265
0.010
-13.098
-0.013
-0.344
210
-0.227
0.008
-11.227
-0.011
-0.295
211
-2.537
-0.010
-19.068
0.013
-3.298
212
-0.225
-0.220
-11.144
0.287
-0.293
213
-4.848
-0.028
-26.909
0.037
-6.302
214
-0.224
-0.449
-11.061
0.584
-0.291
215
-4.791
-0.031
-24.102
0.040
-6.228
216
-0.167
-0.451
-8.254
0.587
-0.217
217
-2.799
0.014
-21.128
-0.019
-3.639
218
-0.224
-0.118
-11.084
0.153
-0.291
219
-2.743
0.012
-18.322
-0.016
-3.565
220
-0.167
-0.120
-8.278
0.156
-0.217
221
-0.336
0.011
-16.826
-0.015
-0.437
222
-0.288
0.010
-14.423
-0.012
-0.374
223
-2.598
-0.009
-22.263
0.011
-3.378
224
-0.286
-0.219
-14.339
0.285
-0.372
225
-4.909
-0.027
-30.104
0.035
-6.381
226
-0.285
-0.448
-14.256
0.582
-0.370
227
-4.837
-0.030
-26.499
0.038
-6.288
228
-0.213
-0.450
-10.651
0.586
-0.277
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 41
3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
Ft.Name
F21 p
F22 p
L.Comb.
Fx
Fy
Fz
Mx
My
C.G. of Loads
101
0.002
0.016
-4.358
-0.021
0.003
375.0 , 375.0
102
0.003
0.019
-4.877
-0.025
0.004
375.0 , 375.0
103
-3.118
0.000
5.747
0.000
-4.053
375.0 , 375.0
104
0.003
-0.225
-5.512
0.293
0.004
375.0 , 375.0
105
-2.338
0.005
3.091
-0.006
-3.039
375.0 , 375.0
106
0.003
-0.164
-5.353
0.213
0.004
375.0 , 375.0
107
-3.119
-0.008
7.698
0.010
-4.055
375.0 , 375.0
108
0.002
-0.233
-3.561
0.302
0.002
375.0 , 375.0
109
0.022
0.083
-14.735
-0.108
0.029
375.0 , 375.0
110
0.022
0.083
-14.735
-0.108
0.029
375.0 , 375.0
111
-3.099
0.064
-4.111
-0.083
-4.029
375.0 , 375.0
112
0.022
-0.161
-15.370
0.209
0.029
375.0 , 375.0
113
-2.319
0.069
-6.767
-0.089
-3.014
375.0 , 375.0
114
0.022
-0.100
-15.211
0.130
0.029
375.0 , 375.0
115
-3.108
0.031
1.783
-0.040
-4.040
375.0 , 375.0
116
0.013
-0.194
-9.476
0.252
0.017
375.0 , 375.0
117
-1.137
0.084
-10.132
-0.109
-1.478
375.0 , 375.0
118
0.022
0.033
-14.982
-0.043
0.029
375.0 , 375.0
119
-0.847
0.084
-11.283
-0.109
-1.102
375.0 , 375.0
120
0.022
0.046
-14.920
-0.059
0.029
375.0 , 375.0
121
-1.146
0.051
-4.238
-0.066
-1.490
375.0 , 375.0
122
0.013
0.000
-9.088
0.000
0.017
375.0 , 375.0
123
0.030
0.110
-18.885
-0.143
0.039
375.0 , 375.0
124
0.030
0.110
-18.885
-0.143
0.039
375.0 , 375.0
125
-3.091
0.091
-8.261
-0.118
-4.018
375.0 , 375.0
126
0.030
-0.134
-19.520
0.174
0.039
375.0 , 375.0
127
-2.311
0.096
-10.917
-0.124
-3.004
375.0 , 375.0
128
0.030
-0.073
-19.361
0.095
0.039
375.0 , 375.0
129
-3.103
0.047
-0.707
-0.061
-4.034
375.0 , 375.0
130
0.018
-0.178
-11.966
0.231
0.023
375.0 , 375.0
101
0.002
-0.013
-3.372
0.017
0.003
375.0 , 375.0
102
0.003
-0.016
-3.686
0.021
0.004
375.0 , 375.0
103
-3.102
-0.031
6.872
0.040
-4.033
375.0 , 375.0
104
0.003
-0.269
-3.832
0.350
0.004
375.0 , 375.0
105
-2.326
-0.027
4.233
0.035
-3.023
375.0 , 375.0
106
0.003
-0.206
-3.795
0.267
0.004
375.0 , 375.0
107
-3.103
-0.025
8.347
0.032
-4.034
375.0 , 375.0
108
0.002
-0.263
-2.357
0.341
0.002
375.0 , 375.0
109
0.023
-0.066
-9.647
0.086
0.030
375.0 , 375.0
110
0.023
-0.066
-9.647
0.086
0.030
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
111
F23 p
-3.082
-0.081
0.911
0.105
112
0.023
-0.319
-9.793
113
-2.306
-0.077
-1.728
114
0.023
-0.256
115
-3.091
116
117
118
119
Page 42
-4.007
375.0 , 375.0
0.415
0.030
375.0 , 375.0
0.100
-2.997
375.0 , 375.0
-9.756
0.332
0.030
375.0 , 375.0
-0.055
4.770
0.071
-4.019
375.0 , 375.0
0.014
-0.293
-5.934
0.380
0.018
375.0 , 375.0
-1.145
-0.067
-5.163
0.087
-1.488
375.0 , 375.0
0.023
-0.119
-9.725
0.154
0.030
375.0 , 375.0
-0.853
-0.067
-6.284
0.086
-1.109
375.0 , 375.0
120
0.023
-0.105
-9.705
0.137
0.030
375.0 , 375.0
121
-1.154
-0.040
-1.304
0.052
-1.500
375.0 , 375.0
122
0.014
-0.092
-5.866
0.120
0.018
375.0 , 375.0
123
0.031
-0.087
-12.156
0.113
0.040
375.0 , 375.0
124
0.031
-0.087
-12.156
0.113
0.040
375.0 , 375.0
125
-3.074
-0.102
-1.598
0.133
-3.996
375.0 , 375.0
126
0.031
-0.340
-12.302
0.442
0.040
375.0 , 375.0
127
-2.298
-0.098
-4.237
0.128
-2.987
375.0 , 375.0
128
0.031
-0.277
-12.265
0.360
0.040
375.0 , 375.0
129
-3.086
-0.067
3.265
0.087
-4.012
375.0 , 375.0
130
0.019
-0.305
-7.439
0.397
0.024
375.0 , 375.0
101
0.057
0.005
-3.419
-0.006
0.074
375.0 , 375.0
102
0.064
0.005
-3.778
-0.006
0.083
375.0 , 375.0
103
-2.923
-0.014
6.410
0.018
-3.800
375.0 , 375.0
104
0.055
-0.263
-3.621
0.342
0.072
375.0 , 375.0
105
-2.176
-0.009
3.863
0.012
-2.829
375.0 , 375.0
106
0.057
-0.196
-3.660
0.255
0.074
375.0 , 375.0
107
-2.949
-0.016
7.921
0.021
-3.833
375.0 , 375.0
108
0.029
-0.265
-2.110
0.345
0.038
375.0 , 375.0
109
0.199
0.015
-10.607
-0.019
0.259
375.0 , 375.0
110
0.199
0.015
-10.607
-0.019
0.259
375.0 , 375.0
111
-2.788
-0.004
-0.419
0.005
-3.624
375.0 , 375.0
112
0.190
-0.253
-10.450
0.329
0.247
375.0 , 375.0
113
-2.041
0.001
-2.966
-0.001
-2.654
375.0 , 375.0
114
0.192
-0.186
-10.489
0.242
0.250
375.0 , 375.0
115
-2.868
-0.010
3.824
0.013
-3.728
375.0 , 375.0
116
0.110
-0.259
-6.207
0.337
0.144
375.0 , 375.0
117
-1.002
0.014
-5.975
-0.018
-1.302
375.0 , 375.0
118
0.198
-0.042
-10.543
0.055
0.257
375.0 , 375.0
119
-0.701
0.014
-7.133
-0.018
-0.912
375.0 , 375.0
120
0.198
-0.028
-10.559
0.036
0.257
375.0 , 375.0
121
-1.081
0.008
-1.732
-0.010
-1.405
375.0 , 375.0
122
0.118
-0.048
-6.300
0.063
0.153
375.0 , 375.0
123
0.256
0.018
-13.483
-0.023
0.333
375.0 , 375.0
124
0.256
0.018
-13.483
-0.023
0.333
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
125
F24 p
F25 p
-2.731
-0.001
-3.295
126
0.247
-0.250
-13.326
127
-1.984
0.004
-5.842
128
0.249
-0.183
-13.365
129
-2.833
-0.008
130
0.145
101
0.057
102
103
Page 43
-3.550
375.0 , 375.0
0.325
0.321
375.0 , 375.0
-0.005
-2.580
375.0 , 375.0
0.238
0.324
375.0 , 375.0
2.098
0.011
-3.683
375.0 , 375.0
-0.257
-7.933
0.334
0.188
375.0 , 375.0
-0.009
-3.457
0.012
0.074
375.0 , 375.0
0.064
-0.010
-3.831
0.013
0.083
375.0 , 375.0
-2.746
-0.025
5.691
0.033
-3.570
375.0 , 375.0
104
0.073
-0.283
-3.981
0.368
0.095
375.0 , 375.0
105
-2.043
-0.021
3.311
0.028
-2.657
375.0 , 375.0
106
0.071
-0.215
-3.943
0.279
0.092
375.0 , 375.0
107
-2.772
-0.021
7.224
0.027
-3.603
375.0 , 375.0
108
0.047
-0.279
-2.448
0.363
0.062
375.0 , 375.0
109
0.200
-0.037
-10.941
0.048
0.260
375.0 , 375.0
110
0.200
-0.037
-10.941
0.048
0.260
375.0 , 375.0
111
-2.610
-0.052
-1.419
0.068
-3.393
375.0 , 375.0
112
0.209
-0.310
-11.091
0.403
0.272
375.0 , 375.0
113
-1.907
-0.048
-3.799
0.063
-2.480
375.0 , 375.0
114
0.207
-0.242
-11.053
0.314
0.269
375.0 , 375.0
115
-2.690
-0.037
2.958
0.048
-3.497
375.0 , 375.0
116
0.129
-0.295
-6.714
0.384
0.168
375.0 , 375.0
117
-0.977
-0.038
-6.413
0.050
-1.270
375.0 , 375.0
118
0.201
-0.096
-11.004
0.125
0.262
375.0 , 375.0
119
-0.683
-0.038
-7.545
0.049
-0.887
375.0 , 375.0
120
0.201
-0.081
-10.988
0.105
0.261
375.0 , 375.0
121
-1.057
-0.024
-2.037
0.031
-1.374
375.0 , 375.0
122
0.121
-0.081
-6.627
0.105
0.158
375.0 , 375.0
123
0.258
-0.048
-13.935
0.062
0.335
375.0 , 375.0
124
0.258
-0.048
-13.935
0.062
0.335
375.0 , 375.0
125
-2.552
-0.063
-4.413
0.082
-3.318
375.0 , 375.0
126
0.267
-0.321
-14.085
0.417
0.347
375.0 , 375.0
127
-1.849
-0.059
-6.793
0.077
-2.404
375.0 , 375.0
128
0.265
-0.253
-14.047
0.329
0.344
375.0 , 375.0
129
-2.655
-0.044
1.161
0.057
-3.452
375.0 , 375.0
130
0.164
-0.302
-8.511
0.392
0.213
375.0 , 375.0
101
-0.002
0.007
-3.966
-0.009
-0.003
375.0 , 375.0
102
-0.003
0.008
-4.392
-0.010
-0.004
375.0 , 375.0
103
-3.124
-0.003
-15.147
0.004
-4.061
375.0 , 375.0
104
-0.003
-0.253
-4.976
0.329
-0.004
375.0 , 375.0
105
-2.344
0.000
-12.458
0.000
-3.047
375.0 , 375.0
106
-0.003
-0.188
-4.830
0.244
-0.004
375.0 , 375.0
107
-3.123
-0.006
-13.390
0.008
-4.060
375.0 , 375.0
108
-0.002
-0.256
-3.219
0.333
-0.002
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F26 p
Page 44
109
-0.023
0.033
-12.487
-0.043
-0.030
375.0 , 375.0
110
-0.023
0.033
-12.487
-0.043
-0.030
375.0 , 375.0
111
-3.144
0.022
-23.242
-0.029
-4.087
375.0 , 375.0
112
-0.023
-0.228
-13.071
0.296
-0.030
375.0 , 375.0
113
-2.364
0.025
-20.553
-0.032
-3.073
375.0 , 375.0
114
-0.023
-0.163
-12.925
0.212
-0.030
375.0 , 375.0
115
-3.135
0.009
-18.247
-0.011
-4.075
375.0 , 375.0
116
-0.014
-0.241
-8.076
0.314
-0.018
375.0 , 375.0
117
-1.182
0.033
-17.106
-0.043
-1.537
375.0 , 375.0
118
-0.023
-0.017
-12.689
0.023
-0.030
375.0 , 375.0
119
-0.892
0.033
-15.951
-0.043
-1.160
375.0 , 375.0
120
-0.023
-0.005
-12.639
0.006
-0.030
375.0 , 375.0
121
-1.173
0.020
-12.111
-0.026
-1.525
375.0 , 375.0
122
-0.014
-0.031
-7.694
0.040
-0.018
375.0 , 375.0
123
-0.032
0.044
-15.895
-0.057
-0.042
375.0 , 375.0
124
-0.032
0.044
-15.895
-0.057
-0.042
375.0 , 375.0
125
-3.153
0.033
-26.650
-0.043
-4.099
375.0 , 375.0
126
-0.032
-0.217
-16.479
0.282
-0.042
375.0 , 375.0
127
-2.373
0.036
-23.961
-0.046
-3.085
375.0 , 375.0
128
-0.032
-0.152
-16.333
0.197
-0.042
375.0 , 375.0
129
-3.140
0.015
-20.292
-0.020
-4.082
375.0 , 375.0
130
-0.019
-0.235
-10.121
0.305
-0.025
375.0 , 375.0
101
-0.002
-0.011
-3.601
0.014
-0.003
375.0 , 375.0
102
-0.003
-0.013
-3.951
0.017
-0.004
375.0 , 375.0
103
-3.108
-0.032
-14.550
0.042
-4.040
375.0 , 375.0
104
-0.003
-0.281
-4.141
0.365
-0.004
375.0 , 375.0
105
-2.332
-0.027
-11.900
0.035
-3.031
375.0 , 375.0
106
-0.003
-0.214
-4.093
0.278
-0.004
375.0 , 375.0
107
-3.107
-0.027
-12.969
0.035
-4.039
375.0 , 375.0
108
-0.002
-0.276
-2.560
0.359
-0.002
375.0 , 375.0
109
-0.022
-0.050
-10.598
0.065
-0.029
375.0 , 375.0
110
-0.022
-0.050
-10.598
0.065
-0.029
375.0 , 375.0
111
-3.127
-0.069
-21.197
0.090
-4.065
375.0 , 375.0
112
-0.022
-0.318
-10.788
0.413
-0.029
375.0 , 375.0
113
-2.351
-0.064
-18.547
0.084
-3.056
375.0 , 375.0
114
-0.022
-0.251
-10.740
0.326
-0.029
375.0 , 375.0
115
-3.118
-0.049
-16.958
0.064
-4.054
375.0 , 375.0
116
-0.013
-0.298
-6.549
0.387
-0.017
375.0 , 375.0
117
-1.190
-0.049
-15.075
0.063
-1.546
375.0 , 375.0
118
-0.022
-0.102
-10.693
0.133
-0.029
375.0 , 375.0
119
-0.898
-0.049
-13.956
0.064
-1.167
375.0 , 375.0
120
-0.022
-0.089
-10.669
0.116
-0.029
375.0 , 375.0
121
-1.181
-0.029
-10.836
0.037
-1.535
375.0 , 375.0
122
-0.013
-0.083
-6.454
0.107
-0.017
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F27 p
F28 p
Page 45
123
-0.031
-0.066
-13.397
0.086
-0.040
375.0 , 375.0
124
-0.031
-0.066
-13.397
0.086
-0.040
375.0 , 375.0
125
-3.136
-0.085
-23.996
0.111
-4.077
375.0 , 375.0
126
-0.031
-0.334
-13.587
0.434
-0.040
375.0 , 375.0
127
-2.360
-0.080
-21.346
0.104
-3.068
375.0 , 375.0
128
-0.031
-0.267
-13.539
0.347
-0.040
375.0 , 375.0
129
-3.124
-0.059
-18.637
0.076
-4.061
375.0 , 375.0
130
-0.019
-0.308
-8.228
0.400
-0.024
375.0 , 375.0
101
-0.056
0.004
-3.434
-0.005
-0.073
375.0 , 375.0
102
-0.063
0.004
-3.797
-0.005
-0.082
375.0 , 375.0
103
-3.049
-0.017
-13.946
0.022
-3.964
375.0 , 375.0
104
-0.066
-0.277
-3.676
0.360
-0.086
375.0 , 375.0
105
-2.303
-0.012
-11.409
0.015
-2.993
375.0 , 375.0
106
-0.065
-0.207
-3.706
0.269
-0.085
375.0 , 375.0
107
-3.024
-0.019
-12.427
0.024
-3.931
375.0 , 375.0
108
-0.041
-0.279
-2.157
0.362
-0.053
375.0 , 375.0
109
-0.194
0.009
-10.689
-0.012
-0.252
375.0 , 375.0
110
-0.194
0.009
-10.689
-0.012
-0.252
375.0 , 375.0
111
-3.180
-0.012
-20.838
0.016
-4.134
375.0 , 375.0
112
-0.197
-0.272
-10.568
0.354
-0.256
375.0 , 375.0
113
-2.434
-0.007
-18.301
0.009
-3.164
375.0 , 375.0
114
-0.196
-0.202
-10.598
0.262
-0.255
375.0 , 375.0
115
-3.102
-0.016
-16.562
0.020
-4.033
375.0 , 375.0
116
-0.119
-0.276
-6.292
0.358
-0.155
375.0 , 375.0
117
-1.395
0.011
-15.320
-0.014
-1.813
375.0 , 375.0
118
-0.193
-0.048
-10.627
0.063
-0.250
375.0 , 375.0
119
-1.094
0.011
-14.162
-0.014
-1.423
375.0 , 375.0
120
-0.193
-0.034
-10.643
0.044
-0.251
375.0 , 375.0
121
-1.317
0.008
-11.044
-0.010
-1.712
375.0 , 375.0
122
-0.115
-0.052
-6.352
0.068
-0.149
375.0 , 375.0
123
-0.250
0.012
-13.591
-0.016
-0.325
375.0 , 375.0
124
-0.250
0.012
-13.591
-0.016
-0.325
375.0 , 375.0
125
-3.236
-0.009
-23.740
0.012
-4.207
375.0 , 375.0
126
-0.253
-0.269
-13.470
0.350
-0.329
375.0 , 375.0
127
-2.490
-0.004
-21.203
0.005
-3.236
375.0 , 375.0
128
-0.252
-0.199
-13.500
0.258
-0.328
375.0 , 375.0
129
-3.136
-0.014
-18.303
0.018
-4.077
375.0 , 375.0
130
-0.153
-0.274
-8.033
0.356
-0.199
375.0 , 375.0
101
-0.058
-0.008
-3.439
0.010
-0.075
375.0 , 375.0
102
-0.065
-0.009
-3.809
0.012
-0.084
375.0 , 375.0
103
-2.876
-0.037
-13.369
0.048
-3.739
375.0 , 375.0
104
-0.062
-0.295
-3.926
0.384
-0.081
375.0 , 375.0
105
-2.173
-0.030
-10.979
0.039
-2.825
375.0 , 375.0
106
-0.063
-0.224
-3.897
0.291
-0.082
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F29 p
107
-2.850
-0.033
108
-0.036
109
-0.205
110
Page 46
-11.845
0.043
-3.705
375.0 , 375.0
-0.291
-2.402
0.379
-0.047
375.0 , 375.0
-0.033
-10.842
0.043
-0.266
375.0 , 375.0
-0.205
-0.033
-10.842
0.043
-0.266
375.0 , 375.0
111
-3.016
-0.061
-20.402
0.079
-3.921
375.0 , 375.0
112
-0.202
-0.319
-10.959
0.415
-0.263
375.0 , 375.0
113
-2.313
-0.054
-18.012
0.070
-3.007
375.0 , 375.0
114
-0.203
-0.248
-10.930
0.322
-0.264
375.0 , 375.0
115
-2.934
-0.048
-16.065
0.062
-3.814
375.0 , 375.0
116
-0.120
-0.306
-6.622
0.398
-0.156
375.0 , 375.0
117
-1.382
-0.031
-15.370
0.040
-1.796
375.0 , 375.0
118
-0.206
-0.092
-10.903
0.119
-0.268
375.0 , 375.0
119
-1.088
-0.031
-14.238
0.041
-1.414
375.0 , 375.0
120
-0.206
-0.077
-10.887
0.100
-0.268
375.0 , 375.0
121
-1.300
-0.018
-11.033
0.023
-1.690
375.0 , 375.0
122
-0.124
-0.079
-6.566
0.102
-0.162
375.0 , 375.0
123
-0.264
-0.042
-13.803
0.055
-0.343
375.0 , 375.0
124
-0.264
-0.042
-13.803
0.055
-0.343
375.0 , 375.0
125
-3.075
-0.070
-23.363
0.091
-3.998
375.0 , 375.0
126
-0.261
-0.328
-13.920
0.426
-0.339
375.0 , 375.0
127
-2.372
-0.063
-20.973
0.082
-3.084
375.0 , 375.0
128
-0.262
-0.257
-13.891
0.333
-0.340
375.0 , 375.0
129
-2.969
-0.053
-17.842
0.069
-3.860
375.0 , 375.0
130
-0.155
-0.311
-8.399
0.405
-0.202
375.0 , 375.0
101
0.061
0.003
-3.609
-0.004
0.079
375.0 , 375.0
102
0.067
0.003
-3.939
-0.004
0.087
375.0 , 375.0
103
-2.821
-0.019
5.900
0.025
-3.667
375.0 , 375.0
104
0.064
-0.270
-3.838
0.351
0.083
375.0 , 375.0
105
-2.099
-0.013
3.440
0.018
-2.729
375.0 , 375.0
106
0.065
-0.202
-3.863
0.262
0.084
375.0 , 375.0
107
-2.848
-0.020
7.476
0.026
-3.702
375.0 , 375.0
108
0.037
-0.271
-2.262
0.353
0.048
375.0 , 375.0
109
0.188
0.004
-10.209
-0.005
0.244
375.0 , 375.0
110
0.188
0.004
-10.209
-0.005
0.244
375.0 , 375.0
111
-2.700
-0.018
-0.370
0.023
-3.510
375.0 , 375.0
112
0.185
-0.269
-10.108
0.350
0.241
375.0 , 375.0
113
-1.978
-0.012
-2.830
0.016
-2.571
375.0 , 375.0
114
0.186
-0.201
-10.133
0.261
0.241
375.0 , 375.0
115
-2.775
-0.020
3.714
0.025
-3.608
375.0 , 375.0
116
0.110
-0.271
-6.024
0.352
0.143
375.0 , 375.0
117
-1.013
0.001
-5.588
-0.002
-1.316
375.0 , 375.0
118
0.187
-0.055
-10.142
0.071
0.243
375.0 , 375.0
119
-0.712
0.002
-6.743
-0.002
-0.926
375.0 , 375.0
120
0.187
-0.040
-10.158
0.052
0.243
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F31 p
121
-1.088
0.000
122
0.111
-0.056
123
0.239
0.005
124
0.239
0.005
125
-2.649
126
127
128
129
-1.505
Page 47
0.001
-1.414
375.0 , 375.0
-6.058
0.073
0.145
375.0 , 375.0
-12.850
-0.006
0.311
375.0 , 375.0
-12.850
-0.006
0.311
375.0 , 375.0
-0.017
-3.011
0.022
-3.444
375.0 , 375.0
0.236
-0.268
-12.749
0.348
0.307
375.0 , 375.0
-1.927
-0.012
-5.471
0.015
-2.505
375.0 , 375.0
0.237
-0.200
-12.774
0.260
0.308
375.0 , 375.0
-2.745
-0.019
2.129
0.025
-3.568
375.0 , 375.0
130
0.140
-0.270
-7.609
0.351
0.183
375.0 , 375.0
101
-0.061
0.003
-3.621
-0.004
-0.079
375.0 , 375.0
102
-0.067
0.003
-3.954
-0.004
-0.087
375.0 , 375.0
103
-2.955
-0.020
-13.755
0.026
-3.842
375.0 , 375.0
104
-0.065
-0.283
-3.850
0.368
-0.084
375.0 , 375.0
105
-2.233
-0.014
-11.305
0.019
-2.903
375.0 , 375.0
106
-0.065
-0.212
-3.876
0.275
-0.085
375.0 , 375.0
107
-2.928
-0.021
-12.173
0.028
-3.807
375.0 , 375.0
108
-0.038
-0.284
-2.268
0.369
-0.050
375.0 , 375.0
109
-0.189
0.007
-10.276
-0.009
-0.246
375.0 , 375.0
110
-0.189
0.007
-10.276
-0.009
-0.246
375.0 , 375.0
111
-3.077
-0.016
-20.077
0.021
-4.000
375.0 , 375.0
112
-0.187
-0.279
-10.172
0.363
-0.243
375.0 , 375.0
113
-2.355
-0.010
-17.627
0.013
-3.062
375.0 , 375.0
114
-0.188
-0.208
-10.198
0.270
-0.244
375.0 , 375.0
115
-3.001
-0.019
-15.966
0.024
-3.902
375.0 , 375.0
116
-0.111
-0.282
-6.061
0.366
-0.145
375.0 , 375.0
117
-1.390
0.010
-14.897
-0.013
-1.806
375.0 , 375.0
118
-0.188
-0.052
-10.209
0.067
-0.244
375.0 , 375.0
119
-1.089
0.009
-13.741
-0.012
-1.416
375.0 , 375.0
120
-0.188
-0.037
-10.226
0.048
-0.244
375.0 , 375.0
121
-1.314
0.007
-10.786
-0.009
-1.708
375.0 , 375.0
122
-0.112
-0.055
-6.099
0.071
-0.146
375.0 , 375.0
123
-0.240
0.008
-12.939
-0.010
-0.312
375.0 , 375.0
124
-0.240
0.008
-12.939
-0.010
-0.312
375.0 , 375.0
125
-3.128
-0.015
-22.740
0.020
-4.066
375.0 , 375.0
126
-0.238
-0.278
-12.835
0.361
-0.309
375.0 , 375.0
127
-2.406
-0.009
-20.290
0.012
-3.128
375.0 , 375.0
128
-0.239
-0.207
-12.861
0.268
-0.310
375.0 , 375.0
129
-3.032
-0.018
-17.564
0.024
-3.942
375.0 , 375.0
130
-0.142
-0.281
-7.659
0.366
-0.185
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 48
Ft.Name
F21 p
Sec.Na
L.Comb.
Fx
Fy
Fz
Mx
My
C.G. of Loads
201
0.004
0.027
-5.540
-0.035
0.005
375.0 , 375.0
202
0.004
0.023
-4.748
-0.030
0.005
375.0 , 375.0
203
-2.493
0.008
3.751
-0.010
-3.241
375.0 , 375.0
204
0.004
-0.172
-5.256
0.224
0.005
375.0 , 375.0
205
-4.990
-0.008
12.250
0.010
-6.487
375.0 , 375.0
206
0.004
-0.368
-5.764
0.478
0.005
375.0 , 375.0
207
-4.991
-0.013
13.437
0.017
-6.488
375.0 , 375.0
208
0.003
-0.373
-4.577
0.485
0.004
375.0 , 375.0
209
0.031
0.116
-19.341
-0.151
0.040
375.0 , 375.0
210
0.026
0.100
-16.578
-0.129
0.034
375.0 , 375.0
211
-2.470
0.084
-8.079
-0.110
-3.212
375.0 , 375.0
212
0.026
-0.096
-17.086
0.124
0.034
375.0 , 375.0
213
-4.967
0.069
0.421
-0.090
-6.457
375.0 , 375.0
214
0.026
-0.291
-17.594
0.378
0.034
375.0 , 375.0
215
-4.974
0.044
4.565
-0.058
-6.466
375.0 , 375.0
216
0.020
-0.316
-13.449
0.410
0.026
375.0 , 375.0
217
-2.458
0.101
-6.715
-0.131
-3.195
375.0 , 375.0
218
0.026
-0.007
-17.107
0.009
0.034
375.0 , 375.0
219
-2.464
0.076
-2.571
-0.099
-3.203
375.0 , 375.0
220
0.020
-0.032
-12.963
0.041
0.026
375.0 , 375.0
221
0.042
0.154
-25.151
-0.200
0.055
375.0 , 375.0
222
0.036
0.132
-21.558
-0.172
0.047
375.0 , 375.0
223
-2.461
0.117
-13.059
-0.152
-3.199
375.0 , 375.0
224
0.036
-0.063
-22.066
0.082
0.047
375.0 , 375.0
225
-4.958
0.102
-4.559
-0.132
-6.445
375.0 , 375.0
226
0.036
-0.258
-22.574
0.336
0.047
375.0 , 375.0
227
-4.967
0.069
0.830
-0.089
-6.457
375.0 , 375.0
228
0.027
-0.291
-17.184
0.379
0.035
375.0 , 375.0
201
0.004
-0.022
-3.872
0.029
0.005
375.0 , 375.0
202
0.004
-0.019
-3.319
0.025
0.005
375.0 , 375.0
203
-2.480
-0.031
5.127
0.041
-3.225
375.0 , 375.0
204
0.004
-0.222
-3.436
0.288
0.005
375.0 , 375.0
205
-4.964
-0.043
13.574
0.056
-6.454
375.0 , 375.0
206
0.004
-0.424
-3.553
0.551
0.005
375.0 , 375.0
207
-4.965
-0.038
14.404
0.050
-6.455
375.0 , 375.0
208
0.003
-0.419
-2.723
0.545
0.004
375.0 , 375.0
209
0.032
-0.092
-12.218
0.120
0.042
375.0 , 375.0
210
0.028
-0.079
-10.472
0.103
0.036
375.0 , 375.0
211
-2.456
-0.091
-2.026
0.119
-3.193
375.0 , 375.0
212
0.028
-0.282
-10.589
0.366
0.036
375.0 , 375.0
213
-4.940
-0.103
6.421
0.134
-6.423
375.0 , 375.0
S1
F22 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F23 p
F24 p
214
0.028
-0.484
215
-4.947
216
0.021
217
Page 49
-10.706
0.629
0.036
375.0 , 375.0
-0.083
9.039
0.108
-6.431
375.0 , 375.0
-0.464
-8.088
0.603
0.027
375.0 , 375.0
-2.474
-0.081
-0.863
0.105
-3.217
375.0 , 375.0
218
0.028
-0.192
-10.639
0.249
0.036
375.0 , 375.0
219
-2.481
-0.061
1.755
0.079
-3.226
375.0 , 375.0
220
0.021
-0.172
-8.021
0.223
0.027
375.0 , 375.0
221
0.043
-0.122
-15.730
0.158
0.056
375.0 , 375.0
222
0.037
-0.104
-13.483
0.136
0.048
375.0 , 375.0
223
-2.447
-0.116
-5.037
0.151
-3.181
375.0 , 375.0
224
0.037
-0.307
-13.600
0.399
0.048
375.0 , 375.0
225
-4.931
-0.128
3.410
0.167
-6.410
375.0 , 375.0
226
0.037
-0.509
-13.717
0.662
0.048
375.0 , 375.0
227
-4.940
-0.102
6.781
0.133
-6.422
375.0 , 375.0
228
0.028
-0.483
-10.346
0.628
0.036
375.0 , 375.0
201
0.090
0.007
-4.001
-0.009
0.116
375.0 , 375.0
202
0.077
0.006
-3.429
-0.008
0.100
375.0 , 375.0
203
-2.313
-0.009
4.721
0.012
-3.007
375.0 , 375.0
204
0.070
-0.208
-3.304
0.271
0.090
375.0 , 375.0
205
-4.702
-0.024
12.871
0.032
-6.113
375.0 , 375.0
206
0.062
-0.423
-3.178
0.550
0.081
375.0 , 375.0
207
-4.722
-0.026
13.729
0.034
-6.138
375.0 , 375.0
208
0.043
-0.424
-2.321
0.552
0.056
375.0 , 375.0
209
0.279
0.021
-13.562
-0.027
0.362
375.0 , 375.0
210
0.239
0.018
-11.624
-0.023
0.310
375.0 , 375.0
211
-2.151
0.003
-3.474
-0.004
-2.796
375.0 , 375.0
212
0.232
-0.196
-11.499
0.255
0.301
375.0 , 375.0
213
-4.540
-0.012
4.677
0.016
-5.903
375.0 , 375.0
214
0.224
-0.411
-11.373
0.534
0.292
375.0 , 375.0
215
-4.600
-0.017
7.583
0.022
-5.980
375.0 , 375.0
216
0.165
-0.415
-8.467
0.540
0.214
375.0 , 375.0
217
-2.334
0.015
-1.699
-0.020
-3.034
375.0 , 375.0
218
0.236
-0.105
-11.488
0.137
0.307
375.0 , 375.0
219
-2.393
0.010
1.207
-0.014
-3.111
375.0 , 375.0
220
0.176
-0.110
-8.582
0.142
0.229
375.0 , 375.0
221
0.358
0.025
-17.588
-0.033
0.466
375.0 , 375.0
222
0.307
0.022
-15.075
-0.028
0.399
375.0 , 375.0
223
-2.082
0.006
-6.925
-0.008
-2.707
375.0 , 375.0
224
0.300
-0.193
-14.950
0.251
0.390
375.0 , 375.0
225
-4.472
-0.009
1.225
0.011
-5.814
375.0 , 375.0
226
0.293
-0.407
-14.824
0.529
0.381
375.0 , 375.0
227
-4.549
-0.014
4.994
0.018
-5.913
375.0 , 375.0
228
0.216
-0.413
-11.055
0.536
0.281
375.0 , 375.0
201
0.090
-0.014
-4.075
0.018
0.116
375.0 , 375.0
S1
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F25 p
S1
202
0.077
-0.012
203
-2.171
204
0.084
205
Page 50
-3.493
0.016
0.100
375.0 , 375.0
-0.024
4.125
0.031
-2.823
375.0 , 375.0
-0.230
-3.613
0.300
0.109
375.0 , 375.0
-4.419
-0.036
11.742
0.047
-5.745
375.0 , 375.0
206
0.091
-0.449
-3.733
0.583
0.119
375.0 , 375.0
207
-4.438
-0.033
12.615
0.043
-5.770
375.0 , 375.0
208
0.072
-0.446
-2.860
0.580
0.094
375.0 , 375.0
209
0.280
-0.052
-14.029
0.067
0.364
375.0 , 375.0
210
0.240
-0.044
-12.025
0.058
0.312
375.0 , 375.0
211
-2.008
-0.056
-4.407
0.073
-2.610
375.0 , 375.0
212
0.247
-0.263
-12.145
0.342
0.321
375.0 , 375.0
213
-4.256
-0.068
3.210
0.089
-5.533
375.0 , 375.0
214
0.254
-0.481
-12.265
0.626
0.331
375.0 , 375.0
215
-4.316
-0.057
6.216
0.074
-5.611
375.0 , 375.0
216
0.194
-0.470
-9.259
0.611
0.253
375.0 , 375.0
217
-2.281
-0.047
-2.323
0.062
-2.966
375.0 , 375.0
218
0.243
-0.170
-12.160
0.222
0.316
375.0 , 375.0
219
-2.342
-0.036
0.683
0.047
-3.044
375.0 , 375.0
220
0.183
-0.159
-9.154
0.207
0.238
375.0 , 375.0
221
0.361
-0.067
-18.221
0.087
0.470
375.0 , 375.0
222
0.310
-0.058
-15.618
0.075
0.402
375.0 , 375.0
223
-1.938
-0.070
-8.000
0.090
-2.520
375.0 , 375.0
224
0.317
-0.276
-15.738
0.359
0.412
375.0 , 375.0
225
-4.186
-0.082
-0.383
0.106
-5.442
375.0 , 375.0
226
0.324
-0.494
-15.858
0.643
0.421
375.0 , 375.0
227
-4.264
-0.067
3.522
0.087
-5.543
375.0 , 375.0
228
0.247
-0.480
-11.953
0.624
0.321
375.0 , 375.0
201
-0.004
0.011
-4.861
-0.015
-0.005
375.0 , 375.0
202
-0.004
0.010
-4.166
-0.012
-0.005
375.0 , 375.0
203
-2.500
0.001
-12.770
-0.001
-3.251
375.0 , 375.0
204
-0.004
-0.199
-4.633
0.259
-0.005
375.0 , 375.0
205
-4.997
-0.008
-21.374
0.010
-6.496
375.0 , 375.0
206
-0.004
-0.408
-5.101
0.530
-0.005
375.0 , 375.0
207
-4.996
-0.010
-20.333
0.014
-6.495
375.0 , 375.0
208
-0.003
-0.410
-4.059
0.534
-0.004
375.0 , 375.0
209
-0.032
0.046
-16.194
-0.060
-0.042
375.0 , 375.0
210
-0.028
0.040
-13.880
-0.051
-0.036
375.0 , 375.0
211
-2.524
0.031
-22.484
-0.040
-3.282
375.0 , 375.0
212
-0.028
-0.169
-14.347
0.220
-0.036
375.0 , 375.0
213
-5.021
0.022
-31.088
-0.029
-6.528
375.0 , 375.0
214
-0.028
-0.378
-14.815
0.491
-0.036
375.0 , 375.0
215
-5.014
0.012
-27.618
-0.016
-6.519
375.0 , 375.0
216
-0.021
-0.388
-11.345
0.504
-0.027
375.0 , 375.0
217
-2.512
0.040
-23.779
-0.051
-3.265
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F26 p
218
-0.028
219
220
Page 51
-0.068
-14.314
0.089
-0.036
375.0 , 375.0
-2.505
0.030
-20.309
-0.039
-3.256
375.0 , 375.0
-0.021
-0.078
-10.844
0.102
-0.027
375.0 , 375.0
221
-0.045
0.062
-20.965
-0.080
-0.058
375.0 , 375.0
222
-0.038
0.053
-17.970
-0.069
-0.050
375.0 , 375.0
223
-2.535
0.044
-26.574
-0.057
-3.296
375.0 , 375.0
224
-0.038
-0.156
-18.437
0.203
-0.050
375.0 , 375.0
225
-5.032
0.035
-35.178
-0.046
-6.542
375.0 , 375.0
226
-0.038
-0.365
-18.904
0.474
-0.050
375.0 , 375.0
227
-5.022
0.022
-30.685
-0.029
-6.529
375.0 , 375.0
228
-0.029
-0.378
-14.412
0.491
-0.037
375.0 , 375.0
201
-0.004
-0.018
-4.243
0.024
-0.005
375.0 , 375.0
202
-0.004
-0.016
-3.637
0.020
-0.005
375.0 , 375.0
203
-2.488
-0.031
-12.116
0.040
-3.234
375.0 , 375.0
204
-0.004
-0.230
-3.789
0.299
-0.005
375.0 , 375.0
205
-4.972
-0.046
-20.595
0.060
-6.463
375.0 , 375.0
206
-0.004
-0.444
-3.941
0.578
-0.005
375.0 , 375.0
207
-4.971
-0.042
-19.686
0.055
-6.462
375.0 , 375.0
208
-0.003
-0.441
-3.032
0.573
-0.004
375.0 , 375.0
209
-0.031
-0.070
-13.549
0.091
-0.040
375.0 , 375.0
210
-0.026
-0.060
-11.613
0.078
-0.034
375.0 , 375.0
211
-2.510
-0.075
-20.093
0.098
-3.264
375.0 , 375.0
212
-0.026
-0.274
-11.765
0.357
-0.034
375.0 , 375.0
213
-4.994
-0.090
-28.572
0.118
-6.493
375.0 , 375.0
214
-0.026
-0.489
-11.917
0.635
-0.034
375.0 , 375.0
215
-4.988
-0.075
-25.668
0.098
-6.484
375.0 , 375.0
216
-0.020
-0.474
-9.014
0.616
-0.026
375.0 , 375.0
217
-2.528
-0.057
-21.207
0.074
-3.287
375.0 , 375.0
218
-0.026
-0.173
-11.817
0.224
-0.034
375.0 , 375.0
219
-2.522
-0.042
-18.304
0.055
-3.278
375.0 , 375.0
220
-0.020
-0.157
-8.914
0.205
-0.026
375.0 , 375.0
221
-0.043
-0.092
-17.468
0.120
-0.056
375.0 , 375.0
222
-0.037
-0.079
-14.972
0.103
-0.048
375.0 , 375.0
223
-2.521
-0.094
-23.451
0.123
-3.278
375.0 , 375.0
224
-0.037
-0.294
-15.124
0.382
-0.048
375.0 , 375.0
225
-5.005
-0.110
-31.931
0.142
-6.507
375.0 , 375.0
226
-0.037
-0.508
-15.276
0.660
-0.048
375.0 , 375.0
227
-4.996
-0.090
-28.188
0.117
-6.495
375.0 , 375.0
228
-0.028
-0.488
-11.533
0.635
-0.036
375.0 , 375.0
201
-0.088
0.006
-4.028
-0.007
-0.115
375.0 , 375.0
202
-0.076
0.005
-3.452
-0.006
-0.098
375.0 , 375.0
203
-2.464
-0.012
-11.571
0.016
-3.204
375.0 , 375.0
204
-0.078
-0.220
-3.355
0.286
-0.101
375.0 , 375.0
205
-4.853
-0.029
-19.691
0.037
-6.309
375.0 , 375.0
S1
F27 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F28 p
S1
Page 52
206
-0.080
-0.445
-3.259
0.578
-0.105
375.0 , 375.0
207
-4.834
-0.030
-18.828
0.039
-6.285
375.0 , 375.0
208
-0.061
-0.446
-2.396
0.580
-0.080
375.0 , 375.0
209
-0.272
0.013
-13.676
-0.016
-0.353
375.0 , 375.0
210
-0.233
0.011
-11.723
-0.014
-0.303
375.0 , 375.0
211
-2.622
-0.006
-19.842
0.008
-3.408
375.0 , 375.0
212
-0.235
-0.214
-11.626
0.278
-0.306
375.0 , 375.0
213
-5.010
-0.023
-27.961
0.030
-6.514
375.0 , 375.0
214
-0.238
-0.439
-11.529
0.570
-0.309
375.0 , 375.0
215
-4.952
-0.025
-25.030
0.033
-6.438
375.0 , 375.0
216
-0.179
-0.441
-8.598
0.574
-0.233
375.0 , 375.0
217
-2.805
0.015
-21.647
-0.020
-3.647
375.0 , 375.0
218
-0.230
-0.112
-11.591
0.146
-0.299
375.0 , 375.0
219
-2.747
0.013
-18.716
-0.016
-3.571
375.0 , 375.0
220
-0.172
-0.115
-8.660
0.149
-0.223
375.0 , 375.0
221
-0.350
0.017
-17.739
-0.022
-0.455
375.0 , 375.0
222
-0.300
0.014
-15.205
-0.019
-0.390
375.0 , 375.0
223
-2.689
-0.002
-23.324
0.003
-3.495
375.0 , 375.0
224
-0.302
-0.210
-15.108
0.274
-0.393
375.0 , 375.0
225
-5.078
-0.019
-31.443
0.025
-6.601
375.0 , 375.0
226
-0.305
-0.435
-15.011
0.566
-0.396
375.0 , 375.0
227
-5.003
-0.023
-27.642
0.030
-6.503
375.0 , 375.0
228
-0.230
-0.439
-11.210
0.570
-0.299
375.0 , 375.0
201
-0.091
-0.013
-4.044
0.016
-0.118
375.0 , 375.0
202
-0.078
-0.011
-3.467
0.014
-0.101
375.0 , 375.0
203
-2.327
-0.033
-11.115
0.043
-3.025
375.0 , 375.0
204
-0.076
-0.240
-3.560
0.311
-0.098
375.0 , 375.0
205
-4.576
-0.056
-18.763
0.072
-5.948
375.0 , 375.0
206
-0.073
-0.468
-3.654
0.609
-0.095
375.0 , 375.0
207
-4.556
-0.053
-17.896
0.069
-5.923
375.0 , 375.0
208
-0.054
-0.466
-2.787
0.605
-0.070
375.0 , 375.0
209
-0.287
-0.046
-13.891
0.060
-0.373
375.0 , 375.0
210
-0.246
-0.040
-11.906
0.051
-0.320
375.0 , 375.0
211
-2.495
-0.062
-19.554
0.081
-3.243
375.0 , 375.0
212
-0.244
-0.268
-12.000
0.349
-0.317
375.0 , 375.0
213
-4.744
-0.084
-27.202
0.110
-6.167
375.0 , 375.0
214
-0.241
-0.497
-12.093
0.646
-0.314
375.0 , 375.0
215
-4.682
-0.075
-24.226
0.097
-6.087
375.0 , 375.0
216
-0.180
-0.487
-9.117
0.633
-0.234
375.0 , 375.0
217
-2.767
-0.035
-21.610
0.046
-3.598
375.0 , 375.0
218
-0.249
-0.166
-12.037
0.215
-0.324
375.0 , 375.0
219
-2.706
-0.025
-18.633
0.033
-3.518
375.0 , 375.0
220
-0.188
-0.156
-9.060
0.202
-0.244
375.0 , 375.0
221
-0.370
-0.059
-18.036
0.076
-0.480
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F29 p
Page 53
222
-0.317
-0.050
-15.459
0.066
-0.412
375.0 , 375.0
223
-2.566
-0.073
-23.107
0.095
-3.335
375.0 , 375.0
224
-0.314
-0.279
-15.553
0.363
-0.409
375.0 , 375.0
225
-4.814
-0.095
-30.755
0.124
-6.259
375.0 , 375.0
226
-0.312
-0.508
-15.647
0.660
-0.406
375.0 , 375.0
227
-4.735
-0.083
-26.891
0.107
-6.156
375.0 , 375.0
228
-0.233
-0.495
-11.782
0.644
-0.303
375.0 , 375.0
201
0.094
0.004
-4.226
-0.005
0.122
375.0 , 375.0
202
0.080
0.004
-3.623
-0.005
0.105
375.0 , 375.0
203
-2.230
-0.014
4.249
0.018
-2.899
375.0 , 375.0
204
0.078
-0.215
-3.542
0.279
0.101
375.0 , 375.0
205
-4.540
-0.032
12.120
0.041
-5.903
375.0 , 375.0
206
0.076
-0.433
-3.461
0.563
0.098
375.0 , 375.0
207
-4.561
-0.032
13.025
0.042
-5.929
375.0 , 375.0
208
0.055
-0.434
-2.555
0.564
0.072
375.0 , 375.0
209
0.263
0.006
-13.004
-0.007
0.342
375.0 , 375.0
210
0.226
0.005
-11.147
-0.006
0.293
375.0 , 375.0
211
-2.085
-0.013
-3.275
0.017
-2.710
375.0 , 375.0
212
0.223
-0.214
-11.066
0.278
0.290
375.0 , 375.0
213
-4.395
-0.030
4.596
0.040
-5.714
375.0 , 375.0
214
0.221
-0.432
-10.985
0.562
0.287
375.0 , 375.0
215
-4.452
-0.032
7.382
0.041
-5.787
375.0 , 375.0
216
0.164
-0.433
-8.198
0.563
0.214
375.0 , 375.0
217
-2.347
-0.001
-1.245
0.002
-3.051
375.0 , 375.0
218
0.223
-0.121
-11.003
0.158
0.289
375.0 , 375.0
219
-2.403
-0.002
1.542
0.003
-3.124
375.0 , 375.0
220
0.166
-0.122
-8.216
0.159
0.216
375.0 , 375.0
221
0.335
0.007
-16.702
-0.009
0.435
375.0 , 375.0
222
0.287
0.006
-14.316
-0.008
0.373
375.0 , 375.0
223
-2.024
-0.012
-6.445
0.015
-2.631
375.0 , 375.0
224
0.284
-0.212
-14.235
0.276
0.370
375.0 , 375.0
225
-4.334
-0.029
1.427
0.038
-5.634
375.0 , 375.0
226
0.282
-0.431
-14.154
0.560
0.367
375.0 , 375.0
227
-4.406
-0.031
5.006
0.040
-5.727
375.0 , 375.0
228
0.210
-0.432
-10.575
0.562
0.273
375.0 , 375.0
201
-0.094
0.004
-4.247
-0.005
-0.122
375.0 , 375.0
202
-0.080
0.004
-3.641
-0.005
-0.105
375.0 , 375.0
203
-2.391
-0.015
-11.481
0.019
-3.108
375.0 , 375.0
204
-0.079
-0.225
-3.557
0.293
-0.102
375.0 , 375.0
205
-4.701
-0.033
-19.322
0.043
-6.112
375.0 , 375.0
206
-0.077
-0.454
-3.474
0.590
-0.100
375.0 , 375.0
207
-4.681
-0.034
-18.412
0.044
-6.085
375.0 , 375.0
208
-0.057
-0.455
-2.564
0.591
-0.074
375.0 , 375.0
209
-0.265
0.010
-13.098
-0.013
-0.344
375.0 , 375.0
S1
F31 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 54
210
-0.227
0.008
-11.227
-0.011
-0.295
375.0 , 375.0
211
-2.537
-0.010
-19.068
0.013
-3.298
375.0 , 375.0
212
-0.225
-0.220
-11.144
0.287
-0.293
375.0 , 375.0
213
-4.848
-0.028
-26.909
0.037
-6.302
375.0 , 375.0
214
-0.224
-0.449
-11.061
0.584
-0.291
375.0 , 375.0
215
-4.791
-0.031
-24.102
0.040
-6.228
375.0 , 375.0
216
-0.167
-0.451
-8.254
0.587
-0.217
375.0 , 375.0
217
-2.799
0.014
-21.128
-0.019
-3.639
375.0 , 375.0
218
-0.224
-0.118
-11.084
0.153
-0.291
375.0 , 375.0
219
-2.743
0.012
-18.322
-0.016
-3.565
375.0 , 375.0
220
-0.167
-0.120
-8.278
0.156
-0.217
375.0 , 375.0
221
-0.336
0.011
-16.826
-0.015
-0.437
375.0 , 375.0
222
-0.288
0.010
-14.423
-0.012
-0.374
375.0 , 375.0
223
-2.598
-0.009
-22.263
0.011
-3.378
375.0 , 375.0
224
-0.286
-0.219
-14.339
0.285
-0.372
375.0 , 375.0
225
-4.909
-0.027
-30.104
0.035
-6.381
375.0 , 375.0
226
-0.285
-0.448
-14.256
0.582
-0.370
375.0 , 375.0
227
-4.837
-0.030
-26.499
0.038
-6.288
375.0 , 375.0
228
-0.213
-0.450
-10.651
0.586
-0.277
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 55
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Uni-Axial)
4.1.1 Formula
if footing is checked in Buoyancy Fz means Fz - Fb
Fz
My X
Fz
- Uni Axial : Rx =
, Ry =
2
Np
Np
Xi
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va -> OK
Max(Hxi , Hyi)
b. Horizontal - Hmax =
< Ha -> OK
Np
c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift
Mx Y
2
Yi
Np(EA)
Fl (mm)
Fw (mm)
Xi (m )
Yi (m )
F21
750
750
F22
750
750
F23
750
750
F24
750
750
F25
750
750
F26
750
750
F27
750
750
F28
750
750
F29
750
750
F31
750
750
Unit( tonf )
Ft.Name
F21
F22
F23
F24
F25
F26
F27
F28
F29
L.Comb.
124
124
124
124
125
125
125
125
124
Pile
PS-12
D.300 12M
PS-12
D.300 12M
PS-12
D.300 12M
PS-12
D.300 12M
PS-12
D.300 12M
PS-12
D.300 12M
PS-12
D.300 12M
R Max
R Min
X-Dir
18.885
18.885
Y-Dir
18.885
18.885
X-Dir
12.156
12.156
Y-Dir
12.156
12.156
X-Dir
13.483
13.483
Y-Dir
13.483
13.483
X-Dir
13.935
13.935
Y-Dir
13.935
13.935
X-Dir
26.65
26.65
Y-Dir
26.65
26.65
X-Dir
23.996
23.996
Y-Dir
23.996
23.996
X-Dir
23.74
23.74
Y-Dir
23.74
23.74
PS-12
D.300 12M
X-Dir
23.363
23.363
Y-Dir
23.363
23.363
PS-12
X-Dir
12.85
12.85
Ru
Uf
Ra
Ua
Result
18.885
58.022
13.4
OK
12.156
58.022
13.4
OK
13.483
58.022
13.4
OK
13.935
58.022
13.4
OK
26.65
77.361
17.866
OK
23.996
77.361
17.866
OK
23.74
77.361
17.866
OK
23.363
77.361
17.866
OK
12.85
58.022
13.4
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F31
125
PS-12
D.300 12M
Y-Dir
12.85
12.85
X-Dir
22.74
22.74
Y-Dir
22.74
22.74
22.74
77.361
Page 56
17.866
L.Comb.
Pile
Hmax (tonf)
Ha (tonf)
Result
F21
107
PS-12
D.300 12M
3.119
5.333
OK
F22
107
PS-12
D.300 12M
3.103
5.333
OK
F23
107
PS-12
D.300 12M
2.949
5.333
OK
F24
107
PS-12
D.300 12M
2.772
5.333
OK
F25
125
PS-12
D.300 12M
3.153
5.333
OK
F26
125
PS-12
D.300 12M
3.136
5.333
OK
F27
125
PS-12
D.300 12M
3.236
5.333
OK
F28
125
PS-12
D.300 12M
3.075
5.333
OK
F29
107
PS-12
D.300 12M
2.848
5.333
OK
F31
125
PS-12
D.300 12M
3.128
5.333
OK
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 57
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
5.1.1 Data
Ft.Name
Sec.Na
Dir.
F21 p
S1
S1
L.Comb.
Fl or Fw
Sl or Sw
Fz
201
750.00
750.00
5.540
0.01
5.540
202
750.00
750.00
4.748
0.00
4.748
203
750.00
750.00
-3.751
-3.24
-3.751
204
750.00
750.00
5.256
0.00
5.256
205
750.00
750.00
-12.250
-6.49
-12.250
206
750.00
750.00
5.764
0.00
5.764
207
750.00
750.00
-13.437
-6.49
-13.437
208
750.00
750.00
4.577
0.00
4.577
209
750.00
750.00
19.341
0.04
19.341
210
750.00
750.00
16.578
0.03
16.578
211
750.00
750.00
8.079
-3.21
8.079
212
750.00
750.00
17.086
0.03
17.086
213
750.00
750.00
-0.421
-6.46
-0.421
214
750.00
750.00
17.594
0.03
17.594
215
750.00
750.00
-4.565
-6.47
-4.565
216
750.00
750.00
13.449
0.03
13.449
217
750.00
750.00
6.715
-3.19
6.715
218
750.00
750.00
17.107
0.03
17.107
219
750.00
750.00
2.571
-3.20
2.571
220
750.00
750.00
12.963
0.03
12.963
221
750.00
750.00
25.151
0.05
25.151
222
750.00
750.00
21.558
0.05
21.558
223
750.00
750.00
13.059
-3.20
13.059
224
750.00
750.00
22.066
0.05
22.066
225
750.00
750.00
4.559
-6.44
4.559
226
750.00
750.00
22.574
0.05
22.574
227
750.00
750.00
-0.830
-6.46
-0.830
228
750.00
750.00
17.184
0.04
17.184
201
750.00
750.00
5.540
-0.035
5.540
202
750.00
750.00
4.748
-0.030
4.748
203
750.00
750.00
-3.751
-0.010
-3.751
204
750.00
750.00
5.256
0.224
5.256
205
750.00
750.00
-12.250
0.010
-12.250
206
750.00
750.00
5.764
0.478
5.764
207
750.00
750.00
-13.437
0.017
-13.437
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F22 p
S1
Page 58
208
750.00
750.00
4.577
0.485
4.577
209
750.00
750.00
19.341
-0.151
19.341
210
750.00
750.00
16.578
-0.129
16.578
211
750.00
750.00
8.079
-0.110
8.079
212
750.00
750.00
17.086
0.124
17.086
213
750.00
750.00
-0.421
-0.090
-0.421
214
750.00
750.00
17.594
0.378
17.594
215
750.00
750.00
-4.565
-0.058
-4.565
216
750.00
750.00
13.449
0.410
13.449
217
750.00
750.00
6.715
-0.131
6.715
218
750.00
750.00
17.107
0.009
17.107
219
750.00
750.00
2.571
-0.099
2.571
220
750.00
750.00
12.963
0.041
12.963
221
750.00
750.00
25.151
-0.200
25.151
222
750.00
750.00
21.558
-0.172
21.558
223
750.00
750.00
13.059
-0.152
13.059
224
750.00
750.00
22.066
0.082
22.066
225
750.00
750.00
4.559
-0.132
4.559
226
750.00
750.00
22.574
0.336
22.574
227
750.00
750.00
-0.830
-0.089
-0.830
228
750.00
750.00
17.184
0.379
17.184
201
750.00
750.00
3.872
0.01
3.872
202
750.00
750.00
3.319
0.00
3.319
203
750.00
750.00
-5.127
-3.22
-5.127
204
750.00
750.00
3.436
0.00
3.436
205
750.00
750.00
-13.574
-6.45
-13.574
206
750.00
750.00
3.553
0.00
3.553
207
750.00
750.00
-14.404
-6.45
-14.404
208
750.00
750.00
2.723
0.00
2.723
209
750.00
750.00
12.218
0.04
12.218
210
750.00
750.00
10.472
0.04
10.472
211
750.00
750.00
2.026
-3.19
2.026
212
750.00
750.00
10.589
0.04
10.589
213
750.00
750.00
-6.421
-6.42
-6.421
214
750.00
750.00
10.706
0.04
10.706
215
750.00
750.00
-9.039
-6.43
-9.039
216
750.00
750.00
8.088
0.03
8.088
217
750.00
750.00
0.863
-3.22
0.863
218
750.00
750.00
10.639
0.04
10.639
219
750.00
750.00
-1.755
-3.23
-1.755
220
750.00
750.00
8.021
0.03
8.021
221
750.00
750.00
15.730
0.06
15.730
222
750.00
750.00
13.483
0.05
13.483
223
750.00
750.00
5.037
-3.18
5.037
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
750.00
750.00
225
750.00
226
750.00
227
Page 59
13.600
0.05
13.600
750.00
-3.410
-6.41
-3.410
750.00
13.717
0.05
13.717
750.00
750.00
-6.781
-6.42
-6.781
228
750.00
750.00
10.346
0.04
10.346
201
750.00
750.00
3.872
0.029
3.872
202
750.00
750.00
3.319
0.025
3.319
203
750.00
750.00
-5.127
0.041
-5.127
204
750.00
750.00
3.436
0.288
3.436
205
750.00
750.00
-13.574
0.056
-13.574
206
750.00
750.00
3.553
0.551
3.553
207
750.00
750.00
-14.404
0.050
-14.404
208
750.00
750.00
2.723
0.545
2.723
209
750.00
750.00
12.218
0.120
12.218
210
750.00
750.00
10.472
0.103
10.472
211
750.00
750.00
2.026
0.119
2.026
212
750.00
750.00
10.589
0.366
10.589
213
750.00
750.00
-6.421
0.134
-6.421
214
750.00
750.00
10.706
0.629
10.706
215
750.00
750.00
-9.039
0.108
-9.039
216
750.00
750.00
8.088
0.603
8.088
217
750.00
750.00
0.863
0.105
0.863
218
750.00
750.00
10.639
0.249
10.639
219
750.00
750.00
-1.755
0.079
-1.755
220
750.00
750.00
8.021
0.223
8.021
221
750.00
750.00
15.730
0.158
15.730
222
750.00
750.00
13.483
0.136
13.483
223
750.00
750.00
5.037
0.151
5.037
224
750.00
750.00
13.600
0.399
13.600
225
750.00
750.00
-3.410
0.167
-3.410
226
750.00
750.00
13.717
0.662
13.717
227
750.00
750.00
-6.781
0.133
-6.781
228
750.00
750.00
10.346
0.628
10.346
201
750.00
750.00
4.001
0.12
4.001
202
750.00
750.00
3.429
0.10
3.429
203
750.00
750.00
-4.721
-3.01
-4.721
204
750.00
750.00
3.304
0.09
3.304
205
750.00
750.00
-12.871
-6.11
-12.871
206
750.00
750.00
3.178
0.08
3.178
207
750.00
750.00
-13.729
-6.14
-13.729
208
750.00
750.00
2.321
0.06
2.321
209
750.00
750.00
13.562
0.36
13.562
210
750.00
750.00
11.624
0.31
11.624
211
750.00
750.00
3.474
-2.80
3.474
F23 p
S1
224
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
212
750.00
750.00
213
750.00
214
750.00
215
Page 60
11.499
0.30
11.499
750.00
-4.677
-5.90
-4.677
750.00
11.373
0.29
11.373
750.00
750.00
-7.583
-5.98
-7.583
216
750.00
750.00
8.467
0.21
8.467
217
750.00
750.00
1.699
-3.03
1.699
218
750.00
750.00
11.488
0.31
11.488
219
750.00
750.00
-1.207
-3.11
-1.207
220
750.00
750.00
8.582
0.23
8.582
221
750.00
750.00
17.588
0.47
17.588
222
750.00
750.00
15.075
0.40
15.075
223
750.00
750.00
6.925
-2.71
6.925
224
750.00
750.00
14.950
0.39
14.950
225
750.00
750.00
-1.225
-5.81
-1.225
226
750.00
750.00
14.824
0.38
14.824
227
750.00
750.00
-4.994
-5.91
-4.994
228
750.00
750.00
11.055
0.28
11.055
201
750.00
750.00
4.001
-0.009
4.001
202
750.00
750.00
3.429
-0.008
3.429
203
750.00
750.00
-4.721
0.012
-4.721
204
750.00
750.00
3.304
0.271
3.304
205
750.00
750.00
-12.871
0.032
-12.871
206
750.00
750.00
3.178
0.550
3.178
207
750.00
750.00
-13.729
0.034
-13.729
208
750.00
750.00
2.321
0.552
2.321
209
750.00
750.00
13.562
-0.027
13.562
210
750.00
750.00
11.624
-0.023
11.624
211
750.00
750.00
3.474
-0.004
3.474
212
750.00
750.00
11.499
0.255
11.499
213
750.00
750.00
-4.677
0.016
-4.677
214
750.00
750.00
11.373
0.534
11.373
215
750.00
750.00
-7.583
0.022
-7.583
216
750.00
750.00
8.467
0.540
8.467
217
750.00
750.00
1.699
-0.020
1.699
218
750.00
750.00
11.488
0.137
11.488
219
750.00
750.00
-1.207
-0.014
-1.207
220
750.00
750.00
8.582
0.142
8.582
221
750.00
750.00
17.588
-0.033
17.588
222
750.00
750.00
15.075
-0.028
15.075
223
750.00
750.00
6.925
-0.008
6.925
224
750.00
750.00
14.950
0.251
14.950
225
750.00
750.00
-1.225
0.011
-1.225
226
750.00
750.00
14.824
0.529
14.824
227
750.00
750.00
-4.994
0.018
-4.994
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F24 p
S1
S1
Page 61
228
750.00
750.00
11.055
0.536
11.055
201
750.00
750.00
4.075
0.12
4.075
202
750.00
750.00
3.493
0.10
3.493
203
750.00
750.00
-4.125
-2.82
-4.125
204
750.00
750.00
3.613
0.11
3.613
205
750.00
750.00
-11.742
-5.74
-11.742
206
750.00
750.00
3.733
0.12
3.733
207
750.00
750.00
-12.615
-5.77
-12.615
208
750.00
750.00
2.860
0.09
2.860
209
750.00
750.00
14.029
0.36
14.029
210
750.00
750.00
12.025
0.31
12.025
211
750.00
750.00
4.407
-2.61
4.407
212
750.00
750.00
12.145
0.32
12.145
213
750.00
750.00
-3.210
-5.53
-3.210
214
750.00
750.00
12.265
0.33
12.265
215
750.00
750.00
-6.216
-5.61
-6.216
216
750.00
750.00
9.259
0.25
9.259
217
750.00
750.00
2.323
-2.97
2.323
218
750.00
750.00
12.160
0.32
12.160
219
750.00
750.00
-0.683
-3.04
-0.683
220
750.00
750.00
9.154
0.24
9.154
221
750.00
750.00
18.221
0.47
18.221
222
750.00
750.00
15.618
0.40
15.618
223
750.00
750.00
8.000
-2.52
8.000
224
750.00
750.00
15.738
0.41
15.738
225
750.00
750.00
0.383
-5.44
0.383
226
750.00
750.00
15.858
0.42
15.858
227
750.00
750.00
-3.522
-5.54
-3.522
228
750.00
750.00
11.953
0.32
11.953
201
750.00
750.00
4.075
0.018
4.075
202
750.00
750.00
3.493
0.016
3.493
203
750.00
750.00
-4.125
0.031
-4.125
204
750.00
750.00
3.613
0.300
3.613
205
750.00
750.00
-11.742
0.047
-11.742
206
750.00
750.00
3.733
0.583
3.733
207
750.00
750.00
-12.615
0.043
-12.615
208
750.00
750.00
2.860
0.580
2.860
209
750.00
750.00
14.029
0.067
14.029
210
750.00
750.00
12.025
0.058
12.025
211
750.00
750.00
4.407
0.073
4.407
212
750.00
750.00
12.145
0.342
12.145
213
750.00
750.00
-3.210
0.089
-3.210
214
750.00
750.00
12.265
0.626
12.265
215
750.00
750.00
-6.216
0.074
-6.216
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F25 p
S1
S1
216
750.00
750.00
217
750.00
218
750.00
219
Page 62
9.259
0.611
9.259
750.00
2.323
0.062
2.323
750.00
12.160
0.222
12.160
750.00
750.00
-0.683
0.047
-0.683
220
750.00
750.00
9.154
0.207
9.154
221
750.00
750.00
18.221
0.087
18.221
222
750.00
750.00
15.618
0.075
15.618
223
750.00
750.00
8.000
0.090
8.000
224
750.00
750.00
15.738
0.359
15.738
225
750.00
750.00
0.383
0.106
0.383
226
750.00
750.00
15.858
0.643
15.858
227
750.00
750.00
-3.522
0.087
-3.522
228
750.00
750.00
11.953
0.624
11.953
201
750.00
750.00
4.861
-0.01
4.861
202
750.00
750.00
4.166
0.00
4.166
203
750.00
750.00
12.770
-3.25
12.770
204
750.00
750.00
4.633
0.00
4.633
205
750.00
750.00
21.374
-6.50
21.374
206
750.00
750.00
5.101
0.00
5.101
207
750.00
750.00
20.333
-6.50
20.333
208
750.00
750.00
4.059
0.00
4.059
209
750.00
750.00
16.194
-0.04
16.194
210
750.00
750.00
13.880
-0.04
13.880
211
750.00
750.00
22.484
-3.28
22.484
212
750.00
750.00
14.347
-0.04
14.347
213
750.00
750.00
31.088
-6.53
31.088
214
750.00
750.00
14.815
-0.04
14.815
215
750.00
750.00
27.618
-6.52
27.618
216
750.00
750.00
11.345
-0.03
11.345
217
750.00
750.00
23.779
-3.27
23.779
218
750.00
750.00
14.314
-0.04
14.314
219
750.00
750.00
20.309
-3.26
20.309
220
750.00
750.00
10.844
-0.03
10.844
221
750.00
750.00
20.965
-0.06
20.965
222
750.00
750.00
17.970
-0.05
17.970
223
750.00
750.00
26.574
-3.30
26.574
224
750.00
750.00
18.437
-0.05
18.437
225
750.00
750.00
35.178
-6.54
35.178
226
750.00
750.00
18.904
-0.05
18.904
227
750.00
750.00
30.685
-6.53
30.685
228
750.00
750.00
14.412
-0.04
14.412
201
750.00
750.00
4.861
-0.015
4.861
202
750.00
750.00
4.166
-0.012
4.166
203
750.00
750.00
12.770
-0.001
12.770
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F26 p
S1
Page 63
204
750.00
750.00
4.633
0.259
4.633
205
750.00
750.00
21.374
0.010
21.374
206
750.00
750.00
5.101
0.530
5.101
207
750.00
750.00
20.333
0.014
20.333
208
750.00
750.00
4.059
0.534
4.059
209
750.00
750.00
16.194
-0.060
16.194
210
750.00
750.00
13.880
-0.051
13.880
211
750.00
750.00
22.484
-0.040
22.484
212
750.00
750.00
14.347
0.220
14.347
213
750.00
750.00
31.088
-0.029
31.088
214
750.00
750.00
14.815
0.491
14.815
215
750.00
750.00
27.618
-0.016
27.618
216
750.00
750.00
11.345
0.504
11.345
217
750.00
750.00
23.779
-0.051
23.779
218
750.00
750.00
14.314
0.089
14.314
219
750.00
750.00
20.309
-0.039
20.309
220
750.00
750.00
10.844
0.102
10.844
221
750.00
750.00
20.965
-0.080
20.965
222
750.00
750.00
17.970
-0.069
17.970
223
750.00
750.00
26.574
-0.057
26.574
224
750.00
750.00
18.437
0.203
18.437
225
750.00
750.00
35.178
-0.046
35.178
226
750.00
750.00
18.904
0.474
18.904
227
750.00
750.00
30.685
-0.029
30.685
228
750.00
750.00
14.412
0.491
14.412
201
750.00
750.00
4.243
-0.01
4.243
202
750.00
750.00
3.637
0.00
3.637
203
750.00
750.00
12.116
-3.23
12.116
204
750.00
750.00
3.789
0.00
3.789
205
750.00
750.00
20.595
-6.46
20.595
206
750.00
750.00
3.941
0.00
3.941
207
750.00
750.00
19.686
-6.46
19.686
208
750.00
750.00
3.032
0.00
3.032
209
750.00
750.00
13.549
-0.04
13.549
210
750.00
750.00
11.613
-0.03
11.613
211
750.00
750.00
20.093
-3.26
20.093
212
750.00
750.00
11.765
-0.03
11.765
213
750.00
750.00
28.572
-6.49
28.572
214
750.00
750.00
11.917
-0.03
11.917
215
750.00
750.00
25.668
-6.48
25.668
216
750.00
750.00
9.014
-0.03
9.014
217
750.00
750.00
21.207
-3.29
21.207
218
750.00
750.00
11.817
-0.03
11.817
219
750.00
750.00
18.304
-3.28
18.304
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 64
220
750.00
750.00
8.914
-0.03
8.914
221
750.00
750.00
17.468
-0.06
17.468
222
750.00
750.00
14.972
-0.05
14.972
223
750.00
750.00
23.451
-3.28
23.451
224
750.00
750.00
15.124
-0.05
15.124
225
750.00
750.00
31.931
-6.51
31.931
226
750.00
750.00
15.276
-0.05
15.276
227
750.00
750.00
28.188
-6.49
28.188
228
750.00
750.00
11.533
-0.04
11.533
201
750.00
750.00
4.243
0.024
4.243
202
750.00
750.00
3.637
0.020
3.637
203
750.00
750.00
12.116
0.040
12.116
204
750.00
750.00
3.789
0.299
3.789
205
750.00
750.00
20.595
0.060
20.595
206
750.00
750.00
3.941
0.578
3.941
207
750.00
750.00
19.686
0.055
19.686
208
750.00
750.00
3.032
0.573
3.032
209
750.00
750.00
13.549
0.091
13.549
210
750.00
750.00
11.613
0.078
11.613
211
750.00
750.00
20.093
0.098
20.093
212
750.00
750.00
11.765
0.357
11.765
213
750.00
750.00
28.572
0.118
28.572
214
750.00
750.00
11.917
0.635
11.917
215
750.00
750.00
25.668
0.098
25.668
216
750.00
750.00
9.014
0.616
9.014
217
750.00
750.00
21.207
0.074
21.207
218
750.00
750.00
11.817
0.224
11.817
219
750.00
750.00
18.304
0.055
18.304
220
750.00
750.00
8.914
0.205
8.914
221
750.00
750.00
17.468
0.120
17.468
222
750.00
750.00
14.972
0.103
14.972
223
750.00
750.00
23.451
0.123
23.451
224
750.00
750.00
15.124
0.382
15.124
225
750.00
750.00
31.931
0.142
31.931
226
750.00
750.00
15.276
0.660
15.276
227
750.00
750.00
28.188
0.117
28.188
228
750.00
750.00
11.533
0.635
11.533
201
750.00
750.00
4.028
-0.11
4.028
202
750.00
750.00
3.452
-0.10
3.452
203
750.00
750.00
11.571
-3.20
11.571
204
750.00
750.00
3.355
-0.10
3.355
205
750.00
750.00
19.691
-6.31
19.691
206
750.00
750.00
3.259
-0.10
3.259
207
750.00
750.00
18.828
-6.28
18.828
F27 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 65
208
750.00
750.00
2.396
-0.08
2.396
209
750.00
750.00
13.676
-0.35
13.676
210
750.00
750.00
11.723
-0.30
11.723
211
750.00
750.00
19.842
-3.41
19.842
212
750.00
750.00
11.626
-0.31
11.626
213
750.00
750.00
27.961
-6.51
27.961
214
750.00
750.00
11.529
-0.31
11.529
215
750.00
750.00
25.030
-6.44
25.030
216
750.00
750.00
8.598
-0.23
8.598
217
750.00
750.00
21.647
-3.65
21.647
218
750.00
750.00
11.591
-0.30
11.591
219
750.00
750.00
18.716
-3.57
18.716
220
750.00
750.00
8.660
-0.22
8.660
221
750.00
750.00
17.739
-0.46
17.739
222
750.00
750.00
15.205
-0.39
15.205
223
750.00
750.00
23.324
-3.50
23.324
224
750.00
750.00
15.108
-0.39
15.108
225
750.00
750.00
31.443
-6.60
31.443
226
750.00
750.00
15.011
-0.40
15.011
227
750.00
750.00
27.642
-6.50
27.642
228
750.00
750.00
11.210
-0.30
11.210
201
750.00
750.00
4.028
-0.007
4.028
202
750.00
750.00
3.452
-0.006
3.452
203
750.00
750.00
11.571
0.016
11.571
204
750.00
750.00
3.355
0.286
3.355
205
750.00
750.00
19.691
0.037
19.691
206
750.00
750.00
3.259
0.578
3.259
207
750.00
750.00
18.828
0.039
18.828
208
750.00
750.00
2.396
0.580
2.396
209
750.00
750.00
13.676
-0.016
13.676
210
750.00
750.00
11.723
-0.014
11.723
211
750.00
750.00
19.842
0.008
19.842
212
750.00
750.00
11.626
0.278
11.626
213
750.00
750.00
27.961
0.030
27.961
214
750.00
750.00
11.529
0.570
11.529
215
750.00
750.00
25.030
0.033
25.030
216
750.00
750.00
8.598
0.574
8.598
217
750.00
750.00
21.647
-0.020
21.647
218
750.00
750.00
11.591
0.146
11.591
219
750.00
750.00
18.716
-0.016
18.716
220
750.00
750.00
8.660
0.149
8.660
221
750.00
750.00
17.739
-0.022
17.739
222
750.00
750.00
15.205
-0.019
15.205
223
750.00
750.00
23.324
0.003
23.324
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F28 p
S1
S1
Page 66
224
750.00
750.00
15.108
0.274
15.108
225
750.00
750.00
31.443
0.025
31.443
226
750.00
750.00
15.011
0.566
15.011
227
750.00
750.00
27.642
0.030
27.642
228
750.00
750.00
11.210
0.570
11.210
201
750.00
750.00
4.044
-0.12
4.044
202
750.00
750.00
3.467
-0.10
3.467
203
750.00
750.00
11.115
-3.02
11.115
204
750.00
750.00
3.560
-0.10
3.560
205
750.00
750.00
18.763
-5.95
18.763
206
750.00
750.00
3.654
-0.10
3.654
207
750.00
750.00
17.896
-5.92
17.896
208
750.00
750.00
2.787
-0.07
2.787
209
750.00
750.00
13.891
-0.37
13.891
210
750.00
750.00
11.906
-0.32
11.906
211
750.00
750.00
19.554
-3.24
19.554
212
750.00
750.00
12.000
-0.32
12.000
213
750.00
750.00
27.202
-6.17
27.202
214
750.00
750.00
12.093
-0.31
12.093
215
750.00
750.00
24.226
-6.09
24.226
216
750.00
750.00
9.117
-0.23
9.117
217
750.00
750.00
21.610
-3.60
21.610
218
750.00
750.00
12.037
-0.32
12.037
219
750.00
750.00
18.633
-3.52
18.633
220
750.00
750.00
9.060
-0.24
9.060
221
750.00
750.00
18.036
-0.48
18.036
222
750.00
750.00
15.459
-0.41
15.459
223
750.00
750.00
23.107
-3.34
23.107
224
750.00
750.00
15.553
-0.41
15.553
225
750.00
750.00
30.755
-6.26
30.755
226
750.00
750.00
15.647
-0.41
15.647
227
750.00
750.00
26.891
-6.16
26.891
228
750.00
750.00
11.782
-0.30
11.782
201
750.00
750.00
4.044
0.016
4.044
202
750.00
750.00
3.467
0.014
3.467
203
750.00
750.00
11.115
0.043
11.115
204
750.00
750.00
3.560
0.311
3.560
205
750.00
750.00
18.763
0.072
18.763
206
750.00
750.00
3.654
0.609
3.654
207
750.00
750.00
17.896
0.069
17.896
208
750.00
750.00
2.787
0.605
2.787
209
750.00
750.00
13.891
0.060
13.891
210
750.00
750.00
11.906
0.051
11.906
211
750.00
750.00
19.554
0.081
19.554
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F29 p
S1
Page 67
212
750.00
750.00
12.000
0.349
12.000
213
750.00
750.00
27.202
0.110
27.202
214
750.00
750.00
12.093
0.646
12.093
215
750.00
750.00
24.226
0.097
24.226
216
750.00
750.00
9.117
0.633
9.117
217
750.00
750.00
21.610
0.046
21.610
218
750.00
750.00
12.037
0.215
12.037
219
750.00
750.00
18.633
0.033
18.633
220
750.00
750.00
9.060
0.202
9.060
221
750.00
750.00
18.036
0.076
18.036
222
750.00
750.00
15.459
0.066
15.459
223
750.00
750.00
23.107
0.095
23.107
224
750.00
750.00
15.553
0.363
15.553
225
750.00
750.00
30.755
0.124
30.755
226
750.00
750.00
15.647
0.660
15.647
227
750.00
750.00
26.891
0.107
26.891
228
750.00
750.00
11.782
0.644
11.782
201
750.00
750.00
4.226
0.12
4.226
202
750.00
750.00
3.623
0.10
3.623
203
750.00
750.00
-4.249
-2.90
-4.249
204
750.00
750.00
3.542
0.10
3.542
205
750.00
750.00
-12.120
-5.90
-12.120
206
750.00
750.00
3.461
0.10
3.461
207
750.00
750.00
-13.025
-5.93
-13.025
208
750.00
750.00
2.555
0.07
2.555
209
750.00
750.00
13.004
0.34
13.004
210
750.00
750.00
11.147
0.29
11.147
211
750.00
750.00
3.275
-2.71
3.275
212
750.00
750.00
11.066
0.29
11.066
213
750.00
750.00
-4.596
-5.71
-4.596
214
750.00
750.00
10.985
0.29
10.985
215
750.00
750.00
-7.382
-5.79
-7.382
216
750.00
750.00
8.198
0.21
8.198
217
750.00
750.00
1.245
-3.05
1.245
218
750.00
750.00
11.003
0.29
11.003
219
750.00
750.00
-1.542
-3.12
-1.542
220
750.00
750.00
8.216
0.22
8.216
221
750.00
750.00
16.702
0.43
16.702
222
750.00
750.00
14.316
0.37
14.316
223
750.00
750.00
6.445
-2.63
6.445
224
750.00
750.00
14.235
0.37
14.235
225
750.00
750.00
-1.427
-5.63
-1.427
226
750.00
750.00
14.154
0.37
14.154
227
750.00
750.00
-5.006
-5.73
-5.006
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 68
228
750.00
750.00
10.575
0.27
10.575
201
750.00
750.00
4.226
-0.005
4.226
202
750.00
750.00
3.623
-0.005
3.623
203
750.00
750.00
-4.249
0.018
-4.249
204
750.00
750.00
3.542
0.279
3.542
205
750.00
750.00
-12.120
0.041
-12.120
206
750.00
750.00
3.461
0.563
3.461
207
750.00
750.00
-13.025
0.042
-13.025
208
750.00
750.00
2.555
0.564
2.555
209
750.00
750.00
13.004
-0.007
13.004
210
750.00
750.00
11.147
-0.006
11.147
211
750.00
750.00
3.275
0.017
3.275
212
750.00
750.00
11.066
0.278
11.066
213
750.00
750.00
-4.596
0.040
-4.596
214
750.00
750.00
10.985
0.562
10.985
215
750.00
750.00
-7.382
0.041
-7.382
216
750.00
750.00
8.198
0.563
8.198
217
750.00
750.00
1.245
0.002
1.245
218
750.00
750.00
11.003
0.158
11.003
219
750.00
750.00
-1.542
0.003
-1.542
220
750.00
750.00
8.216
0.159
8.216
221
750.00
750.00
16.702
-0.009
16.702
222
750.00
750.00
14.316
-0.008
14.316
223
750.00
750.00
6.445
0.015
6.445
224
750.00
750.00
14.235
0.276
14.235
225
750.00
750.00
-1.427
0.038
-1.427
226
750.00
750.00
14.154
0.560
14.154
227
750.00
750.00
-5.006
0.040
-5.006
228
750.00
750.00
10.575
0.562
10.575
201
750.00
750.00
4.247
-0.12
4.247
202
750.00
750.00
3.641
-0.10
3.641
203
750.00
750.00
11.481
-3.11
11.481
204
750.00
750.00
3.557
-0.10
3.557
205
750.00
750.00
19.322
-6.11
19.322
206
750.00
750.00
3.474
-0.10
3.474
207
750.00
750.00
18.412
-6.09
18.412
208
750.00
750.00
2.564
-0.07
2.564
209
750.00
750.00
13.098
-0.34
13.098
210
750.00
750.00
11.227
-0.29
11.227
211
750.00
750.00
19.068
-3.30
19.068
212
750.00
750.00
11.144
-0.29
11.144
213
750.00
750.00
26.909
-6.30
26.909
214
750.00
750.00
11.061
-0.29
11.061
215
750.00
750.00
24.102
-6.23
24.102
F31 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 69
216
750.00
750.00
8.254
-0.22
8.254
217
750.00
750.00
21.128
-3.64
21.128
218
750.00
750.00
11.084
-0.29
11.084
219
750.00
750.00
18.322
-3.57
18.322
220
750.00
750.00
8.278
-0.22
8.278
221
750.00
750.00
16.826
-0.44
16.826
222
750.00
750.00
14.423
-0.37
14.423
223
750.00
750.00
22.263
-3.38
22.263
224
750.00
750.00
14.339
-0.37
14.339
225
750.00
750.00
30.104
-6.38
30.104
226
750.00
750.00
14.256
-0.37
14.256
227
750.00
750.00
26.499
-6.29
26.499
228
750.00
750.00
10.651
-0.28
10.651
201
750.00
750.00
4.247
-0.005
4.247
202
750.00
750.00
3.641
-0.005
3.641
203
750.00
750.00
11.481
0.019
11.481
204
750.00
750.00
3.557
0.293
3.557
205
750.00
750.00
19.322
0.043
19.322
206
750.00
750.00
3.474
0.590
3.474
207
750.00
750.00
18.412
0.044
18.412
208
750.00
750.00
2.564
0.591
2.564
209
750.00
750.00
13.098
-0.013
13.098
210
750.00
750.00
11.227
-0.011
11.227
211
750.00
750.00
19.068
0.013
19.068
212
750.00
750.00
11.144
0.287
11.144
213
750.00
750.00
26.909
0.037
26.909
214
750.00
750.00
11.061
0.584
11.061
215
750.00
750.00
24.102
0.040
24.102
216
750.00
750.00
8.254
0.587
8.254
217
750.00
750.00
21.128
-0.019
21.128
218
750.00
750.00
11.084
0.153
11.084
219
750.00
750.00
18.322
-0.016
18.322
220
750.00
750.00
8.278
0.156
8.278
221
750.00
750.00
16.826
-0.015
16.826
222
750.00
750.00
14.423
-0.012
14.423
223
750.00
750.00
22.263
0.011
22.263
224
750.00
750.00
14.339
0.285
14.339
225
750.00
750.00
30.104
0.035
30.104
226
750.00
750.00
14.256
0.582
14.256
227
750.00
750.00
26.499
0.038
26.499
228
750.00
750.00
10.651
0.586
10.651
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 70
(Flexure)
(Shear)
f'c
fy1
fy2
f_cl
f_clt
fp_clb
0.85
0.75
250.00
3900.00
3900.00
75.0
75.0
150.0
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
228
botom
4 - D13 @ 200
0.375
0.750
44.365
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 71
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
228
botom
4 - D13 @ 200
0.375
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 72
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
228
botom
4 - D13 @ 200
0.375
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
228
top
228
bottom
Mu (tonf-m)
Rn
.Req
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F24
- X direction (All Width)
Sec.Nam
L.Comb.
Client : ICA
Page 73
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
228
botom
4 - D13 @ 200
0.375
0.750
44.365
5.067
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
GroupType : Isolated
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
228
botom
4 - D13 @ 200
0.375
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 74
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
228
botom
4 - D13 @ 200
0.375
0.750
44.365
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 75
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
228
top
228
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.375
0.750
51.865
5.067
4 - D13 @ 200
0.375
0.750
44.365
5.067
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
228
botom
4 - D13 @ 200
0.375
0.750
44.365
5.067
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 76
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
228
top
228
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.375
0.750
50.595
5.067
4 - D13 @ 200
0.375
0.750
43.095
5.067
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
228
botom
4 - D13 @ 200
0.375
0.750
44.365
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 77
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
228
top
228
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.375
0.750
51.865
5.067
4 - D13 @ 200
0.375
0.750
44.365
5.067
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
228
bottom
4.050
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 78
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F22
GroupType : Isolated
Page 79
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F24
GroupType : Isolated
Page 80
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F26
GroupType : Isolated
Page 81
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F28
GroupType : Isolated
Page 82
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F31
GroupType : Isolated
Page 83
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 84
Pr.Name
228 Vc2
0.000 tonf
Pl
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
bo / d
750
c / s
Ft.Name
Pr.Name
1 / 20 Result
F22 Punching Area
13 Pile effect
0.000 tonf
OK
5625.000 cm2
0/1
0.000 tonf
228 Vc2
0.000 tonf
Pl
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
L.Comb.
750
0 / 443.65 mm Vu
Rectangle Vc1
Shape
13
0/1
0.000 tonf
L.Comb.
750
12 Pile effect
5625.000 cm2
Rectangle Vc1
Shape
12
bo / d
c / s
0 / 443.65 mm Vu
1 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pr.Name
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
bo / d
750
750
17 Pile effect
5625.000 cm2
0/1
0.000 tonf
Pl
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
bo / d
Ft.Name
Pr.Name
0 / 443.65 mm Vu
1 / 20 Result
F25 Punching Area
20 Pile effect
0.000 tonf
OK
5625.000 cm2
0/1
Rectangle Vc1
0.000 tonf
228 Vc2
0.000 tonf
Pl
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
Shape
L.Comb.
750
OK
228 Vc2
c / s
bo / d
c / s
Ft.Name
Pr.Name
0 / 443.65 mm Vu
1 / 20 Result
F26 Punching Area
21 Pile effect
0.000 tonf
OK
5625.000 cm2
0/1
Rectangle Vc1
0.000 tonf
228 Vc2
0.000 tonf
Pl
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
Shape
L.Comb.
750
1 / 20 Result
0.000 tonf
0.000 tonf
L.Comb.
21
0 / 443.65 mm Vu
Rectangle Vc1
Shape
750
0/1
Pl
Pr.Name
20
16 Pile effect
5625.000 cm2
0.000 tonf
Ft.Name
750
Page 85
228 Vc2
c / s
17
Client : ICA
0.000 tonf
L.Comb.
750
Rectangle Vc1
Shape
16
bo / d
c / s
0 / 443.65 mm Vu
1 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pr.Name
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
bo / d
750
750
25 Pile effect
5625.000 cm2
0/1
0.000 tonf
Pl
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
bo / d
Ft.Name
Pr.Name
0 / 443.65 mm Vu
1 / 20 Result
F29 Punching Area
37 Pile effect
0.000 tonf
OK
5625.000 cm2
0/1
Rectangle Vc1
0.000 tonf
228 Vc2
0.000 tonf
Pl
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
Shape
L.Comb.
750
OK
228 Vc2
c / s
bo / d
c / s
Ft.Name
Pr.Name
0 / 443.65 mm Vu
1 / 20 Result
F31 Punching Area
39 Pile effect
0.000 tonf
OK
5625.000 cm2
0/1
Rectangle Vc1
0.000 tonf
228 Vc2
0.000 tonf
Pl
590 mm Vc3
0.000 tonf
Pw
590 mm Vc
0.000 tonf
Shape
L.Comb.
750
1 / 20 Result
0.000 tonf
0.000 tonf
L.Comb.
39
0 / 443.65 mm Vu
Rectangle Vc1
Shape
750
0/1
Pl
Pr.Name
37
24 Pile effect
5625.000 cm2
0.000 tonf
Ft.Name
750
Page 86
228 Vc2
c / s
25
Client : ICA
0.000 tonf
L.Comb.
750
Rectangle Vc1
Shape
24
bo / d
c / s
0 / 443.65 mm Vu
1 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 87
fck bo d
(eq 11-35)
<- Vc3
where
= ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior columns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F22 Punching Area
1 c / s
130.359 tonf
26.439 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
17.018 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Page 88
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F24 Punching Area
1 c / s
130.359 tonf
18.876 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F25 Punching Area
1 c / s
130.359 tonf
19.509 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F26 Punching Area
1 c / s
130.359 tonf
36.282 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
33.035 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Page 89
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F28 Punching Area
1 c / s
130.359 tonf
32.547 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F29 Punching Area
1 c / s
130.359 tonf
31.859 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F31 Punching Area
1 c / s
130.359 tonf
17.990 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
31.208 tonf
OK
AFES CALCULATION
PEDESTAL FOR FOUNDATION TYPE F1
TITLE
DESCRIPTION
PROJECT/JOB NO.
09-JC-15 (AL-1)
PROJECT/JOB NAME
ICA PROJECT
CLIENT NAME
ICA
SITE NAME
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME
GROUP NAME
LOADCOMBINATION GROUP NAME
REV
DATE
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
CONTENTS
1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA
2. TENSION DESIGN
2.1 FORMULA
2.2 TENSION DESIGN
3. ONE-WAY SHEAR
3.1 FORMULA
3.2 ONE-WAY SHEAR
Page 1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 2
1. INPUT DATA
1.1 General
Design Code
Input Unit
MKS
Bending
Axial
0.85
f'c
250 kgf/cm
Sprial reinf.
0.7
fy (D10 ~ D16)
2
Output Unit
3900 kgf/cm
MKS
Tied reinf.
0.7
0.7
Ec
fy (D19 ~)
2
3900 kgf/cm
Shear
0.75
Es
2
250998 kgf/cm
2000000 kgf/cm
Steel Db
Cover
50 mm
590
590
50
590
590
50
590
590
590
590
50
Pier Name
12
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
13
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
16
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
17
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
50
590
590
50
590
590
50
590
590
50
590
590
50
590
590
590
590
50
Page 3
Pier Name
20
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
21
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
24
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
25
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
37
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
39
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 4
12
13
16
17
20
Name
Fx
Fy
Fz
Mx
My
SW
-0.585
Empty
0.001
0.003
-0.519
DL
0.002
0.016
-2.853
Operation
0.02
0.067
-10.377
Test
0.028
0.094
-14.527
Wlx
-3.121
-0.019
10.624
Wly
-0.244
-0.635
SLx2
-1.656
0.001
6.575
SLy2
-0.071
-0.353
LL
SW
-0.585
Empty
0.001
-0.003
-0.314
DL
0.002
-0.013
-1.867
Operation
0.021
-0.053
-6.275
Test
0.029
-0.074
-8.784
Wlx
-3.105
-0.015
10.558
Wly
-0.253
-0.146
SLx2
-1.668
-0.001
6.406
SLy2
-0.075
-0.111
LL
SW
-0.585
Empty
0.007
-0.359
DL
0.057
0.005
-1.914
Operation
0.142
0.01
-7.188
Test
0.199
0.013
-10.064
Wlx
-2.987
-0.019
10.188
Wly
-0.009
-0.268
0.157
SLx2
-1.715
-0.002
6.617
SLy2
-0.002
-0.082
0.091
LL
SW
-0.585
Empty
0.007
-0.001
-0.374
DL
0.057
-0.009
-1.952
Operation
0.143
-0.028
-7.484
Test
0.201
-0.039
-10.478
Wlx
-2.81
-0.015
9.522
Wly
0.009
-0.273
-0.15
SLx2
-1.681
-0.002
6.468
SLy2
0.002
-0.084
-0.09
LL
SW
-0.585
Empty
-0.001
0.001
-0.426
DL
-0.002
0.007
-2.461
Operation
-0.021
0.026
-8.521
Test
-0.03
0.037
-11.929
Wlx
-3.121
-0.011
-10.755
Wly
-0.261
-0.584
SLx2
-1.656
-6.599
SLy2
-0.072
-0.289
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
21
24
25
37
39
Page 5
LL
SW
-0.585
Empty
-0.001
-0.002
-0.35
DL
-0.002
-0.011
-2.096
Operation
-0.02
-0.039
-6.997
Test
-0.029
-0.055
-9.796
Wlx
-3.105
-0.019
-10.599
Wly
-0.268
-0.19
SLx2
-1.668
0.002
-6.396
SLy2
-0.075
-0.136
LL
SW
-0.585
Empty
-0.007
-0.363
DL
-0.056
0.004
-1.929
Operation
-0.138
0.005
-7.255
Test
-0.194
0.008
-10.157
Wlx
-2.986
-0.021
-10.149
Wly
-0.003
-0.281
0.121
SLx2
-1.715
0.003
-6.616
SLy2
0.002
-0.082
0.088
LL
SW
-0.585
Empty
-0.007
-0.001
-0.37
DL
-0.058
-0.008
-1.934
Operation
-0.147
-0.025
-7.403
Test
-0.206
-0.034
-10.364
Wlx
-2.811
-0.028
-9.56
Wly
0.003
-0.286
-0.117
SLx2
-1.681
0.003
-6.469
SLy2
-0.002
-0.084
-0.087
LL
SW
-0.585
Empty
0.006
-0.33
DL
0.061
0.003
-2.104
Operation
0.127
0.001
-6.6
Test
0.178
0.002
-9.241
Wlx
-2.888
-0.022
9.839
Wly
-0.003
-0.273
0.101
SLx2
-1.715
-0.004
6.601
SLy2
-0.002
-0.084
0.096
LL
SW
-0.585
Empty
-0.006
-0.333
DL
-0.061
0.003
-2.116
Operation
-0.128
0.004
-6.655
Test
-0.179
0.005
-9.318
Wlx
-2.888
-0.023
-9.801
Wly
0.002
-0.286
0.104
SLx2
-1.715
0.004
-6.601
SLy2
0.002
-0.084
0.095
LL
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 6
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
12
LC#
Fx
Fy
Fz
Mx
My
201
0.004
0.027
-4.721
202
0.004
0.023
-4.046
203
-2.493
0.008
4.453
204
0.004
-0.172
-4.554
205
-4.99
-0.008
12.952
206
0.004
-0.368
-5.062
207
-4.991
-0.013
13.964
208
0.003
-0.373
-4.051
209
0.031
0.116
-18.522
210
0.026
0.1
-15.876
211
-2.47
0.084
-7.377
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
13
212
0.026
213
-4.967
214
0.026
215
-4.974
216
0.02
217
-2.458
218
0.026
219
-2.464
220
-0.096
Page 7
-16.384
0.069
1.122
-0.291
-16.892
0.044
5.091
-0.316
-12.923
0.101
-6.014
-0.007
-16.406
0.076
-2.044
0.02
-0.032
-12.436
221
0.042
0.154
-24.332
222
0.036
0.132
-20.856
223
-2.461
0.117
-12.357
224
0.036
-0.063
-21.364
225
-4.958
0.102
-3.858
226
0.036
-0.258
-21.872
227
-4.967
0.069
1.356
228
0.027
-0.291
-16.658
201
0.004
-0.022
-3.053
202
0.004
-0.019
-2.617
203
-2.48
-0.031
5.829
204
0.004
-0.222
-2.734
205
-4.964
-0.043
14.276
206
0.004
-0.424
-2.851
207
-4.965
-0.038
14.93
208
0.003
-0.419
-2.197
209
0.032
-0.092
-11.399
210
0.028
-0.079
-9.77
211
-2.456
-0.091
-1.324
212
0.028
-0.282
-9.887
213
-4.94
-0.103
7.122
214
0.028
-0.484
-10.004
215
-4.947
-0.083
9.565
216
0.021
-0.464
-7.561
217
-2.474
-0.081
-0.161
218
0.028
-0.192
-9.937
219
-2.481
-0.061
2.281
220
0.021
-0.172
-7.494
221
0.043
-0.122
-14.911
222
0.037
-0.104
-12.781
223
-2.447
-0.116
-4.335
224
0.037
-0.307
-12.898
225
-4.931
-0.128
4.112
226
0.037
-0.509
-13.015
227
-4.94
-0.102
7.307
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
228
Page 8
0.028
-0.483
-9.819
201
0.09
0.007
-3.182
202
0.077
0.006
-2.728
203
-2.313
-0.009
5.423
204
0.07
-0.208
-2.602
205
-4.702
-0.024
13.573
206
0.062
-0.423
-2.476
207
-4.722
-0.026
14.255
208
0.043
-0.424
-1.795
209
0.279
0.021
-12.743
210
0.239
0.018
-10.922
211
-2.151
0.003
-2.772
212
0.232
-0.196
-10.797
213
-4.54
-0.012
5.378
214
0.224
-0.411
-10.671
215
-4.6
-0.017
8.109
216
0.165
-0.415
-7.941
217
-2.334
0.015
-0.997
218
0.236
-0.105
-10.786
219
-2.393
0.01
1.734
220
0.176
-0.11
-8.055
221
0.358
0.025
-16.769
222
0.307
0.022
-14.374
223
-2.082
0.006
-6.223
224
0.3
-0.193
-14.248
225
-4.472
-0.009
1.927
226
0.293
-0.407
-14.122
227
-4.549
-0.014
5.521
228
0.216
-0.413
-10.529
201
0.09
-0.014
-3.256
202
0.077
-0.012
-2.791
203
-2.171
-0.024
4.826
204
0.084
-0.23
-2.911
205
-4.419
-0.036
12.444
206
0.091
-0.449
-3.031
207
-4.438
-0.033
13.142
208
0.072
-0.446
-2.333
209
0.28
-0.052
-13.21
210
0.24
-0.044
-11.323
211
-2.008
-0.056
-3.706
212
0.247
-0.263
-11.443
213
-4.256
-0.068
3.912
214
0.254
-0.481
-11.563
215
-4.316
-0.057
6.743
16
17
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
216
0.194
-0.47
217
-2.281
218
0.243
219
Page 9
-8.732
-0.047
-1.621
-0.17
-11.458
-2.342
-0.036
1.21
220
0.183
-0.159
-8.627
221
0.361
-0.067
-17.402
222
0.31
-0.058
-14.916
223
-1.938
-0.07
-7.298
224
0.317
-0.276
-15.036
225
-4.186
-0.082
0.319
226
0.324
-0.494
-15.156
227
-4.264
-0.067
4.048
228
0.247
-0.48
-11.427
201
-0.004
0.011
-4.042
202
-0.004
0.01
-3.464
203
-2.5
0.001
-12.068
204
-0.004
-0.199
-3.932
205
-4.997
-0.008
-20.672
206
-0.004
-0.408
-4.399
207
-4.996
-0.01
-19.806
208
-0.003
-0.41
-3.533
209
-0.032
0.046
-15.375
210
-0.028
0.04
-13.178
211
-2.524
0.031
-21.782
212
-0.028
-0.169
-13.646
213
-5.021
0.022
-30.386
214
-0.028
-0.378
-14.113
215
-5.014
0.012
-27.092
216
-0.021
-0.388
-10.818
217
-2.512
0.04
-23.077
218
-0.028
-0.068
-13.612
219
-2.505
0.03
-19.782
220
-0.021
-0.078
-10.317
221
-0.045
0.062
-20.146
222
-0.038
0.053
-17.268
223
-2.535
0.044
-25.872
224
-0.038
-0.156
-17.735
225
-5.032
0.035
-34.476
226
-0.038
-0.365
-18.202
227
-5.022
0.022
-30.159
228
-0.029
-0.378
-13.885
201
-0.004
-0.018
-3.424
202
-0.004
-0.016
-2.935
203
-2.488
-0.031
-11.414
20
21
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
24
Page 10
204
-0.004
-0.23
-3.087
205
-4.972
-0.046
-19.894
206
-0.004
-0.444
-3.239
207
-4.971
-0.042
-19.16
208
-0.003
-0.441
-2.505
209
-0.031
-0.07
-12.73
210
-0.026
-0.06
-10.912
211
-2.51
-0.075
-19.391
212
-0.026
-0.274
-11.064
213
-4.994
-0.09
-27.87
214
-0.026
-0.489
-11.216
215
-4.988
-0.075
-25.142
216
-0.02
-0.474
-8.488
217
-2.528
-0.057
-20.506
218
-0.026
-0.173
-11.116
219
-2.522
-0.042
-17.778
220
-0.02
-0.157
-8.388
221
-0.043
-0.092
-16.649
222
-0.037
-0.079
-14.27
223
-2.521
-0.094
-22.75
224
-0.037
-0.294
-14.422
225
-5.005
-0.11
-31.229
226
-0.037
-0.508
-14.574
227
-4.996
-0.09
-27.661
228
-0.028
-0.488
-11.007
201
-0.088
0.006
-3.209
202
-0.076
0.005
-2.75
203
-2.464
-0.012
-10.87
204
-0.078
-0.22
-2.654
205
-4.853
-0.029
-18.989
206
-0.08
-0.445
-2.557
207
-4.834
-0.03
-18.301
208
-0.061
-0.446
-1.869
209
-0.272
0.013
-12.858
210
-0.233
0.011
-11.021
211
-2.622
-0.006
-19.14
212
-0.235
-0.214
-10.924
213
-5.01
-0.023
-27.259
214
-0.238
-0.439
-10.827
215
-4.952
-0.025
-24.504
216
-0.179
-0.441
-8.072
217
-2.805
0.015
-20.945
218
-0.23
-0.112
-10.889
219
-2.747
0.013
-18.19
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
220
-0.172
-0.115
221
-0.35
222
-0.3
223
Page 11
-8.134
0.017
-16.92
0.014
-14.503
-2.689
-0.002
-22.622
224
-0.302
-0.21
-14.406
225
-5.078
-0.019
-30.742
226
-0.305
-0.435
-14.31
227
-5.003
-0.023
-27.116
228
-0.23
-0.439
-10.684
201
-0.091
-0.013
-3.226
202
-0.078
-0.011
-2.765
203
-2.327
-0.033
-10.413
204
-0.076
-0.24
-2.858
205
-4.576
-0.056
-18.061
206
-0.073
-0.468
-2.952
207
-4.556
-0.053
-17.37
208
-0.054
-0.466
-2.261
209
-0.287
-0.046
-13.072
210
-0.246
-0.04
-11.204
211
-2.495
-0.062
-18.852
212
-0.244
-0.268
-11.298
213
-4.744
-0.084
-26.5
214
-0.241
-0.497
-11.392
215
-4.682
-0.075
-23.699
216
-0.18
-0.487
-8.59
217
-2.767
-0.035
-20.908
218
-0.249
-0.166
-11.335
219
-2.706
-0.025
-18.107
220
-0.188
-0.156
-8.534
221
-0.37
-0.059
-17.217
222
-0.317
-0.05
-14.758
223
-2.566
-0.073
-22.406
224
-0.314
-0.279
-14.851
225
-4.814
-0.095
-30.054
226
-0.312
-0.508
-14.945
227
-4.735
-0.083
-26.364
228
-0.233
-0.495
-11.255
201
0.094
0.004
-3.408
202
0.08
0.004
-2.921
203
-2.23
-0.014
4.95
204
0.078
-0.215
-2.84
205
-4.54
-0.032
12.822
206
0.076
-0.433
-2.759
207
-4.561
-0.032
13.552
25
37
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
39
Page 12
208
0.055
-0.434
-2.029
209
0.263
0.006
-12.186
210
0.226
0.005
-10.445
211
-2.085
-0.013
-2.574
212
0.223
-0.214
-10.364
213
-4.395
-0.03
5.298
214
0.221
-0.432
-10.283
215
-4.452
-0.032
7.909
216
0.164
-0.433
-7.672
217
-2.347
-0.001
-0.543
218
0.223
-0.121
-10.301
219
-2.403
-0.002
2.068
220
0.166
-0.122
-7.69
221
0.335
0.007
-15.883
222
0.287
0.006
-13.614
223
-2.024
-0.012
-5.743
224
0.284
-0.212
-13.533
225
-4.334
-0.029
2.128
226
0.282
-0.431
-13.452
227
-4.406
-0.031
5.532
228
0.21
-0.432
-10.049
201
-0.094
0.004
-3.429
202
-0.08
0.004
-2.939
203
-2.391
-0.015
-10.78
204
-0.079
-0.225
-2.856
205
-4.701
-0.033
-18.62
206
-0.077
-0.454
-2.772
207
-4.681
-0.034
-17.886
208
-0.057
-0.455
-2.038
209
-0.265
0.01
-12.279
210
-0.227
0.008
-10.525
211
-2.537
-0.01
-18.366
212
-0.225
-0.22
-10.442
213
-4.848
-0.028
-26.207
214
-0.224
-0.449
-10.359
215
-4.791
-0.031
-23.576
216
-0.167
-0.451
-7.727
217
-2.799
0.014
-20.427
218
-0.224
-0.118
-10.383
219
-2.743
0.012
-17.795
220
-0.167
-0.12
-7.751
221
-0.336
0.011
-16.008
222
-0.288
0.01
-13.721
223
-2.598
-0.009
-21.562
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
224
-0.286
-0.219
-13.638
225
-4.909
-0.027
-29.402
226
-0.285
-0.448
-13.554
227
-4.837
-0.03
-25.972
228
-0.213
-0.45
-10.124
Page 13
LC#
Fx
Fy
Fz
Mx
My
201
0.004
202
0.004
0.027
-5.54
-0.003
0.023
-4.748
-0.002
203
-2.493
0.008
3.751
-0.001
-0.249
204
0.004
-0.172
-5.256
0.017
205
-4.99
-0.008
12.25
0.001
-0.499
206
0.004
-0.368
-5.764
0.037
207
-4.991
-0.013
13.437
0.001
-0.499
208
0.003
-0.373
-4.577
0.037
209
0.031
0.116
-19.341
-0.012
0.003
210
0.026
0.1
-16.578
-0.01
0.003
211
-2.47
0.084
-8.079
-0.008
-0.247
212
0.026
-0.096
-17.086
0.01
0.003
213
-4.967
0.069
0.421
-0.007
-0.497
214
0.026
-0.291
-17.594
0.029
0.003
215
-4.974
0.044
4.565
-0.004
-0.497
216
0.02
-0.316
-13.449
0.032
0.002
217
-2.458
0.101
-6.715
-0.01
-0.246
218
0.026
-0.007
-17.107
0.001
0.003
219
-2.464
0.076
-2.571
-0.008
-0.246
220
0.02
-0.032
-12.963
0.003
0.002
221
0.042
0.154
-25.151
-0.015
0.004
222
0.036
0.132
-21.558
-0.013
0.004
223
-2.461
0.117
-13.059
-0.012
-0.246
224
0.036
-0.063
-22.066
0.006
0.004
225
-4.958
0.102
-4.559
-0.01
-0.496
226
0.036
-0.258
-22.574
0.026
0.004
227
-4.967
0.069
0.83
-0.007
-0.497
228
0.027
-0.291
-17.184
0.029
0.003
201
0.004
-0.022
-3.872
0.002
202
0.004
-0.019
-3.319
0.002
203
-2.48
-0.031
5.127
0.003
-0.248
204
0.004
-0.222
-3.436
0.022
205
-4.964
-0.043
13.574
0.004
-0.496
206
0.004
-0.424
-3.553
0.042
207
-4.965
-0.038
14.404
0.004
-0.497
208
0.003
-0.419
-2.723
0.042
12
13
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
209
Page 14
0.032
-0.092
-12.218
0.009
0.003
210
0.028
-0.079
-10.472
0.008
0.003
211
-2.456
-0.091
-2.026
0.009
-0.246
212
0.028
-0.282
-10.589
0.028
0.003
213
-4.94
-0.103
6.421
0.01
-0.494
214
0.028
-0.484
-10.706
0.048
0.003
215
-4.947
-0.083
9.039
0.008
-0.495
216
0.021
-0.464
-8.088
0.046
0.002
217
-2.474
-0.081
-0.863
0.008
-0.247
218
0.028
-0.192
-10.639
0.019
0.003
219
-2.481
-0.061
1.755
0.006
-0.248
220
0.021
-0.172
-8.021
0.017
0.002
221
0.043
-0.122
-15.73
0.012
0.004
222
0.037
-0.104
-13.483
0.01
0.004
223
-2.447
-0.116
-5.037
0.012
-0.245
224
0.037
-0.307
-13.6
0.031
0.004
225
-4.931
-0.128
3.41
0.013
-0.493
226
0.037
-0.509
-13.717
0.051
0.004
227
-4.94
-0.102
6.781
0.01
-0.494
228
0.028
-0.483
-10.346
0.048
0.003
201
0.09
0.007
-4.001
-0.001
0.009
202
0.077
0.006
-3.429
-0.001
0.008
203
-2.313
-0.009
4.721
0.001
-0.231
204
0.07
-0.208
-3.304
0.021
0.007
205
-4.702
-0.024
12.871
0.002
-0.47
206
0.062
-0.423
-3.178
0.042
0.006
207
-4.722
-0.026
13.729
0.003
-0.472
208
0.043
-0.424
-2.321
0.042
0.004
209
0.279
0.021
-13.562
-0.002
0.028
210
0.239
0.018
-11.624
-0.002
0.024
211
-2.151
0.003
-3.474
-0.215
212
0.232
-0.196
-11.499
0.02
0.023
213
-4.54
-0.012
4.677
0.001
-0.454
214
0.224
-0.411
-11.373
0.041
0.022
215
-4.6
-0.017
7.583
0.002
-0.46
216
0.165
-0.415
-8.467
0.042
0.016
217
-2.334
0.015
-1.699
-0.001
-0.233
218
0.236
-0.105
-11.488
0.01
0.024
219
-2.393
0.01
1.207
-0.001
-0.239
220
0.176
-0.11
-8.582
0.011
0.018
221
0.358
0.025
-17.588
-0.003
0.036
222
0.307
0.022
-15.075
-0.002
0.031
223
-2.082
0.006
-6.925
-0.001
-0.208
224
0.3
-0.193
-14.95
0.019
0.03
16
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
225
Page 15
-4.472
-0.009
1.225
0.001
-0.447
226
0.293
-0.407
-14.824
0.041
0.029
227
-4.549
-0.014
4.994
0.001
-0.455
228
0.216
-0.413
-11.055
0.041
0.022
201
0.09
-0.014
-4.075
0.001
0.009
202
0.077
-0.012
-3.493
0.001
0.008
203
-2.171
-0.024
4.125
0.002
-0.217
204
0.084
-0.23
-3.613
0.023
0.008
205
-4.419
-0.036
11.742
0.004
-0.442
206
0.091
-0.449
-3.733
0.045
0.009
207
-4.438
-0.033
12.615
0.003
-0.444
208
0.072
-0.446
-2.86
0.045
0.007
209
0.28
-0.052
-14.029
0.005
0.028
210
0.24
-0.044
-12.025
0.004
0.024
211
-2.008
-0.056
-4.407
0.006
-0.201
212
0.247
-0.263
-12.145
0.026
0.025
213
-4.256
-0.068
3.21
0.007
-0.426
214
0.254
-0.481
-12.265
0.048
0.025
215
-4.316
-0.057
6.216
0.006
-0.432
216
0.194
-0.47
-9.259
0.047
0.019
217
-2.281
-0.047
-2.323
0.005
-0.228
17
218
0.243
-0.17
-12.16
0.017
0.024
219
-2.342
-0.036
0.683
0.004
-0.234
220
0.183
-0.159
-9.154
0.016
0.018
221
0.361
-0.067
-18.221
0.007
0.036
222
0.31
-0.058
-15.618
0.006
0.031
223
-1.938
-0.07
-8
0.007
-0.194
224
0.317
-0.276
-15.738
0.028
0.032
225
-4.186
-0.082
-0.383
0.008
-0.419
226
0.324
-0.494
-15.858
0.049
0.032
227
-4.264
-0.067
3.522
0.007
-0.426
228
0.247
-0.48
-11.953
0.048
0.025
201
-0.004
0.011
-4.861
-0.001
202
-0.004
0.01
-4.166
-0.001
203
-2.5
0.001
-12.77
-0.25
204
-0.004
-0.199
-4.633
0.02
205
-4.997
-0.008
-21.374
0.001
-0.5
206
-0.004
-0.408
-5.101
0.041
207
-4.996
-0.01
-20.333
0.001
-0.5
208
-0.003
-0.41
-4.059
0.041
209
-0.032
0.046
-16.194
-0.005
-0.003
210
-0.028
0.04
-13.88
-0.004
-0.003
211
-2.524
0.031
-22.484
-0.003
-0.252
212
-0.028
-0.169
-14.347
0.017
-0.003
20
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
213
-5.021
0.022
-31.088
214
-0.028
-0.378
215
-5.014
0.012
216
-0.021
217
Page 16
-0.002
-0.502
-14.815
0.038
-0.003
-27.618
-0.001
-0.501
-0.388
-11.345
0.039
-0.002
-2.512
0.04
-23.779
-0.004
-0.251
218
-0.028
-0.068
-14.314
0.007
-0.003
219
-2.505
0.03
-20.309
-0.003
-0.25
220
-0.021
-0.078
-10.844
0.008
-0.002
221
-0.045
0.062
-20.965
-0.006
-0.004
222
-0.038
0.053
-17.97
-0.005
-0.004
223
-2.535
0.044
-26.574
-0.004
-0.254
224
-0.038
-0.156
-18.437
0.016
-0.004
225
-5.032
0.035
-35.178
-0.004
-0.503
226
-0.038
-0.365
-18.904
0.036
-0.004
227
-5.022
0.022
-30.685
-0.002
-0.502
228
-0.029
-0.378
-14.412
0.038
-0.003
201
-0.004
-0.018
-4.243
0.002
202
-0.004
-0.016
-3.637
0.002
203
-2.488
-0.031
-12.116
0.003
-0.249
204
-0.004
-0.23
-3.789
0.023
205
-4.972
-0.046
-20.595
0.005
-0.497
206
-0.004
-0.444
-3.941
0.044
207
-4.971
-0.042
-19.686
0.004
-0.497
208
-0.003
-0.441
-3.032
0.044
209
-0.031
-0.07
-13.549
0.007
-0.003
210
-0.026
-0.06
-11.613
0.006
-0.003
211
-2.51
-0.075
-20.093
0.008
-0.251
212
-0.026
-0.274
-11.765
0.027
-0.003
213
-4.994
-0.09
-28.572
0.009
-0.499
214
-0.026
-0.489
-11.917
0.049
-0.003
215
-4.988
-0.075
-25.668
0.008
-0.499
216
-0.02
-0.474
-9.014
0.047
-0.002
217
-2.528
-0.057
-21.207
0.006
-0.253
218
-0.026
-0.173
-11.817
0.017
-0.003
219
-2.522
-0.042
-18.304
0.004
-0.252
220
-0.02
-0.157
-8.914
0.016
-0.002
221
-0.043
-0.092
-17.468
0.009
-0.004
222
-0.037
-0.079
-14.972
0.008
-0.004
223
-2.521
-0.094
-23.451
0.009
-0.252
224
-0.037
-0.294
-15.124
0.029
-0.004
225
-5.005
-0.11
-31.931
0.011
-0.501
226
-0.037
-0.508
-15.276
0.051
-0.004
227
-4.996
-0.09
-28.188
0.009
-0.5
228
-0.028
-0.488
-11.533
0.049
-0.003
21
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
201
-0.088
0.006
202
-0.076
0.005
203
-2.464
-0.012
204
-0.078
-0.22
205
-4.853
-0.029
206
-0.08
207
-4.834
208
-4.028
Page 17
-0.001
-0.009
-3.452
-0.008
-11.571
0.001
-0.246
-3.355
0.022
-0.008
-19.691
0.003
-0.485
-0.445
-3.259
0.044
-0.008
-0.03
-18.828
0.003
-0.483
-0.061
-0.446
-2.396
0.045
-0.006
209
-0.272
0.013
-13.676
-0.001
-0.027
210
-0.233
0.011
-11.723
-0.001
-0.023
211
-2.622
-0.006
-19.842
0.001
-0.262
212
-0.235
-0.214
-11.626
0.021
-0.024
213
-5.01
-0.023
-27.961
0.002
-0.501
214
-0.238
-0.439
-11.529
0.044
-0.024
215
-4.952
-0.025
-25.03
0.003
-0.495
216
-0.179
-0.441
-8.598
0.044
-0.018
217
-2.805
0.015
-21.647
-0.002
-0.281
218
-0.23
-0.112
-11.591
0.011
-0.023
219
-2.747
0.013
-18.716
-0.001
-0.275
220
-0.172
-0.115
-8.66
0.011
-0.017
221
-0.35
0.017
-17.739
-0.002
-0.035
24
222
-0.3
0.014
-15.205
-0.001
-0.03
223
-2.689
-0.002
-23.324
-0.269
224
-0.302
-0.21
-15.108
0.021
-0.03
225
-5.078
-0.019
-31.443
0.002
-0.508
226
-0.305
-0.435
-15.011
0.044
-0.03
227
-5.003
-0.023
-27.642
0.002
-0.5
228
-0.23
-0.439
-11.21
0.044
-0.023
201
-0.091
-0.013
-4.044
0.001
-0.009
202
-0.078
-0.011
-3.467
0.001
-0.008
203
-2.327
-0.033
-11.115
0.003
-0.233
204
-0.076
-0.24
-3.56
0.024
-0.008
205
-4.576
-0.056
-18.763
0.006
-0.458
206
-0.073
-0.468
-3.654
0.047
-0.007
207
-4.556
-0.053
-17.896
0.005
-0.456
208
-0.054
-0.466
-2.787
0.047
-0.005
209
-0.287
-0.046
-13.891
0.005
-0.029
210
-0.246
-0.04
-11.906
0.004
-0.025
211
-2.495
-0.062
-19.554
0.006
-0.249
212
-0.244
-0.268
-12
0.027
-0.024
213
-4.744
-0.084
-27.202
0.008
-0.474
214
-0.241
-0.497
-12.093
0.05
-0.024
215
-4.682
-0.075
-24.226
0.007
-0.468
216
-0.18
-0.487
-9.117
0.049
-0.018
25
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 18
217
-2.767
-0.035
-21.61
0.004
-0.277
218
-0.249
-0.166
-12.037
0.017
-0.025
219
-2.706
-0.025
-18.633
0.003
-0.271
220
-0.188
-0.156
-9.06
0.016
-0.019
221
-0.37
-0.059
-18.036
0.006
-0.037
222
-0.317
-0.05
-15.459
0.005
-0.032
223
-2.566
-0.073
-23.107
0.007
-0.257
224
-0.314
-0.279
-15.553
0.028
-0.031
225
-4.814
-0.095
-30.755
0.01
-0.481
226
-0.312
-0.508
-15.647
0.051
-0.031
227
-4.735
-0.083
-26.891
0.008
-0.474
228
-0.233
-0.495
-11.782
0.05
-0.023
201
0.094
0.004
-4.226
0.009
202
0.08
0.004
-3.623
0.008
203
-2.23
-0.014
4.249
0.001
-0.223
204
0.078
-0.215
-3.542
0.021
0.008
205
-4.54
-0.032
12.12
0.003
-0.454
206
0.076
-0.433
-3.461
0.043
0.008
207
-4.561
-0.032
13.025
0.003
-0.456
208
0.055
-0.434
-2.555
0.043
0.006
209
0.263
0.006
-13.004
-0.001
0.026
210
0.226
0.005
-11.147
0.023
211
-2.085
-0.013
-3.275
0.001
-0.208
212
0.223
-0.214
-11.066
0.021
0.022
213
-4.395
-0.03
4.596
0.003
-0.44
214
0.221
-0.432
-10.985
0.043
0.022
215
-4.452
-0.032
7.382
0.003
-0.445
216
0.164
-0.433
-8.198
0.043
0.016
217
-2.347
-0.001
-1.245
-0.235
218
0.223
-0.121
-11.003
0.012
0.022
219
-2.403
-0.002
1.542
-0.24
220
0.166
-0.122
-8.216
0.012
0.017
221
0.335
0.007
-16.702
-0.001
0.033
37
222
0.287
0.006
-14.316
-0.001
0.029
223
-2.024
-0.012
-6.445
0.001
-0.202
224
0.284
-0.212
-14.235
0.021
0.028
225
-4.334
-0.029
1.427
0.003
-0.433
226
0.282
-0.431
-14.154
0.043
0.028
227
-4.406
-0.031
5.006
0.003
-0.441
228
0.21
-0.432
-10.575
0.043
0.021
201
-0.094
0.004
-4.247
-0.009
202
-0.08
0.004
-3.641
-0.008
203
-2.391
-0.015
-11.481
0.001
-0.239
204
-0.079
-0.225
-3.557
0.023
-0.008
39
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
205
-4.701
-0.033
206
-0.077
207
-4.681
208
Page 19
-19.322
0.003
-0.47
-0.454
-3.474
0.045
-0.008
-0.034
-18.412
0.003
-0.468
-0.057
-0.455
-2.564
0.045
-0.006
209
-0.265
0.01
-13.098
-0.001
-0.026
210
-0.227
0.008
-11.227
-0.001
-0.023
211
-2.537
-0.01
-19.068
0.001
-0.254
212
-0.225
-0.22
-11.144
0.022
-0.023
213
-4.848
-0.028
-26.909
0.003
-0.485
214
-0.224
-0.449
-11.061
0.045
-0.022
215
-4.791
-0.031
-24.102
0.003
-0.479
216
-0.167
-0.451
-8.254
0.045
-0.017
217
-2.799
0.014
-21.128
-0.001
-0.28
218
-0.224
-0.118
-11.084
0.012
-0.022
219
-2.743
0.012
-18.322
-0.001
-0.274
220
-0.167
-0.12
-8.278
0.012
-0.017
221
-0.336
0.011
-16.826
-0.001
-0.034
222
-0.288
0.01
-14.423
-0.001
-0.029
223
-2.598
-0.009
-22.263
0.001
-0.26
224
-0.286
-0.219
-14.339
0.022
-0.029
225
-4.909
-0.027
-30.104
0.003
-0.491
226
-0.285
-0.448
-14.256
0.045
-0.028
227
-4.837
-0.03
-26.499
0.003
-0.484
228
-0.213
-0.45
-10.651
0.045
-0.021
2. TENSION DESIGN
2.1 FORMULA
D1
A = 2(D1+D2) t = Nb As
t = A / (2 * (D1 + D2))
(D1 + t) * (D2 + t)3
(D1 - t) * (D2 - t)3
Ix =
12
12
(D2 + t) * (D1 + t)3
(D2 - t) * (D1 - t)3
Iy =
12
12
- Fz
Mux (D2 / 2)
Tux = (
+
) As
A
Ix
- Fz
Muy (D1 / 2)
Tuy = (
+
) As
A
Iy
Tu = Max(Tux, Tuy)
Tu
Req.As =
, = 0.85
fy
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 20
Dia
Unit(mm , tonf,cm2)
LC#
Dia (D1/D2)
Tu
UsingAs/EA
Req.As/EA
Result
201
455.04 / 455.04
-0.35
1.99
N/A
OK
202
455.04 / 455.04
-0.3
1.99
N/A
OK
203
455.04 / 455.04
0.34
1.99
0.1
OK
204
455.04 / 455.04
-0.32
1.99
N/A
OK
205
455.04 / 455.04
0.97
1.99
0.29
OK
206
455.04 / 455.04
-0.35
1.99
N/A
OK
207
455.04 / 455.04
1.05
1.99
0.32
OK
208
455.04 / 455.04
-0.27
1.99
N/A
OK
209
455.04 / 455.04
-1.2
1.99
N/A
OK
210
455.04 / 455.04
-1.03
1.99
N/A
OK
211
455.04 / 455.04
-0.4
1.99
N/A
OK
212
455.04 / 455.04
-1.06
1.99
N/A
OK
213
455.04 / 455.04
0.23
1.99
0.07
OK
214
455.04 / 455.04
-1.09
1.99
N/A
OK
215
455.04 / 455.04
0.49
1.99
0.15
OK
216
455.04 / 455.04
-0.83
1.99
N/A
OK
217
455.04 / 455.04
-0.32
1.99
N/A
OK
218
455.04 / 455.04
-1.07
1.99
N/A
OK
219
455.04 / 455.04
-0.06
1.99
N/A
OK
220
455.04 / 455.04
-0.81
1.99
N/A
OK
221
455.04 / 455.04
-1.57
1.99
N/A
OK
222
455.04 / 455.04
-1.34
1.99
N/A
OK
223
455.04 / 455.04
-0.71
1.99
N/A
OK
224
455.04 / 455.04
-1.38
1.99
N/A
OK
225
455.04 / 455.04
-0.08
1.99
N/A
OK
226
455.04 / 455.04
-1.4
1.99
N/A
OK
227
455.04 / 455.04
0.26
1.99
0.08
OK
228
455.04 / 455.04
-1.06
1.99
N/A
OK
201
455.04 / 455.04
-0.24
1.99
N/A
OK
202
455.04 / 455.04
-0.21
1.99
N/A
OK
203
455.04 / 455.04
0.42
1.99
0.13
OK
204
455.04 / 455.04
-0.21
1.99
N/A
OK
205
455.04 / 455.04
1.05
1.99
0.32
OK
206
455.04 / 455.04
-0.2
1.99
N/A
OK
12
13
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 21
207
455.04 / 455.04
1.1
1.99
0.33
OK
208
455.04 / 455.04
-0.15
1.99
N/A
OK
209
455.04 / 455.04
-0.76
1.99
N/A
OK
210
455.04 / 455.04
-0.65
1.99
N/A
OK
211
455.04 / 455.04
-0.03
1.99
N/A
OK
212
455.04 / 455.04
-0.65
1.99
N/A
OK
213
455.04 / 455.04
0.6
1.99
0.18
OK
214
455.04 / 455.04
-0.65
1.99
N/A
OK
215
455.04 / 455.04
0.77
1.99
0.23
OK
216
455.04 / 455.04
-0.49
1.99
N/A
OK
217
455.04 / 455.04
0.05
1.99
0.01
OK
218
455.04 / 455.04
-0.66
1.99
N/A
OK
219
455.04 / 455.04
0.21
1.99
0.06
OK
220
455.04 / 455.04
-0.49
1.99
N/A
OK
221
455.04 / 455.04
-0.98
1.99
N/A
OK
222
455.04 / 455.04
-0.84
1.99
N/A
OK
223
455.04 / 455.04
-0.21
1.99
N/A
OK
224
455.04 / 455.04
-0.84
1.99
N/A
OK
225
455.04 / 455.04
0.42
1.99
0.13
OK
226
455.04 / 455.04
-0.84
1.99
N/A
OK
227
455.04 / 455.04
0.63
1.99
0.19
OK
228
455.04 / 455.04
-0.63
1.99
N/A
OK
201
455.04 / 455.04
-0.25
1.99
N/A
OK
202
455.04 / 455.04
-0.21
1.99
N/A
OK
203
455.04 / 455.04
0.39
1.99
0.12
OK
204
455.04 / 455.04
-0.2
1.99
N/A
OK
205
455.04 / 455.04
1.99
0.3
OK
206
455.04 / 455.04
-0.18
1.99
N/A
OK
207
455.04 / 455.04
1.05
1.99
0.32
OK
208
455.04 / 455.04
-0.13
1.99
N/A
OK
209
455.04 / 455.04
-0.84
1.99
N/A
OK
210
455.04 / 455.04
-0.72
1.99
N/A
OK
211
455.04 / 455.04
-0.13
1.99
N/A
OK
212
455.04 / 455.04
-0.71
1.99
N/A
OK
213
455.04 / 455.04
0.48
1.99
0.14
OK
214
455.04 / 455.04
-0.69
1.99
N/A
OK
215
455.04 / 455.04
0.66
1.99
0.2
OK
216
455.04 / 455.04
-0.51
1.99
N/A
OK
217
455.04 / 455.04
-0.01
1.99
N/A
OK
218
455.04 / 455.04
-0.71
1.99
N/A
OK
219
455.04 / 455.04
0.17
1.99
0.05
OK
220
455.04 / 455.04
-0.53
1.99
N/A
OK
221
455.04 / 455.04
-1.08
1.99
N/A
OK
222
455.04 / 455.04
-0.93
1.99
N/A
OK
16
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 22
N/A
OK
1.99
N/A
OK
1.99
0.08
OK
-0.91
1.99
N/A
OK
455.04 / 455.04
0.5
1.99
0.15
OK
228
455.04 / 455.04
-0.67
1.99
N/A
OK
201
455.04 / 455.04
-0.25
1.99
N/A
OK
202
455.04 / 455.04
-0.22
1.99
N/A
OK
203
455.04 / 455.04
0.35
1.99
0.1
OK
204
455.04 / 455.04
-0.22
1.99
N/A
OK
205
455.04 / 455.04
0.92
1.99
0.28
OK
206
455.04 / 455.04
-0.21
1.99
N/A
OK
207
455.04 / 455.04
0.97
1.99
0.29
OK
208
455.04 / 455.04
-0.16
1.99
N/A
OK
209
455.04 / 455.04
-0.87
1.99
N/A
OK
210
455.04 / 455.04
-0.74
1.99
N/A
OK
211
455.04 / 455.04
-0.19
1.99
N/A
OK
212
455.04 / 455.04
-0.75
1.99
N/A
OK
213
455.04 / 455.04
0.38
1.99
0.11
OK
214
455.04 / 455.04
-0.75
1.99
N/A
OK
215
455.04 / 455.04
0.57
1.99
0.17
OK
216
455.04 / 455.04
-0.56
1.99
N/A
OK
217
455.04 / 455.04
-0.05
1.99
N/A
OK
218
455.04 / 455.04
-0.75
1.99
N/A
OK
219
455.04 / 455.04
0.14
1.99
0.04
OK
220
455.04 / 455.04
-0.56
1.99
N/A
OK
221
455.04 / 455.04
-1.12
1.99
N/A
OK
222
455.04 / 455.04
-0.96
1.99
N/A
OK
223
455.04 / 455.04
-0.42
1.99
N/A
OK
224
455.04 / 455.04
-0.97
1.99
N/A
OK
225
455.04 / 455.04
0.15
1.99
0.04
OK
226
455.04 / 455.04
-0.97
1.99
N/A
OK
227
455.04 / 455.04
0.4
1.99
0.12
OK
228
455.04 / 455.04
-0.73
1.99
N/A
OK
201
455.04 / 455.04
-0.3
1.99
N/A
OK
202
455.04 / 455.04
-0.26
1.99
N/A
OK
203
455.04 / 455.04
-0.7
1.99
N/A
OK
204
455.04 / 455.04
-0.28
1.99
N/A
OK
205
455.04 / 455.04
-1.13
1.99
N/A
OK
206
455.04 / 455.04
-0.3
1.99
N/A
OK
207
455.04 / 455.04
-1.06
1.99
N/A
OK
208
455.04 / 455.04
-0.24
1.99
N/A
OK
209
455.04 / 455.04
-1.01
1.99
N/A
OK
210
455.04 / 455.04
-0.87
1.99
N/A
OK
223
455.04 / 455.04
-0.35
1.99
224
455.04 / 455.04
-0.92
225
455.04 / 455.04
0.26
226
455.04 / 455.04
227
17
20
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 23
211
455.04 / 455.04
-1.3
1.99
N/A
OK
212
455.04 / 455.04
-0.89
1.99
N/A
OK
213
455.04 / 455.04
-1.74
1.99
N/A
OK
214
455.04 / 455.04
-0.91
1.99
N/A
OK
215
455.04 / 455.04
-1.52
1.99
N/A
OK
216
455.04 / 455.04
-0.69
1.99
N/A
OK
217
455.04 / 455.04
-1.38
1.99
N/A
OK
218
455.04 / 455.04
-0.89
1.99
N/A
OK
219
455.04 / 455.04
-1.17
1.99
N/A
OK
220
455.04 / 455.04
-0.67
1.99
N/A
OK
221
455.04 / 455.04
-1.31
1.99
N/A
OK
222
455.04 / 455.04
-1.12
1.99
N/A
OK
223
455.04 / 455.04
-1.56
1.99
N/A
OK
224
455.04 / 455.04
-1.15
1.99
N/A
OK
225
455.04 / 455.04
-1.99
1.99
N/A
OK
226
455.04 / 455.04
-1.17
1.99
N/A
OK
227
455.04 / 455.04
-1.71
1.99
N/A
OK
228
455.04 / 455.04
-0.89
1.99
N/A
OK
201
455.04 / 455.04
-0.26
1.99
N/A
OK
202
455.04 / 455.04
-0.23
1.99
N/A
OK
203
455.04 / 455.04
-0.65
1.99
N/A
OK
204
455.04 / 455.04
-0.23
1.99
N/A
OK
205
455.04 / 455.04
-1.08
1.99
N/A
OK
206
455.04 / 455.04
-0.23
1.99
N/A
OK
207
455.04 / 455.04
-1.03
1.99
N/A
OK
208
455.04 / 455.04
-0.17
1.99
N/A
OK
209
455.04 / 455.04
-0.84
1.99
N/A
OK
210
455.04 / 455.04
-0.72
1.99
N/A
OK
211
455.04 / 455.04
-1.15
1.99
N/A
OK
212
455.04 / 455.04
-0.72
1.99
N/A
OK
213
455.04 / 455.04
-1.58
1.99
N/A
OK
214
455.04 / 455.04
-0.72
1.99
N/A
OK
215
455.04 / 455.04
-1.4
1.99
N/A
OK
216
455.04 / 455.04
-0.54
1.99
N/A
OK
217
455.04 / 455.04
-1.22
1.99
N/A
OK
218
455.04 / 455.04
-0.73
1.99
N/A
OK
219
455.04 / 455.04
-1.04
1.99
N/A
OK
220
455.04 / 455.04
-0.55
1.99
N/A
OK
221
455.04 / 455.04
-1.09
1.99
N/A
OK
222
455.04 / 455.04
-0.93
1.99
N/A
OK
223
455.04 / 455.04
-1.36
1.99
N/A
OK
224
455.04 / 455.04
-0.93
1.99
N/A
OK
225
455.04 / 455.04
-1.79
1.99
N/A
OK
226
455.04 / 455.04
-0.93
1.99
N/A
OK
21
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 24
-1.56
1.99
N/A
OK
455.04 / 455.04
-0.7
1.99
N/A
OK
455.04 / 455.04
-0.25
1.99
N/A
OK
202
455.04 / 455.04
-0.21
1.99
N/A
OK
203
455.04 / 455.04
-0.62
1.99
N/A
OK
204
455.04 / 455.04
-0.2
1.99
N/A
OK
205
455.04 / 455.04
-1.03
1.99
N/A
OK
206
455.04 / 455.04
-0.19
1.99
N/A
OK
207
455.04 / 455.04
-0.98
1.99
N/A
OK
208
455.04 / 455.04
-0.13
1.99
N/A
OK
209
455.04 / 455.04
-0.84
1.99
N/A
OK
210
455.04 / 455.04
-0.72
1.99
N/A
OK
211
455.04 / 455.04
-1.13
1.99
N/A
OK
212
455.04 / 455.04
-0.72
1.99
N/A
OK
213
455.04 / 455.04
-1.54
1.99
N/A
OK
214
455.04 / 455.04
-0.7
1.99
N/A
OK
215
455.04 / 455.04
-1.36
1.99
N/A
OK
216
455.04 / 455.04
-0.52
1.99
N/A
OK
217
455.04 / 455.04
-1.24
1.99
N/A
OK
218
455.04 / 455.04
-0.71
1.99
N/A
OK
219
455.04 / 455.04
-1.06
1.99
N/A
OK
220
455.04 / 455.04
-0.53
1.99
N/A
OK
221
455.04 / 455.04
-1.09
1.99
N/A
OK
222
455.04 / 455.04
-0.94
1.99
N/A
OK
223
455.04 / 455.04
-1.35
1.99
N/A
OK
224
455.04 / 455.04
-0.93
1.99
N/A
OK
225
455.04 / 455.04
-1.76
1.99
N/A
OK
226
455.04 / 455.04
-0.92
1.99
N/A
OK
227
455.04 / 455.04
-1.52
1.99
N/A
OK
228
455.04 / 455.04
-0.68
1.99
N/A
OK
201
455.04 / 455.04
-0.25
1.99
N/A
OK
202
455.04 / 455.04
-0.21
1.99
N/A
OK
203
455.04 / 455.04
-0.6
1.99
N/A
OK
204
455.04 / 455.04
-0.21
1.99
N/A
OK
205
455.04 / 455.04
-0.98
1.99
N/A
OK
206
455.04 / 455.04
-0.21
1.99
N/A
OK
207
455.04 / 455.04
-0.93
1.99
N/A
OK
208
455.04 / 455.04
-0.16
1.99
N/A
OK
209
455.04 / 455.04
-0.86
1.99
N/A
OK
210
455.04 / 455.04
-0.73
1.99
N/A
OK
211
455.04 / 455.04
-1.12
1.99
N/A
OK
212
455.04 / 455.04
-0.74
1.99
N/A
OK
213
455.04 / 455.04
-1.5
1.99
N/A
OK
214
455.04 / 455.04
-0.74
1.99
N/A
OK
227
455.04 / 455.04
228
201
24
25
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 25
215
455.04 / 455.04
-1.32
1.99
N/A
OK
216
455.04 / 455.04
-0.55
1.99
N/A
OK
217
455.04 / 455.04
-1.24
1.99
N/A
OK
218
455.04 / 455.04
-0.74
1.99
N/A
OK
219
455.04 / 455.04
-1.05
1.99
N/A
OK
220
455.04 / 455.04
-0.56
1.99
N/A
OK
221
455.04 / 455.04
-1.11
1.99
N/A
OK
222
455.04 / 455.04
-0.95
1.99
N/A
OK
223
455.04 / 455.04
-1.34
1.99
N/A
OK
224
455.04 / 455.04
-0.96
1.99
N/A
OK
225
455.04 / 455.04
-1.72
1.99
N/A
OK
226
455.04 / 455.04
-0.96
1.99
N/A
OK
227
455.04 / 455.04
-1.49
1.99
N/A
OK
228
455.04 / 455.04
-0.72
1.99
N/A
OK
201
455.04 / 455.04
-0.26
1.99
N/A
OK
202
455.04 / 455.04
-0.22
1.99
N/A
OK
203
455.04 / 455.04
0.36
1.99
0.11
OK
204
455.04 / 455.04
-0.21
1.99
N/A
OK
205
455.04 / 455.04
0.94
1.99
0.28
OK
206
455.04 / 455.04
-0.2
1.99
N/A
OK
207
455.04 / 455.04
1.99
0.3
OK
208
455.04 / 455.04
-0.14
1.99
N/A
OK
209
455.04 / 455.04
-0.8
1.99
N/A
OK
210
455.04 / 455.04
-0.69
1.99
N/A
OK
211
455.04 / 455.04
-0.12
1.99
N/A
OK
212
455.04 / 455.04
-0.68
1.99
N/A
OK
213
455.04 / 455.04
0.47
1.99
0.14
OK
214
455.04 / 455.04
-0.67
1.99
N/A
OK
215
455.04 / 455.04
0.64
1.99
0.19
OK
216
455.04 / 455.04
-0.49
1.99
N/A
OK
217
455.04 / 455.04
0.02
1.99
0.01
OK
218
455.04 / 455.04
-0.68
1.99
N/A
OK
219
455.04 / 455.04
0.2
1.99
0.06
OK
220
455.04 / 455.04
-0.51
1.99
N/A
OK
221
455.04 / 455.04
-1.03
1.99
N/A
OK
222
455.04 / 455.04
-0.88
1.99
N/A
OK
223
455.04 / 455.04
-0.32
1.99
N/A
OK
224
455.04 / 455.04
-0.88
1.99
N/A
OK
225
455.04 / 455.04
0.27
1.99
0.08
OK
226
455.04 / 455.04
-0.87
1.99
N/A
OK
227
455.04 / 455.04
0.49
1.99
0.15
OK
228
455.04 / 455.04
-0.64
1.99
N/A
OK
201
455.04 / 455.04
-0.26
1.99
N/A
OK
202
455.04 / 455.04
-0.22
1.99
N/A
OK
37
39
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 26
203
455.04 / 455.04
-0.62
1.99
N/A
OK
204
455.04 / 455.04
-0.21
1.99
N/A
OK
205
455.04 / 455.04
-1.01
1.99
N/A
OK
206
455.04 / 455.04
-0.2
1.99
N/A
OK
207
455.04 / 455.04
-0.96
1.99
N/A
OK
208
455.04 / 455.04
-0.14
1.99
N/A
OK
209
455.04 / 455.04
-0.81
1.99
N/A
OK
210
455.04 / 455.04
-0.69
1.99
N/A
OK
211
455.04 / 455.04
-1.09
1.99
N/A
OK
212
455.04 / 455.04
-0.69
1.99
N/A
OK
213
455.04 / 455.04
-1.48
1.99
N/A
OK
214
455.04 / 455.04
-0.67
1.99
N/A
OK
215
455.04 / 455.04
-1.31
1.99
N/A
OK
216
455.04 / 455.04
-0.5
1.99
N/A
OK
217
455.04 / 455.04
-1.21
1.99
N/A
OK
218
455.04 / 455.04
-0.68
1.99
N/A
OK
219
455.04 / 455.04
-1.03
1.99
N/A
OK
220
455.04 / 455.04
-0.51
1.99
N/A
OK
221
455.04 / 455.04
-1.04
1.99
N/A
OK
222
455.04 / 455.04
-0.89
1.99
N/A
OK
223
455.04 / 455.04
-1.28
1.99
N/A
OK
224
455.04 / 455.04
-0.88
1.99
N/A
OK
225
455.04 / 455.04
-1.68
1.99
N/A
OK
226
455.04 / 455.04
-0.87
1.99
N/A
OK
227
455.04 / 455.04
-1.46
1.99
N/A
OK
228
455.04 / 455.04
-0.65
1.99
N/A
OK
3. ONE-WAY SHEAR
3.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 2 fck Bw d
(eq 11-3)
Av fy d
- Vs =
(eq 11-15)
s
- Vu <= Vc + Vs , = 0.75 (eq 11-1)
- When, Value of Vs shall not exceed 8 fck Bw d (Vs max)
12
Dir.
Unit(tonf)
LC#
Vc
Vs
Vs max
Vu
Result
201
19.387
16.353
77.548
0.004
OK
202
19.387
16.353
77.548
0.004
OK
203
19.387
16.353
77.548
2.493
OK
204
19.387
16.353
77.548
0.004
OK
205
19.387
16.353
77.548
4.99
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 27
206
19.387
16.353
77.548
0.004
OK
207
19.387
16.353
77.548
4.991
OK
208
19.387
16.353
77.548
0.003
OK
209
19.387
16.353
77.548
0.031
OK
210
19.387
16.353
77.548
0.026
OK
211
19.387
16.353
77.548
2.47
OK
212
19.387
16.353
77.548
0.026
OK
213
19.387
16.353
77.548
4.967
OK
214
19.387
16.353
77.548
0.026
OK
215
19.387
16.353
77.548
4.974
OK
216
19.387
16.353
77.548
0.02
OK
217
19.387
16.353
77.548
2.458
OK
218
19.387
16.353
77.548
0.026
OK
219
19.387
16.353
77.548
2.464
OK
220
19.387
16.353
77.548
0.02
OK
221
19.387
16.353
77.548
0.042
OK
222
19.387
16.353
77.548
0.036
OK
223
19.387
16.353
77.548
2.461
OK
224
19.387
16.353
77.548
0.036
OK
225
19.387
16.353
77.548
4.958
OK
226
19.387
16.353
77.548
0.036
OK
227
19.387
16.353
77.548
4.967
OK
228
19.387
16.353
77.548
0.027
OK
201
19.387
16.353
77.548
0.027
OK
202
19.387
16.353
77.548
0.023
OK
203
19.387
16.353
77.548
0.008
OK
204
19.387
16.353
77.548
0.172
OK
205
19.387
16.353
77.548
0.008
OK
206
19.387
16.353
77.548
0.368
OK
207
19.387
16.353
77.548
0.013
OK
208
19.387
16.353
77.548
0.373
OK
209
19.387
16.353
77.548
0.116
OK
210
19.387
16.353
77.548
0.1
OK
211
19.387
16.353
77.548
0.084
OK
212
19.387
16.353
77.548
0.096
OK
213
19.387
16.353
77.548
0.069
OK
214
19.387
16.353
77.548
0.291
OK
215
19.387
16.353
77.548
0.044
OK
216
19.387
16.353
77.548
0.316
OK
217
19.387
16.353
77.548
0.101
OK
218
19.387
16.353
77.548
0.007
OK
219
19.387
16.353
77.548
0.076
OK
220
19.387
16.353
77.548
0.032
OK
221
19.387
16.353
77.548
0.154
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 28
222
19.387
16.353
77.548
0.132
OK
223
19.387
16.353
77.548
0.117
OK
224
19.387
16.353
77.548
0.063
OK
225
19.387
16.353
77.548
0.102
OK
226
19.387
16.353
77.548
0.258
OK
227
19.387
16.353
77.548
0.069
OK
228
19.387
16.353
77.548
0.291
OK
201
19.387
16.353
77.548
0.004
OK
202
19.387
16.353
77.548
0.004
OK
203
19.387
16.353
77.548
2.48
OK
204
19.387
16.353
77.548
0.004
OK
205
19.387
16.353
77.548
4.964
OK
206
19.387
16.353
77.548
0.004
OK
207
19.387
16.353
77.548
4.965
OK
208
19.387
16.353
77.548
0.003
OK
209
19.387
16.353
77.548
0.032
OK
210
19.387
16.353
77.548
0.028
OK
211
19.387
16.353
77.548
2.456
OK
212
19.387
16.353
77.548
0.028
OK
213
19.387
16.353
77.548
4.94
OK
214
19.387
16.353
77.548
0.028
OK
215
19.387
16.353
77.548
4.947
OK
216
19.387
16.353
77.548
0.021
OK
217
19.387
16.353
77.548
2.474
OK
218
19.387
16.353
77.548
0.028
OK
219
19.387
16.353
77.548
2.481
OK
220
19.387
16.353
77.548
0.021
OK
221
19.387
16.353
77.548
0.043
OK
222
19.387
16.353
77.548
0.037
OK
223
19.387
16.353
77.548
2.447
OK
224
19.387
16.353
77.548
0.037
OK
225
19.387
16.353
77.548
4.931
OK
226
19.387
16.353
77.548
0.037
OK
227
19.387
16.353
77.548
4.94
OK
228
19.387
16.353
77.548
0.028
OK
201
19.387
16.353
77.548
0.022
OK
202
19.387
16.353
77.548
0.019
OK
203
19.387
16.353
77.548
0.031
OK
204
19.387
16.353
77.548
0.222
OK
205
19.387
16.353
77.548
0.043
OK
206
19.387
16.353
77.548
0.424
OK
207
19.387
16.353
77.548
0.038
OK
208
19.387
16.353
77.548
0.419
OK
209
19.387
16.353
77.548
0.092
OK
13
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
16
Page 29
210
19.387
16.353
77.548
0.079
OK
211
19.387
16.353
77.548
0.091
OK
212
19.387
16.353
77.548
0.282
OK
213
19.387
16.353
77.548
0.103
OK
214
19.387
16.353
77.548
0.484
OK
215
19.387
16.353
77.548
0.083
OK
216
19.387
16.353
77.548
0.464
OK
217
19.387
16.353
77.548
0.081
OK
218
19.387
16.353
77.548
0.192
OK
219
19.387
16.353
77.548
0.061
OK
220
19.387
16.353
77.548
0.172
OK
221
19.387
16.353
77.548
0.122
OK
222
19.387
16.353
77.548
0.104
OK
223
19.387
16.353
77.548
0.116
OK
224
19.387
16.353
77.548
0.307
OK
225
19.387
16.353
77.548
0.128
OK
226
19.387
16.353
77.548
0.509
OK
227
19.387
16.353
77.548
0.102
OK
228
19.387
16.353
77.548
0.483
OK
201
19.387
16.353
77.548
0.09
OK
202
19.387
16.353
77.548
0.077
OK
203
19.387
16.353
77.548
2.313
OK
204
19.387
16.353
77.548
0.07
OK
205
19.387
16.353
77.548
4.702
OK
206
19.387
16.353
77.548
0.062
OK
207
19.387
16.353
77.548
4.722
OK
208
19.387
16.353
77.548
0.043
OK
209
19.387
16.353
77.548
0.279
OK
210
19.387
16.353
77.548
0.239
OK
211
19.387
16.353
77.548
2.151
OK
212
19.387
16.353
77.548
0.232
OK
213
19.387
16.353
77.548
4.54
OK
214
19.387
16.353
77.548
0.224
OK
215
19.387
16.353
77.548
4.6
OK
216
19.387
16.353
77.548
0.165
OK
217
19.387
16.353
77.548
2.334
OK
218
19.387
16.353
77.548
0.236
OK
219
19.387
16.353
77.548
2.393
OK
220
19.387
16.353
77.548
0.176
OK
221
19.387
16.353
77.548
0.358
OK
222
19.387
16.353
77.548
0.307
OK
223
19.387
16.353
77.548
2.082
OK
224
19.387
16.353
77.548
0.3
OK
225
19.387
16.353
77.548
4.472
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 30
226
19.387
16.353
77.548
0.293
OK
227
19.387
16.353
77.548
4.549
OK
228
19.387
16.353
77.548
0.216
OK
201
19.387
16.353
77.548
0.007
OK
202
19.387
16.353
77.548
0.006
OK
203
19.387
16.353
77.548
0.009
OK
204
19.387
16.353
77.548
0.208
OK
205
19.387
16.353
77.548
0.024
OK
206
19.387
16.353
77.548
0.423
OK
207
19.387
16.353
77.548
0.026
OK
208
19.387
16.353
77.548
0.424
OK
209
19.387
16.353
77.548
0.021
OK
210
19.387
16.353
77.548
0.018
OK
211
19.387
16.353
77.548
0.003
OK
212
19.387
16.353
77.548
0.196
OK
213
19.387
16.353
77.548
0.012
OK
214
19.387
16.353
77.548
0.411
OK
215
19.387
16.353
77.548
0.017
OK
216
19.387
16.353
77.548
0.415
OK
217
19.387
16.353
77.548
0.015
OK
218
19.387
16.353
77.548
0.105
OK
219
19.387
16.353
77.548
0.01
OK
220
19.387
16.353
77.548
0.11
OK
221
19.387
16.353
77.548
0.025
OK
222
19.387
16.353
77.548
0.022
OK
223
19.387
16.353
77.548
0.006
OK
224
19.387
16.353
77.548
0.193
OK
225
19.387
16.353
77.548
0.009
OK
226
19.387
16.353
77.548
0.407
OK
227
19.387
16.353
77.548
0.014
OK
228
19.387
16.353
77.548
0.413
OK
201
19.387
16.353
77.548
0.09
OK
202
19.387
16.353
77.548
0.077
OK
203
19.387
16.353
77.548
2.171
OK
204
19.387
16.353
77.548
0.084
OK
205
19.387
16.353
77.548
4.419
OK
206
19.387
16.353
77.548
0.091
OK
207
19.387
16.353
77.548
4.438
OK
208
19.387
16.353
77.548
0.072
OK
209
19.387
16.353
77.548
0.28
OK
210
19.387
16.353
77.548
0.24
OK
211
19.387
16.353
77.548
2.008
OK
212
19.387
16.353
77.548
0.247
OK
213
19.387
16.353
77.548
4.256
OK
17
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 31
214
19.387
16.353
77.548
0.254
OK
215
19.387
16.353
77.548
4.316
OK
216
19.387
16.353
77.548
0.194
OK
217
19.387
16.353
77.548
2.282
OK
218
19.387
16.353
77.548
0.243
OK
219
19.387
16.353
77.548
2.342
OK
220
19.387
16.353
77.548
0.183
OK
221
19.387
16.353
77.548
0.361
OK
222
19.387
16.353
77.548
0.31
OK
223
19.387
16.353
77.548
1.938
OK
224
19.387
16.353
77.548
0.317
OK
225
19.387
16.353
77.548
4.186
OK
226
19.387
16.353
77.548
0.324
OK
227
19.387
16.353
77.548
4.264
OK
228
19.387
16.353
77.548
0.247
OK
201
19.387
16.353
77.548
0.014
OK
202
19.387
16.353
77.548
0.012
OK
203
19.387
16.353
77.548
0.024
OK
204
19.387
16.353
77.548
0.23
OK
205
19.387
16.353
77.548
0.036
OK
206
19.387
16.353
77.548
0.449
OK
207
19.387
16.353
77.548
0.033
OK
208
19.387
16.353
77.548
0.446
OK
209
19.387
16.353
77.548
0.052
OK
210
19.387
16.353
77.548
0.044
OK
211
19.387
16.353
77.548
0.056
OK
212
19.387
16.353
77.548
0.263
OK
213
19.387
16.353
77.548
0.068
OK
214
19.387
16.353
77.548
0.481
OK
215
19.387
16.353
77.548
0.057
OK
216
19.387
16.353
77.548
0.47
OK
217
19.387
16.353
77.548
0.047
OK
218
19.387
16.353
77.548
0.17
OK
219
19.387
16.353
77.548
0.036
OK
220
19.387
16.353
77.548
0.159
OK
221
19.387
16.353
77.548
0.067
OK
222
19.387
16.353
77.548
0.058
OK
223
19.387
16.353
77.548
0.07
OK
224
19.387
16.353
77.548
0.276
OK
225
19.387
16.353
77.548
0.082
OK
226
19.387
16.353
77.548
0.494
OK
227
19.387
16.353
77.548
0.067
OK
228
19.387
16.353
77.548
0.48
OK
201
19.387
16.353
77.548
0.004
OK
20
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 32
0.004
OK
77.548
2.5
OK
77.548
0.004
OK
16.353
77.548
4.997
OK
19.387
16.353
77.548
0.004
OK
207
19.387
16.353
77.548
4.996
OK
208
19.387
16.353
77.548
0.003
OK
209
19.387
16.353
77.548
0.032
OK
210
19.387
16.353
77.548
0.028
OK
211
19.387
16.353
77.548
2.524
OK
212
19.387
16.353
77.548
0.028
OK
213
19.387
16.353
77.548
5.021
OK
214
19.387
16.353
77.548
0.028
OK
215
19.387
16.353
77.548
5.014
OK
216
19.387
16.353
77.548
0.021
OK
217
19.387
16.353
77.548
2.512
OK
218
19.387
16.353
77.548
0.028
OK
219
19.387
16.353
77.548
2.505
OK
220
19.387
16.353
77.548
0.021
OK
221
19.387
16.353
77.548
0.045
OK
222
19.387
16.353
77.548
0.038
OK
223
19.387
16.353
77.548
2.535
OK
224
19.387
16.353
77.548
0.038
OK
225
19.387
16.353
77.548
5.032
OK
226
19.387
16.353
77.548
0.038
OK
227
19.387
16.353
77.548
5.022
OK
228
19.387
16.353
77.548
0.029
OK
201
19.387
16.353
77.548
0.011
OK
202
19.387
16.353
77.548
0.01
OK
203
19.387
16.353
77.548
0.001
OK
204
19.387
16.353
77.548
0.199
OK
205
19.387
16.353
77.548
0.008
OK
206
19.387
16.353
77.548
0.408
OK
207
19.387
16.353
77.548
0.01
OK
208
19.387
16.353
77.548
0.41
OK
209
19.387
16.353
77.548
0.046
OK
210
19.387
16.353
77.548
0.04
OK
211
19.387
16.353
77.548
0.031
OK
212
19.387
16.353
77.548
0.169
OK
213
19.387
16.353
77.548
0.022
OK
214
19.387
16.353
77.548
0.378
OK
215
19.387
16.353
77.548
0.012
OK
216
19.387
16.353
77.548
0.388
OK
217
19.387
16.353
77.548
0.04
OK
202
19.387
16.353
77.548
203
19.387
16.353
204
19.387
16.353
205
19.387
206
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 33
0.068
OK
77.548
0.03
OK
77.548
0.078
OK
16.353
77.548
0.062
OK
19.387
16.353
77.548
0.053
OK
223
19.387
16.353
77.548
0.044
OK
224
19.387
16.353
77.548
0.156
OK
225
19.387
16.353
77.548
0.035
OK
226
19.387
16.353
77.548
0.365
OK
227
19.387
16.353
77.548
0.022
OK
228
19.387
16.353
77.548
0.378
OK
201
19.387
16.353
77.548
0.004
OK
202
19.387
16.353
77.548
0.004
OK
203
19.387
16.353
77.548
2.488
OK
204
19.387
16.353
77.548
0.004
OK
205
19.387
16.353
77.548
4.972
OK
206
19.387
16.353
77.548
0.004
OK
207
19.387
16.353
77.548
4.971
OK
208
19.387
16.353
77.548
0.003
OK
209
19.387
16.353
77.548
0.031
OK
210
19.387
16.353
77.548
0.026
OK
211
19.387
16.353
77.548
2.51
OK
212
19.387
16.353
77.548
0.026
OK
213
19.387
16.353
77.548
4.994
OK
214
19.387
16.353
77.548
0.026
OK
215
19.387
16.353
77.548
4.988
OK
216
19.387
16.353
77.548
0.02
OK
217
19.387
16.353
77.548
2.528
OK
218
19.387
16.353
77.548
0.026
OK
219
19.387
16.353
77.548
2.522
OK
220
19.387
16.353
77.548
0.02
OK
221
19.387
16.353
77.548
0.043
OK
222
19.387
16.353
77.548
0.037
OK
223
19.387
16.353
77.548
2.521
OK
224
19.387
16.353
77.548
0.037
OK
225
19.387
16.353
77.548
5.005
OK
226
19.387
16.353
77.548
0.037
OK
227
19.387
16.353
77.548
4.996
OK
228
19.387
16.353
77.548
0.028
OK
201
19.387
16.353
77.548
0.018
OK
202
19.387
16.353
77.548
0.016
OK
203
19.387
16.353
77.548
0.031
OK
204
19.387
16.353
77.548
0.23
OK
205
19.387
16.353
77.548
0.046
OK
218
19.387
16.353
77.548
219
19.387
16.353
220
19.387
16.353
221
19.387
222
21
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
24
Page 34
206
19.387
16.353
77.548
0.444
OK
207
19.387
16.353
77.548
0.042
OK
208
19.387
16.353
77.548
0.441
OK
209
19.387
16.353
77.548
0.07
OK
210
19.387
16.353
77.548
0.06
OK
211
19.387
16.353
77.548
0.075
OK
212
19.387
16.353
77.548
0.274
OK
213
19.387
16.353
77.548
0.09
OK
214
19.387
16.353
77.548
0.489
OK
215
19.387
16.353
77.548
0.075
OK
216
19.387
16.353
77.548
0.474
OK
217
19.387
16.353
77.548
0.057
OK
218
19.387
16.353
77.548
0.173
OK
219
19.387
16.353
77.548
0.042
OK
220
19.387
16.353
77.548
0.158
OK
221
19.387
16.353
77.548
0.092
OK
222
19.387
16.353
77.548
0.079
OK
223
19.387
16.353
77.548
0.094
OK
224
19.387
16.353
77.548
0.294
OK
225
19.387
16.353
77.548
0.11
OK
226
19.387
16.353
77.548
0.508
OK
227
19.387
16.353
77.548
0.09
OK
228
19.387
16.353
77.548
0.488
OK
201
19.387
16.353
77.548
0.088
OK
202
19.387
16.353
77.548
0.076
OK
203
19.387
16.353
77.548
2.464
OK
204
19.387
16.353
77.548
0.078
OK
205
19.387
16.353
77.548
4.853
OK
206
19.387
16.353
77.548
0.08
OK
207
19.387
16.353
77.548
4.834
OK
208
19.387
16.353
77.548
0.061
OK
209
19.387
16.353
77.548
0.272
OK
210
19.387
16.353
77.548
0.233
OK
211
19.387
16.353
77.548
2.622
OK
212
19.387
16.353
77.548
0.235
OK
213
19.387
16.353
77.548
5.01
OK
214
19.387
16.353
77.548
0.238
OK
215
19.387
16.353
77.548
4.952
OK
216
19.387
16.353
77.548
0.179
OK
217
19.387
16.353
77.548
2.805
OK
218
19.387
16.353
77.548
0.23
OK
219
19.387
16.353
77.548
2.747
OK
220
19.387
16.353
77.548
0.172
OK
221
19.387
16.353
77.548
0.35
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 35
222
19.387
16.353
77.548
0.3
OK
223
19.387
16.353
77.548
2.689
OK
224
19.387
16.353
77.548
0.302
OK
225
19.387
16.353
77.548
5.078
OK
226
19.387
16.353
77.548
0.305
OK
227
19.387
16.353
77.548
5.003
OK
228
19.387
16.353
77.548
0.23
OK
201
19.387
16.353
77.548
0.006
OK
202
19.387
16.353
77.548
0.005
OK
203
19.387
16.353
77.548
0.012
OK
204
19.387
16.353
77.548
0.22
OK
205
19.387
16.353
77.548
0.029
OK
206
19.387
16.353
77.548
0.445
OK
207
19.387
16.353
77.548
0.03
OK
208
19.387
16.353
77.548
0.446
OK
209
19.387
16.353
77.548
0.013
OK
210
19.387
16.353
77.548
0.011
OK
211
19.387
16.353
77.548
0.006
OK
212
19.387
16.353
77.548
0.214
OK
213
19.387
16.353
77.548
0.023
OK
214
19.387
16.353
77.548
0.439
OK
215
19.387
16.353
77.548
0.025
OK
216
19.387
16.353
77.548
0.442
OK
217
19.387
16.353
77.548
0.015
OK
218
19.387
16.353
77.548
0.112
OK
219
19.387
16.353
77.548
0.013
OK
220
19.387
16.353
77.548
0.115
OK
221
19.387
16.353
77.548
0.017
OK
222
19.387
16.353
77.548
0.014
OK
223
19.387
16.353
77.548
0.002
OK
224
19.387
16.353
77.548
0.21
OK
225
19.387
16.353
77.548
0.019
OK
226
19.387
16.353
77.548
0.435
OK
227
19.387
16.353
77.548
0.023
OK
228
19.387
16.353
77.548
0.439
OK
201
19.387
16.353
77.548
0.091
OK
202
19.387
16.353
77.548
0.078
OK
203
19.387
16.353
77.548
2.327
OK
204
19.387
16.353
77.548
0.076
OK
205
19.387
16.353
77.548
4.576
OK
206
19.387
16.353
77.548
0.073
OK
207
19.387
16.353
77.548
4.556
OK
208
19.387
16.353
77.548
0.054
OK
209
19.387
16.353
77.548
0.287
OK
25
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 36
210
19.387
16.353
77.548
0.246
OK
211
19.387
16.353
77.548
2.495
OK
212
19.387
16.353
77.548
0.244
OK
213
19.387
16.353
77.548
4.744
OK
214
19.387
16.353
77.548
0.241
OK
215
19.387
16.353
77.548
4.682
OK
216
19.387
16.353
77.548
0.18
OK
217
19.387
16.353
77.548
2.767
OK
218
19.387
16.353
77.548
0.249
OK
219
19.387
16.353
77.548
2.706
OK
220
19.387
16.353
77.548
0.188
OK
221
19.387
16.353
77.548
0.37
OK
222
19.387
16.353
77.548
0.317
OK
223
19.387
16.353
77.548
2.566
OK
224
19.387
16.353
77.548
0.314
OK
225
19.387
16.353
77.548
4.814
OK
226
19.387
16.353
77.548
0.312
OK
227
19.387
16.353
77.548
4.735
OK
228
19.387
16.353
77.548
0.233
OK
201
19.387
16.353
77.548
0.013
OK
202
19.387
16.353
77.548
0.011
OK
203
19.387
16.353
77.548
0.033
OK
204
19.387
16.353
77.548
0.24
OK
205
19.387
16.353
77.548
0.056
OK
206
19.387
16.353
77.548
0.468
OK
207
19.387
16.353
77.548
0.053
OK
208
19.387
16.353
77.548
0.466
OK
209
19.387
16.353
77.548
0.046
OK
210
19.387
16.353
77.548
0.04
OK
211
19.387
16.353
77.548
0.062
OK
212
19.387
16.353
77.548
0.268
OK
213
19.387
16.353
77.548
0.084
OK
214
19.387
16.353
77.548
0.497
OK
215
19.387
16.353
77.548
0.075
OK
216
19.387
16.353
77.548
0.487
OK
217
19.387
16.353
77.548
0.035
OK
218
19.387
16.353
77.548
0.166
OK
219
19.387
16.353
77.548
0.025
OK
220
19.387
16.353
77.548
0.156
OK
221
19.387
16.353
77.548
0.059
OK
222
19.387
16.353
77.548
0.05
OK
223
19.387
16.353
77.548
0.073
OK
224
19.387
16.353
77.548
0.279
OK
225
19.387
16.353
77.548
0.095
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 37
226
19.387
16.353
77.548
0.508
OK
227
19.387
16.353
77.548
0.083
OK
228
19.387
16.353
77.548
0.495
OK
201
19.387
16.353
77.548
0.094
OK
202
19.387
16.353
77.548
0.08
OK
203
19.387
16.353
77.548
2.23
OK
204
19.387
16.353
77.548
0.078
OK
205
19.387
16.353
77.548
4.54
OK
206
19.387
16.353
77.548
0.076
OK
207
19.387
16.353
77.548
4.561
OK
208
19.387
16.353
77.548
0.055
OK
209
19.387
16.353
77.548
0.263
OK
210
19.387
16.353
77.548
0.226
OK
211
19.387
16.353
77.548
2.085
OK
212
19.387
16.353
77.548
0.223
OK
213
19.387
16.353
77.548
4.395
OK
214
19.387
16.353
77.548
0.221
OK
215
19.387
16.353
77.548
4.452
OK
216
19.387
16.353
77.548
0.164
OK
217
19.387
16.353
77.548
2.347
OK
218
19.387
16.353
77.548
0.223
OK
219
19.387
16.353
77.548
2.403
OK
220
19.387
16.353
77.548
0.166
OK
221
19.387
16.353
77.548
0.335
OK
222
19.387
16.353
77.548
0.287
OK
223
19.387
16.353
77.548
2.024
OK
224
19.387
16.353
77.548
0.284
OK
225
19.387
16.353
77.548
4.334
OK
226
19.387
16.353
77.548
0.282
OK
227
19.387
16.353
77.548
4.406
OK
228
19.387
16.353
77.548
0.21
OK
201
19.387
16.353
77.548
0.004
OK
202
19.387
16.353
77.548
0.004
OK
203
19.387
16.353
77.548
0.014
OK
204
19.387
16.353
77.548
0.215
OK
205
19.387
16.353
77.548
0.032
OK
206
19.387
16.353
77.548
0.433
OK
207
19.387
16.353
77.548
0.033
OK
208
19.387
16.353
77.548
0.434
OK
209
19.387
16.353
77.548
0.006
OK
210
19.387
16.353
77.548
0.005
OK
211
19.387
16.353
77.548
0.013
OK
212
19.387
16.353
77.548
0.214
OK
213
19.387
16.353
77.548
0.03
OK
37
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 38
214
19.387
16.353
77.548
0.432
OK
215
19.387
16.353
77.548
0.032
OK
216
19.387
16.353
77.548
0.433
OK
217
19.387
16.353
77.548
0.001
OK
218
19.387
16.353
77.548
0.121
OK
219
19.387
16.353
77.548
0.002
OK
220
19.387
16.353
77.548
0.122
OK
221
19.387
16.353
77.548
0.007
OK
222
19.387
16.353
77.548
0.006
OK
223
19.387
16.353
77.548
0.012
OK
224
19.387
16.353
77.548
0.212
OK
225
19.387
16.353
77.548
0.029
OK
226
19.387
16.353
77.548
0.431
OK
227
19.387
16.353
77.548
0.031
OK
228
19.387
16.353
77.548
0.432
OK
201
19.387
16.353
77.548
0.094
OK
202
19.387
16.353
77.548
0.08
OK
203
19.387
16.353
77.548
2.391
OK
204
19.387
16.353
77.548
0.079
OK
205
19.387
16.353
77.548
4.701
OK
206
19.387
16.353
77.548
0.077
OK
207
19.387
16.353
77.548
4.681
OK
208
19.387
16.353
77.548
0.057
OK
209
19.387
16.353
77.548
0.265
OK
210
19.387
16.353
77.548
0.227
OK
211
19.387
16.353
77.548
2.537
OK
212
19.387
16.353
77.548
0.225
OK
213
19.387
16.353
77.548
4.848
OK
214
19.387
16.353
77.548
0.224
OK
215
19.387
16.353
77.548
4.791
OK
216
19.387
16.353
77.548
0.167
OK
217
19.387
16.353
77.548
2.799
OK
218
19.387
16.353
77.548
0.224
OK
219
19.387
16.353
77.548
2.743
OK
220
19.387
16.353
77.548
0.167
OK
221
19.387
16.353
77.548
0.336
OK
222
19.387
16.353
77.548
0.288
OK
223
19.387
16.353
77.548
2.598
OK
224
19.387
16.353
77.548
0.286
OK
225
19.387
16.353
77.548
4.909
OK
226
19.387
16.353
77.548
0.285
OK
227
19.387
16.353
77.548
4.837
OK
228
19.387
16.353
77.548
0.213
OK
201
19.387
16.353
77.548
0.004
OK
X
39
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 39
202
19.387
16.353
77.548
0.004
OK
203
19.387
16.353
77.548
0.015
OK
204
19.387
16.353
77.548
0.225
OK
205
19.387
16.353
77.548
0.033
OK
206
19.387
16.353
77.548
0.454
OK
207
19.387
16.353
77.548
0.034
OK
208
19.387
16.353
77.548
0.455
OK
209
19.387
16.353
77.548
0.01
OK
210
19.387
16.353
77.548
0.008
OK
211
19.387
16.353
77.548
0.01
OK
212
19.387
16.353
77.548
0.22
OK
213
19.387
16.353
77.548
0.028
OK
214
19.387
16.353
77.548
0.449
OK
215
19.387
16.353
77.548
0.031
OK
216
19.387
16.353
77.548
0.451
OK
217
19.387
16.353
77.548
0.014
OK
218
19.387
16.353
77.548
0.118
OK
219
19.387
16.353
77.548
0.012
OK
220
19.387
16.353
77.548
0.12
OK
221
19.387
16.353
77.548
0.011
OK
222
19.387
16.353
77.548
0.01
OK
223
19.387
16.353
77.548
0.009
OK
224
19.387
16.353
77.548
0.219
OK
225
19.387
16.353
77.548
0.027
OK
226
19.387
16.353
77.548
0.448
OK
227
19.387
16.353
77.548
0.03
OK
228
19.387
16.353
77.548
0.45
OK
AFES CALCULATION
FOOTING FOR FOUNDATION TYPE F2
TITLE
DESCRIPTION
PROJECT/JOB NO.
09-JC-15 (AL-1)
PROJECT/JOB NAME
ICA PROJECT
CLIENT NAME
ICA
SITE NAME
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME
DATE
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
FOUNDATION LISTS
Group Name
No.
Description
No.
Description
F65
F66
F67
F68
F69
F70
F71
F72
F73
10
F74
11
F75
12
F76
13
F77
14
F78
15
F79
16
F80
17
F81
18
F82
19
F83
20
F84
21
F85
22
F86
23
F87
24
F88
F2
Page 1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
CONTENTS
1. GENERAL
1.1 MATERIALS & UNIT WEIGHT
1.2 SUBSOIL CONDITION & SAFETY FACTORS
1.3 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE
Page 2
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 3
1. GENERAL
1.1 MATERIALS & UNIT WEIGHT
Items
Value
250.000 kgf/cm2
150.000 kgf/cm2
3900.000 kgf/cm2
3900.000 kgf/cm2
1.700 ton/m3
2.400 ton/m3
250998.000 kgf/cm2
- Pile Capacity
Items
Value
Pile Name
Footing List
F65, F66, F67, F68, F69, F70, F71, F72, F73, F74, F75, F76, F77,
Diameter
300 mm
Length
12 m
Thick
9 mm
Shape
Circle
Capacity ( Ha , Ua , Va )
4 , 13.4 , 58 tonf
Description
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
1.7
Friction factor ()
0.3
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
1.3 LOAD COMBINATION
Index
SW
SELF WEIGHT
Empty
EMPTY LOAD
DL
DEAD LOAD
Operation
OPERATION LOAD
Test
TEST LOAD
Wlx
Wly
SLx2
SLy2
10
LL
LIVE LOAD
Comb . ID
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
.6 SW + .6 DL + .6 Operation + .7 SLx2
122
.6 SW + .6 DL + .6 Operation + .7 SLy2
123
124
125
126
127
128
129
130
Page 4
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Comb . ID
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
Page 5
2. DRAWING
REFERENCE DWGS
A06
A01A02 A03 A04 A05
3000
6000
6440
16
NO.
DWG NO.
DWG TITLE
2000
6000
11500
38
F8940
F90
5000
15
6000
11
10
16
F2324
F27
15
F7323
F77
6000
12
NOTES
* OUTPUT UNIT : mm
6000
13
37
F2939
F31
17
F2425
F28
10000
14
14
F7222
F76
08
07
8000
06
05
02
01
6000
8000
03
11
F7119
F75
10
F7018
F74
9F6926
F78
1F652F66
7F63
3F61
8F64
4F62
31
36
F83
F88
5F67
6F68
30
35
F82
F87
6000
04
12
F2120
F25
29
34
F81
F86
28
33
F80
F85
09
2000
6000
6000
5500
13000
13
F2221
F26
PROCESS PIPING
VESSELS STRUCT.
ELEC.
INST.
27
32
F79
F84
SCALE
AS SHOWN
JOB NO.
09-JC-15 (AL-1)
MICROFILM NO.
OUTPUT UNIT : mm
REFERENCE DWGS
750
TOP
DWG TITLE
D13@200
750
375x2
D13@200
375
375
CL FOOTING
BOTTOM
DWG NO.
75
TYP.
NO.
NOTES
* PILE
1-300 PS-12 D.300 12M
* ANCHOR BOLT
1X4-M20 ANC. BOLTS (TYPE TYPE L)
375x2
D13@200
* OUTPUT UNIT : mm
D13@200
240
75
75
90
50
TYP.
120x3
D10
600
75
100
D16
360
D10
@200
300
700
110 PROJ.
25 GR.
FOUNDATION PLAN
(24 EA)
6-D16
150
PEDESTAL
PROCESS PIPING
SECTION
SCALE
REV.
DATE
DESCRIPTION
AS SHOWN
VESSELS STRUCT.
JOB NO.
09-JC-15 (AL-1)
ELEC.
INST.
MICROFILM NO.
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 9
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name
750
750
240 360
F65
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F65
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.243 tonf
1.199 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
240 360
Page 10
F66
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F66
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F67
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 11
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F67
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F68
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F68
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.243 tonf
1.199 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
240 360
Page 12
F69
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F69
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F70
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 13
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F70
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F71
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F71
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.243 tonf
1.199 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
240 360
Page 14
F72
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F72
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F73
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 15
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F73
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F74
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F74
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.243 tonf
1.199 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
240 360
Page 16
F75
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F75
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F76
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 17
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F76
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F77
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F77
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.243 tonf
1.199 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
240 360
Page 18
F78
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F78
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F79
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 19
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F79
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F80
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F80
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.243 tonf
1.199 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
240 360
Page 20
F81
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F81
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F82
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 21
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F82
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F83
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F83
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.243 tonf
1.199 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
240 360
Page 22
F84
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F84
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F85
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 23
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F85
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F86
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
3
Soil Volume
3
Pier Wt
F86
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
0.563 m2
0.811 tonf
0.243 tonf
1.199 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
750
240 360
Page 24
F87
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F87
All Direct
0.338 m3
0.143 m3
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
( mm ) Ft. Name
750
750
240 360
F88
Ft. Type
ISO
Area
0.563 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.338 m3
Ft. Weight
0.811 tonf
Soil Height
300.00 mm
Soil Volume
0.143 m3
Soil Weight
0.243 tonf
Buoyancy
Not Consider
1.054 tonf
P = 11.54 ton
600
300
700
P = 3.25 ton
Footing
Weight
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 25
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F88
All Direct
0.338 m
0.143 m
0.145 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
0.811 tonf
0.243 tonf
1.199 tonf
S1
0.563 m
Ft.Name
Pr.Name
Shape
Pw
Ph
F65
Rectangle
240.000
Pl
360.000
700.000
Area
0.086
Weight
0.145
Off X
0.000
Off Y
0.000
F66
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F67
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F68
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F69
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F70
10
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F71
11
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F72
14
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F73
15
Rectangle
240.000
360.000
700.000
0.000
0.000
18
Rectangle
240.000
360.000
700.000
0.086
0.086
0.145
F74
0.145
0.000
0.000
F75
19
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F76
22
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F77
23
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F78
26
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F79
27
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F80
28
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F81
29
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F82
30
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F83
31
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F84
32
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F85
33
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F86
34
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F87
35
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
F88
36
Rectangle
240.000
360.000
700.000
0.086
0.145
0.000
0.000
Fy
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch)
are based on the right hand rule.
My
Fx
Mx
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Index
SW
SELF WEIGHT
Empty
EMPTY LOAD
DL
DEAD LOAD
Operation
OPERATION LOAD
Test
TEST LOAD
Wlx
Wly
SLx2
SLy2
10
LL
LIVE LOAD
Page 26
Ft.Name
F65
Pr.Name
Load Case
F67
Mx
My
-0.15
0.01
0.01
-0.09
0.06
0.07
-0.46
0.15
0.3
-1.73
0.21
0.42
-2.42
-1.14
-0.56
3.93
-0.64
-2.73
10.5
-1.18
-0.37
3.41
-0.22
-1.12
4.48
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.02
-0.1
-0.02
0.08
-0.59
-0.05
0.33
-2.07
-0.06
0.46
-2.9
-1.05
0.07
-1.88
0.48
-3.13
11.64
-1.18
0.32
-3.07
0.24
-1.12
4.49
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
0.01
-0.11
0.05
0.06
-0.8
0.14
0.15
-2.24
0.19
0.21
-3.13
-1.09
-0.32
3.91
-0.24
-1.75
5.49
-1.01
-0.3
3.7
-0.1
-0.38
1.38
10
0.000
0.000
-1.054
0.000
0.000
Footing SW
F68
Fz
Footing SW
Fy
Footing SW
F66
Fx
-0.15
-0.01
0.01
-0.1
-0.09
0.05
-0.74
-0.23
0.13
-2.1
-0.33
0.18
-2.94
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
10
11
0.33
-4.1
0.41
-1.18
4.09
-1.03
0.33
-4
0.09
-0.38
1.35
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
-0.01
-0.19
0.08
-0.05
-0.78
0.27
-0.21
-3.72
0.38
-0.3
-5.21
-1.33
-0.12
2.2
0.63
-2.72
-10.38
-1.66
0.22
4.62
0.22
-1.12
-4.43
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
-0.21
0.07
-0.85
0.26
-4.2
0.36
-5.88
-2.04
6.78
0.01
-0.12
-0.07
-1.66
6.37
-0.01
-0.02
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
-0.1
0.05
-0.47
0.16
-0.01
-2.05
0.22
-0.02
-2.88
-2.04
-0.01
6.8
-0.05
-0.16
0.75
-1.72
6.46
-0.03
-0.03
0.44
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
-0.21
0.07
-0.83
0.25
0.01
-4.11
0.35
0.01
-5.76
-2.06
-0.01
6.83
-0.18
-1.71
6.55
-0.04
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
-0.2
0.07
-0.83
Footing SW
F72
14
Footing SW
F73
15
Page 27
-1.11
Footing SW
F71
Client : ICA
Footing SW
F70
Footing SW
F69
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
18
-4.1
0.35
-5.73
-1.99
-0.01
6.57
-0.18
-1.65
6.33
-0.04
10
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.01
-0.21
-0.07
-0.85
-0.26
-4.21
-0.36
-5.9
-2.04
-6.78
-0.13
-0.03
-1.66
-6.37
-0.02
-0.02
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.01
-0.16
-0.05
-0.71
-0.16
-0.02
-3.18
-0.22
-0.02
-4.45
-2.03
-6.64
0.05
-0.17
0.73
-1.73
-6.44
0.03
-0.03
0.41
10
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.01
-0.21
-0.07
-0.83
-0.25
-0.01
-4.13
-0.35
-0.02
-5.79
-2.06
-0.01
-6.82
-0.19
-1.71
-6.55
-0.04
10
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.01
-0.2
-0.07
-0.83
-0.25
-0.01
-4.08
-0.35
-0.01
-5.72
-1.99
-0.01
-6.57
-0.19
-1.65
-6.33
-0.04
Footing SW
F76
22
Footing SW
F77
23
10
Footing SW
F78
26
Page 28
0.25
10
19
Client : ICA
Footing SW
F75
Footing SW
F74
0.000
0.000
-1.054
0.000
0.000
-0.15
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
27
28
29
-0.01
-0.2
-0.04
-0.06
-0.88
-0.18
-0.25
-3.95
-0.25
-0.35
-5.53
-1.42
-0.31
-3.65
-0.47
-3.12
-11.54
-1.65
-0.18
-3.94
-0.23
-1.12
-4.44
10
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.04
0.04
0.01
-0.4
0.07
0.02
-0.82
0.1
0.02
-1.15
-0.75
-0.01
2.87
-0.13
-0.01
-2.19
10.19
-0.01
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
-0.08
0.07
-0.69
0.14
0.01
-1.6
0.2
0.02
-2.24
-1.39
-0.01
5.82
-0.13
-0.02
-2.19
10.2
-0.01
0.01
10
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
-0.09
0.07
-0.75
0.16
-1.79
0.23
-2.5
-1.35
5.64
-0.13
0.02
-2.19
10.18
-0.01
-0.01
10
Footing SW
F82
30
Page 29
-0.01
Footing SW
F81
Client : ICA
Footing SW
F80
Footing SW
F79
0.000
0.000
-1.054
0.000
0.000
-0.15
0.01
-0.09
0.07
-0.75
0.16
0.01
-1.79
0.23
0.01
-2.51
-1.36
5.67
-0.02
-0.13
0.31
-2.18
10.11
-0.01
-0.01
0.09
10
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing SW
F83
31
F84
33
34
0.000
-1.054
0.000
0.000
-0.15
-0.01
-0.07
0.02
-0.07
-0.5
0.06
-0.19
-1.42
0.09
-0.26
-1.99
-0.98
0.14
2.83
0.25
-1.78
-5.78
-1.33
0.3
4.72
0.11
-0.39
-1.47
10
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.04
-0.04
0.01
-0.4
-0.07
0.02
-0.82
-0.1
0.02
-1.15
-0.75
0.01
-2.87
-0.12
0.01
-2.19
-10.19
-0.01
10
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.01
-0.08
-0.07
-0.69
-0.14
0.01
-1.6
-0.2
0.02
-2.24
-1.39
0.01
-5.81
-0.12
-0.03
-2.19
-10.2
-0.01
0.01
10
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.01
-0.09
-0.07
-0.75
-0.16
-1.79
-0.23
-2.5
-1.36
-5.64
-0.12
0.03
-2.19
-10.18
-0.01
-0.01
10
0.000
0.000
-1.054
0.000
0.000
-0.15
-0.01
-0.09
-0.07
-0.75
-0.16
0.01
-1.79
-0.23
0.01
-2.5
-1.36
-5.67
0.03
-0.12
0.21
-2.19
-10.11
Footing SW
F87
35
Page 30
Footing SW
F86
Client : ICA
0.000
Footing SW
F85
Footing SW
32
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 31
0.01
-0.01
0.09
10
0.000
0.000
-1.054
0.000
0.000
Footing SW
-0.15
-0.01
-0.01
-0.06
-0.06
-0.06
-0.44
-0.15
-0.17
-1.25
-0.22
-0.23
-1.76
-0.99
-0.17
-3.04
-0.44
-1.21
-4.32
-1.36
-0.32
-5.1
-0.1
-0.39
-1.44
10
0.000
0.000
-1.054
0.000
0.000
36
F88
Footing SW
In Footing Bottom
In Footing Bottom Center
with Pier Self Weight,
with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing
Pr.Name L.Comb.
101
F65
Fx
Fy
Fz
Mx
My
0.072
0.083
-0.546
0.000
0.000
102
0.072
0.083
-0.546
0.000
0.000
103
-1.064
-0.479
3.381
0.000
0.000
104
-0.567
-2.652
9.950
0.000
0.000
105
-0.780
-0.338
2.399
0.000
0.000
106
-0.407
-1.968
7.326
0.000
0.000
107
-1.093
-0.512
3.599
0.000
0.000
108
-0.596
-2.685
10.168
0.000
0.000
109
0.215
0.369
-2.188
0.000
0.000
110
0.215
0.369
-2.188
0.000
0.000
111
-0.921
-0.193
1.739
0.000
0.000
112
-0.424
-2.366
8.308
0.000
0.000
113
-0.637
-0.052
0.757
0.000
0.000
114
-0.264
-1.682
5.684
0.000
0.000
115
-1.007
-0.341
2.614
0.000
0.000
116
-0.510
-2.514
9.183
0.000
0.000
117
-0.614
0.107
0.198
0.000
0.000
118
0.061
-0.418
0.950
0.000
0.000
119
-0.407
0.173
-0.398
0.000
0.000
120
0.100
-0.221
0.166
0.000
0.000
121
-0.700
-0.040
1.073
0.000
0.000
122
-0.025
-0.565
1.825
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F66
Page 32
123
0.275
0.489
-2.879
0.000
0.000
124
0.275
0.489
-2.879
0.000
0.000
125
-0.861
-0.073
1.048
0.000
0.000
126
-0.364
-2.246
7.617
0.000
0.000
127
-0.577
0.068
0.066
0.000
0.000
128
-0.204
-1.562
4.993
0.000
0.000
129
-0.971
-0.269
2.200
0.000
0.000
130
-0.474
-2.442
8.769
0.000
0.000
201
0.101
0.116
-0.764
0.000
0.000
202
0.086
0.100
-0.655
0.000
0.000
203
-0.822
-0.350
2.486
0.000
0.000
204
-0.425
-2.088
7.742
0.000
0.000
205
-1.731
-0.800
5.628
0.000
0.000
206
-0.936
-4.276
16.138
0.000
0.000
207
-1.753
-0.824
5.792
0.000
0.000
208
-0.958
-4.301
16.302
0.000
0.000
209
0.301
0.517
-3.063
0.000
0.000
210
0.258
0.443
-2.626
0.000
0.000
211
-0.651
-0.007
0.516
0.000
0.000
212
-0.253
-1.745
5.771
0.000
0.000
213
-1.560
-0.456
3.658
0.000
0.000
214
-0.764
-3.933
14.168
0.000
0.000
215
-1.624
-0.567
4.314
0.000
0.000
216
-0.829
-4.044
14.824
0.000
0.000
217
-1.518
-0.118
2.488
0.000
0.000
218
-0.072
-1.243
4.099
0.000
0.000
219
-1.582
-0.229
3.144
0.000
0.000
220
-0.137
-1.354
4.755
0.000
0.000
221
0.385
0.685
-4.031
0.000
0.000
222
0.330
0.587
-3.455
0.000
0.000
223
-0.579
0.137
-0.313
0.000
0.000
224
-0.181
-1.601
4.942
0.000
0.000
225
-1.488
-0.312
2.828
0.000
0.000
226
-0.692
-3.789
13.339
0.000
0.000
227
-1.570
-0.459
3.692
0.000
0.000
228
-0.775
-3.936
14.203
0.000
0.000
101
-0.022
0.096
-0.691
0.000
0.000
102
-0.022
0.096
-0.691
0.000
0.000
103
-1.069
0.165
-2.566
0.000
0.000
104
0.455
-3.036
10.946
0.000
0.000
105
-0.807
0.148
-2.097
0.000
0.000
106
0.336
-2.253
8.037
0.000
0.000
107
-1.060
0.127
-2.290
0.000
0.000
108
0.464
-3.074
11.222
0.000
0.000
109
-0.066
0.407
-2.657
0.000
0.000
110
-0.066
0.407
-2.657
0.000
0.000
111
-1.113
0.476
-4.532
0.000
0.000
112
0.411
-2.725
8.980
0.000
0.000
113
-0.851
0.459
-4.063
0.000
0.000
114
0.292
-1.942
6.071
0.000
0.000
115
-1.087
0.313
-3.469
0.000
0.000
116
0.437
-2.888
10.043
0.000
0.000
117
-0.895
0.632
-4.806
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F67
Page 33
118
0.101
-0.378
0.489
0.000
0.000
119
-0.688
0.576
-4.269
0.000
0.000
120
0.059
-0.182
-0.298
0.000
0.000
121
-0.869
0.470
-3.743
0.000
0.000
122
0.128
-0.541
1.552
0.000
0.000
123
-0.085
0.538
-3.485
0.000
0.000
124
-0.085
0.538
-3.485
0.000
0.000
125
-1.132
0.607
-5.360
0.000
0.000
126
0.392
-2.594
8.152
0.000
0.000
127
-0.870
0.590
-4.891
0.000
0.000
128
0.273
-1.811
5.243
0.000
0.000
129
-1.098
0.392
-3.966
0.000
0.000
130
0.426
-2.809
9.546
0.000
0.000
201
-0.031
0.134
-0.967
0.000
0.000
202
-0.026
0.115
-0.829
0.000
0.000
203
-0.864
0.170
-2.329
0.000
0.000
204
0.355
-2.390
8.480
0.000
0.000
205
-1.702
0.226
-3.829
0.000
0.000
206
0.737
-4.896
17.790
0.000
0.000
207
-1.695
0.197
-3.622
0.000
0.000
208
0.743
-4.925
17.997
0.000
0.000
209
-0.092
0.570
-3.720
0.000
0.000
210
-0.079
0.488
-3.188
0.000
0.000
211
-0.917
0.544
-4.688
0.000
0.000
212
0.302
-2.017
6.121
0.000
0.000
213
-1.754
0.599
-6.188
0.000
0.000
214
0.684
-4.523
15.431
0.000
0.000
215
-1.735
0.477
-5.391
0.000
0.000
216
0.704
-4.645
16.228
0.000
0.000
217
-1.857
0.971
-7.793
0.000
0.000
218
0.279
-1.195
3.553
0.000
0.000
219
-1.837
0.849
-6.996
0.000
0.000
220
0.299
-1.317
4.350
0.000
0.000
221
-0.119
0.753
-4.879
0.000
0.000
222
-0.102
0.646
-4.182
0.000
0.000
223
-0.940
0.701
-5.682
0.000
0.000
224
0.280
-1.860
5.128
0.000
0.000
225
-1.777
0.756
-7.182
0.000
0.000
226
0.661
-4.366
14.437
0.000
0.000
227
-1.752
0.595
-6.136
0.000
0.000
228
0.687
-4.527
15.483
0.000
0.000
101
0.055
0.064
-0.909
0.000
0.000
102
0.055
0.064
-0.909
0.000
0.000
103
-1.039
-0.257
3.006
0.000
0.000
104
-0.185
-1.684
4.586
0.000
0.000
105
-0.766
-0.177
2.027
0.000
0.000
106
-0.125
-1.247
3.212
0.000
0.000
107
-1.061
-0.283
3.370
0.000
0.000
108
-0.207
-1.710
4.950
0.000
0.000
109
0.184
0.208
-3.034
0.000
0.000
110
0.184
0.208
-3.034
0.000
0.000
111
-0.910
-0.113
0.881
0.000
0.000
112
-0.056
-1.540
2.461
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F68
Page 34
113
-0.637
-0.033
-0.098
0.000
0.000
114
0.004
-1.103
1.087
0.000
0.000
115
-0.984
-0.196
2.095
0.000
0.000
116
-0.130
-1.623
3.675
0.000
0.000
117
-0.523
0.000
-0.446
0.000
0.000
118
0.113
-0.059
-2.069
0.000
0.000
119
-0.346
0.052
-1.093
0.000
0.000
120
0.131
0.008
-2.311
0.000
0.000
121
-0.597
-0.083
0.767
0.000
0.000
122
0.040
-0.142
-0.856
0.000
0.000
123
0.238
0.269
-3.929
0.000
0.000
124
0.238
0.269
-3.929
0.000
0.000
125
-0.856
-0.052
-0.014
0.000
0.000
126
-0.002
-1.479
1.566
0.000
0.000
127
-0.582
0.028
-0.993
0.000
0.000
128
0.058
-1.042
0.192
0.000
0.000
129
-0.951
-0.160
1.558
0.000
0.000
130
-0.097
-1.587
3.138
0.000
0.000
201
0.077
0.090
-1.273
0.000
0.000
202
0.066
0.077
-1.091
0.000
0.000
203
-0.809
-0.180
2.041
0.000
0.000
204
-0.126
-1.322
3.305
0.000
0.000
205
-1.684
-0.437
5.173
0.000
0.000
206
-0.318
-2.720
7.701
0.000
0.000
207
-1.701
-0.456
5.446
0.000
0.000
208
-0.335
-2.739
7.974
0.000
0.000
209
0.258
0.291
-4.248
0.000
0.000
210
0.221
0.250
-3.641
0.000
0.000
211
-0.654
-0.007
-0.509
0.000
0.000
212
0.029
-1.149
0.755
0.000
0.000
213
-1.530
-0.264
2.623
0.000
0.000
214
-0.163
-2.547
5.151
0.000
0.000
215
-1.585
-0.326
3.533
0.000
0.000
216
-0.218
-2.610
6.061
0.000
0.000
217
-1.294
-0.196
1.905
0.000
0.000
218
0.069
-0.322
-1.574
0.000
0.000
219
-1.349
-0.258
2.815
0.000
0.000
220
0.014
-0.384
-0.664
0.000
0.000
221
0.333
0.377
-5.501
0.000
0.000
222
0.286
0.323
-4.715
0.000
0.000
223
-0.590
0.066
-1.583
0.000
0.000
224
0.094
-1.076
-0.319
0.000
0.000
225
-1.465
-0.191
1.549
0.000
0.000
226
-0.098
-2.474
4.077
0.000
0.000
227
-1.536
-0.272
2.728
0.000
0.000
228
-0.170
-2.555
5.256
0.000
0.000
101
-0.104
0.054
-0.847
0.000
0.000
102
-0.104
0.054
-0.847
0.000
0.000
103
-1.212
0.384
-4.950
0.000
0.000
104
0.308
-1.131
3.246
0.000
0.000
105
-0.935
0.302
-3.924
0.000
0.000
106
0.205
-0.835
2.223
0.000
0.000
107
-1.170
0.362
-4.611
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F69
Page 35
108
0.350
-1.153
3.585
0.000
0.000
109
-0.326
0.178
-2.840
0.000
0.000
110
-0.326
0.178
-2.840
0.000
0.000
111
-1.434
0.508
-6.943
0.000
0.000
112
0.086
-1.007
1.253
0.000
0.000
113
-1.157
0.426
-5.917
0.000
0.000
114
-0.017
-0.711
0.230
0.000
0.000
115
-1.304
0.437
-5.807
0.000
0.000
116
0.216
-1.078
2.389
0.000
0.000
117
-1.048
0.408
-5.640
0.000
0.000
118
-0.264
-0.089
-1.895
0.000
0.000
119
-0.867
0.350
-4.940
0.000
0.000
120
-0.279
-0.022
-2.131
0.000
0.000
121
-0.917
0.336
-4.504
0.000
0.000
122
-0.133
-0.160
-0.759
0.000
0.000
123
-0.420
0.230
-3.679
0.000
0.000
124
-0.420
0.230
-3.679
0.000
0.000
125
-1.528
0.560
-7.782
0.000
0.000
126
-0.008
-0.955
0.414
0.000
0.000
127
-1.251
0.477
-6.756
0.000
0.000
128
-0.111
-0.659
-0.609
0.000
0.000
129
-1.360
0.468
-6.310
0.000
0.000
130
0.160
-1.047
1.886
0.000
0.000
201
-0.146
0.076
-1.186
0.000
0.000
202
-0.125
0.065
-1.016
0.000
0.000
203
-1.011
0.329
-4.299
0.000
0.000
204
0.205
-0.883
2.258
0.000
0.000
205
-1.898
0.593
-7.581
0.000
0.000
206
0.534
-1.831
5.532
0.000
0.000
207
-1.866
0.577
-7.327
0.000
0.000
208
0.566
-1.847
5.786
0.000
0.000
209
-0.456
0.249
-3.976
0.000
0.000
210
-0.391
0.214
-3.408
0.000
0.000
211
-1.278
0.478
-6.690
0.000
0.000
212
-0.062
-0.734
-0.134
0.000
0.000
213
-2.164
0.742
-9.973
0.000
0.000
214
0.268
-1.682
3.141
0.000
0.000
215
-2.066
0.688
-9.121
0.000
0.000
216
0.366
-1.736
3.993
0.000
0.000
217
-1.938
0.706
-9.408
0.000
0.000
218
-0.258
-0.358
-1.383
0.000
0.000
219
-1.840
0.652
-8.556
0.000
0.000
220
-0.160
-0.411
-0.531
0.000
0.000
221
-0.588
0.322
-5.151
0.000
0.000
222
-0.504
0.276
-4.415
0.000
0.000
223
-1.390
0.540
-7.697
0.000
0.000
224
-0.174
-0.672
-1.140
0.000
0.000
225
-2.277
0.804
-10.980
0.000
0.000
226
0.155
-1.620
2.134
0.000
0.000
227
-2.151
0.735
-9.876
0.000
0.000
228
0.281
-1.689
3.238
0.000
0.000
101
0.097
-0.063
-0.962
0.000
0.000
102
0.097
-0.063
-0.962
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 36
103
-1.233
-0.184
1.238
0.000
0.000
104
0.723
-2.786
-11.343
0.000
0.000
105
-0.901
-0.154
0.688
0.000
0.000
106
0.567
-2.105
-8.748
0.000
0.000
107
-1.272
-0.159
1.623
0.000
0.000
108
0.684
-2.761
-10.958
0.000
0.000
109
0.352
-0.264
-4.499
0.000
0.000
110
0.352
-0.264
-4.499
0.000
0.000
111
-0.978
-0.385
-2.299
0.000
0.000
112
0.978
-2.987
-14.880
0.000
0.000
113
-0.646
-0.355
-2.849
0.000
0.000
114
0.822
-2.306
-12.285
0.000
0.000
115
-1.119
-0.279
-0.499
0.000
0.000
116
0.837
-2.881
-13.080
0.000
0.000
117
-0.809
-0.111
-1.267
0.000
0.000
118
0.503
-1.047
-7.599
0.000
0.000
119
-0.519
-0.150
-2.075
0.000
0.000
120
0.465
-0.851
-6.824
0.000
0.000
121
-0.950
-0.006
0.532
0.000
0.000
122
0.362
-0.941
-5.800
0.000
0.000
123
0.459
-0.348
-5.989
0.000
0.000
124
0.459
-0.348
-5.989
0.000
0.000
125
-0.871
-0.469
-3.789
0.000
0.000
126
1.085
-3.071
-16.370
0.000
0.000
127
-0.539
-0.439
-4.339
0.000
0.000
128
0.928
-2.390
-13.775
0.000
0.000
129
-1.055
-0.330
-1.393
0.000
0.000
130
0.901
-2.932
-13.974
0.000
0.000
201
0.136
-0.088
-1.347
0.000
0.000
202
0.116
-0.076
-1.154
0.000
0.000
203
-0.948
-0.172
0.606
0.000
0.000
204
0.617
-2.254
-9.459
0.000
0.000
205
-2.012
-0.269
2.366
0.000
0.000
206
1.118
-4.432
-17.764
0.000
0.000
207
-2.041
-0.250
2.654
0.000
0.000
208
1.089
-4.414
-17.475
0.000
0.000
209
0.493
-0.370
-6.299
0.000
0.000
210
0.422
-0.317
-5.399
0.000
0.000
211
-0.642
-0.414
-3.639
0.000
0.000
212
0.923
-2.495
-13.704
0.000
0.000
213
-1.706
-0.510
-1.879
0.000
0.000
214
1.424
-4.674
-22.008
0.000
0.000
215
-1.811
-0.431
-0.529
0.000
0.000
216
1.318
-4.594
-20.659
0.000
0.000
217
-2.066
0.010
1.527
0.000
0.000
218
0.746
-1.994
-12.042
0.000
0.000
219
-2.172
0.089
2.876
0.000
0.000
220
0.641
-1.915
-10.693
0.000
0.000
221
0.643
-0.487
-8.385
0.000
0.000
222
0.551
-0.418
-7.187
0.000
0.000
223
-0.513
-0.514
-5.427
0.000
0.000
224
1.052
-2.596
-15.492
0.000
0.000
225
-1.577
-0.611
-3.667
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F70
10
Page 37
226
1.552
-4.774
-23.796
0.000
0.000
227
-1.715
-0.507
-1.870
0.000
0.000
228
1.415
-4.670
-22.000
0.000
0.000
101
0.080
0.001
-1.055
0.000
0.000
102
0.080
0.001
-1.055
0.000
0.000
103
-1.961
-0.003
5.722
0.000
0.000
104
0.091
-0.124
-1.127
0.000
0.000
105
-1.451
-0.002
4.028
0.000
0.000
106
0.088
-0.093
-1.109
0.000
0.000
107
-1.993
-0.003
6.144
0.000
0.000
108
0.059
-0.124
-0.705
0.000
0.000
109
0.323
0.005
-5.048
0.000
0.000
110
0.323
0.005
-5.048
0.000
0.000
111
-1.718
0.001
1.729
0.000
0.000
112
0.334
-0.120
-5.120
0.000
0.000
113
-1.208
0.002
0.035
0.000
0.000
114
0.331
-0.089
-5.102
0.000
0.000
115
-1.847
-0.001
3.748
0.000
0.000
116
0.205
-0.122
-3.101
0.000
0.000
117
-0.836
0.006
-0.588
0.000
0.000
118
0.324
-0.005
-5.064
0.000
0.000
119
-0.546
0.006
-1.703
0.000
0.000
120
0.324
-0.003
-5.060
0.000
0.000
121
-0.965
0.004
1.432
0.000
0.000
122
0.195
-0.007
-3.045
0.000
0.000
123
0.425
0.006
-6.729
0.000
0.000
124
0.425
0.006
-6.729
0.000
0.000
125
-1.616
0.002
0.048
0.000
0.000
126
0.436
-0.119
-6.801
0.000
0.000
127
-1.106
0.003
-1.646
0.000
0.000
128
0.433
-0.088
-6.783
0.000
0.000
129
-1.786
0.000
2.740
0.000
0.000
130
0.266
-0.121
-4.109
0.000
0.000
201
0.112
0.001
-1.477
0.000
0.000
202
0.096
0.001
-1.266
0.000
0.000
203
-1.537
-0.002
4.156
0.000
0.000
204
0.105
-0.099
-1.324
0.000
0.000
205
-3.170
-0.005
9.577
0.000
0.000
206
0.114
-0.199
-1.381
0.000
0.000
207
-3.194
-0.006
9.894
0.000
0.000
208
0.090
-0.199
-1.065
0.000
0.000
209
0.452
0.007
-7.067
0.000
0.000
210
0.388
0.006
-6.058
0.000
0.000
211
-1.245
0.003
-0.636
0.000
0.000
212
0.396
-0.094
-6.115
0.000
0.000
213
-2.878
0.000
4.786
0.000
0.000
214
0.405
-0.194
-6.173
0.000
0.000
215
-2.975
-0.002
6.300
0.000
0.000
216
0.308
-0.196
-4.658
0.000
0.000
217
-2.096
0.008
3.500
0.000
0.000
218
0.389
-0.016
-6.092
0.000
0.000
219
-2.193
0.006
5.015
0.000
0.000
220
0.292
-0.018
-4.578
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F71
11
Page 38
221
0.595
0.008
-9.421
0.000
0.000
222
0.510
0.007
-8.075
0.000
0.000
223
-1.123
0.004
-2.653
0.000
0.000
224
0.519
-0.093
-8.132
0.000
0.000
225
-2.756
0.001
2.768
0.000
0.000
226
0.528
-0.193
-8.190
0.000
0.000
227
-2.883
-0.001
4.787
0.000
0.000
228
0.400
-0.195
-6.171
0.000
0.000
101
0.059
-0.002
-0.572
0.000
0.000
102
0.059
-0.002
-0.572
0.000
0.000
103
-1.977
-0.010
6.226
0.000
0.000
104
0.012
-0.159
0.173
0.000
0.000
105
-1.468
-0.008
4.526
0.000
0.000
106
0.024
-0.120
-0.013
0.000
0.000
107
-2.001
-0.009
6.455
0.000
0.000
108
-0.012
-0.158
0.402
0.000
0.000
109
0.209
-0.013
-2.523
0.000
0.000
110
0.209
-0.013
-2.523
0.000
0.000
111
-1.827
-0.021
4.275
0.000
0.000
112
0.162
-0.170
-1.778
0.000
0.000
113
-1.318
-0.019
2.576
0.000
0.000
114
0.174
-0.131
-1.964
0.000
0.000
115
-1.911
-0.016
5.284
0.000
0.000
116
0.078
-0.165
-0.769
0.000
0.000
117
-0.998
-0.012
1.998
0.000
0.000
118
0.191
-0.035
-2.212
0.000
0.000
119
-0.696
-0.012
0.867
0.000
0.000
120
0.195
-0.029
-2.290
0.000
0.000
121
-1.081
-0.007
3.007
0.000
0.000
122
0.107
-0.030
-1.203
0.000
0.000
123
0.272
-0.018
-3.345
0.000
0.000
124
0.272
-0.018
-3.345
0.000
0.000
125
-1.764
-0.026
3.453
0.000
0.000
126
0.225
-0.175
-2.600
0.000
0.000
127
-1.255
-0.024
1.753
0.000
0.000
128
0.237
-0.136
-2.786
0.000
0.000
129
-1.873
-0.019
4.791
0.000
0.000
130
0.116
-0.168
-1.262
0.000
0.000
201
0.083
-0.003
-0.801
0.000
0.000
202
0.071
-0.002
-0.686
0.000
0.000
203
-1.558
-0.009
4.752
0.000
0.000
204
0.033
-0.128
-0.090
0.000
0.000
205
-3.187
-0.015
10.190
0.000
0.000
206
-0.004
-0.254
0.506
0.000
0.000
207
-3.204
-0.015
10.362
0.000
0.000
208
-0.022
-0.253
0.677
0.000
0.000
209
0.293
-0.018
-3.532
0.000
0.000
210
0.251
-0.016
-3.028
0.000
0.000
211
-1.378
-0.022
2.411
0.000
0.000
212
0.213
-0.141
-2.432
0.000
0.000
213
-3.007
-0.028
7.849
0.000
0.000
214
0.176
-0.267
-1.836
0.000
0.000
215
-3.069
-0.025
8.606
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F72
14
Page 39
216
0.113
-0.263
-1.079
0.000
0.000
217
-2.335
-0.014
6.659
0.000
0.000
218
0.212
-0.062
-2.362
0.000
0.000
219
-2.398
-0.010
7.416
0.000
0.000
220
0.149
-0.058
-1.605
0.000
0.000
221
0.381
-0.025
-4.683
0.000
0.000
222
0.326
-0.022
-4.014
0.000
0.000
223
-1.302
-0.028
1.424
0.000
0.000
224
0.289
-0.147
-3.418
0.000
0.000
225
-2.931
-0.034
6.863
0.000
0.000
226
0.251
-0.273
-2.822
0.000
0.000
227
-3.013
-0.029
7.866
0.000
0.000
228
0.170
-0.267
-1.818
0.000
0.000
101
0.079
0.002
-1.035
0.000
0.000
102
0.079
0.002
-1.035
0.000
0.000
103
-1.976
-0.006
5.791
0.000
0.000
104
0.079
-0.175
-1.034
0.000
0.000
105
-1.462
-0.004
4.085
0.000
0.000
106
0.079
-0.131
-1.034
0.000
0.000
107
-2.008
-0.007
6.205
0.000
0.000
108
0.047
-0.176
-0.620
0.000
0.000
109
0.317
0.008
-4.942
0.000
0.000
110
0.317
0.008
-4.942
0.000
0.000
111
-1.738
0.000
1.884
0.000
0.000
112
0.317
-0.169
-4.941
0.000
0.000
113
-1.224
0.002
0.178
0.000
0.000
114
0.317
-0.125
-4.941
0.000
0.000
115
-1.865
-0.003
3.861
0.000
0.000
116
0.190
-0.172
-2.964
0.000
0.000
117
-0.880
0.007
-0.356
0.000
0.000
118
0.317
-0.019
-4.940
0.000
0.000
119
-0.581
0.007
-1.503
0.000
0.000
120
0.317
-0.012
-4.940
0.000
0.000
121
-1.007
0.004
1.621
0.000
0.000
122
0.190
-0.022
-2.963
0.000
0.000
123
0.417
0.011
-6.587
0.000
0.000
124
0.417
0.011
-6.587
0.000
0.000
125
-1.638
0.003
0.239
0.000
0.000
126
0.417
-0.166
-6.586
0.000
0.000
127
-1.124
0.005
-1.467
0.000
0.000
128
0.417
-0.122
-6.586
0.000
0.000
129
-1.805
-0.001
2.874
0.000
0.000
130
0.250
-0.170
-3.951
0.000
0.000
201
0.111
0.003
-1.449
0.000
0.000
202
0.095
0.002
-1.242
0.000
0.000
203
-1.549
-0.004
4.219
0.000
0.000
204
0.095
-0.139
-1.241
0.000
0.000
205
-3.193
-0.010
9.680
0.000
0.000
206
0.095
-0.281
-1.240
0.000
0.000
207
-3.217
-0.011
9.990
0.000
0.000
208
0.071
-0.281
-0.930
0.000
0.000
209
0.444
0.011
-6.919
0.000
0.000
210
0.380
0.010
-5.930
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F73
15
Page 40
211
-1.264
0.003
-0.470
0.000
0.000
212
0.380
-0.132
-5.930
0.000
0.000
213
-2.908
-0.003
4.991
0.000
0.000
214
0.380
-0.274
-5.929
0.000
0.000
215
-3.003
-0.006
6.474
0.000
0.000
216
0.285
-0.276
-4.446
0.000
0.000
217
-2.185
0.008
3.896
0.000
0.000
218
0.380
-0.049
-5.926
0.000
0.000
219
-2.280
0.006
5.379
0.000
0.000
220
0.285
-0.051
-4.443
0.000
0.000
221
0.584
0.015
-9.222
0.000
0.000
222
0.500
0.013
-7.904
0.000
0.000
223
-1.144
0.007
-2.444
0.000
0.000
224
0.500
-0.128
-7.904
0.000
0.000
225
-2.788
0.000
3.017
0.000
0.000
226
0.500
-0.270
-7.903
0.000
0.000
227
-2.913
-0.003
4.993
0.000
0.000
228
0.375
-0.273
-5.927
0.000
0.000
101
0.078
0.001
-1.038
0.000
0.000
102
0.078
0.001
-1.038
0.000
0.000
103
-1.909
-0.007
5.537
0.000
0.000
104
0.078
-0.179
-1.039
0.000
0.000
105
-1.412
-0.005
3.893
0.000
0.000
106
0.078
-0.134
-1.039
0.000
0.000
107
-1.940
-0.007
5.952
0.000
0.000
108
0.047
-0.179
-0.624
0.000
0.000
109
0.315
0.003
-4.929
0.000
0.000
110
0.315
0.003
-4.929
0.000
0.000
111
-1.672
-0.005
1.646
0.000
0.000
112
0.315
-0.177
-4.930
0.000
0.000
113
-1.175
-0.003
0.002
0.000
0.000
114
0.315
-0.132
-4.930
0.000
0.000
115
-1.798
-0.006
3.618
0.000
0.000
116
0.189
-0.178
-2.958
0.000
0.000
117
-0.840
0.003
-0.495
0.000
0.000
118
0.315
-0.026
-4.930
0.000
0.000
119
-0.551
0.003
-1.604
0.000
0.000
120
0.315
-0.019
-4.930
0.000
0.000
121
-0.966
0.002
1.476
0.000
0.000
122
0.189
-0.027
-2.958
0.000
0.000
123
0.414
0.003
-6.567
0.000
0.000
124
0.414
0.003
-6.567
0.000
0.000
125
-1.573
-0.005
0.008
0.000
0.000
126
0.414
-0.177
-6.568
0.000
0.000
127
-1.076
-0.003
-1.636
0.000
0.000
128
0.414
-0.132
-6.568
0.000
0.000
129
-1.739
-0.006
2.635
0.000
0.000
130
0.248
-0.178
-3.941
0.000
0.000
201
0.109
0.001
-1.453
0.000
0.000
202
0.094
0.001
-1.246
0.000
0.000
203
-1.496
-0.005
4.014
0.000
0.000
204
0.094
-0.143
-1.246
0.000
0.000
205
-3.086
-0.012
9.274
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F74
18
Page 41
206
0.094
-0.287
-1.247
0.000
0.000
207
-3.109
-0.012
9.586
0.000
0.000
208
0.070
-0.287
-0.936
0.000
0.000
209
0.441
0.004
-6.901
0.000
0.000
210
0.378
0.004
-5.915
0.000
0.000
211
-1.212
-0.003
-0.655
0.000
0.000
212
0.378
-0.140
-5.916
0.000
0.000
213
-2.801
-0.009
4.605
0.000
0.000
214
0.378
-0.284
-5.916
0.000
0.000
215
-2.896
-0.010
6.084
0.000
0.000
216
0.283
-0.285
-4.438
0.000
0.000
217
-2.097
0.004
3.586
0.000
0.000
218
0.378
-0.058
-5.916
0.000
0.000
219
-2.191
0.003
5.065
0.000
0.000
220
0.283
-0.059
-4.438
0.000
0.000
221
0.580
0.004
-9.194
0.000
0.000
222
0.497
0.004
-7.880
0.000
0.000
223
-1.093
-0.003
-2.620
0.000
0.000
224
0.497
-0.140
-7.881
0.000
0.000
225
-2.682
-0.009
2.640
0.000
0.000
226
0.497
-0.284
-7.882
0.000
0.000
227
-2.807
-0.010
4.610
0.000
0.000
228
0.373
-0.285
-5.912
0.000
0.000
101
-0.080
0.000
-1.058
0.000
0.000
102
-0.080
0.000
-1.058
0.000
0.000
103
-2.123
-0.003
-7.843
0.000
0.000
104
-0.076
-0.130
-1.086
0.000
0.000
105
-1.612
-0.002
-6.147
0.000
0.000
106
-0.077
-0.097
-1.079
0.000
0.000
107
-2.091
-0.003
-7.420
0.000
0.000
108
-0.044
-0.130
-0.663
0.000
0.000
109
-0.324
0.000
-5.058
0.000
0.000
110
-0.324
0.000
-5.058
0.000
0.000
111
-2.367
-0.003
-11.843
0.000
0.000
112
-0.320
-0.130
-5.086
0.000
0.000
113
-1.856
-0.002
-10.147
0.000
0.000
114
-0.321
-0.097
-5.079
0.000
0.000
115
-2.237
-0.003
-9.820
0.000
0.000
116
-0.190
-0.130
-3.063
0.000
0.000
117
-1.485
-0.001
-9.517
0.000
0.000
118
-0.325
-0.011
-5.074
0.000
0.000
119
-1.194
-0.001
-8.402
0.000
0.000
120
-0.325
-0.008
-5.070
0.000
0.000
121
-1.355
-0.001
-7.494
0.000
0.000
122
-0.195
-0.011
-3.051
0.000
0.000
123
-0.426
0.000
-6.743
0.000
0.000
124
-0.426
0.000
-6.743
0.000
0.000
125
-2.469
-0.003
-13.528
0.000
0.000
126
-0.422
-0.130
-6.771
0.000
0.000
127
-1.958
-0.002
-11.832
0.000
0.000
128
-0.423
-0.097
-6.764
0.000
0.000
129
-2.299
-0.003
-10.831
0.000
0.000
130
-0.252
-0.130
-4.074
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F75
19
Page 42
201
-0.112
0.000
-1.481
0.000
0.000
202
-0.096
0.000
-1.270
0.000
0.000
203
-1.730
-0.002
-6.698
0.000
0.000
204
-0.093
-0.104
-1.292
0.000
0.000
205
-3.365
-0.005
-12.126
0.000
0.000
206
-0.090
-0.208
-1.314
0.000
0.000
207
-3.341
-0.005
-11.808
0.000
0.000
208
-0.066
-0.208
-0.997
0.000
0.000
209
-0.454
0.000
-7.081
0.000
0.000
210
-0.389
0.000
-6.070
0.000
0.000
211
-2.023
-0.002
-11.498
0.000
0.000
212
-0.386
-0.104
-6.092
0.000
0.000
213
-3.658
-0.005
-16.926
0.000
0.000
214
-0.382
-0.208
-6.114
0.000
0.000
215
-3.560
-0.005
-15.408
0.000
0.000
216
-0.285
-0.208
-4.597
0.000
0.000
217
-2.876
-0.002
-15.625
0.000
0.000
218
-0.390
-0.024
-6.104
0.000
0.000
219
-2.779
-0.002
-14.107
0.000
0.000
220
-0.293
-0.024
-4.587
0.000
0.000
221
-0.596
0.000
-9.440
0.000
0.000
222
-0.511
0.000
-8.092
0.000
0.000
223
-2.146
-0.002
-13.520
0.000
0.000
224
-0.508
-0.104
-8.114
0.000
0.000
225
-3.780
-0.005
-18.948
0.000
0.000
226
-0.505
-0.208
-8.136
0.000
0.000
227
-3.652
-0.005
-16.925
0.000
0.000
228
-0.377
-0.208
-6.113
0.000
0.000
101
-0.059
-0.003
-0.871
0.000
0.000
102
-0.059
-0.003
-0.871
0.000
0.000
103
-2.086
-0.008
-7.506
0.000
0.000
104
-0.014
-0.168
-0.139
0.000
0.000
105
-1.579
-0.007
-5.847
0.000
0.000
106
-0.025
-0.127
-0.322
0.000
0.000
107
-2.062
-0.007
-7.158
0.000
0.000
108
0.010
-0.167
0.209
0.000
0.000
109
-0.207
-0.019
-3.892
0.000
0.000
110
-0.207
-0.019
-3.892
0.000
0.000
111
-2.234
-0.024
-10.527
0.000
0.000
112
-0.162
-0.184
-3.160
0.000
0.000
113
-1.727
-0.023
-8.868
0.000
0.000
114
-0.173
-0.143
-3.343
0.000
0.000
115
-2.151
-0.016
-8.970
0.000
0.000
116
-0.079
-0.176
-1.603
0.000
0.000
117
-1.414
-0.020
-8.403
0.000
0.000
118
-0.188
-0.041
-3.609
0.000
0.000
119
-1.113
-0.020
-7.275
0.000
0.000
120
-0.193
-0.035
-3.679
0.000
0.000
121
-1.332
-0.012
-6.846
0.000
0.000
122
-0.105
-0.033
-2.052
0.000
0.000
123
-0.270
-0.026
-5.164
0.000
0.000
124
-0.270
-0.026
-5.164
0.000
0.000
125
-2.297
-0.031
-11.799
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F76
22
Page 43
126
-0.225
-0.191
-4.432
0.000
0.000
127
-1.790
-0.030
-10.140
0.000
0.000
128
-0.236
-0.150
-4.615
0.000
0.000
129
-2.189
-0.021
-9.733
0.000
0.000
130
-0.117
-0.181
-2.366
0.000
0.000
201
-0.083
-0.004
-1.219
0.000
0.000
202
-0.071
-0.004
-1.045
0.000
0.000
203
-1.692
-0.008
-6.353
0.000
0.000
204
-0.035
-0.136
-0.460
0.000
0.000
205
-3.314
-0.012
-11.661
0.000
0.000
206
0.001
-0.268
0.126
0.000
0.000
207
-3.296
-0.011
-11.400
0.000
0.000
208
0.019
-0.267
0.387
0.000
0.000
209
-0.290
-0.027
-5.449
0.000
0.000
210
-0.248
-0.023
-4.670
0.000
0.000
211
-1.870
-0.027
-9.978
0.000
0.000
212
-0.212
-0.155
-4.085
0.000
0.000
213
-3.492
-0.031
-15.286
0.000
0.000
214
-0.176
-0.287
-3.499
0.000
0.000
215
-3.429
-0.025
-14.119
0.000
0.000
216
-0.114
-0.281
-2.332
0.000
0.000
217
-2.836
-0.024
-14.336
0.000
0.000
218
-0.208
-0.069
-4.063
0.000
0.000
219
-2.774
-0.019
-13.169
0.000
0.000
220
-0.146
-0.064
-2.895
0.000
0.000
221
-0.378
-0.036
-7.230
0.000
0.000
222
-0.324
-0.031
-6.197
0.000
0.000
223
-1.946
-0.035
-11.505
0.000
0.000
224
-0.288
-0.163
-5.611
0.000
0.000
225
-3.567
-0.039
-16.813
0.000
0.000
226
-0.252
-0.295
-5.026
0.000
0.000
227
-3.486
-0.031
-15.264
0.000
0.000
228
-0.171
-0.287
-3.476
0.000
0.000
101
-0.079
-0.004
-1.041
0.000
0.000
102
-0.079
-0.004
-1.041
0.000
0.000
103
-2.136
-0.014
-7.866
0.000
0.000
104
-0.079
-0.190
-1.038
0.000
0.000
105
-1.622
-0.012
-6.160
0.000
0.000
106
-0.079
-0.144
-1.039
0.000
0.000
107
-2.104
-0.012
-7.450
0.000
0.000
108
-0.047
-0.188
-0.622
0.000
0.000
109
-0.317
-0.016
-4.968
0.000
0.000
110
-0.317
-0.016
-4.968
0.000
0.000
111
-2.374
-0.026
-11.793
0.000
0.000
112
-0.317
-0.202
-4.965
0.000
0.000
113
-1.860
-0.024
-10.087
0.000
0.000
114
-0.317
-0.156
-4.966
0.000
0.000
115
-2.247
-0.020
-9.806
0.000
0.000
116
-0.190
-0.196
-2.978
0.000
0.000
117
-1.515
-0.015
-9.554
0.000
0.000
118
-0.317
-0.044
-4.967
0.000
0.000
119
-1.216
-0.015
-8.407
0.000
0.000
120
-0.317
-0.037
-4.967
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F77
23
Page 44
121
-1.389
-0.009
-7.566
0.000
0.000
122
-0.190
-0.038
-2.979
0.000
0.000
123
-0.418
-0.021
-6.622
0.000
0.000
124
-0.418
-0.021
-6.622
0.000
0.000
125
-2.475
-0.031
-13.447
0.000
0.000
126
-0.418
-0.207
-6.619
0.000
0.000
127
-1.961
-0.029
-11.741
0.000
0.000
128
-0.418
-0.161
-6.620
0.000
0.000
129
-2.308
-0.023
-10.798
0.000
0.000
130
-0.251
-0.199
-3.970
0.000
0.000
201
-0.111
-0.006
-1.457
0.000
0.000
202
-0.095
-0.005
-1.249
0.000
0.000
203
-1.740
-0.013
-6.709
0.000
0.000
204
-0.095
-0.154
-1.247
0.000
0.000
205
-3.386
-0.021
-12.169
0.000
0.000
206
-0.095
-0.302
-1.244
0.000
0.000
207
-3.362
-0.020
-11.857
0.000
0.000
208
-0.071
-0.301
-0.932
0.000
0.000
209
-0.444
-0.022
-6.955
0.000
0.000
210
-0.380
-0.019
-5.962
0.000
0.000
211
-2.026
-0.027
-11.422
0.000
0.000
212
-0.380
-0.168
-5.959
0.000
0.000
213
-3.672
-0.035
-16.882
0.000
0.000
214
-0.380
-0.317
-5.957
0.000
0.000
215
-3.576
-0.030
-15.391
0.000
0.000
216
-0.285
-0.312
-4.466
0.000
0.000
217
-2.948
-0.018
-15.788
0.000
0.000
218
-0.380
-0.079
-5.959
0.000
0.000
219
-2.853
-0.013
-14.298
0.000
0.000
220
-0.285
-0.074
-4.468
0.000
0.000
221
-0.585
-0.029
-9.271
0.000
0.000
222
-0.502
-0.025
-7.946
0.000
0.000
223
-2.147
-0.033
-13.406
0.000
0.000
224
-0.502
-0.174
-7.944
0.000
0.000
225
-3.793
-0.041
-18.866
0.000
0.000
226
-0.502
-0.323
-7.942
0.000
0.000
227
-3.667
-0.035
-16.880
0.000
0.000
228
-0.376
-0.317
-5.955
0.000
0.000
101
-0.078
-0.001
-1.034
0.000
0.000
102
-0.078
-0.001
-1.034
0.000
0.000
103
-2.066
-0.012
-7.609
0.000
0.000
104
-0.078
-0.189
-1.035
0.000
0.000
105
-1.569
-0.009
-5.965
0.000
0.000
106
-0.078
-0.142
-1.035
0.000
0.000
107
-2.035
-0.012
-7.195
0.000
0.000
108
-0.047
-0.189
-0.621
0.000
0.000
109
-0.315
-0.009
-4.913
0.000
0.000
110
-0.315
-0.009
-4.913
0.000
0.000
111
-2.303
-0.020
-11.488
0.000
0.000
112
-0.315
-0.197
-4.914
0.000
0.000
113
-1.806
-0.017
-9.844
0.000
0.000
114
-0.315
-0.150
-4.914
0.000
0.000
115
-2.177
-0.016
-9.523
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F78
26
Page 45
116
-0.189
-0.193
-2.949
0.000
0.000
117
-1.471
-0.008
-9.347
0.000
0.000
118
-0.315
-0.038
-4.914
0.000
0.000
119
-1.182
-0.008
-8.238
0.000
0.000
120
-0.315
-0.031
-4.914
0.000
0.000
121
-1.345
-0.005
-7.382
0.000
0.000
122
-0.189
-0.034
-2.949
0.000
0.000
123
-0.414
-0.012
-6.546
0.000
0.000
124
-0.414
-0.012
-6.546
0.000
0.000
125
-2.402
-0.023
-13.121
0.000
0.000
126
-0.414
-0.200
-6.547
0.000
0.000
127
-1.905
-0.020
-11.477
0.000
0.000
128
-0.414
-0.153
-6.547
0.000
0.000
129
-2.236
-0.018
-10.503
0.000
0.000
130
-0.248
-0.195
-3.929
0.000
0.000
201
-0.109
-0.001
-1.448
0.000
0.000
202
-0.094
-0.001
-1.241
0.000
0.000
203
-1.684
-0.010
-6.501
0.000
0.000
204
-0.094
-0.152
-1.242
0.000
0.000
205
-3.274
-0.019
-11.761
0.000
0.000
206
-0.094
-0.302
-1.242
0.000
0.000
207
-3.251
-0.019
-11.451
0.000
0.000
208
-0.070
-0.302
-0.932
0.000
0.000
209
-0.441
-0.013
-6.878
0.000
0.000
210
-0.378
-0.011
-5.896
0.000
0.000
211
-1.968
-0.020
-11.156
0.000
0.000
212
-0.378
-0.161
-5.896
0.000
0.000
213
-3.559
-0.028
-16.416
0.000
0.000
214
-0.378
-0.312
-5.897
0.000
0.000
215
-3.464
-0.026
-14.942
0.000
0.000
216
-0.283
-0.309
-4.423
0.000
0.000
217
-2.855
-0.009
-15.397
0.000
0.000
218
-0.378
-0.072
-5.897
0.000
0.000
219
-2.760
-0.007
-13.923
0.000
0.000
220
-0.283
-0.070
-4.423
0.000
0.000
221
-0.580
-0.017
-9.164
0.000
0.000
222
-0.497
-0.014
-7.855
0.000
0.000
223
-2.087
-0.023
-13.115
0.000
0.000
224
-0.497
-0.165
-7.856
0.000
0.000
225
-3.678
-0.032
-18.375
0.000
0.000
226
-0.497
-0.315
-7.857
0.000
0.000
227
-3.553
-0.028
-16.411
0.000
0.000
228
-0.373
-0.312
-5.893
0.000
0.000
101
-0.049
-0.077
-1.081
0.000
0.000
102
-0.049
-0.077
-1.081
0.000
0.000
103
-1.467
-0.392
-4.730
0.000
0.000
104
-0.522
-3.198
-12.620
0.000
0.000
105
-1.112
-0.313
-3.818
0.000
0.000
106
-0.404
-2.418
-9.735
0.000
0.000
107
-1.447
-0.361
-4.298
0.000
0.000
108
-0.502
-3.167
-12.188
0.000
0.000
109
-0.217
-0.312
-4.834
0.000
0.000
110
-0.217
-0.312
-4.834
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F79
27
Page 46
111
-1.635
-0.627
-8.483
0.000
0.000
112
-0.690
-3.433
-16.373
0.000
0.000
113
-1.280
-0.548
-7.571
0.000
0.000
114
-0.572
-2.653
-13.488
0.000
0.000
115
-1.548
-0.502
-6.549
0.000
0.000
116
-0.603
-3.308
-14.439
0.000
0.000
117
-1.375
-0.435
-7.595
0.000
0.000
118
-0.382
-1.093
-7.943
0.000
0.000
119
-1.085
-0.404
-6.905
0.000
0.000
120
-0.340
-0.898
-7.166
0.000
0.000
121
-1.288
-0.310
-5.662
0.000
0.000
122
-0.295
-0.968
-6.009
0.000
0.000
123
-0.288
-0.411
-6.415
0.000
0.000
124
-0.288
-0.411
-6.415
0.000
0.000
125
-1.706
-0.726
-10.064
0.000
0.000
126
-0.761
-3.532
-17.954
0.000
0.000
127
-1.352
-0.647
-9.152
0.000
0.000
128
-0.643
-2.752
-15.069
0.000
0.000
129
-1.591
-0.562
-7.498
0.000
0.000
130
-0.646
-3.368
-15.388
0.000
0.000
201
-0.069
-0.108
-1.513
0.000
0.000
202
-0.059
-0.092
-1.297
0.000
0.000
203
-1.193
-0.344
-4.216
0.000
0.000
204
-0.437
-2.589
-10.528
0.000
0.000
205
-2.328
-0.596
-7.136
0.000
0.000
206
-0.816
-5.086
-19.760
0.000
0.000
207
-2.313
-0.573
-6.811
0.000
0.000
208
-0.801
-5.063
-19.435
0.000
0.000
209
-0.304
-0.437
-6.768
0.000
0.000
210
-0.260
-0.374
-5.801
0.000
0.000
211
-1.395
-0.626
-8.720
0.000
0.000
212
-0.639
-2.871
-15.032
0.000
0.000
213
-2.529
-0.878
-11.639
0.000
0.000
214
-1.017
-5.368
-24.263
0.000
0.000
215
-2.464
-0.785
-10.189
0.000
0.000
216
-0.952
-5.274
-22.813
0.000
0.000
217
-2.741
-0.638
-11.718
0.000
0.000
218
-0.613
-2.048
-12.462
0.000
0.000
219
-2.676
-0.545
-10.268
0.000
0.000
220
-0.548
-1.955
-11.012
0.000
0.000
221
-0.403
-0.575
-8.981
0.000
0.000
222
-0.346
-0.493
-7.698
0.000
0.000
223
-1.480
-0.745
-10.617
0.000
0.000
224
-0.724
-2.990
-16.929
0.000
0.000
225
-2.614
-0.997
-13.536
0.000
0.000
226
-1.102
-5.487
-26.160
0.000
0.000
227
-2.528
-0.874
-11.612
0.000
0.000
228
-1.016
-5.364
-24.236
0.000
0.000
101
0.046
0.009
-0.444
0.000
0.000
102
0.046
0.009
-0.444
0.000
0.000
103
-0.700
0.003
2.421
0.000
0.000
104
0.048
-0.117
-0.451
0.000
0.000
105
-0.513
0.005
1.705
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 47
106
0.047
-0.086
-0.449
0.000
0.000
107
-0.718
-0.001
2.599
0.000
0.000
108
0.030
-0.121
-0.273
0.000
0.000
109
0.116
0.024
-1.228
0.000
0.000
110
0.116
0.024
-1.228
0.000
0.000
111
-0.630
0.018
1.637
0.000
0.000
112
0.118
-0.102
-1.235
0.000
0.000
113
-0.443
0.020
0.921
0.000
0.000
114
0.117
-0.071
-1.233
0.000
0.000
115
-0.676
0.008
2.128
0.000
0.000
116
0.072
-0.112
-0.744
0.000
0.000
117
-1.416
0.024
5.902
0.000
0.000
118
0.116
0.017
-1.226
0.000
0.000
119
-1.033
0.024
4.119
0.000
0.000
120
0.116
0.019
-1.226
0.000
0.000
121
-1.463
0.014
6.393
0.000
0.000
122
0.070
0.007
-0.735
0.000
0.000
123
0.146
0.031
-1.558
0.000
0.000
124
0.146
0.031
-1.558
0.000
0.000
125
-0.600
0.025
1.307
0.000
0.000
126
0.148
-0.095
-1.565
0.000
0.000
127
-0.414
0.026
0.591
0.000
0.000
128
0.147
-0.064
-1.563
0.000
0.000
129
-0.658
0.013
1.930
0.000
0.000
130
0.090
-0.107
-0.942
0.000
0.000
201
0.064
0.013
-0.622
0.000
0.000
202
0.055
0.011
-0.533
0.000
0.000
203
-0.542
0.006
1.759
0.000
0.000
204
0.057
-0.090
-0.538
0.000
0.000
205
-1.138
0.001
4.051
0.000
0.000
206
0.058
-0.191
-0.544
0.000
0.000
207
-1.152
-0.002
4.184
0.000
0.000
208
0.045
-0.194
-0.411
0.000
0.000
209
0.162
0.034
-1.719
0.000
0.000
210
0.139
0.029
-1.474
0.000
0.000
211
-0.458
0.024
0.818
0.000
0.000
212
0.141
-0.072
-1.479
0.000
0.000
213
-1.054
0.019
3.110
0.000
0.000
214
0.142
-0.173
-1.485
0.000
0.000
215
-1.089
0.012
3.479
0.000
0.000
216
0.108
-0.180
-1.116
0.000
0.000
217
-3.144
0.029
13.804
0.000
0.000
218
0.139
0.014
-1.469
0.000
0.000
219
-3.179
0.022
14.172
0.000
0.000
220
0.104
0.007
-1.101
0.000
0.000
221
0.204
0.043
-2.181
0.000
0.000
222
0.175
0.037
-1.870
0.000
0.000
223
-0.422
0.032
0.422
0.000
0.000
224
0.177
-0.064
-1.875
0.000
0.000
225
-1.018
0.028
2.714
0.000
0.000
226
0.178
-0.164
-1.881
0.000
0.000
227
-1.062
0.018
3.182
0.000
0.000
228
0.135
-0.174
-1.413
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F80
28
Page 48
101
0.075
0.003
-0.773
0.000
0.000
102
0.075
0.003
-0.773
0.000
0.000
103
-1.313
-0.003
5.042
0.000
0.000
104
0.076
-0.124
-0.791
0.000
0.000
105
-0.966
-0.002
3.588
0.000
0.000
106
0.076
-0.092
-0.786
0.000
0.000
107
-1.343
-0.004
5.351
0.000
0.000
108
0.046
-0.125
-0.482
0.000
0.000
109
0.213
0.014
-2.296
0.000
0.000
110
0.213
0.014
-2.296
0.000
0.000
111
-1.175
0.008
3.519
0.000
0.000
112
0.214
-0.113
-2.314
0.000
0.000
113
-0.828
0.010
2.065
0.000
0.000
114
0.214
-0.081
-2.309
0.000
0.000
115
-1.260
0.002
4.437
0.000
0.000
116
0.129
-0.119
-1.396
0.000
0.000
117
-1.319
0.014
4.843
0.000
0.000
118
0.212
0.006
-2.289
0.000
0.000
119
-0.936
0.014
3.058
0.000
0.000
120
0.212
0.008
-2.291
0.000
0.000
121
-1.404
0.008
5.762
0.000
0.000
122
0.127
0.001
-1.371
0.000
0.000
123
0.271
0.019
-2.937
0.000
0.000
124
0.271
0.019
-2.937
0.000
0.000
125
-1.117
0.013
2.878
0.000
0.000
126
0.272
-0.108
-2.955
0.000
0.000
127
-0.770
0.015
1.424
0.000
0.000
128
0.272
-0.076
-2.951
0.000
0.000
129
-1.225
0.005
4.053
0.000
0.000
130
0.164
-0.116
-1.780
0.000
0.000
201
0.105
0.004
-1.082
0.000
0.000
202
0.090
0.004
-0.928
0.000
0.000
203
-1.020
-0.001
3.724
0.000
0.000
204
0.091
-0.098
-0.942
0.000
0.000
205
-2.131
-0.006
8.376
0.000
0.000
206
0.092
-0.200
-0.956
0.000
0.000
207
-2.153
-0.007
8.608
0.000
0.000
208
0.069
-0.201
-0.725
0.000
0.000
209
0.298
0.020
-3.214
0.000
0.000
210
0.256
0.017
-2.755
0.000
0.000
211
-0.855
0.012
1.897
0.000
0.000
212
0.256
-0.085
-2.770
0.000
0.000
213
-1.965
0.007
6.549
0.000
0.000
214
0.257
-0.186
-2.784
0.000
0.000
215
-2.029
0.003
7.238
0.000
0.000
216
0.193
-0.191
-2.095
0.000
0.000
217
-3.028
0.017
12.543
0.000
0.000
218
0.254
0.000
-2.740
0.000
0.000
219
-3.092
0.013
13.232
0.000
0.000
220
0.190
-0.004
-2.051
0.000
0.000
221
0.379
0.027
-4.112
0.000
0.000
222
0.325
0.023
-3.524
0.000
0.000
223
-0.785
0.018
1.128
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F81
29
Page 49
224
0.326
-0.079
-3.539
0.000
0.000
225
-1.896
0.013
5.780
0.000
0.000
226
0.327
-0.180
-3.553
0.000
0.000
227
-1.977
0.008
6.661
0.000
0.000
228
0.245
-0.186
-2.672
0.000
0.000
101
0.081
0.002
-0.839
0.000
0.000
102
0.081
0.002
-0.839
0.000
0.000
103
-1.272
-0.002
4.804
0.000
0.000
104
0.079
-0.125
-0.822
0.000
0.000
105
-0.934
-0.001
3.393
0.000
0.000
106
0.079
-0.093
-0.826
0.000
0.000
107
-1.304
-0.003
5.140
0.000
0.000
108
0.047
-0.126
-0.486
0.000
0.000
109
0.234
0.001
-2.538
0.000
0.000
110
0.234
0.001
-2.538
0.000
0.000
111
-1.119
-0.003
3.105
0.000
0.000
112
0.232
-0.126
-2.521
0.000
0.000
113
-0.781
-0.002
1.694
0.000
0.000
114
0.233
-0.094
-2.525
0.000
0.000
115
-1.213
-0.003
4.120
0.000
0.000
116
0.138
-0.126
-1.506
0.000
0.000
117
-1.299
0.002
4.585
0.000
0.000
118
0.235
-0.007
-2.546
0.000
0.000
119
-0.916
0.002
2.804
0.000
0.000
120
0.235
-0.005
-2.544
0.000
0.000
121
-1.393
0.001
5.600
0.000
0.000
122
0.141
-0.007
-1.531
0.000
0.000
123
0.299
0.000
-3.253
0.000
0.000
124
0.299
0.000
-3.253
0.000
0.000
125
-1.054
-0.004
2.390
0.000
0.000
126
0.297
-0.127
-3.236
0.000
0.000
127
-0.716
-0.003
0.979
0.000
0.000
128
0.297
-0.095
-3.240
0.000
0.000
129
-1.174
-0.004
3.691
0.000
0.000
130
0.177
-0.127
-1.935
0.000
0.000
201
0.113
0.003
-1.175
0.000
0.000
202
0.097
0.002
-1.007
0.000
0.000
203
-0.985
-0.001
3.508
0.000
0.000
204
0.096
-0.099
-0.993
0.000
0.000
205
-2.068
-0.004
8.022
0.000
0.000
206
0.094
-0.201
-0.980
0.000
0.000
207
-2.092
-0.005
8.274
0.000
0.000
208
0.070
-0.201
-0.728
0.000
0.000
209
0.328
0.001
-3.553
0.000
0.000
210
0.281
0.001
-3.046
0.000
0.000
211
-0.802
-0.002
1.469
0.000
0.000
212
0.279
-0.100
-3.032
0.000
0.000
213
-1.884
-0.005
5.983
0.000
0.000
214
0.278
-0.202
-3.018
0.000
0.000
215
-1.954
-0.006
6.745
0.000
0.000
216
0.207
-0.202
-2.257
0.000
0.000
217
-3.004
0.003
12.218
0.000
0.000
218
0.282
-0.015
-3.064
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F82
30
Page 50
219
-3.074
0.002
12.980
0.000
0.000
220
0.212
-0.016
-2.302
0.000
0.000
221
0.419
0.000
-4.554
0.000
0.000
222
0.359
0.000
-3.904
0.000
0.000
223
-0.724
-0.003
0.611
0.000
0.000
224
0.357
-0.102
-3.890
0.000
0.000
225
-1.806
-0.006
5.125
0.000
0.000
226
0.356
-0.203
-3.876
0.000
0.000
227
-1.896
-0.006
6.101
0.000
0.000
228
0.266
-0.203
-2.900
0.000
0.000
101
0.081
0.000
-0.840
0.000
0.000
102
0.081
0.000
-0.840
0.000
0.000
103
-1.274
-0.004
4.828
0.000
0.000
104
0.060
-0.128
-0.531
0.000
0.000
105
-0.935
-0.003
3.411
0.000
0.000
106
0.065
-0.096
-0.608
0.000
0.000
107
-1.306
-0.004
5.164
0.000
0.000
108
0.028
-0.128
-0.195
0.000
0.000
109
0.235
0.007
-2.541
0.000
0.000
110
0.235
0.007
-2.541
0.000
0.000
111
-1.120
0.003
3.127
0.000
0.000
112
0.214
-0.121
-2.232
0.000
0.000
113
-0.781
0.004
1.710
0.000
0.000
114
0.219
-0.089
-2.309
0.000
0.000
115
-1.214
0.000
4.143
0.000
0.000
116
0.120
-0.124
-1.216
0.000
0.000
117
-1.293
0.009
4.538
0.000
0.000
118
0.229
-0.001
-2.478
0.000
0.000
119
-0.911
0.009
2.768
0.000
0.000
120
0.231
0.001
-2.494
0.000
0.000
121
-1.387
0.006
5.554
0.000
0.000
122
0.135
-0.003
-1.462
0.000
0.000
123
0.299
0.010
-3.257
0.000
0.000
124
0.299
0.010
-3.257
0.000
0.000
125
-1.056
0.006
2.411
0.000
0.000
126
0.278
-0.118
-2.948
0.000
0.000
127
-0.717
0.007
0.994
0.000
0.000
128
0.283
-0.086
-3.025
0.000
0.000
129
-1.176
0.002
3.714
0.000
0.000
130
0.158
-0.122
-1.645
0.000
0.000
201
0.113
0.000
-1.176
0.000
0.000
202
0.097
0.000
-1.008
0.000
0.000
203
-0.987
-0.003
3.526
0.000
0.000
204
0.080
-0.102
-0.761
0.000
0.000
205
-2.071
-0.006
8.061
0.000
0.000
206
0.064
-0.205
-0.514
0.000
0.000
207
-2.095
-0.006
8.313
0.000
0.000
208
0.039
-0.205
-0.262
0.000
0.000
209
0.329
0.010
-3.557
0.000
0.000
210
0.282
0.008
-3.049
0.000
0.000
211
-0.802
0.005
1.485
0.000
0.000
212
0.265
-0.094
-2.802
0.000
0.000
213
-1.886
0.002
6.020
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F83
31
Page 51
214
0.248
-0.196
-2.555
0.000
0.000
215
-1.957
0.000
6.782
0.000
0.000
216
0.178
-0.199
-1.792
0.000
0.000
217
-2.993
0.013
12.120
0.000
0.000
218
0.270
-0.008
-2.914
0.000
0.000
219
-3.063
0.011
12.883
0.000
0.000
220
0.199
-0.010
-2.152
0.000
0.000
221
0.419
0.014
-4.560
0.000
0.000
222
0.359
0.012
-3.908
0.000
0.000
223
-0.725
0.009
0.626
0.000
0.000
224
0.342
-0.090
-3.661
0.000
0.000
225
-1.809
0.006
5.160
0.000
0.000
226
0.325
-0.193
-3.414
0.000
0.000
227
-1.899
0.003
6.138
0.000
0.000
228
0.235
-0.196
-2.437
0.000
0.000
101
0.023
-0.077
-0.573
0.000
0.000
102
0.023
-0.077
-0.573
0.000
0.000
103
-0.955
0.066
2.255
0.000
0.000
104
0.278
-1.857
-6.355
0.000
0.000
105
-0.711
0.030
1.548
0.000
0.000
106
0.214
-1.412
-4.910
0.000
0.000
107
-0.964
0.097
2.484
0.000
0.000
108
0.269
-1.826
-6.126
0.000
0.000
109
0.081
-0.255
-1.923
0.000
0.000
110
0.081
-0.255
-1.923
0.000
0.000
111
-0.897
-0.112
0.905
0.000
0.000
112
0.336
-2.035
-7.705
0.000
0.000
113
-0.652
-0.148
0.198
0.000
0.000
114
0.272
-1.590
-6.260
0.000
0.000
115
-0.929
-0.010
1.674
0.000
0.000
116
0.304
-1.933
-6.936
0.000
0.000
117
-0.853
-0.048
1.380
0.000
0.000
118
0.157
-0.528
-2.951
0.000
0.000
119
-0.619
-0.100
0.554
0.000
0.000
120
0.138
-0.460
-2.694
0.000
0.000
121
-0.885
0.054
2.149
0.000
0.000
122
0.125
-0.426
-2.182
0.000
0.000
123
0.106
-0.329
-2.491
0.000
0.000
124
0.106
-0.329
-2.491
0.000
0.000
125
-0.872
-0.186
0.337
0.000
0.000
126
0.361
-2.109
-8.273
0.000
0.000
127
-0.627
-0.222
-0.370
0.000
0.000
128
0.297
-1.664
-6.827
0.000
0.000
129
-0.914
-0.054
1.333
0.000
0.000
130
0.319
-1.977
-7.277
0.000
0.000
201
0.032
-0.108
-0.802
0.000
0.000
202
0.028
-0.092
-0.688
0.000
0.000
203
-0.755
0.022
1.575
0.000
0.000
204
0.232
-1.516
-5.313
0.000
0.000
205
-1.537
0.136
3.837
0.000
0.000
206
0.436
-2.940
-9.939
0.000
0.000
207
-1.544
0.160
4.009
0.000
0.000
208
0.429
-2.917
-9.767
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F84
32
Page 52
209
0.113
-0.357
-2.692
0.000
0.000
210
0.097
-0.306
-2.308
0.000
0.000
211
-0.685
-0.192
-0.045
0.000
0.000
212
0.301
-1.730
-6.933
0.000
0.000
213
-1.468
-0.077
2.217
0.000
0.000
214
0.505
-3.154
-11.559
0.000
0.000
215
-1.492
-0.001
2.794
0.000
0.000
216
0.481
-3.078
-10.982
0.000
0.000
217
-1.904
0.138
4.769
0.000
0.000
218
0.261
-0.891
-4.511
0.000
0.000
219
-1.928
0.215
5.346
0.000
0.000
220
0.236
-0.814
-3.934
0.000
0.000
221
0.148
-0.461
-3.487
0.000
0.000
222
0.127
-0.395
-2.989
0.000
0.000
223
-0.655
-0.280
-0.727
0.000
0.000
224
0.331
-1.819
-7.615
0.000
0.000
225
-1.438
-0.166
1.536
0.000
0.000
226
0.535
-3.243
-12.240
0.000
0.000
227
-1.469
-0.067
2.283
0.000
0.000
228
0.503
-3.144
-11.493
0.000
0.000
101
-0.046
0.009
-0.444
0.000
0.000
102
-0.046
0.009
-0.444
0.000
0.000
103
-0.793
0.015
-3.309
0.000
0.000
104
-0.044
-0.107
-0.434
0.000
0.000
105
-0.606
0.014
-2.593
0.000
0.000
106
-0.045
-0.078
-0.437
0.000
0.000
107
-0.775
0.011
-3.131
0.000
0.000
108
-0.026
-0.111
-0.256
0.000
0.000
109
-0.116
0.024
-1.228
0.000
0.000
110
-0.116
0.024
-1.228
0.000
0.000
111
-0.863
0.030
-4.093
0.000
0.000
112
-0.114
-0.092
-1.218
0.000
0.000
113
-0.676
0.029
-3.377
0.000
0.000
114
-0.114
-0.063
-1.220
0.000
0.000
115
-0.817
0.020
-3.602
0.000
0.000
116
-0.068
-0.102
-0.727
0.000
0.000
117
-1.651
0.024
-8.358
0.000
0.000
118
-0.116
0.017
-1.226
0.000
0.000
119
-1.267
0.024
-6.575
0.000
0.000
120
-0.116
0.019
-1.226
0.000
0.000
121
-1.605
0.014
-7.866
0.000
0.000
122
-0.070
0.007
-0.735
0.000
0.000
123
-0.146
0.031
-1.558
0.000
0.000
124
-0.146
0.031
-1.558
0.000
0.000
125
-0.893
0.037
-4.423
0.000
0.000
126
-0.144
-0.085
-1.548
0.000
0.000
127
-0.706
0.036
-3.707
0.000
0.000
128
-0.145
-0.056
-1.550
0.000
0.000
129
-0.835
0.025
-3.800
0.000
0.000
130
-0.086
-0.097
-0.925
0.000
0.000
201
-0.064
0.013
-0.622
0.000
0.000
202
-0.055
0.011
-0.533
0.000
0.000
203
-0.653
0.016
-2.825
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F85
33
Page 53
204
-0.054
-0.082
-0.525
0.000
0.000
205
-1.250
0.020
-5.117
0.000
0.000
206
-0.052
-0.175
-0.517
0.000
0.000
207
-1.237
0.018
-4.984
0.000
0.000
208
-0.038
-0.177
-0.384
0.000
0.000
209
-0.162
0.034
-1.719
0.000
0.000
210
-0.139
0.029
-1.474
0.000
0.000
211
-0.737
0.034
-3.766
0.000
0.000
212
-0.138
-0.064
-1.466
0.000
0.000
213
-1.334
0.038
-6.058
0.000
0.000
214
-0.136
-0.157
-1.458
0.000
0.000
215
-1.300
0.031
-5.689
0.000
0.000
216
-0.101
-0.164
-1.089
0.000
0.000
217
-3.429
0.029
-16.751
0.000
0.000
218
-0.139
0.014
-1.469
0.000
0.000
219
-3.394
0.022
-16.383
0.000
0.000
220
-0.104
0.007
-1.101
0.000
0.000
221
-0.204
0.043
-2.181
0.000
0.000
222
-0.175
0.037
-1.870
0.000
0.000
223
-0.773
0.042
-4.162
0.000
0.000
224
-0.174
-0.056
-1.862
0.000
0.000
225
-1.370
0.047
-6.454
0.000
0.000
226
-0.172
-0.148
-1.854
0.000
0.000
227
-1.327
0.037
-5.986
0.000
0.000
228
-0.128
-0.158
-1.386
0.000
0.000
101
-0.075
0.003
-0.773
0.000
0.000
102
-0.075
0.003
-0.773
0.000
0.000
103
-1.465
0.009
-6.587
0.000
0.000
104
-0.078
-0.113
-0.807
0.000
0.000
105
-1.117
0.008
-5.134
0.000
0.000
106
-0.077
-0.084
-0.799
0.000
0.000
107
-1.435
0.008
-6.278
0.000
0.000
108
-0.048
-0.114
-0.498
0.000
0.000
109
-0.213
0.014
-2.297
0.000
0.000
110
-0.213
0.014
-2.297
0.000
0.000
111
-1.603
0.020
-8.111
0.000
0.000
112
-0.216
-0.102
-2.331
0.000
0.000
113
-1.255
0.019
-6.658
0.000
0.000
114
-0.215
-0.073
-2.322
0.000
0.000
115
-1.518
0.014
-7.192
0.000
0.000
116
-0.131
-0.108
-1.412
0.000
0.000
117
-1.748
0.014
-9.436
0.000
0.000
118
-0.212
0.006
-2.290
0.000
0.000
119
-1.364
0.014
-7.651
0.000
0.000
120
-0.212
0.008
-2.292
0.000
0.000
121
-1.663
0.008
-8.517
0.000
0.000
122
-0.127
0.001
-1.371
0.000
0.000
123
-0.271
0.019
-2.938
0.000
0.000
124
-0.271
0.019
-2.938
0.000
0.000
125
-1.661
0.025
-8.752
0.000
0.000
126
-0.274
-0.097
-2.972
0.000
0.000
127
-1.313
0.024
-7.299
0.000
0.000
128
-0.273
-0.068
-2.964
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F86
34
Page 54
129
-1.553
0.017
-7.577
0.000
0.000
130
-0.166
-0.105
-1.797
0.000
0.000
201
-0.105
0.004
-1.082
0.000
0.000
202
-0.090
0.004
-0.928
0.000
0.000
203
-1.202
0.008
-5.579
0.000
0.000
204
-0.092
-0.089
-0.955
0.000
0.000
205
-2.314
0.013
-10.230
0.000
0.000
206
-0.095
-0.182
-0.982
0.000
0.000
207
-2.292
0.012
-9.998
0.000
0.000
208
-0.072
-0.183
-0.750
0.000
0.000
209
-0.298
0.020
-3.216
0.000
0.000
210
-0.256
0.017
-2.756
0.000
0.000
211
-1.368
0.022
-7.408
0.000
0.000
212
-0.258
-0.076
-2.784
0.000
0.000
213
-2.480
0.026
-12.059
0.000
0.000
214
-0.260
-0.169
-2.811
0.000
0.000
215
-2.416
0.022
-11.370
0.000
0.000
216
-0.197
-0.173
-2.122
0.000
0.000
217
-3.545
0.017
-18.053
0.000
0.000
218
-0.254
0.000
-2.741
0.000
0.000
219
-3.481
0.013
-17.364
0.000
0.000
220
-0.190
-0.004
-2.052
0.000
0.000
221
-0.379
0.027
-4.113
0.000
0.000
222
-0.325
0.023
-3.526
0.000
0.000
223
-1.437
0.028
-8.177
0.000
0.000
224
-0.328
-0.070
-3.553
0.000
0.000
225
-2.549
0.032
-12.828
0.000
0.000
226
-0.330
-0.163
-3.580
0.000
0.000
227
-2.468
0.027
-11.947
0.000
0.000
228
-0.249
-0.168
-2.699
0.000
0.000
101
-0.081
0.002
-0.838
0.000
0.000
102
-0.081
0.002
-0.838
0.000
0.000
103
-1.436
0.006
-6.481
0.000
0.000
104
-0.078
-0.113
-0.808
0.000
0.000
105
-1.097
0.005
-5.070
0.000
0.000
106
-0.079
-0.084
-0.816
0.000
0.000
107
-1.404
0.005
-6.146
0.000
0.000
108
-0.046
-0.114
-0.473
0.000
0.000
109
-0.234
0.001
-2.536
0.000
0.000
110
-0.234
0.001
-2.536
0.000
0.000
111
-1.589
0.005
-8.179
0.000
0.000
112
-0.231
-0.114
-2.506
0.000
0.000
113
-1.250
0.004
-6.768
0.000
0.000
114
-0.232
-0.085
-2.513
0.000
0.000
115
-1.495
0.005
-7.165
0.000
0.000
116
-0.137
-0.114
-1.492
0.000
0.000
117
-1.770
0.000
-9.660
0.000
0.000
118
-0.235
-0.007
-2.544
0.000
0.000
119
-1.386
0.000
-7.879
0.000
0.000
120
-0.235
-0.005
-2.542
0.000
0.000
121
-1.676
0.000
-8.646
0.000
0.000
122
-0.141
-0.007
-1.530
0.000
0.000
123
-0.299
0.000
-3.250
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F87
35
Page 55
124
-0.299
0.000
-3.250
0.000
0.000
125
-1.654
0.004
-8.893
0.000
0.000
126
-0.296
-0.115
-3.220
0.000
0.000
127
-1.315
0.003
-7.482
0.000
0.000
128
-0.297
-0.086
-3.227
0.000
0.000
129
-1.534
0.004
-7.593
0.000
0.000
130
-0.176
-0.115
-1.920
0.000
0.000
201
-0.113
0.003
-1.173
0.000
0.000
202
-0.097
0.002
-1.006
0.000
0.000
203
-1.181
0.006
-5.520
0.000
0.000
204
-0.095
-0.090
-0.982
0.000
0.000
205
-2.265
0.009
-10.034
0.000
0.000
206
-0.092
-0.182
-0.958
0.000
0.000
207
-2.241
0.008
-9.783
0.000
0.000
208
-0.068
-0.182
-0.706
0.000
0.000
209
-0.328
0.001
-3.550
0.000
0.000
210
-0.281
0.001
-3.043
0.000
0.000
211
-1.365
0.004
-7.558
0.000
0.000
212
-0.278
-0.091
-3.019
0.000
0.000
213
-2.449
0.008
-12.072
0.000
0.000
214
-0.276
-0.183
-2.995
0.000
0.000
215
-2.379
0.007
-11.311
0.000
0.000
216
-0.206
-0.183
-2.234
0.000
0.000
217
-3.572
0.000
-18.309
0.000
0.000
218
-0.282
-0.015
-3.061
0.000
0.000
219
-3.502
-0.001
-17.548
0.000
0.000
220
-0.212
-0.016
-2.300
0.000
0.000
221
-0.419
0.000
-4.550
0.000
0.000
222
-0.359
0.000
-3.900
0.000
0.000
223
-1.443
0.003
-8.414
0.000
0.000
224
-0.356
-0.092
-3.876
0.000
0.000
225
-2.527
0.006
-12.929
0.000
0.000
226
-0.354
-0.184
-3.852
0.000
0.000
227
-2.437
0.006
-11.954
0.000
0.000
228
-0.264
-0.184
-2.877
0.000
0.000
101
-0.081
0.000
-0.839
0.000
0.000
102
-0.081
0.000
-0.839
0.000
0.000
103
-1.438
0.004
-6.507
0.000
0.000
104
-0.055
-0.116
-0.630
0.000
0.000
105
-1.099
0.003
-5.090
0.000
0.000
106
-0.061
-0.087
-0.682
0.000
0.000
107
-1.406
0.004
-6.171
0.000
0.000
108
-0.023
-0.116
-0.294
0.000
0.000
109
-0.235
0.007
-2.538
0.000
0.000
110
-0.235
0.007
-2.538
0.000
0.000
111
-1.592
0.011
-8.206
0.000
0.000
112
-0.209
-0.109
-2.329
0.000
0.000
113
-1.253
0.010
-6.789
0.000
0.000
114
-0.215
-0.080
-2.381
0.000
0.000
115
-1.498
0.008
-7.191
0.000
0.000
116
-0.115
-0.112
-1.314
0.000
0.000
117
-1.766
0.005
-9.618
0.000
0.000
118
-0.229
-0.001
-2.475
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F88
36
Page 56
119
-1.383
0.005
-7.848
0.000
0.000
120
-0.231
0.001
-2.491
0.000
0.000
121
-1.672
0.002
-8.603
0.000
0.000
122
-0.135
-0.003
-1.460
0.000
0.000
123
-0.299
0.010
-3.253
0.000
0.000
124
-0.299
0.010
-3.253
0.000
0.000
125
-1.656
0.014
-8.921
0.000
0.000
126
-0.273
-0.106
-3.044
0.000
0.000
127
-1.317
0.013
-7.504
0.000
0.000
128
-0.280
-0.077
-3.096
0.000
0.000
129
-1.536
0.010
-7.620
0.000
0.000
130
-0.153
-0.110
-1.743
0.000
0.000
201
-0.113
0.000
-1.175
0.000
0.000
202
-0.097
0.000
-1.007
0.000
0.000
203
-1.183
0.003
-5.541
0.000
0.000
204
-0.076
-0.093
-0.840
0.000
0.000
205
-2.268
0.006
-10.076
0.000
0.000
206
-0.056
-0.186
-0.672
0.000
0.000
207
-2.244
0.006
-9.824
0.000
0.000
208
-0.031
-0.186
-0.421
0.000
0.000
209
-0.329
0.010
-3.553
0.000
0.000
210
-0.282
0.008
-3.046
0.000
0.000
211
-1.368
0.012
-7.580
0.000
0.000
212
-0.261
-0.084
-2.878
0.000
0.000
213
-2.453
0.015
-12.114
0.000
0.000
214
-0.240
-0.177
-2.711
0.000
0.000
215
-2.383
0.013
-11.353
0.000
0.000
216
-0.170
-0.179
-1.950
0.000
0.000
217
-3.562
0.004
-18.217
0.000
0.000
218
-0.270
-0.008
-2.911
0.000
0.000
219
-3.492
0.002
-17.455
0.000
0.000
220
-0.199
-0.010
-2.149
0.000
0.000
221
-0.419
0.014
-4.554
0.000
0.000
222
-0.359
0.012
-3.904
0.000
0.000
223
-1.444
0.015
-8.438
0.000
0.000
224
-0.338
-0.081
-3.736
0.000
0.000
225
-2.530
0.018
-12.972
0.000
0.000
226
-0.317
-0.174
-3.569
0.000
0.000
227
-2.440
0.015
-11.997
0.000
0.000
228
-0.227
-0.177
-2.593
0.000
0.000
101
-0.072
-0.067
-0.505
0.000
0.000
102
-0.072
-0.067
-0.505
0.000
0.000
103
-1.062
-0.237
-3.549
0.000
0.000
104
-0.514
-1.275
-4.825
0.000
0.000
105
-0.815
-0.194
-2.788
0.000
0.000
106
-0.404
-0.973
-3.745
0.000
0.000
107
-1.033
-0.210
-3.347
0.000
0.000
108
-0.485
-1.248
-4.623
0.000
0.000
109
-0.218
-0.225
-1.696
0.000
0.000
110
-0.218
-0.225
-1.696
0.000
0.000
111
-1.208
-0.395
-4.740
0.000
0.000
112
-0.660
-1.433
-6.016
0.000
0.000
113
-0.961
-0.352
-3.979
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 57
114
-0.549
-1.131
-4.936
0.000
0.000
115
-1.121
-0.305
-4.062
0.000
0.000
116
-0.573
-1.343
-5.338
0.000
0.000
117
-1.169
-0.452
-5.264
0.000
0.000
118
-0.285
-0.499
-2.705
0.000
0.000
119
-0.931
-0.396
-4.372
0.000
0.000
120
-0.268
-0.430
-2.453
0.000
0.000
121
-1.082
-0.362
-4.586
0.000
0.000
122
-0.198
-0.409
-2.026
0.000
0.000
123
-0.279
-0.291
-2.198
0.000
0.000
124
-0.279
-0.291
-2.198
0.000
0.000
125
-1.269
-0.461
-5.242
0.000
0.000
126
-0.721
-1.499
-6.518
0.000
0.000
127
-1.021
-0.419
-4.481
0.000
0.000
128
-0.611
-1.197
-5.438
0.000
0.000
129
-1.157
-0.345
-4.363
0.000
0.000
130
-0.609
-1.383
-5.639
0.000
0.000
201
-0.101
-0.094
-0.707
0.000
0.000
202
-0.086
-0.080
-0.606
0.000
0.000
203
-0.878
-0.216
-3.041
0.000
0.000
204
-0.440
-1.047
-4.062
0.000
0.000
205
-1.670
-0.352
-5.476
0.000
0.000
206
-0.794
-2.013
-7.518
0.000
0.000
207
-1.649
-0.332
-5.325
0.000
0.000
208
-0.772
-1.993
-7.367
0.000
0.000
209
-0.305
-0.315
-2.374
0.000
0.000
210
-0.262
-0.270
-2.035
0.000
0.000
211
-1.054
-0.406
-4.470
0.000
0.000
212
-0.615
-1.236
-5.491
0.000
0.000
213
-1.846
-0.542
-6.906
0.000
0.000
214
-0.969
-2.203
-8.947
0.000
0.000
215
-1.780
-0.475
-6.397
0.000
0.000
216
-0.903
-2.135
-8.438
0.000
0.000
217
-2.300
-0.757
-9.681
0.000
0.000
218
-0.406
-0.857
-4.197
0.000
0.000
219
-2.235
-0.690
-9.172
0.000
0.000
220
-0.340
-0.789
-3.688
0.000
0.000
221
-0.391
-0.407
-3.077
0.000
0.000
222
-0.335
-0.349
-2.638
0.000
0.000
223
-1.127
-0.485
-5.073
0.000
0.000
224
-0.688
-1.316
-6.094
0.000
0.000
225
-1.919
-0.621
-7.508
0.000
0.000
226
-1.042
-2.282
-9.550
0.000
0.000
227
-1.835
-0.534
-6.849
0.000
0.000
228
-0.958
-2.195
-8.890
0.000
0.000
Pr.Name L.Comb.
101
F65
1
Fx
Fy
Fz
Mx
My
0.072
0.083
-0.691
-0.108
0.094
102
0.072
0.083
-0.691
-0.108
0.094
103
-1.064
-0.479
3.236
0.623
-1.383
104
-0.567
-2.652
9.805
3.448
-0.737
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 58
105
-0.780
-0.338
2.254
0.440
-1.014
106
-0.407
-1.968
7.181
2.559
-0.529
107
-1.093
-0.512
3.512
0.666
-1.421
108
-0.596
-2.685
10.081
3.491
-0.775
109
0.215
0.369
-2.333
-0.480
0.280
110
0.215
0.369
-2.333
-0.480
0.280
111
-0.921
-0.193
1.594
0.251
-1.197
112
-0.424
-2.366
8.163
3.076
-0.551
113
-0.637
-0.052
0.612
0.068
-0.828
114
-0.264
-1.682
5.539
2.187
-0.344
115
-1.007
-0.341
2.527
0.443
-1.309
116
-0.510
-2.514
9.096
3.268
-0.663
117
-0.614
0.107
0.053
-0.139
-0.798
118
0.061
-0.418
0.805
0.543
0.079
119
-0.407
0.173
-0.543
-0.224
-0.529
120
0.100
-0.221
0.020
0.287
0.129
121
-0.700
-0.040
0.986
0.053
-0.910
122
-0.025
-0.565
1.738
0.735
-0.032
123
0.275
0.489
-3.024
-0.636
0.358
124
0.275
0.489
-3.024
-0.636
0.358
125
-0.861
-0.073
0.903
0.095
-1.119
126
-0.364
-2.246
7.472
2.920
-0.473
127
-0.577
0.068
-0.079
-0.088
-0.750
128
-0.204
-1.562
4.848
2.031
-0.266
129
-0.971
-0.269
2.113
0.349
-1.262
130
-0.474
-2.442
8.682
3.174
-0.616
201
0.101
0.116
-0.968
-0.151
0.131
202
0.086
0.100
-0.829
-0.129
0.112
203
-0.822
-0.350
2.312
0.455
-1.069
204
-0.425
-2.088
7.567
2.715
-0.552
205
-1.731
-0.800
5.454
1.039
-2.251
206
-0.936
-4.276
15.964
5.559
-1.217
207
-1.753
-0.824
5.661
1.072
-2.279
208
-0.958
-4.301
16.172
5.592
-1.245
209
0.301
0.517
-3.266
-0.672
0.391
210
0.258
0.443
-2.800
-0.576
0.335
211
-0.651
-0.007
0.342
0.009
-0.846
212
-0.253
-1.745
5.597
2.269
-0.329
213
-1.560
-0.456
3.483
0.593
-2.027
214
-0.764
-3.933
13.994
5.113
-0.994
215
-1.624
-0.567
4.183
0.737
-2.111
216
-0.829
-4.044
14.694
5.257
-1.078
217
-1.518
-0.118
2.314
0.154
-1.973
218
-0.072
-1.243
3.925
1.616
-0.094
219
-1.582
-0.229
3.014
0.298
-2.057
220
-0.137
-1.354
4.625
1.760
-0.177
221
0.385
0.685
-4.234
-0.890
0.501
222
0.330
0.587
-3.629
-0.763
0.429
223
-0.579
0.137
-0.487
-0.178
-0.752
224
-0.181
-1.601
4.768
2.082
-0.236
225
-1.488
-0.312
2.654
0.406
-1.934
226
-0.692
-3.789
13.165
4.926
-0.900
227
-1.570
-0.459
3.561
0.597
-2.041
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F66
Page 59
228
-0.775
-3.936
14.072
5.117
-1.007
101
-0.022
0.096
-0.836
-0.125
-0.029
102
-0.022
0.096
-0.836
-0.125
-0.029
103
-1.069
0.165
-2.711
-0.215
-1.390
104
0.455
-3.036
10.801
3.947
0.592
105
-0.807
0.148
-2.242
-0.192
-1.049
106
0.336
-2.253
7.892
2.929
0.436
107
-1.060
0.127
-2.377
-0.165
-1.378
108
0.464
-3.074
11.135
3.997
0.603
109
-0.066
0.407
-2.802
-0.529
-0.086
110
-0.066
0.407
-2.802
-0.529
-0.086
111
-1.113
0.476
-4.677
-0.619
-1.447
112
0.411
-2.725
8.835
3.543
0.534
113
-0.851
0.459
-4.208
-0.596
-1.107
114
0.292
-1.942
5.926
2.525
0.379
115
-1.087
0.313
-3.556
-0.407
-1.413
116
0.437
-2.888
9.956
3.754
0.569
117
-0.895
0.632
-4.951
-0.822
-1.164
118
0.101
-0.378
0.344
0.492
0.132
119
-0.688
0.576
-4.414
-0.749
-0.895
120
0.059
-0.182
-0.443
0.237
0.077
121
-0.869
0.470
-3.830
-0.610
-1.130
122
0.128
-0.541
1.465
0.704
0.166
123
-0.085
0.538
-3.630
-0.699
-0.111
124
-0.085
0.538
-3.630
-0.699
-0.111
125
-1.132
0.607
-5.505
-0.789
-1.472
126
0.392
-2.594
8.007
3.372
0.510
127
-0.870
0.590
-5.036
-0.767
-1.131
128
0.273
-1.811
5.098
2.354
0.355
129
-1.098
0.392
-4.053
-0.509
-1.427
130
0.426
-2.809
9.459
3.652
0.554
201
-0.031
0.134
-1.171
-0.175
-0.040
202
-0.026
0.115
-1.003
-0.150
-0.034
203
-0.864
0.170
-2.503
-0.222
-1.123
204
0.355
-2.390
8.306
3.108
0.462
205
-1.702
0.226
-4.003
-0.293
-2.212
206
0.737
-4.896
17.616
6.365
0.958
207
-1.695
0.197
-3.753
-0.256
-2.204
208
0.743
-4.925
17.867
6.402
0.966
209
-0.092
0.570
-3.923
-0.741
-0.120
210
-0.079
0.488
-3.363
-0.635
-0.103
211
-0.917
0.544
-4.863
-0.707
-1.192
212
0.302
-2.017
5.947
2.622
0.393
213
-1.754
0.599
-6.363
-0.778
-2.281
214
0.684
-4.523
15.257
5.880
0.889
215
-1.735
0.477
-5.522
-0.620
-2.255
216
0.704
-4.645
16.097
6.038
0.915
217
-1.857
0.971
-7.968
-1.263
-2.414
218
0.279
-1.195
3.378
1.553
0.363
219
-1.837
0.849
-7.127
-1.104
-2.388
220
0.299
-1.317
4.219
1.712
0.389
221
-0.119
0.753
-5.082
-0.979
-0.155
222
-0.102
0.646
-4.356
-0.839
-0.133
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F67
Page 60
223
-0.940
0.701
-5.856
-0.911
224
0.280
-1.860
4.953
2.418
-1.221
0.363
225
-1.777
0.756
-7.356
-0.983
-2.310
226
0.661
-4.366
14.263
5.675
0.860
227
-1.752
0.595
-6.267
-0.773
-2.277
228
0.687
-4.527
15.352
5.885
0.893
101
0.055
0.064
-1.054
-0.083
0.072
102
0.055
0.064
-1.054
-0.083
0.072
103
-1.039
-0.257
2.861
0.334
-1.351
104
-0.185
-1.684
4.441
2.189
-0.241
105
-0.766
-0.177
1.882
0.230
-0.995
106
-0.125
-1.247
3.067
1.621
-0.163
107
-1.061
-0.283
3.283
0.367
-1.379
108
-0.207
-1.710
4.863
2.222
-0.269
109
0.184
0.208
-3.179
-0.270
0.239
110
0.184
0.208
-3.179
-0.270
0.239
111
-0.910
-0.113
0.736
0.147
-1.183
112
-0.056
-1.540
2.316
2.002
-0.073
113
-0.637
-0.033
-0.243
0.043
-0.827
114
0.004
-1.103
0.942
1.434
0.005
115
-0.984
-0.196
2.008
0.255
-1.279
116
-0.130
-1.623
3.588
2.110
-0.168
117
-0.523
0.000
-0.591
0.000
-0.680
118
0.113
-0.059
-2.215
0.076
0.147
119
-0.346
0.052
-1.238
-0.068
-0.450
120
0.131
0.008
-2.456
-0.010
0.170
121
-0.597
-0.083
0.680
0.108
-0.776
122
0.040
-0.142
-0.943
0.184
0.052
123
0.238
0.269
-4.074
-0.350
0.309
124
0.238
0.269
-4.074
-0.350
0.309
125
-0.856
-0.052
-0.159
0.068
-1.113
126
-0.002
-1.479
1.421
1.923
-0.003
127
-0.582
0.028
-1.138
-0.037
-0.757
128
0.058
-1.042
0.047
1.355
0.075
129
-0.951
-0.160
1.471
0.207
-1.237
130
-0.097
-1.587
3.051
2.063
-0.126
201
0.077
0.090
-1.476
-0.116
0.100
202
0.066
0.077
-1.265
-0.100
0.086
203
-0.809
-0.180
1.867
0.234
-1.052
204
-0.126
-1.322
3.131
1.718
-0.164
205
-1.684
-0.437
4.999
0.568
-2.190
206
-0.318
-2.720
7.527
3.536
-0.413
207
-1.701
-0.456
5.315
0.593
-2.211
208
-0.335
-2.739
7.843
3.561
-0.435
209
0.258
0.291
-4.451
-0.379
0.335
210
0.221
0.250
-3.815
-0.324
0.287
211
-0.654
-0.007
-0.683
0.009
-0.851
212
0.029
-1.149
0.581
1.493
0.037
213
-1.530
-0.264
2.449
0.343
-1.988
214
-0.163
-2.547
4.977
3.311
-0.212
215
-1.585
-0.326
3.403
0.424
-2.060
216
-0.218
-2.610
5.931
3.392
-0.284
217
-1.294
-0.196
1.731
0.255
-1.682
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F68
Page 61
218
0.069
-0.322
-1.748
0.418
0.090
219
-1.349
-0.258
2.684
0.336
-1.754
220
0.014
-0.384
-0.794
0.500
0.018
221
0.333
0.377
-5.704
-0.490
0.433
222
0.286
0.323
-4.889
-0.420
0.371
223
-0.590
0.066
-1.757
-0.086
-0.766
224
0.094
-1.076
-0.493
1.398
0.122
225
-1.465
-0.191
1.375
0.248
-1.904
226
-0.098
-2.474
3.903
3.216
-0.128
227
-1.536
-0.272
2.597
0.353
-1.997
228
-0.170
-2.555
5.125
3.321
-0.221
101
-0.104
0.054
-0.992
-0.070
-0.135
102
-0.104
0.054
-0.992
-0.070
-0.135
103
-1.212
0.384
-5.095
-0.499
-1.576
104
0.308
-1.131
3.101
1.470
0.400
105
-0.935
0.302
-4.069
-0.392
-1.216
106
0.205
-0.835
2.078
1.085
0.266
107
-1.170
0.362
-4.698
-0.471
-1.522
108
0.350
-1.153
3.498
1.498
0.454
109
-0.326
0.178
-2.985
-0.231
-0.424
110
-0.326
0.178
-2.985
-0.231
-0.424
111
-1.434
0.508
-7.088
-0.660
-1.864
112
0.086
-1.007
1.108
1.309
0.112
113
-1.157
0.426
-6.062
-0.553
-1.504
114
-0.017
-0.711
0.085
0.924
-0.022
115
-1.304
0.437
-5.894
-0.568
-1.695
116
0.216
-1.078
2.302
1.402
0.281
117
-1.048
0.408
-5.785
-0.530
-1.362
118
-0.264
-0.089
-2.040
0.115
-0.343
119
-0.867
0.350
-5.085
-0.455
-1.127
120
-0.279
-0.022
-2.276
0.029
-0.363
121
-0.917
0.336
-4.591
-0.437
-1.192
122
-0.133
-0.160
-0.846
0.208
-0.173
123
-0.420
0.230
-3.824
-0.299
-0.546
124
-0.420
0.230
-3.824
-0.299
-0.546
125
-1.528
0.560
-7.927
-0.728
-1.986
126
-0.008
-0.955
0.269
1.242
-0.010
127
-1.251
0.477
-6.901
-0.621
-1.626
128
-0.111
-0.659
-0.754
0.856
-0.144
129
-1.360
0.468
-6.397
-0.608
-1.768
130
0.160
-1.047
1.799
1.361
0.208
201
-0.146
0.076
-1.389
-0.098
-0.189
202
-0.125
0.065
-1.191
-0.084
-0.162
203
-1.011
0.329
-4.473
-0.427
-1.315
204
0.205
-0.883
2.084
1.148
0.266
205
-1.898
0.593
-7.755
-0.771
-2.467
206
0.534
-1.831
5.358
2.381
0.695
207
-1.866
0.577
-7.458
-0.750
-2.426
208
0.566
-1.847
5.656
2.402
0.735
209
-0.456
0.249
-4.179
-0.324
-0.593
210
-0.391
0.214
-3.582
-0.278
-0.509
211
-1.278
0.478
-6.865
-0.621
-1.661
212
-0.062
-0.734
-0.308
0.955
-0.080
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F69
Page 62
213
-2.164
0.742
-10.147
-0.964
214
0.268
-1.682
2.967
2.187
-2.813
0.348
215
-2.066
0.688
-9.251
-0.895
-2.686
216
0.366
-1.736
3.862
2.257
0.476
217
-1.938
0.706
-9.582
-0.917
-2.519
218
-0.258
-0.358
-1.557
0.465
-0.335
219
-1.840
0.652
-8.687
-0.848
-2.392
220
-0.160
-0.411
-0.662
0.535
-0.208
221
-0.588
0.322
-5.354
-0.419
-0.764
222
-0.504
0.276
-4.589
-0.359
-0.655
223
-1.390
0.540
-7.871
-0.702
-1.808
224
-0.174
-0.672
-1.315
0.874
-0.227
225
-2.277
0.804
-11.154
-1.045
-2.960
226
0.155
-1.620
1.960
2.106
0.202
227
-2.151
0.735
-10.007
-0.956
-2.796
228
0.281
-1.689
3.107
2.196
0.366
101
0.097
-0.063
-1.107
0.082
0.126
102
0.097
-0.063
-1.107
0.082
0.126
103
-1.233
-0.184
1.093
0.239
-1.603
104
0.723
-2.786
-11.488
3.622
0.940
105
-0.901
-0.154
0.543
0.200
-1.171
106
0.567
-2.105
-8.893
2.737
0.736
107
-1.272
-0.159
1.536
0.206
-1.653
108
0.684
-2.761
-11.045
3.589
0.889
109
0.352
-0.264
-4.644
0.343
0.458
110
0.352
-0.264
-4.644
0.343
0.458
111
-0.978
-0.385
-2.444
0.501
-1.271
112
0.978
-2.987
-15.025
3.883
1.271
113
-0.646
-0.355
-2.994
0.461
-0.839
114
0.822
-2.306
-12.430
2.998
1.068
115
-1.119
-0.279
-0.586
0.363
-1.454
116
0.837
-2.881
-13.167
3.746
1.088
117
-0.809
-0.111
-1.412
0.145
-1.052
118
0.503
-1.047
-7.744
1.361
0.654
119
-0.519
-0.150
-2.220
0.194
-0.675
120
0.465
-0.851
-6.969
1.106
0.605
121
-0.950
-0.006
0.445
0.008
-1.235
122
0.362
-0.941
-5.887
1.223
0.471
123
0.459
-0.348
-6.134
0.452
0.597
124
0.459
-0.348
-6.134
0.452
0.597
125
-0.871
-0.469
-3.934
0.610
-1.132
126
1.085
-3.071
-16.515
3.992
1.411
127
-0.539
-0.439
-4.484
0.570
-0.700
128
0.928
-2.390
-13.920
3.107
1.207
129
-1.055
-0.330
-1.480
0.429
-1.371
130
0.901
-2.932
-14.061
3.811
1.172
201
0.136
-0.088
-1.550
0.115
0.177
202
0.116
-0.076
-1.329
0.098
0.151
203
-0.948
-0.172
0.431
0.224
-1.232
204
0.617
-2.254
-9.633
2.930
0.802
205
-2.012
-0.269
2.191
0.350
-2.615
206
1.118
-4.432
-17.938
5.762
1.453
207
-2.041
-0.250
2.524
0.325
-2.653
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F70
10
Page 63
208
1.089
-4.414
-17.606
5.738
1.416
209
0.493
-0.370
-6.502
0.480
0.641
210
0.422
-0.317
-5.573
0.412
0.549
211
-0.642
-0.414
-3.813
0.538
-0.834
212
0.923
-2.495
-13.878
3.244
1.200
213
-1.706
-0.510
-2.053
0.664
-2.217
214
1.424
-4.674
-22.183
6.076
1.851
215
-1.811
-0.431
-0.660
0.561
-2.355
216
1.318
-4.594
-20.789
5.973
1.714
217
-2.066
0.010
1.353
-0.013
-2.686
218
0.746
-1.994
-12.216
2.592
0.970
219
-2.172
0.089
2.746
-0.116
-2.823
220
0.641
-1.915
-10.823
2.489
0.833
221
0.643
-0.487
-8.588
0.633
0.835
222
0.551
-0.418
-7.361
0.543
0.716
223
-0.513
-0.514
-5.601
0.669
-0.667
224
1.052
-2.596
-15.666
3.375
1.367
225
-1.577
-0.611
-3.841
0.795
-2.050
226
1.552
-4.774
-23.971
6.207
2.018
227
-1.715
-0.507
-2.001
0.659
-2.229
228
1.415
-4.670
-22.130
6.071
1.839
101
0.080
0.001
-1.200
-0.001
0.104
102
0.080
0.001
-1.200
-0.001
0.104
103
-1.961
-0.003
5.577
0.004
-2.549
104
0.091
-0.124
-1.272
0.161
0.118
105
-1.451
-0.002
3.883
0.003
-1.886
106
0.088
-0.093
-1.254
0.121
0.115
107
-1.993
-0.003
6.057
0.004
-2.591
108
0.059
-0.124
-0.792
0.162
0.077
109
0.323
0.005
-5.193
-0.007
0.420
110
0.323
0.005
-5.193
-0.007
0.420
111
-1.718
0.001
1.584
-0.001
-2.233
112
0.334
-0.120
-5.265
0.156
0.434
113
-1.208
0.002
-0.110
-0.003
-1.570
114
0.331
-0.089
-5.247
0.115
0.431
115
-1.847
-0.001
3.661
0.001
-2.401
116
0.205
-0.122
-3.188
0.159
0.266
117
-0.836
0.006
-0.733
-0.007
-1.087
118
0.324
-0.005
-5.209
0.007
0.421
119
-0.546
0.006
-1.848
-0.007
-0.710
120
0.324
-0.003
-5.205
0.004
0.421
121
-0.965
0.004
1.345
-0.005
-1.255
122
0.195
-0.007
-3.132
0.010
0.253
123
0.425
0.006
-6.874
-0.008
0.553
124
0.425
0.006
-6.874
-0.008
0.553
125
-1.616
0.002
-0.097
-0.003
-2.101
126
0.436
-0.119
-6.946
0.155
0.567
127
-1.106
0.003
-1.791
-0.004
-1.437
128
0.433
-0.088
-6.928
0.114
0.563
129
-1.786
0.000
2.653
0.001
-2.322
130
0.266
-0.121
-4.196
0.158
0.346
201
0.112
0.001
-1.680
-0.002
0.146
202
0.096
0.001
-1.440
-0.002
0.125
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F71
11
Page 64
203
-1.537
-0.002
3.981
0.003
204
0.105
-0.099
-1.498
0.128
-1.998
0.136
205
-3.170
-0.005
9.403
0.007
-4.120
206
0.114
-0.199
-1.555
0.258
0.148
207
-3.194
-0.006
9.763
0.007
-4.152
208
0.090
-0.199
-1.195
0.259
0.116
209
0.452
0.007
-7.270
-0.009
0.588
210
0.388
0.006
-6.232
-0.008
0.504
211
-1.245
0.003
-0.810
-0.004
-1.619
212
0.396
-0.094
-6.289
0.122
0.515
213
-2.878
0.000
4.611
0.001
-3.741
214
0.405
-0.194
-6.347
0.252
0.527
215
-2.975
-0.002
6.169
0.002
-3.867
216
0.308
-0.196
-4.789
0.254
0.401
217
-2.096
0.008
3.326
-0.010
-2.725
218
0.389
-0.016
-6.266
0.021
0.506
219
-2.193
0.006
4.884
-0.008
-2.851
220
0.292
-0.018
-4.708
0.023
0.380
221
0.595
0.008
-9.624
-0.011
0.774
222
0.510
0.007
-8.249
-0.009
0.663
223
-1.123
0.004
-2.827
-0.005
-1.460
224
0.519
-0.093
-8.307
0.121
0.674
225
-2.756
0.001
2.594
-0.001
-3.582
226
0.528
-0.193
-8.364
0.251
0.686
227
-2.883
-0.001
4.656
0.001
-3.748
228
0.400
-0.195
-6.302
0.253
0.520
101
0.059
-0.002
-0.717
0.003
0.077
102
0.059
-0.002
-0.717
0.003
0.077
103
-1.977
-0.010
6.081
0.013
-2.570
104
0.012
-0.159
0.028
0.207
0.016
105
-1.468
-0.008
4.381
0.010
-1.908
106
0.024
-0.120
-0.158
0.156
0.031
107
-2.001
-0.009
6.368
0.012
-2.601
108
-0.012
-0.158
0.315
0.206
-0.015
109
0.209
-0.013
-2.668
0.017
0.272
110
0.209
-0.013
-2.668
0.017
0.272
111
-1.827
-0.021
4.130
0.027
-2.375
112
0.162
-0.170
-1.923
0.221
0.211
113
-1.318
-0.019
2.430
0.025
-1.713
114
0.174
-0.131
-2.109
0.170
0.226
115
-1.911
-0.016
5.197
0.021
-2.484
116
0.078
-0.165
-0.856
0.214
0.102
117
-0.998
-0.012
1.852
0.016
-1.297
118
0.191
-0.035
-2.357
0.045
0.248
119
-0.696
-0.012
0.722
0.016
-0.905
120
0.195
-0.029
-2.435
0.038
0.254
121
-1.081
-0.007
2.920
0.009
-1.406
122
0.107
-0.030
-1.290
0.038
0.139
123
0.272
-0.018
-3.490
0.023
0.354
124
0.272
-0.018
-3.490
0.023
0.354
125
-1.764
-0.026
3.308
0.034
-2.293
126
0.225
-0.175
-2.745
0.228
0.293
127
-1.255
-0.024
1.608
0.031
-1.632
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F72
14
Page 65
128
0.237
-0.136
-2.931
0.176
0.308
129
-1.873
-0.019
4.704
0.024
-2.435
130
0.116
-0.168
-1.349
0.218
0.151
201
0.083
-0.003
-1.004
0.004
0.107
202
0.071
-0.002
-0.861
0.003
0.092
203
-1.558
-0.009
4.578
0.011
-2.025
204
0.033
-0.128
-0.265
0.166
0.043
205
-3.187
-0.015
10.016
0.020
-4.143
206
-0.004
-0.254
0.331
0.330
-0.006
207
-3.204
-0.015
10.231
0.019
-4.166
208
-0.022
-0.253
0.547
0.329
-0.029
209
0.293
-0.018
-3.735
0.024
0.380
210
0.251
-0.016
-3.202
0.020
0.326
211
-1.378
-0.022
2.237
0.029
-1.791
212
0.213
-0.141
-2.606
0.184
0.277
213
-3.007
-0.028
7.675
0.037
-3.909
214
0.176
-0.267
-2.010
0.347
0.228
215
-3.069
-0.025
8.475
0.032
-3.990
216
0.113
-0.263
-1.209
0.342
0.147
217
-2.335
-0.014
6.485
0.018
-3.036
218
0.212
-0.062
-2.536
0.081
0.275
219
-2.398
-0.010
7.286
0.013
-3.117
220
0.149
-0.058
-1.735
0.076
0.194
221
0.381
-0.025
-4.886
0.033
0.495
222
0.326
-0.022
-4.188
0.028
0.424
223
-1.302
-0.028
1.250
0.036
-1.693
224
0.289
-0.147
-3.592
0.191
0.375
225
-2.931
-0.034
6.689
0.045
-3.811
226
0.251
-0.273
-2.996
0.355
0.327
227
-3.013
-0.029
7.736
0.038
-3.917
228
0.170
-0.267
-1.949
0.348
0.220
101
0.079
0.002
-1.180
-0.003
0.103
102
0.079
0.002
-1.180
-0.003
0.103
103
-1.976
-0.006
5.646
0.008
-2.569
104
0.079
-0.175
-1.179
0.228
0.103
105
-1.462
-0.004
3.939
0.005
-1.901
106
0.079
-0.131
-1.179
0.170
0.103
107
-2.008
-0.007
6.118
0.009
-2.610
108
0.047
-0.176
-0.707
0.229
0.062
109
0.317
0.008
-5.087
-0.010
0.412
110
0.317
0.008
-5.087
-0.010
0.412
111
-1.738
0.000
1.739
0.000
-2.259
112
0.317
-0.169
-5.086
0.220
0.412
113
-1.224
0.002
0.032
-0.003
-1.592
114
0.317
-0.125
-5.086
0.162
0.412
115
-1.865
-0.003
3.774
0.004
-2.424
116
0.190
-0.172
-3.051
0.224
0.247
117
-0.880
0.007
-0.501
-0.009
-1.144
118
0.317
-0.019
-5.085
0.025
0.412
119
-0.581
0.007
-1.648
-0.010
-0.755
120
0.317
-0.012
-5.086
0.016
0.412
121
-1.007
0.004
1.533
-0.005
-1.309
122
0.190
-0.022
-3.050
0.029
0.247
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F73
15
Page 66
123
0.417
0.011
-6.732
-0.014
124
0.417
0.011
-6.732
-0.014
0.542
0.542
125
-1.638
0.003
0.094
-0.004
-2.129
126
0.417
-0.166
-6.731
0.216
0.542
127
-1.124
0.005
-1.613
-0.006
-1.462
128
0.417
-0.122
-6.731
0.158
0.542
129
-1.805
-0.001
2.787
0.002
-2.346
130
0.250
-0.170
-4.038
0.222
0.325
201
0.111
0.003
-1.652
-0.004
0.144
202
0.095
0.002
-1.416
-0.003
0.123
203
-1.549
-0.004
4.045
0.005
-2.014
204
0.095
-0.139
-1.415
0.181
0.123
205
-3.193
-0.010
9.505
0.014
-4.151
206
0.095
-0.281
-1.415
0.365
0.123
207
-3.217
-0.011
9.859
0.014
-4.182
208
0.071
-0.281
-1.061
0.366
0.092
209
0.444
0.011
-7.122
-0.015
0.577
210
0.380
0.010
-6.105
-0.012
0.495
211
-1.264
0.003
-0.644
-0.004
-1.643
212
0.380
-0.132
-6.104
0.172
0.495
213
-2.908
-0.003
4.817
0.004
-3.780
214
0.380
-0.274
-6.103
0.356
0.495
215
-3.003
-0.006
6.343
0.007
-3.904
216
0.285
-0.276
-4.577
0.359
0.371
217
-2.185
0.008
3.722
-0.011
-2.840
218
0.380
-0.049
-6.100
0.064
0.495
219
-2.280
0.006
5.248
-0.007
-2.964
220
0.285
-0.051
-4.574
0.067
0.371
221
0.584
0.015
-9.425
-0.020
0.759
222
0.500
0.013
-8.079
-0.017
0.651
223
-1.144
0.007
-2.618
-0.009
-1.487
224
0.500
-0.128
-8.078
0.167
0.651
225
-2.788
0.000
2.843
-0.001
-3.624
226
0.500
-0.270
-8.077
0.351
0.651
227
-2.913
-0.003
4.863
0.004
-3.787
228
0.375
-0.273
-6.057
0.355
0.488
101
0.078
0.001
-1.183
-0.001
0.101
102
0.078
0.001
-1.183
-0.001
0.101
103
-1.909
-0.007
5.392
0.009
-2.482
104
0.078
-0.179
-1.184
0.233
0.101
105
-1.412
-0.005
3.748
0.007
-1.836
106
0.078
-0.134
-1.184
0.174
0.101
107
-1.940
-0.007
5.865
0.010
-2.522
108
0.047
-0.179
-0.711
0.233
0.061
109
0.315
0.003
-5.074
-0.004
0.410
110
0.315
0.003
-5.074
-0.004
0.410
111
-1.672
-0.005
1.501
0.007
-2.174
112
0.315
-0.177
-5.075
0.230
0.410
113
-1.175
-0.003
-0.143
0.004
-1.528
114
0.315
-0.132
-5.075
0.172
0.410
115
-1.798
-0.006
3.531
0.008
-2.337
116
0.189
-0.178
-3.045
0.232
0.246
117
-0.840
0.003
-0.640
-0.004
-1.092
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F74
18
Page 67
118
0.315
-0.026
-5.075
0.033
0.410
119
-0.551
0.003
-1.749
-0.004
-0.717
120
0.315
-0.019
-5.075
0.024
0.410
121
-0.966
0.002
1.389
-0.002
-1.256
122
0.189
-0.027
-3.045
0.035
0.246
123
0.414
0.003
-6.712
-0.004
0.538
124
0.414
0.003
-6.712
-0.004
0.538
125
-1.573
-0.005
-0.137
0.007
-2.045
126
0.414
-0.177
-6.713
0.230
0.538
127
-1.076
-0.003
-1.781
0.004
-1.399
128
0.414
-0.132
-6.713
0.172
0.538
129
-1.739
-0.006
2.548
0.008
-2.260
130
0.248
-0.178
-4.028
0.232
0.323
201
0.109
0.001
-1.656
-0.002
0.142
202
0.094
0.001
-1.420
-0.002
0.122
203
-1.496
-0.005
3.840
0.007
-1.945
204
0.094
-0.143
-1.421
0.186
0.122
205
-3.086
-0.012
9.100
0.015
-4.011
206
0.094
-0.287
-1.421
0.373
0.122
207
-3.109
-0.012
9.455
0.015
-4.042
208
0.070
-0.287
-1.066
0.373
0.091
209
0.441
0.004
-7.104
-0.005
0.573
210
0.378
0.004
-6.089
-0.005
0.491
211
-1.212
-0.003
-0.829
0.004
-1.575
212
0.378
-0.140
-6.090
0.183
0.491
213
-2.801
-0.009
4.431
0.012
-3.642
214
0.378
-0.284
-6.091
0.370
0.491
215
-2.896
-0.010
5.953
0.013
-3.764
216
0.283
-0.285
-4.568
0.371
0.369
217
-2.097
0.004
3.412
-0.005
-2.726
218
0.378
-0.058
-6.090
0.075
0.491
219
-2.191
0.003
4.934
-0.004
-2.849
220
0.283
-0.059
-4.568
0.076
0.369
221
0.580
0.004
-9.397
-0.005
0.753
222
0.497
0.004
-8.055
-0.005
0.646
223
-1.093
-0.003
-2.795
0.004
-1.421
224
0.497
-0.140
-8.055
0.183
0.646
225
-2.682
-0.009
2.465
0.012
-3.487
226
0.497
-0.284
-8.056
0.370
0.646
227
-2.807
-0.010
4.479
0.013
-3.649
228
0.373
-0.285
-6.043
0.371
0.484
101
-0.080
0.000
-1.203
0.000
-0.104
102
-0.080
0.000
-1.203
0.000
-0.104
103
-2.123
-0.003
-7.988
0.004
-2.760
104
-0.076
-0.130
-1.231
0.169
-0.099
105
-1.612
-0.002
-6.292
0.003
-2.096
106
-0.077
-0.097
-1.224
0.127
-0.100
107
-2.091
-0.003
-7.507
0.004
-2.718
108
-0.044
-0.130
-0.750
0.169
-0.057
109
-0.324
0.000
-5.203
0.000
-0.421
110
-0.324
0.000
-5.203
0.000
-0.421
111
-2.367
-0.003
-11.988
0.004
-3.077
112
-0.320
-0.130
-5.231
0.169
-0.416
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F75
19
Page 68
113
-1.856
-0.002
-10.292
0.003
-2.413
114
-0.321
-0.097
-5.224
0.127
-0.417
115
-2.237
-0.003
-9.907
0.004
-2.909
116
-0.190
-0.130
-3.150
0.169
-0.248
117
-1.485
-0.001
-9.662
0.001
-1.930
118
-0.325
-0.011
-5.219
0.015
-0.422
119
-1.194
-0.001
-8.547
0.001
-1.553
120
-0.325
-0.008
-5.215
0.011
-0.422
121
-1.355
-0.001
-7.581
0.001
-1.762
122
-0.195
-0.011
-3.138
0.015
-0.254
123
-0.426
0.000
-6.888
0.000
-0.554
124
-0.426
0.000
-6.888
0.000
-0.554
125
-2.469
-0.003
-13.673
0.004
-3.210
126
-0.422
-0.130
-6.916
0.169
-0.549
127
-1.958
-0.002
-11.977
0.003
-2.546
128
-0.423
-0.097
-6.909
0.127
-0.550
129
-2.299
-0.003
-10.918
0.004
-2.988
130
-0.252
-0.130
-4.161
0.169
-0.327
201
-0.112
0.000
-1.684
0.000
-0.146
202
-0.096
0.000
-1.444
0.000
-0.125
203
-1.730
-0.002
-6.872
0.003
-2.250
204
-0.093
-0.104
-1.466
0.135
-0.121
205
-3.365
-0.005
-12.300
0.006
-4.374
206
-0.090
-0.208
-1.489
0.270
-0.116
207
-3.341
-0.005
-11.939
0.006
-4.343
208
-0.066
-0.208
-1.128
0.270
-0.085
209
-0.454
0.000
-7.284
0.000
-0.590
210
-0.389
0.000
-6.244
0.000
-0.505
211
-2.023
-0.002
-11.672
0.003
-2.630
212
-0.386
-0.104
-6.266
0.135
-0.501
213
-3.658
-0.005
-17.100
0.006
-4.755
214
-0.382
-0.208
-6.289
0.270
-0.497
215
-3.560
-0.005
-15.539
0.006
-4.629
216
-0.285
-0.208
-4.728
0.270
-0.371
217
-2.876
-0.002
-15.799
0.002
-3.739
218
-0.390
-0.024
-6.278
0.031
-0.507
219
-2.779
-0.002
-14.238
0.002
-3.612
220
-0.293
-0.024
-4.717
0.031
-0.381
221
-0.596
0.000
-9.643
0.000
-0.775
222
-0.511
0.000
-8.266
0.000
-0.665
223
-2.146
-0.002
-13.694
0.003
-2.789
224
-0.508
-0.104
-8.288
0.135
-0.660
225
-3.780
-0.005
-19.122
0.006
-4.914
226
-0.505
-0.208
-8.311
0.270
-0.656
227
-3.652
-0.005
-17.055
0.006
-4.748
228
-0.377
-0.208
-6.244
0.270
-0.490
101
-0.059
-0.003
-1.016
0.004
-0.077
102
-0.059
-0.003
-1.016
0.004
-0.077
103
-2.086
-0.008
-7.651
0.010
-2.712
104
-0.014
-0.168
-0.284
0.218
-0.018
105
-1.579
-0.007
-5.992
0.009
-2.053
106
-0.025
-0.127
-0.467
0.165
-0.033
107
-2.062
-0.007
-7.245
0.009
-2.681
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F76
22
Page 69
108
0.010
-0.167
0.122
0.217
0.012
109
-0.207
-0.019
-4.037
0.025
-0.269
110
-0.207
-0.019
-4.037
0.025
-0.269
111
-2.234
-0.024
-10.672
0.031
-2.904
112
-0.162
-0.184
-3.305
0.239
-0.211
113
-1.727
-0.023
-9.013
0.030
-2.245
114
-0.173
-0.143
-3.488
0.186
-0.225
115
-2.151
-0.016
-9.057
0.021
-2.797
116
-0.079
-0.176
-1.690
0.229
-0.103
117
-1.414
-0.020
-8.548
0.026
-1.839
118
-0.188
-0.041
-3.754
0.053
-0.245
119
-1.113
-0.020
-7.420
0.025
-1.446
120
-0.193
-0.035
-3.825
0.046
-0.251
121
-1.332
-0.012
-6.933
0.016
-1.731
122
-0.105
-0.033
-2.139
0.043
-0.137
123
-0.270
-0.026
-5.309
0.034
-0.351
124
-0.270
-0.026
-5.309
0.034
-0.351
125
-2.297
-0.031
-11.944
0.040
-2.986
126
-0.225
-0.191
-4.577
0.248
-0.293
127
-1.790
-0.030
-10.285
0.039
-2.327
128
-0.236
-0.150
-4.760
0.195
-0.307
129
-2.189
-0.021
-9.820
0.027
-2.846
130
-0.117
-0.181
-2.453
0.235
-0.152
201
-0.083
-0.004
-1.423
0.005
-0.107
202
-0.071
-0.004
-1.219
0.005
-0.092
203
-1.692
-0.008
-6.527
0.010
-2.200
204
-0.035
-0.136
-0.634
0.176
-0.045
205
-3.314
-0.012
-11.835
0.015
-4.308
206
0.001
-0.268
-0.048
0.348
0.002
207
-3.296
-0.011
-11.531
0.014
-4.285
208
0.019
-0.267
0.257
0.347
0.025
209
-0.290
-0.027
-5.652
0.035
-0.377
210
-0.248
-0.023
-4.845
0.030
-0.323
211
-1.870
-0.027
-10.153
0.035
-2.431
212
-0.212
-0.155
-4.259
0.201
-0.276
213
-3.492
-0.031
-15.461
0.040
-4.539
214
-0.176
-0.287
-3.673
0.373
-0.229
215
-3.429
-0.025
-14.249
0.033
-4.458
216
-0.114
-0.281
-2.462
0.365
-0.149
217
-2.836
-0.024
-14.511
0.032
-3.687
218
-0.208
-0.069
-4.237
0.090
-0.270
219
-2.774
-0.019
-13.299
0.024
-3.606
220
-0.146
-0.064
-3.026
0.083
-0.190
221
-0.378
-0.036
-7.433
0.047
-0.491
222
-0.324
-0.031
-6.371
0.041
-0.421
223
-1.946
-0.035
-11.679
0.046
-2.529
224
-0.288
-0.163
-5.785
0.212
-0.374
225
-3.567
-0.039
-16.987
0.051
-4.637
226
-0.252
-0.295
-5.200
0.384
-0.328
227
-3.486
-0.031
-15.394
0.041
-4.532
228
-0.171
-0.287
-3.607
0.374
-0.222
101
-0.079
-0.004
-1.186
0.005
-0.103
102
-0.079
-0.004
-1.186
0.005
-0.103
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 70
103
-2.136
-0.014
-8.011
0.018
-2.777
104
-0.079
-0.190
-1.183
0.247
-0.103
105
-1.622
-0.012
-6.305
0.015
-2.108
106
-0.079
-0.144
-1.184
0.187
-0.103
107
-2.104
-0.012
-7.537
0.016
-2.736
108
-0.047
-0.188
-0.709
0.245
-0.062
109
-0.317
-0.016
-5.113
0.021
-0.412
110
-0.317
-0.016
-5.113
0.021
-0.412
111
-2.374
-0.026
-11.938
0.034
-3.086
112
-0.317
-0.202
-5.110
0.263
-0.412
113
-1.860
-0.024
-10.232
0.031
-2.418
114
-0.317
-0.156
-5.111
0.202
-0.412
115
-2.247
-0.020
-9.893
0.025
-2.921
116
-0.190
-0.196
-3.065
0.254
-0.247
117
-1.515
-0.015
-9.699
0.020
-1.970
118
-0.317
-0.044
-5.112
0.057
-0.412
119
-1.216
-0.015
-8.552
0.020
-1.581
120
-0.317
-0.037
-5.112
0.048
-0.412
121
-1.389
-0.009
-7.654
0.012
-1.805
122
-0.190
-0.038
-3.066
0.049
-0.247
123
-0.418
-0.021
-6.767
0.027
-0.543
124
-0.418
-0.021
-6.767
0.027
-0.543
125
-2.475
-0.031
-13.592
0.040
-3.218
126
-0.418
-0.207
-6.764
0.269
-0.543
127
-1.961
-0.029
-11.886
0.037
-2.549
128
-0.418
-0.161
-6.765
0.209
-0.543
129
-2.308
-0.023
-10.885
0.029
-3.000
130
-0.251
-0.199
-4.057
0.258
-0.326
201
-0.111
-0.006
-1.661
0.007
-0.144
202
-0.095
-0.005
-1.423
0.006
-0.123
203
-1.740
-0.013
-6.883
0.017
-2.263
204
-0.095
-0.154
-1.421
0.200
-0.123
205
-3.386
-0.021
-12.343
0.027
-4.402
206
-0.095
-0.302
-1.419
0.393
-0.123
207
-3.362
-0.020
-11.988
0.025
-4.371
208
-0.071
-0.301
-1.063
0.392
-0.092
209
-0.444
-0.022
-7.158
0.029
-0.577
210
-0.380
-0.019
-6.136
0.025
-0.495
211
-2.026
-0.027
-11.596
0.035
-2.634
212
-0.380
-0.168
-6.133
0.218
-0.495
213
-3.672
-0.035
-17.056
0.046
-4.773
214
-0.380
-0.317
-6.131
0.412
-0.495
215
-3.576
-0.030
-15.522
0.040
-4.649
216
-0.285
-0.312
-4.597
0.406
-0.371
217
-2.948
-0.018
-15.962
0.023
-3.833
218
-0.380
-0.079
-6.133
0.103
-0.495
219
-2.853
-0.013
-14.428
0.017
-3.709
220
-0.285
-0.074
-4.599
0.097
-0.371
221
-0.585
-0.029
-9.474
0.038
-0.761
222
-0.502
-0.025
-8.121
0.033
-0.652
223
-2.147
-0.033
-13.581
0.043
-2.791
224
-0.502
-0.174
-8.118
0.226
-0.652
225
-3.793
-0.041
-19.041
0.054
-4.931
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F77
23
Page 71
226
-0.502
-0.323
-8.116
0.420
-0.652
227
-3.667
-0.035
-17.010
0.045
-4.768
228
-0.376
-0.317
-6.086
0.411
-0.489
101
-0.078
-0.001
-1.179
0.001
-0.101
102
-0.078
-0.001
-1.179
0.001
-0.101
103
-2.066
-0.012
-7.754
0.016
-2.686
104
-0.078
-0.189
-1.180
0.246
-0.101
105
-1.569
-0.009
-6.110
0.012
-2.040
106
-0.078
-0.142
-1.180
0.185
-0.101
107
-2.035
-0.012
-7.282
0.015
-2.645
108
-0.047
-0.189
-0.708
0.245
-0.061
109
-0.315
-0.009
-5.058
0.012
-0.410
110
-0.315
-0.009
-5.058
0.012
-0.410
111
-2.303
-0.020
-11.633
0.026
-2.994
112
-0.315
-0.197
-5.059
0.256
-0.410
113
-1.806
-0.017
-9.989
0.022
-2.348
114
-0.315
-0.150
-5.059
0.195
-0.410
115
-2.177
-0.016
-9.610
0.021
-2.830
116
-0.189
-0.193
-3.036
0.251
-0.246
117
-1.471
-0.008
-9.492
0.011
-1.912
118
-0.315
-0.038
-5.059
0.049
-0.410
119
-1.182
-0.008
-8.384
0.011
-1.536
120
-0.315
-0.031
-5.059
0.040
-0.410
121
-1.345
-0.005
-7.469
0.006
-1.748
122
-0.189
-0.034
-3.036
0.044
-0.246
123
-0.414
-0.012
-6.691
0.016
-0.538
124
-0.414
-0.012
-6.691
0.016
-0.538
125
-2.402
-0.023
-13.266
0.030
-3.123
126
-0.414
-0.200
-6.692
0.260
-0.538
127
-1.905
-0.020
-11.622
0.026
-2.477
128
-0.414
-0.153
-6.692
0.199
-0.538
129
-2.236
-0.018
-10.590
0.024
-2.907
130
-0.248
-0.195
-4.016
0.254
-0.323
201
-0.109
-0.001
-1.651
0.002
-0.142
202
-0.094
-0.001
-1.415
0.002
-0.122
203
-1.684
-0.010
-6.675
0.013
-2.189
204
-0.094
-0.152
-1.416
0.197
-0.122
205
-3.274
-0.019
-11.935
0.024
-4.257
206
-0.094
-0.302
-1.417
0.393
-0.122
207
-3.251
-0.019
-11.581
0.024
-4.226
208
-0.070
-0.302
-1.063
0.392
-0.091
209
-0.441
-0.013
-7.081
0.016
-0.573
210
-0.378
-0.011
-6.070
0.014
-0.491
211
-1.968
-0.020
-11.330
0.025
-2.559
212
-0.378
-0.161
-6.071
0.210
-0.491
213
-3.559
-0.028
-16.590
0.037
-4.626
214
-0.378
-0.312
-6.071
0.405
-0.491
215
-3.464
-0.026
-15.072
0.033
-4.504
216
-0.283
-0.309
-4.554
0.402
-0.369
217
-2.855
-0.009
-15.571
0.012
-3.711
218
-0.378
-0.072
-6.071
0.094
-0.491
219
-2.760
-0.007
-14.053
0.009
-3.588
220
-0.283
-0.070
-4.554
0.090
-0.369
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F78
26
Page 72
221
-0.580
-0.017
-9.368
0.022
-0.753
222
-0.497
-0.014
-8.029
0.019
-0.646
223
-2.087
-0.023
-13.289
0.030
-2.713
224
-0.497
-0.165
-8.030
0.214
-0.646
225
-3.678
-0.032
-18.549
0.042
-4.781
226
-0.497
-0.315
-8.031
0.410
-0.646
227
-3.553
-0.028
-16.542
0.037
-4.619
228
-0.373
-0.312
-6.024
0.405
-0.484
101
-0.049
-0.077
-1.226
0.100
-0.064
102
-0.049
-0.077
-1.226
0.100
-0.064
103
-1.467
-0.392
-4.875
0.510
-1.907
104
-0.522
-3.198
-12.765
4.157
-0.679
105
-1.112
-0.313
-3.963
0.407
-1.446
106
-0.404
-2.418
-9.880
3.143
-0.525
107
-1.447
-0.361
-4.385
0.470
-1.882
108
-0.502
-3.167
-12.275
4.117
-0.653
109
-0.217
-0.312
-4.979
0.406
-0.282
110
-0.217
-0.312
-4.979
0.406
-0.282
111
-1.635
-0.627
-8.628
0.815
-2.126
112
-0.690
-3.433
-16.518
4.463
-0.897
113
-1.280
-0.548
-7.716
0.713
-1.665
114
-0.572
-2.653
-13.633
3.449
-0.743
115
-1.548
-0.502
-6.636
0.653
-2.013
116
-0.603
-3.308
-14.526
4.301
-0.784
117
-1.375
-0.435
-7.741
0.566
-1.787
118
-0.382
-1.093
-8.088
1.421
-0.496
119
-1.085
-0.404
-7.050
0.526
-1.411
120
-0.340
-0.898
-7.311
1.167
-0.442
121
-1.288
-0.310
-5.749
0.404
-1.674
122
-0.295
-0.968
-6.096
1.259
-0.383
123
-0.288
-0.411
-6.560
0.534
-0.374
124
-0.288
-0.411
-6.560
0.534
-0.374
125
-1.706
-0.726
-10.209
0.944
-2.218
126
-0.761
-3.532
-18.099
4.592
-0.989
127
-1.352
-0.647
-9.297
0.841
-1.757
128
-0.643
-2.752
-15.214
3.577
-0.836
129
-1.591
-0.562
-7.585
0.730
-2.068
130
-0.646
-3.368
-15.475
4.378
-0.840
201
-0.069
-0.108
-1.717
0.140
-0.089
202
-0.059
-0.092
-1.471
0.120
-0.076
203
-1.193
-0.344
-4.391
0.448
-1.551
204
-0.437
-2.589
-10.703
3.366
-0.568
205
-2.328
-0.596
-7.310
0.775
-3.026
206
-0.816
-5.086
-19.934
6.612
-1.060
207
-2.313
-0.573
-6.942
0.745
-3.007
208
-0.801
-5.063
-19.566
6.582
-1.041
209
-0.304
-0.437
-6.971
0.568
-0.395
210
-0.260
-0.374
-5.975
0.487
-0.339
211
-1.395
-0.626
-8.894
0.814
-1.813
212
-0.639
-2.871
-15.206
3.733
-0.830
213
-2.529
-0.878
-11.813
1.142
-3.288
214
-1.017
-5.368
-24.437
6.978
-1.322
215
-2.464
-0.785
-10.320
1.020
-3.203
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F79
27
Page 73
216
-0.952
-5.274
-22.944
6.857
-1.238
217
-2.741
-0.638
-11.892
0.830
-3.564
218
-0.613
-2.048
-12.636
2.663
-0.797
219
-2.676
-0.545
-10.399
0.708
-3.479
220
-0.548
-1.955
-11.143
2.541
-0.712
221
-0.403
-0.575
-9.184
0.748
-0.524
222
-0.346
-0.493
-7.872
0.641
-0.449
223
-1.480
-0.745
-10.791
0.969
-1.924
224
-0.724
-2.990
-17.103
3.887
-0.941
225
-2.614
-0.997
-13.711
1.296
-3.399
226
-1.102
-5.487
-26.335
7.133
-1.433
227
-2.528
-0.874
-11.743
1.136
-3.286
228
-1.016
-5.364
-24.367
6.973
-1.321
101
0.046
0.009
-0.589
-0.012
0.060
102
0.046
0.009
-0.589
-0.012
0.060
103
-0.700
0.003
2.276
-0.004
-0.910
104
0.048
-0.117
-0.596
0.152
0.062
105
-0.513
0.005
1.560
-0.006
-0.668
106
0.047
-0.086
-0.594
0.111
0.062
107
-0.718
-0.001
2.512
0.001
-0.934
108
0.030
-0.121
-0.360
0.157
0.038
109
0.116
0.024
-1.373
-0.031
0.151
110
0.116
0.024
-1.373
-0.031
0.151
111
-0.630
0.018
1.492
-0.023
-0.819
112
0.118
-0.102
-1.380
0.133
0.153
113
-0.443
0.020
0.776
-0.025
-0.577
114
0.117
-0.071
-1.378
0.092
0.153
115
-0.676
0.008
2.041
-0.011
-0.879
116
0.072
-0.112
-0.831
0.145
0.093
117
-1.416
0.024
5.756
-0.031
-1.841
118
0.116
0.017
-1.371
-0.022
0.151
119
-1.033
0.024
3.974
-0.031
-1.343
120
0.116
0.019
-1.372
-0.024
0.151
121
-1.463
0.014
6.306
-0.019
-1.902
122
0.070
0.007
-0.822
-0.010
0.090
123
0.146
0.031
-1.703
-0.040
0.190
124
0.146
0.031
-1.703
-0.040
0.190
125
-0.600
0.025
1.162
-0.033
-0.780
126
0.148
-0.095
-1.710
0.124
0.192
127
-0.414
0.026
0.446
-0.034
-0.538
128
0.147
-0.064
-1.708
0.083
0.192
129
-0.658
0.013
1.843
-0.016
-0.856
130
0.090
-0.107
-1.029
0.140
0.116
201
0.064
0.013
-0.825
-0.016
0.084
202
0.055
0.011
-0.707
-0.014
0.072
203
-0.542
0.006
1.585
-0.008
-0.704
204
0.057
-0.090
-0.713
0.117
0.074
205
-1.138
0.001
3.877
-0.002
-1.480
206
0.058
-0.191
-0.718
0.248
0.076
207
-1.152
-0.002
4.054
0.002
-1.498
208
0.045
-0.194
-0.541
0.252
0.058
209
0.162
0.034
-1.922
-0.044
0.211
210
0.139
0.029
-1.648
-0.037
0.181
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F80
28
Page 74
211
-0.458
0.024
0.644
-0.031
212
0.141
-0.072
-1.653
0.094
-0.595
0.183
213
-1.054
0.019
2.936
-0.025
-1.371
214
0.142
-0.173
-1.659
0.225
0.185
215
-1.089
0.012
3.348
-0.016
-1.416
216
0.108
-0.180
-1.247
0.234
0.140
217
-3.144
0.029
13.630
-0.037
-4.088
218
0.139
0.014
-1.643
-0.018
0.181
219
-3.179
0.022
14.042
-0.028
-4.133
220
0.104
0.007
-1.231
-0.009
0.136
221
0.204
0.043
-2.384
-0.056
0.266
222
0.175
0.037
-2.044
-0.048
0.228
223
-0.422
0.032
0.248
-0.042
-0.548
224
0.177
-0.064
-2.049
0.083
0.230
225
-1.018
0.028
2.540
-0.036
-1.324
226
0.178
-0.164
-2.055
0.214
0.232
227
-1.062
0.018
3.051
-0.024
-1.381
228
0.135
-0.174
-1.544
0.226
0.175
101
0.075
0.003
-0.918
-0.004
0.098
102
0.075
0.003
-0.918
-0.004
0.098
103
-1.313
-0.003
4.897
0.004
-1.707
104
0.076
-0.124
-0.936
0.161
0.099
105
-0.966
-0.002
3.443
0.002
-1.256
106
0.076
-0.092
-0.932
0.120
0.098
107
-1.343
-0.004
5.264
0.005
-1.746
108
0.046
-0.125
-0.569
0.163
0.060
109
0.213
0.014
-2.441
-0.018
0.277
110
0.213
0.014
-2.441
-0.018
0.277
111
-1.175
0.008
3.374
-0.010
-1.528
112
0.214
-0.113
-2.459
0.147
0.278
113
-0.828
0.010
1.920
-0.012
-1.076
114
0.214
-0.081
-2.455
0.106
0.278
115
-1.260
0.002
4.350
-0.003
-1.638
116
0.129
-0.119
-1.483
0.154
0.167
117
-1.319
0.014
4.698
-0.018
-1.715
118
0.212
0.006
-2.434
-0.008
0.276
119
-0.936
0.014
2.913
-0.018
-1.217
120
0.212
0.008
-2.436
-0.011
0.276
121
-1.404
0.008
5.675
-0.011
-1.826
122
0.127
0.001
-1.458
-0.001
0.165
123
0.271
0.019
-3.082
-0.025
0.352
124
0.271
0.019
-3.082
-0.025
0.352
125
-1.117
0.013
2.733
-0.017
-1.452
126
0.272
-0.108
-3.100
0.140
0.354
127
-0.770
0.015
1.279
-0.019
-1.001
128
0.272
-0.076
-3.096
0.099
0.353
129
-1.225
0.005
3.966
-0.007
-1.593
130
0.164
-0.116
-1.867
0.150
0.213
201
0.105
0.004
-1.285
-0.005
0.137
202
0.090
0.004
-1.102
-0.005
0.117
203
-1.020
-0.001
3.550
0.002
-1.327
204
0.091
-0.098
-1.116
0.127
0.118
205
-2.131
-0.006
8.202
0.008
-2.770
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F81
29
Page 75
206
0.092
-0.200
-1.131
0.259
0.119
207
-2.153
-0.007
8.478
0.009
-2.799
208
0.069
-0.201
-0.855
0.261
0.090
209
0.298
0.020
-3.418
-0.025
0.388
210
0.256
0.017
-2.929
-0.022
0.332
211
-0.855
0.012
1.723
-0.016
-1.111
212
0.256
-0.085
-2.944
0.110
0.333
213
-1.965
0.007
6.375
-0.009
-2.555
214
0.257
-0.186
-2.958
0.242
0.334
215
-2.029
0.003
7.107
-0.004
-2.638
216
0.193
-0.191
-2.226
0.248
0.251
217
-3.028
0.017
12.369
-0.022
-3.936
218
0.254
0.000
-2.914
0.000
0.330
219
-3.092
0.013
13.101
-0.016
-4.019
220
0.190
-0.004
-2.182
0.005
0.247
221
0.379
0.027
-4.315
-0.035
0.493
222
0.325
0.023
-3.699
-0.030
0.423
223
-0.785
0.018
0.953
-0.023
-1.021
224
0.326
-0.079
-3.713
0.102
0.424
225
-1.896
0.013
5.605
-0.017
-2.464
226
0.327
-0.180
-3.727
0.235
0.425
227
-1.977
0.008
6.530
-0.010
-2.570
228
0.245
-0.186
-2.803
0.242
0.319
101
0.081
0.002
-0.984
-0.003
0.105
102
0.081
0.002
-0.984
-0.003
0.105
103
-1.272
-0.002
4.659
0.003
-1.654
104
0.079
-0.125
-0.967
0.163
0.103
105
-0.934
-0.001
3.248
0.001
-1.214
106
0.079
-0.093
-0.971
0.121
0.103
107
-1.304
-0.003
5.053
0.004
-1.696
108
0.047
-0.126
-0.573
0.164
0.061
109
0.234
0.001
-2.683
-0.001
0.304
110
0.234
0.001
-2.683
-0.001
0.304
111
-1.119
-0.003
2.960
0.004
-1.455
112
0.232
-0.126
-2.666
0.164
0.302
113
-0.781
-0.002
1.549
0.003
-1.015
114
0.233
-0.094
-2.670
0.123
0.302
115
-1.213
-0.003
4.033
0.004
-1.576
116
0.138
-0.126
-1.593
0.164
0.180
117
-1.299
0.002
4.440
-0.002
-1.689
118
0.235
-0.007
-2.692
0.009
0.305
119
-0.916
0.002
2.659
-0.002
-1.190
120
0.235
-0.005
-2.689
0.006
0.305
121
-1.393
0.001
5.513
-0.002
-1.810
122
0.141
-0.007
-1.618
0.009
0.183
123
0.299
0.000
-3.398
0.000
0.389
124
0.299
0.000
-3.398
0.000
0.389
125
-1.054
-0.004
2.245
0.005
-1.370
126
0.297
-0.127
-3.381
0.165
0.386
127
-0.716
-0.003
0.834
0.004
-0.930
128
0.297
-0.095
-3.385
0.124
0.387
129
-1.174
-0.004
3.604
0.005
-1.526
130
0.177
-0.127
-2.022
0.165
0.231
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F82
30
Page 76
201
0.113
0.003
-1.378
-0.004
202
0.097
0.002
-1.181
-0.003
0.147
0.126
203
-0.985
-0.001
3.333
0.001
-1.281
204
0.096
-0.099
-1.167
0.129
0.124
205
-2.068
-0.004
7.848
0.005
-2.688
206
0.094
-0.201
-1.154
0.261
0.122
207
-2.092
-0.005
8.143
0.006
-2.719
208
0.070
-0.201
-0.859
0.262
0.091
209
0.328
0.001
-3.756
-0.002
0.426
210
0.281
0.001
-3.220
-0.002
0.365
211
-0.802
-0.002
1.295
0.003
-1.042
212
0.279
-0.100
-3.206
0.131
0.363
213
-1.884
-0.005
5.809
0.007
-2.449
214
0.278
-0.202
-3.193
0.263
0.361
215
-1.954
-0.006
6.614
0.007
-2.540
216
0.207
-0.202
-2.388
0.263
0.270
217
-3.004
0.003
12.044
-0.004
-3.905
218
0.282
-0.015
-3.238
0.020
0.367
219
-3.074
0.002
12.849
-0.003
-3.997
220
0.212
-0.016
-2.433
0.020
0.276
221
0.419
0.000
-4.757
0.000
0.544
222
0.359
0.000
-4.078
0.000
0.466
223
-0.724
-0.003
0.437
0.004
-0.941
224
0.357
-0.102
-4.064
0.132
0.464
225
-1.806
-0.006
4.951
0.008
-2.348
226
0.356
-0.203
-4.051
0.264
0.462
227
-1.896
-0.006
5.970
0.008
-2.464
228
0.266
-0.203
-3.031
0.264
0.346
101
0.081
0.000
-0.985
0.000
0.105
102
0.081
0.000
-0.985
0.000
0.105
103
-1.274
-0.004
4.683
0.005
-1.656
104
0.060
-0.128
-0.676
0.166
0.078
105
-0.935
-0.003
3.266
0.004
-1.216
106
0.065
-0.096
-0.753
0.125
0.085
107
-1.306
-0.004
5.077
0.005
-1.698
108
0.028
-0.128
-0.282
0.166
0.036
109
0.235
0.007
-2.686
-0.009
0.306
110
0.235
0.007
-2.686
-0.009
0.306
111
-1.120
0.003
2.982
-0.004
-1.456
112
0.214
-0.121
-2.377
0.157
0.278
113
-0.781
0.004
1.565
-0.005
-1.016
114
0.219
-0.089
-2.454
0.116
0.285
115
-1.214
0.000
4.056
0.000
-1.578
116
0.120
-0.124
-1.303
0.161
0.156
117
-1.293
0.009
4.393
-0.012
-1.681
118
0.229
-0.001
-2.623
0.001
0.298
119
-0.911
0.009
2.623
-0.011
-1.184
120
0.231
0.001
-2.639
-0.002
0.300
121
-1.387
0.006
5.467
-0.008
-1.803
122
0.135
-0.003
-1.549
0.005
0.176
123
0.299
0.010
-3.402
-0.013
0.389
124
0.299
0.010
-3.402
-0.013
0.389
125
-1.056
0.006
2.266
-0.008
-1.373
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F83
31
Page 77
126
0.278
-0.118
-3.093
0.153
0.361
127
-0.717
0.007
0.849
-0.009
-0.932
128
0.283
-0.086
-3.170
0.112
0.368
129
-1.176
0.002
3.627
-0.003
-1.528
130
0.158
-0.122
-1.732
0.159
0.206
201
0.113
0.000
-1.379
0.000
0.147
202
0.097
0.000
-1.182
0.000
0.126
203
-0.987
-0.003
3.352
0.004
-1.283
204
0.080
-0.102
-0.935
0.133
0.105
205
-2.071
-0.006
7.887
0.008
-2.692
206
0.064
-0.205
-0.688
0.266
0.083
207
-2.095
-0.006
8.182
0.008
-2.724
208
0.039
-0.205
-0.392
0.266
0.051
209
0.329
0.010
-3.761
-0.013
0.428
210
0.282
0.008
-3.223
-0.011
0.367
211
-0.802
0.005
1.311
-0.007
-1.043
212
0.265
-0.094
-2.976
0.122
0.345
213
-1.886
0.002
5.845
-0.003
-2.452
214
0.248
-0.196
-2.729
0.255
0.323
215
-1.957
0.000
6.651
0.000
-2.543
216
0.178
-0.199
-1.923
0.258
0.231
217
-2.993
0.013
11.946
-0.017
-3.890
218
0.270
-0.008
-3.088
0.011
0.351
219
-3.063
0.011
12.752
-0.014
-3.982
220
0.199
-0.010
-2.283
0.013
0.259
221
0.419
0.014
-4.763
-0.018
0.544
222
0.359
0.012
-4.083
-0.016
0.466
223
-0.725
0.009
0.452
-0.011
-0.943
224
0.342
-0.090
-3.835
0.118
0.445
225
-1.809
0.006
4.986
-0.007
-2.352
226
0.325
-0.193
-3.588
0.251
0.423
227
-1.899
0.003
6.007
-0.003
-2.469
228
0.235
-0.196
-2.568
0.255
0.306
101
0.023
-0.077
-0.718
0.100
0.030
102
0.023
-0.077
-0.718
0.100
0.030
103
-0.955
0.066
2.110
-0.086
-1.242
104
0.278
-1.857
-6.500
2.414
0.361
105
-0.711
0.030
1.403
-0.039
-0.924
106
0.214
-1.412
-5.055
1.836
0.279
107
-0.964
0.097
2.397
-0.126
-1.253
108
0.269
-1.826
-6.213
2.374
0.349
109
0.081
-0.255
-2.068
0.332
0.105
110
0.081
-0.255
-2.068
0.332
0.105
111
-0.897
-0.112
0.760
0.146
-1.166
112
0.336
-2.035
-7.850
2.646
0.437
113
-0.652
-0.148
0.053
0.192
-0.848
114
0.272
-1.590
-6.405
2.067
0.354
115
-0.929
-0.010
1.587
0.013
-1.208
116
0.304
-1.933
-7.023
2.513
0.395
117
-0.853
-0.048
1.234
0.062
-1.109
118
0.157
-0.528
-3.096
0.686
0.204
119
-0.619
-0.100
0.409
0.129
-0.805
120
0.138
-0.460
-2.839
0.598
0.180
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F84
32
Page 78
121
-0.885
0.054
2.062
-0.070
-1.151
122
0.125
-0.426
-2.269
0.554
0.162
123
0.106
-0.329
-2.636
0.428
0.138
124
0.106
-0.329
-2.636
0.428
0.138
125
-0.872
-0.186
0.192
0.242
-1.134
126
0.361
-2.109
-8.418
2.742
0.469
127
-0.627
-0.222
-0.515
0.288
-0.816
128
0.297
-1.664
-6.973
2.163
0.386
129
-0.914
-0.054
1.246
0.071
-1.189
130
0.319
-1.977
-7.364
2.571
0.414
201
0.032
-0.108
-1.005
0.140
0.042
202
0.028
-0.092
-0.862
0.120
0.036
203
-0.755
0.022
1.401
-0.029
-0.981
204
0.232
-1.516
-5.487
1.971
0.301
205
-1.537
0.136
3.663
-0.177
-1.998
206
0.436
-2.940
-10.113
3.823
0.566
207
-1.544
0.160
3.878
-0.207
-2.007
208
0.429
-2.917
-9.898
3.792
0.557
209
0.113
-0.357
-2.895
0.464
0.147
210
0.097
-0.306
-2.482
0.398
0.126
211
-0.685
-0.192
-0.219
0.249
-0.891
212
0.301
-1.730
-7.107
2.249
0.392
213
-1.468
-0.077
2.043
0.100
-1.908
214
0.505
-3.154
-11.733
4.100
0.657
215
-1.492
-0.001
2.663
0.001
-1.939
216
0.481
-3.078
-11.113
4.001
0.625
217
-1.904
0.138
4.595
-0.179
-2.475
218
0.261
-0.891
-4.685
1.158
0.339
219
-1.928
0.215
5.216
-0.279
-2.507
220
0.236
-0.814
-4.065
1.059
0.307
221
0.148
-0.461
-3.691
0.599
0.193
222
0.127
-0.395
-3.163
0.513
0.165
223
-0.655
-0.280
-0.901
0.365
-0.852
224
0.331
-1.819
-7.789
2.364
0.431
225
-1.438
-0.166
1.361
0.216
-1.869
226
0.535
-3.243
-12.415
4.216
0.696
227
-1.469
-0.067
2.152
0.087
-1.910
228
0.503
-3.144
-11.624
4.087
0.654
101
-0.046
0.009
-0.589
-0.012
-0.060
102
-0.046
0.009
-0.589
-0.012
-0.060
103
-0.793
0.015
-3.454
-0.020
-1.031
104
-0.044
-0.107
-0.579
0.139
-0.057
105
-0.606
0.014
-2.738
-0.018
-0.788
106
-0.045
-0.078
-0.582
0.101
-0.058
107
-0.775
0.011
-3.218
-0.015
-1.007
108
-0.026
-0.111
-0.343
0.144
-0.033
109
-0.116
0.024
-1.373
-0.031
-0.151
110
-0.116
0.024
-1.373
-0.031
-0.151
111
-0.863
0.030
-4.238
-0.039
-1.122
112
-0.114
-0.092
-1.363
0.120
-0.148
113
-0.676
0.029
-3.522
-0.037
-0.879
114
-0.114
-0.063
-1.366
0.082
-0.149
115
-0.817
0.020
-3.689
-0.027
-1.062
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F85
33
Page 79
116
-0.068
-0.102
-0.814
0.132
-0.088
117
-1.651
0.024
-8.503
-0.031
-2.146
118
-0.116
0.017
-1.371
-0.022
-0.151
119
-1.267
0.024
-6.720
-0.031
-1.648
120
-0.116
0.019
-1.372
-0.024
-0.151
121
-1.605
0.014
-7.953
-0.019
-2.086
122
-0.070
0.007
-0.822
-0.010
-0.090
123
-0.146
0.031
-1.703
-0.040
-0.190
124
-0.146
0.031
-1.703
-0.040
-0.190
125
-0.893
0.037
-4.568
-0.048
-1.161
126
-0.144
-0.085
-1.693
0.111
-0.187
127
-0.706
0.036
-3.852
-0.046
-0.918
128
-0.145
-0.056
-1.696
0.073
-0.188
129
-0.835
0.025
-3.887
-0.032
-1.085
130
-0.086
-0.097
-1.012
0.127
-0.111
201
-0.064
0.013
-0.825
-0.016
-0.084
202
-0.055
0.011
-0.707
-0.014
-0.072
203
-0.653
0.016
-2.999
-0.020
-0.849
204
-0.054
-0.082
-0.699
0.107
-0.070
205
-1.250
0.020
-5.291
-0.027
-1.626
206
-0.052
-0.175
-0.691
0.227
-0.068
207
-1.237
0.018
-5.114
-0.023
-1.608
208
-0.038
-0.177
-0.514
0.231
-0.050
209
-0.162
0.034
-1.922
-0.044
-0.211
210
-0.139
0.029
-1.648
-0.037
-0.181
211
-0.737
0.034
-3.940
-0.044
-0.958
212
-0.138
-0.064
-1.640
0.083
-0.179
213
-1.334
0.038
-6.232
-0.050
-1.735
214
-0.136
-0.157
-1.632
0.204
-0.177
215
-1.300
0.031
-5.820
-0.041
-1.689
216
-0.101
-0.164
-1.220
0.213
-0.132
217
-3.429
0.029
-16.925
-0.037
-4.457
218
-0.139
0.014
-1.643
-0.018
-0.181
219
-3.394
0.022
-16.513
-0.028
-4.412
220
-0.104
0.007
-1.231
-0.009
-0.136
221
-0.204
0.043
-2.384
-0.056
-0.266
222
-0.175
0.037
-2.044
-0.048
-0.228
223
-0.773
0.042
-4.336
-0.055
-1.005
224
-0.174
-0.056
-2.036
0.072
-0.226
225
-1.370
0.047
-6.628
-0.061
-1.782
226
-0.172
-0.148
-2.028
0.193
-0.224
227
-1.327
0.037
-6.117
-0.049
-1.725
228
-0.128
-0.158
-1.517
0.205
-0.167
101
-0.075
0.003
-0.918
-0.004
-0.098
102
-0.075
0.003
-0.918
-0.004
-0.098
103
-1.465
0.009
-6.732
-0.012
-1.905
104
-0.078
-0.113
-0.952
0.147
-0.101
105
-1.117
0.008
-5.279
-0.010
-1.453
106
-0.077
-0.084
-0.944
0.109
-0.100
107
-1.435
0.008
-6.365
-0.010
-1.866
108
-0.048
-0.114
-0.585
0.148
-0.062
109
-0.213
0.014
-2.442
-0.018
-0.277
110
-0.213
0.014
-2.442
-0.018
-0.277
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F86
34
Page 80
111
-1.603
0.020
-8.256
-0.026
-2.084
112
-0.216
-0.102
-2.476
0.133
-0.281
113
-1.255
0.019
-6.803
-0.024
-1.632
114
-0.215
-0.073
-2.468
0.095
-0.280
115
-1.518
0.014
-7.279
-0.019
-1.973
116
-0.131
-0.108
-1.499
0.140
-0.170
117
-1.748
0.014
-9.581
-0.018
-2.273
118
-0.212
0.006
-2.435
-0.008
-0.276
119
-1.364
0.014
-7.796
-0.018
-1.774
120
-0.212
0.008
-2.437
-0.011
-0.276
121
-1.663
0.008
-8.604
-0.011
-2.162
122
-0.127
0.001
-1.458
-0.001
-0.165
123
-0.271
0.019
-3.083
-0.025
-0.352
124
-0.271
0.019
-3.083
-0.025
-0.352
125
-1.661
0.025
-8.897
-0.033
-2.159
126
-0.274
-0.097
-3.117
0.126
-0.356
127
-1.313
0.024
-7.444
-0.031
-1.708
128
-0.273
-0.068
-3.109
0.088
-0.355
129
-1.553
0.017
-7.664
-0.023
-2.018
130
-0.166
-0.105
-1.884
0.136
-0.215
201
-0.105
0.004
-1.285
-0.005
-0.137
202
-0.090
0.004
-1.102
-0.005
-0.117
203
-1.202
0.008
-5.753
-0.011
-1.563
204
-0.092
-0.089
-1.129
0.116
-0.120
205
-2.314
0.013
-10.404
-0.017
-3.008
206
-0.095
-0.182
-1.156
0.237
-0.123
207
-2.292
0.012
-10.129
-0.016
-2.979
208
-0.072
-0.183
-0.881
0.238
-0.094
209
-0.298
0.020
-3.419
-0.025
-0.388
210
-0.256
0.017
-2.931
-0.022
-0.332
211
-1.368
0.022
-7.582
-0.028
-1.778
212
-0.258
-0.076
-2.958
0.099
-0.335
213
-2.480
0.026
-12.233
-0.034
-3.223
214
-0.260
-0.169
-2.985
0.219
-0.339
215
-2.416
0.022
-11.500
-0.029
-3.140
216
-0.197
-0.173
-2.252
0.225
-0.255
217
-3.545
0.017
-18.228
-0.022
-4.609
218
-0.254
0.000
-2.916
0.000
-0.330
219
-3.481
0.013
-17.495
-0.016
-4.526
220
-0.190
-0.004
-2.183
0.005
-0.247
221
-0.379
0.027
-4.316
-0.035
-0.493
222
-0.325
0.023
-3.700
-0.030
-0.423
223
-1.437
0.028
-8.351
-0.036
-1.868
224
-0.328
-0.070
-3.727
0.091
-0.426
225
-2.549
0.032
-13.002
-0.042
-3.314
226
-0.330
-0.163
-3.754
0.212
-0.429
227
-2.468
0.027
-12.077
-0.035
-3.208
228
-0.249
-0.168
-2.829
0.219
-0.323
101
-0.081
0.002
-0.983
-0.003
-0.105
102
-0.081
0.002
-0.983
-0.003
-0.105
103
-1.436
0.006
-6.626
-0.008
-1.867
104
-0.078
-0.113
-0.953
0.147
-0.101
105
-1.097
0.005
-5.215
-0.007
-1.426
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 81
106
-0.079
-0.084
-0.961
0.110
-0.102
107
-1.404
0.005
-6.233
-0.007
-1.825
108
-0.046
-0.114
-0.560
0.148
-0.059
109
-0.234
0.001
-2.681
-0.001
-0.304
110
-0.234
0.001
-2.681
-0.001
-0.304
111
-1.589
0.005
-8.324
-0.007
-2.066
112
-0.231
-0.114
-2.651
0.148
-0.300
113
-1.250
0.004
-6.913
-0.005
-1.625
114
-0.232
-0.085
-2.659
0.111
-0.301
115
-1.495
0.005
-7.252
-0.006
-1.944
116
-0.137
-0.114
-1.579
0.149
-0.179
117
-1.770
0.000
-9.805
0.000
-2.301
118
-0.235
-0.007
-2.690
0.009
-0.305
119
-1.386
0.000
-8.024
-0.001
-1.802
120
-0.235
-0.005
-2.687
0.006
-0.305
121
-1.676
0.000
-8.733
0.000
-2.179
122
-0.141
-0.007
-1.617
0.009
-0.183
123
-0.299
0.000
-3.395
0.000
-0.389
124
-0.299
0.000
-3.395
0.000
-0.389
125
-1.654
0.004
-9.038
-0.005
-2.150
126
-0.296
-0.115
-3.365
0.150
-0.385
127
-1.315
0.003
-7.627
-0.004
-1.710
128
-0.297
-0.086
-3.373
0.112
-0.386
129
-1.534
0.004
-7.680
-0.005
-1.995
130
-0.176
-0.115
-2.007
0.150
-0.229
201
-0.113
0.003
-1.376
-0.004
-0.147
202
-0.097
0.002
-1.180
-0.003
-0.126
203
-1.181
0.006
-5.694
-0.007
-1.536
204
-0.095
-0.090
-1.156
0.116
-0.123
205
-2.265
0.009
-10.209
-0.011
-2.945
206
-0.092
-0.182
-1.132
0.236
-0.120
207
-2.241
0.008
-9.914
-0.011
-2.913
208
-0.068
-0.182
-0.837
0.237
-0.089
209
-0.328
0.001
-3.754
-0.002
-0.426
210
-0.281
0.001
-3.217
-0.002
-0.365
211
-1.365
0.004
-7.732
-0.006
-1.774
212
-0.278
-0.091
-3.193
0.118
-0.362
213
-2.449
0.008
-12.246
-0.010
-3.183
214
-0.276
-0.183
-3.169
0.238
-0.359
215
-2.379
0.007
-11.442
-0.009
-3.092
216
-0.206
-0.183
-2.365
0.238
-0.268
217
-3.572
0.000
-18.483
0.000
-4.643
218
-0.282
-0.015
-3.235
0.020
-0.367
219
-3.502
-0.001
-17.679
0.001
-4.552
220
-0.212
-0.016
-2.431
0.020
-0.276
221
-0.419
0.000
-4.753
0.000
-0.544
222
-0.359
0.000
-4.074
0.000
-0.466
223
-1.443
0.003
-8.589
-0.004
-1.876
224
-0.356
-0.092
-4.050
0.120
-0.463
225
-2.527
0.006
-13.103
-0.008
-3.285
226
-0.354
-0.184
-4.026
0.239
-0.460
227
-2.437
0.006
-12.084
-0.008
-3.168
228
-0.264
-0.184
-3.008
0.239
-0.344
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F87
35
Page 82
101
-0.081
0.000
-0.984
0.000
-0.105
102
-0.081
0.000
-0.984
0.000
-0.105
103
-1.438
0.004
-6.652
-0.005
-1.869
104
-0.055
-0.116
-0.775
0.151
-0.072
105
-1.099
0.003
-5.235
-0.004
-1.428
106
-0.061
-0.087
-0.827
0.113
-0.080
107
-1.406
0.004
-6.258
-0.005
-1.827
108
-0.023
-0.116
-0.381
0.151
-0.029
109
-0.235
0.007
-2.683
-0.009
-0.306
110
-0.235
0.007
-2.683
-0.009
-0.306
111
-1.592
0.011
-8.351
-0.014
-2.070
112
-0.209
-0.109
-2.474
0.142
-0.272
113
-1.253
0.010
-6.934
-0.013
-1.629
114
-0.215
-0.080
-2.526
0.104
-0.280
115
-1.498
0.008
-7.278
-0.011
-1.947
116
-0.115
-0.112
-1.401
0.145
-0.150
117
-1.766
0.005
-9.763
-0.006
-2.296
118
-0.229
-0.001
-2.620
0.001
-0.298
119
-1.383
0.005
-7.993
-0.007
-1.798
120
-0.231
0.001
-2.636
-0.002
-0.300
121
-1.672
0.002
-8.690
-0.003
-2.173
122
-0.135
-0.003
-1.547
0.005
-0.176
123
-0.299
0.010
-3.398
-0.013
-0.389
124
-0.299
0.010
-3.398
-0.013
-0.389
125
-1.656
0.014
-9.066
-0.018
-2.153
126
-0.273
-0.106
-3.189
0.138
-0.355
127
-1.317
0.013
-7.649
-0.017
-1.712
128
-0.280
-0.077
-3.241
0.100
-0.363
129
-1.536
0.010
-7.707
-0.013
-1.997
130
-0.153
-0.110
-1.830
0.143
-0.199
201
-0.113
0.000
-1.378
0.000
-0.147
202
-0.097
0.000
-1.181
0.000
-0.126
203
-1.183
0.003
-5.715
-0.004
-1.538
204
-0.076
-0.093
-1.014
0.121
-0.099
205
-2.268
0.006
-10.250
-0.008
-2.949
206
-0.056
-0.186
-0.847
0.241
-0.072
207
-2.244
0.006
-9.955
-0.008
-2.917
208
-0.031
-0.186
-0.551
0.241
-0.041
209
-0.329
0.010
-3.756
-0.013
-0.428
210
-0.282
0.008
-3.220
-0.011
-0.367
211
-1.368
0.012
-7.754
-0.015
-1.778
212
-0.261
-0.084
-3.053
0.110
-0.340
213
-2.453
0.015
-12.289
-0.019
-3.189
214
-0.240
-0.177
-2.885
0.230
-0.313
215
-2.383
0.013
-11.484
-0.017
-3.098
216
-0.170
-0.179
-2.080
0.233
-0.221
217
-3.562
0.004
-18.391
-0.005
-4.631
218
-0.270
-0.008
-3.085
0.011
-0.351
219
-3.492
0.002
-17.586
-0.002
-4.540
220
-0.199
-0.010
-2.280
0.013
-0.259
221
-0.419
0.014
-4.757
-0.018
-0.544
222
-0.359
0.012
-4.078
-0.016
-0.466
223
-1.444
0.015
-8.612
-0.020
-1.878
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F88
36
Page 83
224
-0.338
-0.081
-3.911
0.105
-0.439
225
-2.530
0.018
-13.147
-0.024
-3.289
226
-0.317
-0.174
-3.743
0.226
-0.412
227
-2.440
0.015
-12.127
-0.020
-3.172
228
-0.227
-0.177
-2.724
0.230
-0.296
101
-0.072
-0.067
-0.650
0.087
-0.094
102
-0.072
-0.067
-0.650
0.087
-0.094
103
-1.062
-0.237
-3.694
0.308
-1.381
104
-0.514
-1.275
-4.970
1.658
-0.668
105
-0.815
-0.194
-2.933
0.253
-1.059
106
-0.404
-0.973
-3.890
1.265
-0.525
107
-1.033
-0.210
-3.434
0.273
-1.343
108
-0.485
-1.248
-4.710
1.623
-0.631
109
-0.218
-0.225
-1.841
0.293
-0.283
110
-0.218
-0.225
-1.841
0.293
-0.283
111
-1.208
-0.395
-4.885
0.514
-1.570
112
-0.660
-1.433
-6.161
1.863
-0.858
113
-0.961
-0.352
-4.124
0.458
-1.249
114
-0.549
-1.131
-5.081
1.470
-0.714
115
-1.121
-0.305
-4.149
0.397
-1.457
116
-0.573
-1.343
-5.425
1.746
-0.745
117
-1.169
-0.452
-5.409
0.588
-1.520
118
-0.285
-0.499
-2.850
0.648
-0.371
119
-0.931
-0.396
-4.517
0.514
-1.211
120
-0.268
-0.430
-2.598
0.559
-0.349
121
-1.082
-0.362
-4.673
0.471
-1.407
122
-0.198
-0.409
-2.113
0.531
-0.257
123
-0.279
-0.291
-2.343
0.378
-0.363
124
-0.279
-0.291
-2.343
0.378
-0.363
125
-1.269
-0.461
-5.387
0.599
-1.650
126
-0.721
-1.499
-6.663
1.949
-0.937
127
-1.021
-0.419
-4.626
0.544
-1.328
128
-0.611
-1.197
-5.583
1.556
-0.794
129
-1.157
-0.345
-4.450
0.448
-1.505
130
-0.609
-1.383
-5.726
1.797
-0.792
201
-0.101
-0.094
-0.910
0.122
-0.131
202
-0.086
-0.080
-0.780
0.105
-0.112
203
-0.878
-0.216
-3.215
0.281
-1.142
204
-0.440
-1.047
-4.236
1.361
-0.572
205
-1.670
-0.352
-5.651
0.458
-2.172
206
-0.794
-2.013
-7.692
2.617
-1.032
207
-1.649
-0.332
-5.456
0.432
-2.143
208
-0.772
-1.993
-7.497
2.591
-1.004
209
-0.305
-0.315
-2.578
0.410
-0.397
210
-0.262
-0.270
-2.209
0.351
-0.340
211
-1.054
-0.406
-4.645
0.528
-1.370
212
-0.615
-1.236
-5.665
1.607
-0.800
213
-1.846
-0.542
-7.080
0.705
-2.399
214
-0.969
-2.203
-9.121
2.864
-1.259
215
-1.780
-0.475
-6.527
0.617
-2.314
216
-0.903
-2.135
-8.569
2.776
-1.174
217
-2.300
-0.757
-9.855
0.985
-2.990
218
-0.406
-0.857
-4.371
1.113
-0.527
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 84
219
-2.235
-0.690
-9.303
0.897
-2.905
220
-0.340
-0.789
-3.819
1.026
-0.442
221
-0.391
-0.407
-3.280
0.530
-0.508
222
-0.335
-0.349
-2.812
0.454
-0.435
223
-1.127
-0.485
-5.247
0.631
-1.465
224
-0.688
-1.316
-6.268
1.710
-0.895
225
-1.919
-0.621
-7.682
0.808
-2.494
226
-1.042
-2.282
-9.724
2.967
-1.355
227
-1.835
-0.534
-6.979
0.694
-2.386
228
-0.958
-2.195
-9.021
2.853
-1.246
3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
p
Ft.Name
F65 p
L.Comb.
Fx
Fy
Fz
Mx
My
C.G. of Loads
101
0.072
0.083
-1.745
-0.108
0.094
375.0 , 375.0
102
0.072
0.083
-1.745
-0.108
0.094
375.0 , 375.0
103
-1.064
-0.479
2.182
0.623
-1.383
375.0 , 375.0
104
-0.567
-2.652
8.751
3.448
-0.737
375.0 , 375.0
105
-0.780
-0.338
1.200
0.440
-1.014
375.0 , 375.0
106
-0.407
-1.968
6.127
2.559
-0.529
375.0 , 375.0
107
-1.093
-0.512
2.880
0.666
-1.421
375.0 , 375.0
108
-0.596
-2.685
9.449
3.491
-0.775
375.0 , 375.0
109
0.215
0.369
-3.387
-0.480
0.280
375.0 , 375.0
110
0.215
0.369
-3.387
-0.480
0.280
375.0 , 375.0
111
-0.921
-0.193
0.540
0.251
-1.197
375.0 , 375.0
112
-0.424
-2.366
7.109
3.076
-0.551
375.0 , 375.0
113
-0.637
-0.052
-0.442
0.068
-0.828
375.0 , 375.0
114
-0.264
-1.682
4.485
2.187
-0.344
375.0 , 375.0
115
-1.007
-0.341
1.895
0.443
-1.309
375.0 , 375.0
116
-0.510
-2.514
8.464
3.268
-0.663
375.0 , 375.0
117
-0.614
0.107
-1.001
-0.139
-0.798
375.0 , 375.0
118
0.061
-0.418
-0.249
0.543
0.079
375.0 , 375.0
119
-0.407
0.173
-1.598
-0.224
-0.529
375.0 , 375.0
120
0.100
-0.221
-1.034
0.287
0.129
375.0 , 375.0
121
-0.700
-0.040
0.354
0.053
-0.910
375.0 , 375.0
122
-0.025
-0.565
1.106
0.735
-0.032
375.0 , 375.0
123
0.275
0.489
-4.078
-0.636
0.358
375.0 , 375.0
124
0.275
0.489
-4.078
-0.636
0.358
375.0 , 375.0
125
-0.861
-0.073
-0.151
0.095
-1.119
375.0 , 375.0
126
-0.364
-2.246
6.418
2.920
-0.473
375.0 , 375.0
127
-0.577
0.068
-1.133
-0.088
-0.750
375.0 , 375.0
128
-0.204
-1.562
3.794
2.031
-0.266
375.0 , 375.0
129
-0.971
-0.269
1.480
0.349
-1.262
375.0 , 375.0
130
-0.474
-2.442
8.049
3.174
-0.616
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F66 p
F67 p
Page 85
101
-0.022
0.096
-1.890
-0.125
-0.029
375.0 , 375.0
102
-0.022
0.096
-1.890
-0.125
-0.029
375.0 , 375.0
103
-1.069
0.165
-3.765
-0.214
-1.390
375.0 , 375.0
104
0.455
-3.036
9.747
3.947
0.592
375.0 , 375.0
105
-0.807
0.148
-3.297
-0.192
-1.049
375.0 , 375.0
106
0.336
-2.253
6.837
2.929
0.436
375.0 , 375.0
107
-1.060
0.127
-3.009
-0.165
-1.378
375.0 , 375.0
108
0.464
-3.074
10.503
3.997
0.603
375.0 , 375.0
109
-0.066
0.407
-3.856
-0.529
-0.086
375.0 , 375.0
110
-0.066
0.407
-3.856
-0.529
-0.086
375.0 , 375.0
111
-1.113
0.476
-5.731
-0.619
-1.447
375.0 , 375.0
112
0.411
-2.725
7.781
3.543
0.534
375.0 , 375.0
113
-0.851
0.459
-5.263
-0.596
-1.107
375.0 , 375.0
114
0.292
-1.942
4.871
2.525
0.379
375.0 , 375.0
115
-1.087
0.313
-4.189
-0.407
-1.413
375.0 , 375.0
116
0.437
-2.888
9.323
3.754
0.569
375.0 , 375.0
117
-0.895
0.632
-6.005
-0.822
-1.164
375.0 , 375.0
118
0.101
-0.378
-0.711
0.492
0.132
375.0 , 375.0
119
-0.688
0.576
-5.468
-0.749
-0.895
375.0 , 375.0
120
0.059
-0.182
-1.497
0.237
0.077
375.0 , 375.0
121
-0.869
0.470
-4.463
-0.610
-1.130
375.0 , 375.0
122
0.128
-0.541
0.832
0.704
0.166
375.0 , 375.0
123
-0.085
0.538
-4.684
-0.699
-0.110
375.0 , 375.0
124
-0.085
0.538
-4.684
-0.699
-0.110
375.0 , 375.0
125
-1.132
0.607
-6.559
-0.789
-1.472
375.0 , 375.0
126
0.392
-2.594
6.953
3.372
0.510
375.0 , 375.0
127
-0.870
0.590
-6.091
-0.767
-1.131
375.0 , 375.0
128
0.273
-1.811
4.043
2.354
0.355
375.0 , 375.0
129
-1.098
0.392
-4.686
-0.509
-1.427
375.0 , 375.0
130
0.426
-2.809
8.826
3.652
0.554
375.0 , 375.0
101
0.055
0.064
-2.108
-0.083
0.072
375.0 , 375.0
102
0.055
0.064
-2.108
-0.083
0.072
375.0 , 375.0
103
-1.039
-0.257
1.807
0.334
-1.351
375.0 , 375.0
104
-0.185
-1.684
3.387
2.189
-0.240
375.0 , 375.0
105
-0.766
-0.177
0.828
0.230
-0.995
375.0 , 375.0
106
-0.125
-1.247
2.013
1.621
-0.162
375.0 , 375.0
107
-1.061
-0.283
2.650
0.367
-1.379
375.0 , 375.0
108
-0.207
-1.710
4.230
2.222
-0.269
375.0 , 375.0
109
0.184
0.208
-4.233
-0.270
0.239
375.0 , 375.0
110
0.184
0.208
-4.233
-0.270
0.239
375.0 , 375.0
111
-0.910
-0.113
-0.318
0.147
-1.183
375.0 , 375.0
112
-0.056
-1.540
1.262
2.002
-0.073
375.0 , 375.0
113
-0.637
-0.033
-1.297
0.043
-0.827
375.0 , 375.0
114
0.004
-1.103
-0.112
1.434
0.005
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F68 p
115
-0.984
-0.196
116
-0.130
117
-0.523
118
119
Page 86
1.375
0.255
-1.279
375.0 , 375.0
-1.623
2.955
2.110
-0.168
375.0 , 375.0
0.000
-1.646
0.000
-0.680
375.0 , 375.0
0.113
-0.059
-3.269
0.076
0.147
375.0 , 375.0
-0.346
0.052
-2.293
-0.068
-0.450
375.0 , 375.0
120
0.131
0.008
-3.510
-0.010
0.170
375.0 , 375.0
121
-0.597
-0.083
0.048
0.108
-0.776
375.0 , 375.0
122
0.040
-0.142
-1.575
0.184
0.052
375.0 , 375.0
123
0.238
0.269
-5.128
-0.350
0.309
375.0 , 375.0
124
0.238
0.269
-5.128
-0.350
0.309
375.0 , 375.0
125
-0.856
-0.052
-1.213
0.068
-1.113
375.0 , 375.0
126
-0.002
-1.479
0.367
1.923
-0.003
375.0 , 375.0
127
-0.582
0.028
-2.192
-0.037
-0.757
375.0 , 375.0
128
0.058
-1.042
-1.007
1.355
0.075
375.0 , 375.0
129
-0.951
-0.160
0.838
0.207
-1.237
375.0 , 375.0
130
-0.097
-1.587
2.418
2.063
-0.126
375.0 , 375.0
101
-0.104
0.054
-2.046
-0.070
-0.135
375.0 , 375.0
102
-0.104
0.054
-2.046
-0.070
-0.135
375.0 , 375.0
103
-1.212
0.384
-6.149
-0.499
-1.576
375.0 , 375.0
104
0.308
-1.131
2.047
1.470
0.400
375.0 , 375.0
105
-0.935
0.302
-5.124
-0.392
-1.216
375.0 , 375.0
106
0.205
-0.835
1.023
1.085
0.267
375.0 , 375.0
107
-1.170
0.362
-5.331
-0.471
-1.522
375.0 , 375.0
108
0.350
-1.153
2.865
1.498
0.454
375.0 , 375.0
109
-0.326
0.178
-4.039
-0.231
-0.424
375.0 , 375.0
110
-0.326
0.178
-4.039
-0.231
-0.424
375.0 , 375.0
111
-1.434
0.508
-8.142
-0.660
-1.864
375.0 , 375.0
112
0.086
-1.007
0.054
1.309
0.112
375.0 , 375.0
113
-1.157
0.426
-7.117
-0.553
-1.504
375.0 , 375.0
114
-0.017
-0.711
-0.970
0.924
-0.022
375.0 , 375.0
115
-1.304
0.437
-6.527
-0.568
-1.695
375.0 , 375.0
116
0.216
-1.078
1.669
1.402
0.281
375.0 , 375.0
117
-1.048
0.408
-6.839
-0.530
-1.362
375.0 , 375.0
118
-0.264
-0.089
-3.094
0.115
-0.343
375.0 , 375.0
119
-0.867
0.350
-6.139
-0.455
-1.127
375.0 , 375.0
120
-0.279
-0.022
-3.331
0.029
-0.363
375.0 , 375.0
121
-0.917
0.336
-5.224
-0.437
-1.192
375.0 , 375.0
122
-0.133
-0.160
-1.479
0.208
-0.173
375.0 , 375.0
123
-0.420
0.230
-4.878
-0.299
-0.546
375.0 , 375.0
124
-0.420
0.230
-4.878
-0.299
-0.546
375.0 , 375.0
125
-1.528
0.560
-8.981
-0.728
-1.986
375.0 , 375.0
126
-0.008
-0.955
-0.785
1.242
-0.010
375.0 , 375.0
127
-1.251
0.477
-7.956
-0.621
-1.626
375.0 , 375.0
128
-0.111
-0.659
-1.809
0.856
-0.144
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F69 p
F70 p
129
-1.360
0.468
130
0.160
101
0.097
102
103
Page 87
-7.030
-0.608
-1.768
375.0 , 375.0
-1.047
1.166
1.361
0.208
375.0 , 375.0
-0.063
-2.161
0.082
0.126
375.0 , 375.0
0.097
-0.063
-2.161
0.082
0.126
375.0 , 375.0
-1.233
-0.184
0.039
0.239
-1.603
375.0 , 375.0
104
0.723
-2.786
-12.542
3.622
0.940
375.0 , 375.0
105
-0.901
-0.154
-0.511
0.200
-1.171
375.0 , 375.0
106
0.567
-2.105
-9.947
2.737
0.736
375.0 , 375.0
107
-1.272
-0.159
0.903
0.206
-1.653
375.0 , 375.0
108
0.684
-2.761
-11.678
3.589
0.889
375.0 , 375.0
109
0.352
-0.264
-5.698
0.343
0.458
375.0 , 375.0
110
0.352
-0.264
-5.698
0.343
0.458
375.0 , 375.0
111
-0.978
-0.385
-3.498
0.501
-1.271
375.0 , 375.0
112
0.978
-2.987
-16.079
3.883
1.271
375.0 , 375.0
113
-0.646
-0.355
-4.048
0.461
-0.839
375.0 , 375.0
114
0.822
-2.306
-13.484
2.998
1.068
375.0 , 375.0
115
-1.119
-0.279
-1.219
0.363
-1.454
375.0 , 375.0
116
0.837
-2.881
-13.800
3.746
1.088
375.0 , 375.0
117
-0.809
-0.111
-2.467
0.145
-1.052
375.0 , 375.0
118
0.503
-1.047
-8.799
1.361
0.654
375.0 , 375.0
119
-0.519
-0.150
-3.275
0.194
-0.675
375.0 , 375.0
120
0.465
-0.851
-8.024
1.106
0.605
375.0 , 375.0
121
-0.950
-0.006
-0.187
0.008
-1.235
375.0 , 375.0
122
0.362
-0.941
-6.519
1.223
0.471
375.0 , 375.0
123
0.459
-0.348
-7.188
0.452
0.597
375.0 , 375.0
124
0.459
-0.348
-7.188
0.452
0.597
375.0 , 375.0
125
-0.871
-0.469
-4.988
0.610
-1.132
375.0 , 375.0
126
1.085
-3.071
-17.569
3.992
1.411
375.0 , 375.0
127
-0.539
-0.439
-5.538
0.570
-0.700
375.0 , 375.0
128
0.928
-2.390
-14.974
3.107
1.207
375.0 , 375.0
129
-1.055
-0.330
-2.113
0.429
-1.371
375.0 , 375.0
130
0.901
-2.932
-14.694
3.811
1.172
375.0 , 375.0
101
0.080
0.001
-2.254
-0.001
0.104
375.0 , 375.0
102
0.080
0.001
-2.254
-0.001
0.104
375.0 , 375.0
103
-1.961
-0.003
4.523
0.004
-2.549
375.0 , 375.0
104
0.091
-0.124
-2.326
0.161
0.118
375.0 , 375.0
105
-1.451
-0.002
2.828
0.003
-1.886
375.0 , 375.0
106
0.088
-0.093
-2.308
0.121
0.115
375.0 , 375.0
107
-1.993
-0.003
5.424
0.004
-2.591
375.0 , 375.0
108
0.059
-0.124
-1.425
0.162
0.077
375.0 , 375.0
109
0.323
0.005
-6.247
-0.006
0.420
375.0 , 375.0
110
0.323
0.005
-6.247
-0.006
0.420
375.0 , 375.0
111
-1.718
0.001
0.530
-0.001
-2.233
375.0 , 375.0
112
0.334
-0.120
-6.319
0.156
0.434
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
113
F71 p
-1.208
0.002
-1.165
-0.003
114
0.331
-0.089
-6.301
115
-1.847
-0.001
3.029
116
0.205
-0.122
117
-0.836
118
119
120
Page 88
-1.570
375.0 , 375.0
0.115
0.431
375.0 , 375.0
0.001
-2.401
375.0 , 375.0
-3.820
0.159
0.266
375.0 , 375.0
0.006
-1.787
-0.007
-1.087
375.0 , 375.0
0.324
-0.005
-6.264
0.007
0.421
375.0 , 375.0
-0.546
0.006
-2.902
-0.007
-0.710
375.0 , 375.0
0.324
-0.003
-6.260
0.004
0.421
375.0 , 375.0
121
-0.965
0.004
0.712
-0.005
-1.255
375.0 , 375.0
122
0.195
-0.007
-3.765
0.010
0.253
375.0 , 375.0
123
0.425
0.006
-7.928
-0.008
0.553
375.0 , 375.0
124
0.425
0.006
-7.928
-0.008
0.553
375.0 , 375.0
125
-1.616
0.002
-1.151
-0.003
-2.101
375.0 , 375.0
126
0.436
-0.119
-8.000
0.155
0.567
375.0 , 375.0
127
-1.106
0.003
-2.846
-0.004
-1.437
375.0 , 375.0
128
0.433
-0.088
-7.982
0.114
0.563
375.0 , 375.0
129
-1.786
0.000
2.020
0.001
-2.322
375.0 , 375.0
130
0.266
-0.121
-4.829
0.158
0.346
375.0 , 375.0
101
0.059
-0.002
-1.771
0.003
0.077
375.0 , 375.0
102
0.059
-0.002
-1.771
0.003
0.077
375.0 , 375.0
103
-1.977
-0.010
5.027
0.013
-2.570
375.0 , 375.0
104
0.012
-0.159
-1.026
0.207
0.016
375.0 , 375.0
105
-1.468
-0.008
3.327
0.010
-1.908
375.0 , 375.0
106
0.024
-0.120
-1.213
0.156
0.031
375.0 , 375.0
107
-2.001
-0.009
5.735
0.012
-2.601
375.0 , 375.0
108
-0.012
-0.158
-0.318
0.206
-0.015
375.0 , 375.0
109
0.209
-0.013
-3.722
0.017
0.272
375.0 , 375.0
110
0.209
-0.013
-3.722
0.017
0.272
375.0 , 375.0
111
-1.827
-0.021
3.076
0.027
-2.375
375.0 , 375.0
112
0.162
-0.170
-2.977
0.221
0.211
375.0 , 375.0
113
-1.318
-0.019
1.376
0.025
-1.713
375.0 , 375.0
114
0.174
-0.131
-3.164
0.170
0.226
375.0 , 375.0
115
-1.911
-0.016
4.565
0.021
-2.484
375.0 , 375.0
116
0.078
-0.165
-1.488
0.214
0.102
375.0 , 375.0
117
-0.998
-0.012
0.798
0.016
-1.297
375.0 , 375.0
118
0.191
-0.035
-3.412
0.045
0.248
375.0 , 375.0
119
-0.696
-0.012
-0.332
0.016
-0.905
375.0 , 375.0
120
0.195
-0.029
-3.489
0.038
0.254
375.0 , 375.0
121
-1.081
-0.007
2.287
0.009
-1.406
375.0 , 375.0
122
0.107
-0.030
-1.923
0.038
0.139
375.0 , 375.0
123
0.272
-0.018
-4.544
0.023
0.354
375.0 , 375.0
124
0.272
-0.018
-4.544
0.023
0.354
375.0 , 375.0
125
-1.764
-0.026
2.254
0.034
-2.293
375.0 , 375.0
126
0.225
-0.175
-3.799
0.228
0.293
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
127
F72 p
F73 p
-1.255
-0.024
0.554
0.031
128
0.237
-0.136
-3.986
129
-1.873
-0.019
4.071
130
0.116
-0.168
101
0.079
Page 89
-1.632
375.0 , 375.0
0.176
0.308
375.0 , 375.0
0.024
-2.435
375.0 , 375.0
-1.982
0.218
0.151
375.0 , 375.0
0.002
-2.234
-0.003
0.103
375.0 , 375.0
102
0.079
0.002
-2.234
-0.003
0.103
375.0 , 375.0
103
-1.976
-0.006
4.592
0.008
-2.569
375.0 , 375.0
104
0.079
-0.175
-2.233
0.228
0.103
375.0 , 375.0
105
-1.462
-0.004
2.885
0.005
-1.901
375.0 , 375.0
106
0.079
-0.131
-2.234
0.170
0.103
375.0 , 375.0
107
-2.008
-0.007
5.485
0.009
-2.610
375.0 , 375.0
108
0.047
-0.176
-1.340
0.229
0.062
375.0 , 375.0
109
0.317
0.008
-6.141
-0.010
0.412
375.0 , 375.0
110
0.317
0.008
-6.141
-0.010
0.412
375.0 , 375.0
111
-1.738
0.000
0.685
0.000
-2.259
375.0 , 375.0
112
0.317
-0.169
-6.140
0.220
0.412
375.0 , 375.0
113
-1.224
0.002
-1.022
-0.003
-1.592
375.0 , 375.0
114
0.317
-0.125
-6.141
0.162
0.412
375.0 , 375.0
115
-1.865
-0.003
3.141
0.004
-2.424
375.0 , 375.0
116
0.190
-0.172
-3.684
0.224
0.247
375.0 , 375.0
117
-0.880
0.007
-1.556
-0.009
-1.144
375.0 , 375.0
118
0.317
-0.019
-6.139
0.025
0.412
375.0 , 375.0
119
-0.581
0.007
-2.702
-0.010
-0.755
375.0 , 375.0
120
0.317
-0.012
-6.140
0.016
0.412
375.0 , 375.0
121
-1.007
0.004
0.901
-0.005
-1.309
375.0 , 375.0
122
0.190
-0.022
-3.683
0.029
0.247
375.0 , 375.0
123
0.417
0.011
-7.786
-0.014
0.542
375.0 , 375.0
124
0.417
0.011
-7.786
-0.014
0.542
375.0 , 375.0
125
-1.638
0.003
-0.960
-0.004
-2.129
375.0 , 375.0
126
0.417
-0.166
-7.785
0.216
0.542
375.0 , 375.0
127
-1.124
0.005
-2.667
-0.006
-1.462
375.0 , 375.0
128
0.417
-0.122
-7.786
0.158
0.542
375.0 , 375.0
129
-1.805
-0.001
2.154
0.002
-2.346
375.0 , 375.0
130
0.250
-0.170
-4.671
0.222
0.325
375.0 , 375.0
101
0.078
0.001
-2.237
-0.001
0.101
375.0 , 375.0
102
0.078
0.001
-2.237
-0.001
0.101
375.0 , 375.0
103
-1.909
-0.007
4.338
0.009
-2.482
375.0 , 375.0
104
0.078
-0.179
-2.238
0.233
0.101
375.0 , 375.0
105
-1.412
-0.005
2.694
0.007
-1.836
375.0 , 375.0
106
0.078
-0.134
-2.238
0.174
0.101
375.0 , 375.0
107
-1.940
-0.007
5.233
0.010
-2.522
375.0 , 375.0
108
0.047
-0.179
-1.343
0.233
0.061
375.0 , 375.0
109
0.315
0.003
-6.128
-0.004
0.410
375.0 , 375.0
110
0.315
0.003
-6.128
-0.004
0.410
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
111
F74 p
-1.672
-0.005
0.447
0.007
112
0.315
-0.177
-6.129
113
-1.175
-0.003
-1.197
114
0.315
-0.132
115
-1.798
116
117
118
119
Page 90
-2.174
375.0 , 375.0
0.230
0.410
375.0 , 375.0
0.004
-1.528
375.0 , 375.0
-6.129
0.172
0.410
375.0 , 375.0
-0.006
2.898
0.008
-2.337
375.0 , 375.0
0.189
-0.178
-3.678
0.232
0.246
375.0 , 375.0
-0.840
0.003
-1.695
-0.004
-1.092
375.0 , 375.0
0.315
-0.026
-6.129
0.033
0.410
375.0 , 375.0
-0.551
0.003
-2.803
-0.004
-0.717
375.0 , 375.0
120
0.315
-0.019
-6.129
0.024
0.410
375.0 , 375.0
121
-0.966
0.002
0.757
-0.002
-1.256
375.0 , 375.0
122
0.189
-0.027
-3.678
0.035
0.246
375.0 , 375.0
123
0.414
0.003
-7.766
-0.004
0.538
375.0 , 375.0
124
0.414
0.003
-7.766
-0.004
0.538
375.0 , 375.0
125
-1.573
-0.005
-1.191
0.007
-2.045
375.0 , 375.0
126
0.414
-0.177
-7.767
0.230
0.538
375.0 , 375.0
127
-1.076
-0.003
-2.835
0.004
-1.399
375.0 , 375.0
128
0.414
-0.132
-7.767
0.172
0.538
375.0 , 375.0
129
-1.739
-0.006
1.915
0.008
-2.260
375.0 , 375.0
130
0.248
-0.178
-4.661
0.232
0.323
375.0 , 375.0
101
-0.080
0.000
-2.257
0.000
-0.104
375.0 , 375.0
102
-0.080
0.000
-2.257
0.000
-0.104
375.0 , 375.0
103
-2.123
-0.003
-9.042
0.004
-2.760
375.0 , 375.0
104
-0.076
-0.130
-2.285
0.169
-0.099
375.0 , 375.0
105
-1.612
-0.002
-7.346
0.003
-2.096
375.0 , 375.0
106
-0.077
-0.097
-2.278
0.127
-0.100
375.0 , 375.0
107
-2.091
-0.003
-8.139
0.004
-2.718
375.0 , 375.0
108
-0.044
-0.130
-1.382
0.169
-0.057
375.0 , 375.0
109
-0.324
0.000
-6.257
0.000
-0.421
375.0 , 375.0
110
-0.324
0.000
-6.257
0.000
-0.421
375.0 , 375.0
111
-2.367
-0.003
-13.042
0.004
-3.077
375.0 , 375.0
112
-0.320
-0.130
-6.285
0.169
-0.416
375.0 , 375.0
113
-1.856
-0.002
-11.346
0.003
-2.413
375.0 , 375.0
114
-0.321
-0.097
-6.278
0.127
-0.417
375.0 , 375.0
115
-2.237
-0.003
-10.539
0.004
-2.909
375.0 , 375.0
116
-0.190
-0.130
-3.782
0.169
-0.248
375.0 , 375.0
117
-1.485
-0.001
-10.716
0.001
-1.930
375.0 , 375.0
118
-0.325
-0.011
-6.274
0.015
-0.422
375.0 , 375.0
119
-1.194
-0.001
-9.602
0.001
-1.553
375.0 , 375.0
120
-0.325
-0.008
-6.270
0.011
-0.422
375.0 , 375.0
121
-1.355
-0.001
-8.213
0.001
-1.762
375.0 , 375.0
122
-0.195
-0.011
-3.771
0.015
-0.254
375.0 , 375.0
123
-0.426
0.000
-7.942
0.000
-0.554
375.0 , 375.0
124
-0.426
0.000
-7.942
0.000
-0.554
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F75 p
F76 p
125
-2.469
-0.003
126
-0.422
127
-1.958
128
Page 91
-14.727
0.004
-3.210
375.0 , 375.0
-0.130
-7.970
0.169
-0.549
375.0 , 375.0
-0.002
-13.031
0.003
-2.546
375.0 , 375.0
-0.423
-0.097
-7.963
0.127
-0.550
375.0 , 375.0
129
-2.299
-0.003
-11.550
0.004
-2.988
375.0 , 375.0
130
-0.252
-0.130
-4.793
0.169
-0.327
375.0 , 375.0
101
-0.059
-0.003
-2.070
0.004
-0.077
375.0 , 375.0
102
-0.059
-0.003
-2.070
0.004
-0.077
375.0 , 375.0
103
-2.086
-0.008
-8.705
0.010
-2.712
375.0 , 375.0
104
-0.014
-0.168
-1.338
0.218
-0.018
375.0 , 375.0
105
-1.579
-0.007
-7.047
0.009
-2.053
375.0 , 375.0
106
-0.025
-0.127
-1.521
0.165
-0.033
375.0 , 375.0
107
-2.062
-0.007
-7.877
0.009
-2.681
375.0 , 375.0
108
0.010
-0.167
-0.510
0.217
0.012
375.0 , 375.0
109
-0.207
-0.019
-5.091
0.025
-0.269
375.0 , 375.0
110
-0.207
-0.019
-5.091
0.025
-0.269
375.0 , 375.0
111
-2.234
-0.024
-11.726
0.031
-2.904
375.0 , 375.0
112
-0.162
-0.184
-4.359
0.239
-0.211
375.0 , 375.0
113
-1.727
-0.023
-10.068
0.030
-2.245
375.0 , 375.0
114
-0.173
-0.143
-4.542
0.186
-0.225
375.0 , 375.0
115
-2.151
-0.016
-9.690
0.021
-2.797
375.0 , 375.0
116
-0.079
-0.176
-2.323
0.229
-0.103
375.0 , 375.0
117
-1.414
-0.020
-9.602
0.026
-1.839
375.0 , 375.0
118
-0.188
-0.041
-4.808
0.053
-0.245
375.0 , 375.0
119
-1.113
-0.020
-8.475
0.025
-1.446
375.0 , 375.0
120
-0.193
-0.035
-4.879
0.046
-0.251
375.0 , 375.0
121
-1.332
-0.012
-7.566
0.016
-1.731
375.0 , 375.0
122
-0.105
-0.033
-2.771
0.043
-0.137
375.0 , 375.0
123
-0.270
-0.026
-6.363
0.034
-0.351
375.0 , 375.0
124
-0.270
-0.026
-6.363
0.034
-0.351
375.0 , 375.0
125
-2.297
-0.031
-12.998
0.040
-2.986
375.0 , 375.0
126
-0.225
-0.191
-5.631
0.248
-0.292
375.0 , 375.0
127
-1.790
-0.030
-11.340
0.039
-2.327
375.0 , 375.0
128
-0.236
-0.150
-5.814
0.195
-0.307
375.0 , 375.0
129
-2.189
-0.021
-10.453
0.027
-2.846
375.0 , 375.0
130
-0.117
-0.181
-3.086
0.235
-0.152
375.0 , 375.0
101
-0.079
-0.004
-2.240
0.005
-0.103
375.0 , 375.0
102
-0.079
-0.004
-2.240
0.005
-0.103
375.0 , 375.0
103
-2.136
-0.014
-9.065
0.018
-2.777
375.0 , 375.0
104
-0.079
-0.190
-2.237
0.247
-0.103
375.0 , 375.0
105
-1.622
-0.012
-7.359
0.015
-2.108
375.0 , 375.0
106
-0.079
-0.144
-2.238
0.187
-0.103
375.0 , 375.0
107
-2.104
-0.012
-8.169
0.016
-2.736
375.0 , 375.0
108
-0.047
-0.188
-1.341
0.245
-0.062
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F77 p
109
-0.317
-0.016
110
-0.317
111
-2.374
112
Page 92
-6.167
0.021
-0.412
375.0 , 375.0
-0.016
-6.167
0.021
-0.412
375.0 , 375.0
-0.026
-12.992
0.034
-3.086
375.0 , 375.0
-0.317
-0.202
-6.164
0.263
-0.412
375.0 , 375.0
113
-1.860
-0.024
-11.286
0.031
-2.418
375.0 , 375.0
114
-0.317
-0.156
-6.165
0.202
-0.412
375.0 , 375.0
115
-2.247
-0.020
-10.525
0.025
-2.921
375.0 , 375.0
116
-0.190
-0.196
-3.697
0.254
-0.247
375.0 , 375.0
117
-1.515
-0.015
-10.753
0.020
-1.970
375.0 , 375.0
118
-0.317
-0.044
-6.166
0.057
-0.412
375.0 , 375.0
119
-1.216
-0.015
-9.607
0.020
-1.581
375.0 , 375.0
120
-0.317
-0.037
-6.166
0.048
-0.412
375.0 , 375.0
121
-1.389
-0.009
-8.286
0.012
-1.805
375.0 , 375.0
122
-0.190
-0.038
-3.699
0.049
-0.247
375.0 , 375.0
123
-0.418
-0.021
-7.821
0.027
-0.543
375.0 , 375.0
124
-0.418
-0.021
-7.821
0.027
-0.543
375.0 , 375.0
125
-2.475
-0.031
-14.646
0.040
-3.218
375.0 , 375.0
126
-0.418
-0.207
-7.818
0.269
-0.543
375.0 , 375.0
127
-1.961
-0.029
-12.940
0.037
-2.549
375.0 , 375.0
128
-0.418
-0.161
-7.819
0.209
-0.543
375.0 , 375.0
129
-2.308
-0.023
-11.518
0.029
-3.000
375.0 , 375.0
130
-0.251
-0.199
-4.690
0.258
-0.326
375.0 , 375.0
101
-0.078
-0.001
-2.233
0.001
-0.101
375.0 , 375.0
102
-0.078
-0.001
-2.233
0.001
-0.101
375.0 , 375.0
103
-2.066
-0.012
-8.808
0.016
-2.686
375.0 , 375.0
104
-0.078
-0.189
-2.234
0.246
-0.101
375.0 , 375.0
105
-1.569
-0.009
-7.165
0.012
-2.040
375.0 , 375.0
106
-0.078
-0.142
-2.234
0.185
-0.101
375.0 , 375.0
107
-2.035
-0.012
-7.915
0.015
-2.645
375.0 , 375.0
108
-0.047
-0.189
-1.341
0.245
-0.061
375.0 , 375.0
109
-0.315
-0.009
-6.112
0.012
-0.409
375.0 , 375.0
110
-0.315
-0.009
-6.112
0.012
-0.409
375.0 , 375.0
111
-2.303
-0.020
-12.687
0.026
-2.994
375.0 , 375.0
112
-0.315
-0.197
-6.113
0.256
-0.409
375.0 , 375.0
113
-1.806
-0.017
-11.044
0.022
-2.348
375.0 , 375.0
114
-0.315
-0.150
-6.113
0.195
-0.409
375.0 , 375.0
115
-2.177
-0.016
-10.242
0.021
-2.830
375.0 , 375.0
116
-0.189
-0.193
-3.668
0.251
-0.246
375.0 , 375.0
117
-1.471
-0.008
-10.546
0.011
-1.912
375.0 , 375.0
118
-0.315
-0.038
-6.113
0.049
-0.409
375.0 , 375.0
119
-1.182
-0.008
-9.438
0.011
-1.536
375.0 , 375.0
120
-0.315
-0.031
-6.113
0.040
-0.409
375.0 , 375.0
121
-1.345
-0.005
-8.101
0.006
-1.748
375.0 , 375.0
122
-0.189
-0.034
-3.668
0.044
-0.246
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F78 p
F79 p
123
-0.414
-0.012
124
-0.414
125
-2.402
126
Page 93
-7.745
0.016
-0.538
375.0 , 375.0
-0.012
-7.745
0.016
-0.538
375.0 , 375.0
-0.023
-14.320
0.030
-3.123
375.0 , 375.0
-0.414
-0.200
-7.746
0.260
-0.538
375.0 , 375.0
127
-1.905
-0.020
-12.677
0.026
-2.477
375.0 , 375.0
128
-0.414
-0.153
-7.746
0.199
-0.538
375.0 , 375.0
129
-2.236
-0.018
-11.222
0.024
-2.907
375.0 , 375.0
130
-0.248
-0.195
-4.648
0.254
-0.323
375.0 , 375.0
101
-0.049
-0.077
-2.280
0.100
-0.064
375.0 , 375.0
102
-0.049
-0.077
-2.280
0.100
-0.064
375.0 , 375.0
103
-1.467
-0.392
-5.929
0.510
-1.907
375.0 , 375.0
104
-0.522
-3.198
-13.819
4.157
-0.679
375.0 , 375.0
105
-1.112
-0.313
-5.017
0.407
-1.446
375.0 , 375.0
106
-0.404
-2.418
-10.935
3.143
-0.525
375.0 , 375.0
107
-1.447
-0.361
-5.017
0.470
-1.882
375.0 , 375.0
108
-0.502
-3.167
-12.907
4.117
-0.653
375.0 , 375.0
109
-0.217
-0.312
-6.033
0.406
-0.282
375.0 , 375.0
110
-0.217
-0.312
-6.033
0.406
-0.282
375.0 , 375.0
111
-1.635
-0.627
-9.682
0.815
-2.126
375.0 , 375.0
112
-0.690
-3.433
-17.572
4.463
-0.897
375.0 , 375.0
113
-1.280
-0.548
-8.770
0.713
-1.665
375.0 , 375.0
114
-0.572
-2.653
-14.688
3.449
-0.743
375.0 , 375.0
115
-1.548
-0.502
-7.269
0.653
-2.013
375.0 , 375.0
116
-0.603
-3.308
-15.159
4.301
-0.784
375.0 , 375.0
117
-1.375
-0.435
-8.795
0.566
-1.787
375.0 , 375.0
118
-0.382
-1.093
-9.142
1.421
-0.496
375.0 , 375.0
119
-1.085
-0.404
-8.105
0.526
-1.411
375.0 , 375.0
120
-0.340
-0.898
-8.365
1.167
-0.442
375.0 , 375.0
121
-1.288
-0.310
-6.382
0.404
-1.674
375.0 , 375.0
122
-0.295
-0.968
-6.729
1.259
-0.383
375.0 , 375.0
123
-0.288
-0.411
-7.614
0.534
-0.374
375.0 , 375.0
124
-0.288
-0.411
-7.614
0.534
-0.374
375.0 , 375.0
125
-1.706
-0.726
-11.263
0.944
-2.218
375.0 , 375.0
126
-0.761
-3.532
-19.153
4.592
-0.989
375.0 , 375.0
127
-1.352
-0.647
-10.351
0.841
-1.757
375.0 , 375.0
128
-0.643
-2.752
-16.269
3.577
-0.836
375.0 , 375.0
129
-1.591
-0.562
-8.218
0.730
-2.068
375.0 , 375.0
130
-0.646
-3.368
-16.108
4.378
-0.840
375.0 , 375.0
101
0.046
0.009
-1.643
-0.012
0.060
375.0 , 375.0
102
0.046
0.009
-1.643
-0.012
0.060
375.0 , 375.0
103
-0.700
0.003
1.222
-0.004
-0.910
375.0 , 375.0
104
0.048
-0.117
-1.650
0.152
0.062
375.0 , 375.0
105
-0.513
0.005
0.505
-0.006
-0.668
375.0 , 375.0
106
0.047
-0.086
-1.649
0.111
0.062
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F80 p
107
-0.718
-0.001
1.879
108
0.030
-0.121
109
0.116
0.024
110
0.116
111
Page 94
0.001
-0.934
375.0 , 375.0
-0.993
0.157
0.038
375.0 , 375.0
-2.427
-0.031
0.151
375.0 , 375.0
0.024
-2.427
-0.031
0.151
375.0 , 375.0
-0.630
0.018
0.438
-0.023
-0.819
375.0 , 375.0
112
0.118
-0.102
-2.434
0.133
0.153
375.0 , 375.0
113
-0.443
0.020
-0.279
-0.025
-0.577
375.0 , 375.0
114
0.117
-0.071
-2.433
0.092
0.153
375.0 , 375.0
115
-0.676
0.008
1.409
-0.011
-0.879
375.0 , 375.0
116
0.072
-0.112
-1.463
0.145
0.093
375.0 , 375.0
117
-1.416
0.024
4.702
-0.031
-1.841
375.0 , 375.0
118
0.116
0.017
-2.425
-0.022
0.151
375.0 , 375.0
119
-1.033
0.024
2.920
-0.031
-1.343
375.0 , 375.0
120
0.116
0.019
-2.426
-0.024
0.151
375.0 , 375.0
121
-1.463
0.014
5.673
-0.019
-1.902
375.0 , 375.0
122
0.070
0.007
-1.454
-0.010
0.090
375.0 , 375.0
123
0.146
0.031
-2.757
-0.040
0.190
375.0 , 375.0
124
0.146
0.031
-2.757
-0.040
0.190
375.0 , 375.0
125
-0.600
0.025
0.108
-0.032
-0.780
375.0 , 375.0
126
0.148
-0.095
-2.764
0.124
0.192
375.0 , 375.0
127
-0.414
0.026
-0.609
-0.034
-0.538
375.0 , 375.0
128
0.147
-0.064
-2.763
0.083
0.192
375.0 , 375.0
129
-0.658
0.013
1.211
-0.016
-0.856
375.0 , 375.0
130
0.090
-0.107
-1.661
0.140
0.116
375.0 , 375.0
101
0.075
0.003
-1.972
-0.004
0.098
375.0 , 375.0
102
0.075
0.003
-1.972
-0.004
0.098
375.0 , 375.0
103
-1.313
-0.003
3.843
0.004
-1.707
375.0 , 375.0
104
0.076
-0.124
-1.990
0.161
0.099
375.0 , 375.0
105
-0.966
-0.002
2.389
0.002
-1.256
375.0 , 375.0
106
0.076
-0.092
-1.986
0.120
0.098
375.0 , 375.0
107
-1.343
-0.004
4.632
0.005
-1.746
375.0 , 375.0
108
0.046
-0.125
-1.201
0.163
0.060
375.0 , 375.0
109
0.213
0.014
-3.495
-0.018
0.277
375.0 , 375.0
110
0.213
0.014
-3.495
-0.018
0.277
375.0 , 375.0
111
-1.175
0.008
2.320
-0.010
-1.528
375.0 , 375.0
112
0.214
-0.113
-3.513
0.147
0.278
375.0 , 375.0
113
-0.828
0.010
0.866
-0.012
-1.076
375.0 , 375.0
114
0.214
-0.081
-3.509
0.106
0.278
375.0 , 375.0
115
-1.260
0.002
3.718
-0.003
-1.638
375.0 , 375.0
116
0.129
-0.119
-2.115
0.154
0.167
375.0 , 375.0
117
-1.319
0.014
3.644
-0.018
-1.715
375.0 , 375.0
118
0.212
0.006
-3.488
-0.008
0.276
375.0 , 375.0
119
-0.936
0.014
1.859
-0.018
-1.217
375.0 , 375.0
120
0.212
0.008
-3.490
-0.011
0.276
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F81 p
F82 p
Page 95
121
-1.404
0.008
5.042
-0.011
-1.826
375.0 , 375.0
122
0.127
0.001
-2.090
-0.001
0.165
375.0 , 375.0
123
0.271
0.019
-4.136
-0.025
0.352
375.0 , 375.0
124
0.271
0.019
-4.136
-0.025
0.352
375.0 , 375.0
125
-1.117
0.013
1.679
-0.017
-1.452
375.0 , 375.0
126
0.272
-0.108
-4.154
0.140
0.354
375.0 , 375.0
127
-0.770
0.015
0.225
-0.019
-1.001
375.0 , 375.0
128
0.272
-0.076
-4.150
0.099
0.353
375.0 , 375.0
129
-1.225
0.005
3.333
-0.007
-1.593
375.0 , 375.0
130
0.164
-0.116
-2.500
0.150
0.213
375.0 , 375.0
101
0.081
0.002
-2.038
-0.003
0.105
375.0 , 375.0
102
0.081
0.002
-2.038
-0.003
0.105
375.0 , 375.0
103
-1.272
-0.002
3.605
0.003
-1.654
375.0 , 375.0
104
0.079
-0.125
-2.021
0.163
0.103
375.0 , 375.0
105
-0.934
-0.001
2.194
0.001
-1.214
375.0 , 375.0
106
0.079
-0.093
-2.026
0.121
0.103
375.0 , 375.0
107
-1.304
-0.003
4.420
0.004
-1.696
375.0 , 375.0
108
0.047
-0.126
-1.206
0.164
0.061
375.0 , 375.0
109
0.234
0.001
-3.737
-0.001
0.304
375.0 , 375.0
110
0.234
0.001
-3.737
-0.001
0.304
375.0 , 375.0
111
-1.119
-0.003
1.906
0.004
-1.455
375.0 , 375.0
112
0.232
-0.126
-3.720
0.164
0.302
375.0 , 375.0
113
-0.781
-0.002
0.495
0.003
-1.015
375.0 , 375.0
114
0.233
-0.094
-3.725
0.123
0.302
375.0 , 375.0
115
-1.213
-0.003
3.401
0.004
-1.576
375.0 , 375.0
116
0.138
-0.126
-2.225
0.164
0.180
375.0 , 375.0
117
-1.299
0.002
3.386
-0.002
-1.689
375.0 , 375.0
118
0.235
-0.007
-3.746
0.009
0.305
375.0 , 375.0
119
-0.916
0.002
1.605
-0.002
-1.190
375.0 , 375.0
120
0.235
-0.005
-3.744
0.006
0.305
375.0 , 375.0
121
-1.393
0.001
4.881
-0.002
-1.810
375.0 , 375.0
122
0.141
-0.007
-2.251
0.009
0.183
375.0 , 375.0
123
0.299
0.000
-4.452
0.000
0.389
375.0 , 375.0
124
0.299
0.000
-4.452
0.000
0.389
375.0 , 375.0
125
-1.054
-0.004
1.191
0.005
-1.370
375.0 , 375.0
126
0.297
-0.127
-4.435
0.165
0.386
375.0 , 375.0
127
-0.716
-0.003
-0.220
0.004
-0.930
375.0 , 375.0
128
0.297
-0.095
-4.440
0.124
0.387
375.0 , 375.0
129
-1.174
-0.004
2.972
0.005
-1.526
375.0 , 375.0
130
0.177
-0.127
-2.654
0.165
0.231
375.0 , 375.0
101
0.081
0.000
-2.039
0.000
0.105
375.0 , 375.0
102
0.081
0.000
-2.039
0.000
0.105
375.0 , 375.0
103
-1.274
-0.004
3.629
0.005
-1.656
375.0 , 375.0
104
0.060
-0.128
-1.730
0.166
0.078
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
105
F83 p
-0.935
-0.003
2.212
0.004
106
0.065
-0.096
-1.808
107
-1.306
-0.004
4.444
108
0.028
-0.128
109
0.235
110
111
112
113
Page 96
-1.216
375.0 , 375.0
0.125
0.085
375.0 , 375.0
0.005
-1.698
375.0 , 375.0
-0.915
0.166
0.036
375.0 , 375.0
0.007
-3.740
-0.009
0.306
375.0 , 375.0
0.235
0.007
-3.740
-0.009
0.306
375.0 , 375.0
-1.120
0.003
1.928
-0.004
-1.456
375.0 , 375.0
0.214
-0.121
-3.431
0.157
0.278
375.0 , 375.0
-0.781
0.004
0.511
-0.005
-1.016
375.0 , 375.0
114
0.219
-0.089
-3.509
0.116
0.285
375.0 , 375.0
115
-1.214
0.000
3.424
0.000
-1.578
375.0 , 375.0
116
0.120
-0.124
-1.935
0.161
0.156
375.0 , 375.0
117
-1.293
0.009
3.339
-0.012
-1.681
375.0 , 375.0
118
0.229
-0.001
-3.677
0.001
0.298
375.0 , 375.0
119
-0.911
0.009
1.569
-0.011
-1.184
375.0 , 375.0
120
0.231
0.001
-3.693
-0.002
0.300
375.0 , 375.0
121
-1.387
0.006
4.835
-0.008
-1.803
375.0 , 375.0
122
0.135
-0.003
-2.181
0.005
0.176
375.0 , 375.0
123
0.299
0.010
-4.456
-0.013
0.389
375.0 , 375.0
124
0.299
0.010
-4.456
-0.013
0.389
375.0 , 375.0
125
-1.056
0.006
1.212
-0.008
-1.373
375.0 , 375.0
126
0.278
-0.118
-4.147
0.153
0.361
375.0 , 375.0
127
-0.717
0.007
-0.205
-0.009
-0.932
375.0 , 375.0
128
0.283
-0.086
-4.225
0.112
0.368
375.0 , 375.0
129
-1.176
0.002
2.994
-0.003
-1.528
375.0 , 375.0
130
0.158
-0.122
-2.365
0.159
0.206
375.0 , 375.0
101
0.023
-0.077
-1.772
0.100
0.030
375.0 , 375.0
102
0.023
-0.077
-1.772
0.100
0.030
375.0 , 375.0
103
-0.955
0.066
1.056
-0.086
-1.242
375.0 , 375.0
104
0.278
-1.857
-7.554
2.414
0.361
375.0 , 375.0
105
-0.711
0.030
0.349
-0.039
-0.924
375.0 , 375.0
106
0.214
-1.412
-6.109
1.836
0.279
375.0 , 375.0
107
-0.964
0.097
1.765
-0.126
-1.253
375.0 , 375.0
108
0.269
-1.826
-6.845
2.374
0.349
375.0 , 375.0
109
0.081
-0.255
-3.122
0.332
0.105
375.0 , 375.0
110
0.081
-0.255
-3.122
0.332
0.105
375.0 , 375.0
111
-0.897
-0.112
-0.294
0.146
-1.166
375.0 , 375.0
112
0.336
-2.035
-8.904
2.646
0.437
375.0 , 375.0
113
-0.652
-0.148
-1.001
0.192
-0.848
375.0 , 375.0
114
0.272
-1.590
-7.459
2.067
0.354
375.0 , 375.0
115
-0.929
-0.010
0.955
0.013
-1.208
375.0 , 375.0
116
0.304
-1.933
-7.655
2.513
0.395
375.0 , 375.0
117
-0.853
-0.048
0.180
0.062
-1.109
375.0 , 375.0
118
0.157
-0.528
-4.151
0.686
0.204
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
119
F84 p
F85 p
-0.619
-0.100
-0.646
120
0.138
-0.460
-3.894
121
-0.885
0.054
1.429
122
0.125
-0.426
-2.902
123
0.106
-0.329
124
0.106
125
-0.872
126
127
Page 97
-0.805
375.0 , 375.0
0.598
0.180
375.0 , 375.0
-0.070
-1.151
375.0 , 375.0
0.554
0.162
375.0 , 375.0
-3.690
0.428
0.138
375.0 , 375.0
-0.329
-3.690
0.428
0.138
375.0 , 375.0
-0.186
-0.862
0.242
-1.134
375.0 , 375.0
0.361
-2.109
-9.472
2.742
0.469
375.0 , 375.0
-0.627
-0.222
-1.569
0.288
-0.816
375.0 , 375.0
128
0.297
-1.664
-8.027
2.163
0.386
375.0 , 375.0
129
-0.914
-0.054
0.614
0.071
-1.189
375.0 , 375.0
130
0.319
-1.977
-7.996
2.571
0.414
375.0 , 375.0
101
-0.046
0.009
-1.643
-0.012
-0.060
375.0 , 375.0
102
-0.046
0.009
-1.643
-0.012
-0.060
375.0 , 375.0
103
-0.793
0.015
-4.508
-0.019
-1.031
375.0 , 375.0
104
-0.044
-0.107
-1.633
0.139
-0.057
375.0 , 375.0
105
-0.606
0.014
-3.792
-0.018
-0.788
375.0 , 375.0
106
-0.045
-0.078
-1.636
0.101
-0.058
375.0 , 375.0
107
-0.775
0.011
-3.851
-0.015
-1.007
375.0 , 375.0
108
-0.026
-0.111
-0.976
0.144
-0.033
375.0 , 375.0
109
-0.116
0.024
-2.427
-0.031
-0.151
375.0 , 375.0
110
-0.116
0.024
-2.427
-0.031
-0.151
375.0 , 375.0
111
-0.863
0.030
-5.292
-0.039
-1.122
375.0 , 375.0
112
-0.114
-0.092
-2.417
0.120
-0.148
375.0 , 375.0
113
-0.676
0.029
-4.576
-0.037
-0.879
375.0 , 375.0
114
-0.114
-0.063
-2.420
0.082
-0.149
375.0 , 375.0
115
-0.817
0.020
-4.321
-0.027
-1.062
375.0 , 375.0
116
-0.068
-0.102
-1.446
0.132
-0.088
375.0 , 375.0
117
-1.651
0.024
-9.557
-0.031
-2.146
375.0 , 375.0
118
-0.116
0.017
-2.425
-0.022
-0.151
375.0 , 375.0
119
-1.267
0.024
-7.775
-0.031
-1.648
375.0 , 375.0
120
-0.116
0.019
-2.426
-0.024
-0.151
375.0 , 375.0
121
-1.605
0.014
-8.586
-0.019
-2.086
375.0 , 375.0
122
-0.070
0.007
-1.454
-0.010
-0.090
375.0 , 375.0
123
-0.146
0.031
-2.757
-0.040
-0.190
375.0 , 375.0
124
-0.146
0.031
-2.757
-0.040
-0.190
375.0 , 375.0
125
-0.893
0.037
-5.622
-0.048
-1.161
375.0 , 375.0
126
-0.144
-0.085
-2.747
0.111
-0.187
375.0 , 375.0
127
-0.706
0.036
-4.906
-0.046
-0.918
375.0 , 375.0
128
-0.145
-0.056
-2.750
0.073
-0.188
375.0 , 375.0
129
-0.835
0.025
-4.519
-0.032
-1.085
375.0 , 375.0
130
-0.086
-0.097
-1.644
0.127
-0.111
375.0 , 375.0
101
-0.075
0.003
-1.972
-0.004
-0.097
375.0 , 375.0
102
-0.075
0.003
-1.972
-0.004
-0.097
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F86 p
103
-1.465
0.009
-7.786
104
-0.078
-0.113
105
-1.117
0.008
106
-0.077
107
Page 98
-0.012
-1.905
375.0 , 375.0
-2.006
0.147
-0.101
375.0 , 375.0
-6.333
-0.010
-1.453
375.0 , 375.0
-0.084
-1.998
0.109
-0.100
375.0 , 375.0
-1.435
0.008
-6.997
-0.010
-1.866
375.0 , 375.0
108
-0.048
-0.114
-1.217
0.148
-0.062
375.0 , 375.0
109
-0.213
0.014
-3.496
-0.018
-0.277
375.0 , 375.0
110
-0.213
0.014
-3.496
-0.018
-0.277
375.0 , 375.0
111
-1.603
0.020
-9.310
-0.026
-2.084
375.0 , 375.0
112
-0.216
-0.102
-3.530
0.133
-0.281
375.0 , 375.0
113
-1.255
0.019
-7.857
-0.024
-1.632
375.0 , 375.0
114
-0.215
-0.073
-3.522
0.095
-0.280
375.0 , 375.0
115
-1.518
0.014
-7.912
-0.019
-1.973
375.0 , 375.0
116
-0.131
-0.108
-2.132
0.140
-0.170
375.0 , 375.0
117
-1.748
0.014
-10.635
-0.018
-2.273
375.0 , 375.0
118
-0.212
0.006
-3.489
-0.008
-0.276
375.0 , 375.0
119
-1.364
0.014
-8.850
-0.018
-1.774
375.0 , 375.0
120
-0.212
0.008
-3.491
-0.011
-0.276
375.0 , 375.0
121
-1.663
0.008
-9.236
-0.011
-2.162
375.0 , 375.0
122
-0.127
0.001
-2.091
-0.001
-0.165
375.0 , 375.0
123
-0.271
0.019
-4.137
-0.025
-0.352
375.0 , 375.0
124
-0.271
0.019
-4.137
-0.025
-0.352
375.0 , 375.0
125
-1.661
0.025
-9.951
-0.032
-2.159
375.0 , 375.0
126
-0.274
-0.097
-4.171
0.126
-0.356
375.0 , 375.0
127
-1.313
0.024
-8.498
-0.031
-1.708
375.0 , 375.0
128
-0.273
-0.068
-4.163
0.088
-0.355
375.0 , 375.0
129
-1.553
0.017
-8.296
-0.023
-2.018
375.0 , 375.0
130
-0.166
-0.105
-2.516
0.136
-0.215
375.0 , 375.0
101
-0.081
0.002
-2.037
-0.003
-0.105
375.0 , 375.0
102
-0.081
0.002
-2.037
-0.003
-0.105
375.0 , 375.0
103
-1.436
0.006
-7.680
-0.008
-1.867
375.0 , 375.0
104
-0.078
-0.113
-2.007
0.147
-0.101
375.0 , 375.0
105
-1.097
0.005
-6.270
-0.006
-1.426
375.0 , 375.0
106
-0.079
-0.084
-2.015
0.110
-0.102
375.0 , 375.0
107
-1.404
0.005
-6.865
-0.007
-1.825
375.0 , 375.0
108
-0.046
-0.114
-1.192
0.148
-0.059
375.0 , 375.0
109
-0.234
0.001
-3.735
-0.001
-0.304
375.0 , 375.0
110
-0.234
0.001
-3.735
-0.001
-0.304
375.0 , 375.0
111
-1.589
0.005
-9.378
-0.006
-2.066
375.0 , 375.0
112
-0.231
-0.114
-3.705
0.148
-0.300
375.0 , 375.0
113
-1.250
0.004
-7.968
-0.005
-1.625
375.0 , 375.0
114
-0.232
-0.085
-3.713
0.111
-0.301
375.0 , 375.0
115
-1.495
0.005
-7.884
-0.006
-1.944
375.0 , 375.0
116
-0.137
-0.114
-2.211
0.149
-0.179
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F87 p
117
-1.770
0.000
-10.859
118
-0.235
-0.007
119
-1.386
0.000
120
-0.235
121
Page 99
0.000
-2.301
375.0 , 375.0
-3.744
0.009
-0.305
375.0 , 375.0
-9.078
-0.001
-1.802
375.0 , 375.0
-0.005
-3.742
0.006
-0.305
375.0 , 375.0
-1.676
0.000
-9.365
0.000
-2.179
375.0 , 375.0
122
-0.141
-0.007
-2.250
0.009
-0.183
375.0 , 375.0
123
-0.299
0.000
-4.449
0.000
-0.389
375.0 , 375.0
124
-0.299
0.000
-4.449
0.000
-0.389
375.0 , 375.0
125
-1.654
0.004
-10.092
-0.005
-2.150
375.0 , 375.0
126
-0.296
-0.115
-4.419
0.150
-0.385
375.0 , 375.0
127
-1.315
0.003
-8.682
-0.004
-1.710
375.0 , 375.0
128
-0.297
-0.086
-4.427
0.112
-0.386
375.0 , 375.0
129
-1.534
0.004
-8.313
-0.005
-1.995
375.0 , 375.0
130
-0.176
-0.115
-2.640
0.150
-0.229
375.0 , 375.0
101
-0.081
0.000
-2.038
0.000
-0.105
375.0 , 375.0
102
-0.081
0.000
-2.038
0.000
-0.105
375.0 , 375.0
103
-1.438
0.004
-7.706
-0.005
-1.869
375.0 , 375.0
104
-0.055
-0.116
-1.829
0.151
-0.071
375.0 , 375.0
105
-1.099
0.003
-6.289
-0.004
-1.428
375.0 , 375.0
106
-0.061
-0.087
-1.882
0.113
-0.080
375.0 , 375.0
107
-1.406
0.004
-6.891
-0.005
-1.827
375.0 , 375.0
108
-0.023
-0.116
-1.014
0.151
-0.029
375.0 , 375.0
109
-0.235
0.007
-3.737
-0.009
-0.306
375.0 , 375.0
110
-0.235
0.007
-3.737
-0.009
-0.306
375.0 , 375.0
111
-1.592
0.011
-9.405
-0.014
-2.070
375.0 , 375.0
112
-0.209
-0.109
-3.528
0.142
-0.272
375.0 , 375.0
113
-1.253
0.010
-7.988
-0.013
-1.629
375.0 , 375.0
114
-0.215
-0.080
-3.581
0.104
-0.280
375.0 , 375.0
115
-1.498
0.008
-7.910
-0.011
-1.947
375.0 , 375.0
116
-0.115
-0.112
-2.033
0.145
-0.149
375.0 , 375.0
117
-1.766
0.005
-10.817
-0.006
-2.296
375.0 , 375.0
118
-0.229
-0.001
-3.674
0.001
-0.298
375.0 , 375.0
119
-1.383
0.005
-9.047
-0.007
-1.798
375.0 , 375.0
120
-0.231
0.001
-3.690
-0.002
-0.300
375.0 , 375.0
121
-1.672
0.002
-9.322
-0.003
-2.173
375.0 , 375.0
122
-0.135
-0.003
-2.179
0.005
-0.176
375.0 , 375.0
123
-0.299
0.010
-4.452
-0.013
-0.389
375.0 , 375.0
124
-0.299
0.010
-4.452
-0.013
-0.389
375.0 , 375.0
125
-1.656
0.014
-10.120
-0.018
-2.153
375.0 , 375.0
126
-0.273
-0.106
-4.243
0.138
-0.355
375.0 , 375.0
127
-1.317
0.013
-8.703
-0.017
-1.712
375.0 , 375.0
128
-0.280
-0.077
-4.296
0.100
-0.363
375.0 , 375.0
129
-1.536
0.010
-8.339
-0.013
-1.997
375.0 , 375.0
130
-0.153
-0.110
-2.462
0.143
-0.199
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F88 p
Page 100
101
-0.072
-0.067
-1.704
0.087
-0.094
375.0 , 375.0
102
-0.072
-0.067
-1.704
0.087
-0.094
375.0 , 375.0
103
-1.062
-0.237
-4.748
0.308
-1.381
375.0 , 375.0
104
-0.514
-1.275
-6.024
1.658
-0.668
375.0 , 375.0
105
-0.815
-0.194
-3.987
0.253
-1.059
375.0 , 375.0
106
-0.404
-0.973
-4.944
1.265
-0.525
375.0 , 375.0
107
-1.033
-0.210
-4.067
0.273
-1.343
375.0 , 375.0
108
-0.485
-1.248
-5.343
1.623
-0.631
375.0 , 375.0
109
-0.218
-0.225
-2.895
0.293
-0.283
375.0 , 375.0
110
-0.218
-0.225
-2.895
0.293
-0.283
375.0 , 375.0
111
-1.208
-0.395
-5.939
0.514
-1.570
375.0 , 375.0
112
-0.660
-1.433
-7.215
1.863
-0.858
375.0 , 375.0
113
-0.961
-0.352
-5.178
0.458
-1.249
375.0 , 375.0
114
-0.549
-1.131
-6.135
1.470
-0.714
375.0 , 375.0
115
-1.121
-0.305
-4.781
0.397
-1.457
375.0 , 375.0
116
-0.573
-1.343
-6.057
1.746
-0.745
375.0 , 375.0
117
-1.169
-0.452
-6.463
0.588
-1.520
375.0 , 375.0
118
-0.285
-0.499
-3.904
0.648
-0.371
375.0 , 375.0
119
-0.931
-0.396
-5.571
0.514
-1.211
375.0 , 375.0
120
-0.268
-0.430
-3.652
0.559
-0.349
375.0 , 375.0
121
-1.082
-0.362
-5.305
0.471
-1.407
375.0 , 375.0
122
-0.198
-0.409
-2.746
0.531
-0.257
375.0 , 375.0
123
-0.279
-0.291
-3.397
0.378
-0.363
375.0 , 375.0
124
-0.279
-0.291
-3.397
0.378
-0.363
375.0 , 375.0
125
-1.269
-0.461
-6.441
0.599
-1.650
375.0 , 375.0
126
-0.721
-1.499
-7.717
1.949
-0.937
375.0 , 375.0
127
-1.021
-0.419
-5.680
0.544
-1.328
375.0 , 375.0
128
-0.611
-1.197
-6.637
1.556
-0.794
375.0 , 375.0
129
-1.157
-0.345
-5.082
0.448
-1.505
375.0 , 375.0
130
-0.609
-1.383
-6.358
1.797
-0.792
375.0 , 375.0
Ft.Name
Sec.Na
L.Comb.
201
F65 p
Fx
0.101
Fy
Fz
Mx
0.116
-0.968
-0.151
My
C.G. of Loads
0.131
375.0 , 375.0
202
0.086
0.100
-0.829
-0.129
0.112
375.0 , 375.0
203
-0.822
-0.350
2.312
0.455
-1.069
375.0 , 375.0
204
-0.425
-2.088
7.567
2.715
-0.552
375.0 , 375.0
205
-1.731
-0.800
5.454
1.039
-2.251
375.0 , 375.0
206
-0.936
-4.276
15.964
5.559
-1.217
375.0 , 375.0
207
-1.753
-0.824
5.661
1.072
-2.279
375.0 , 375.0
208
-0.958
-4.301
16.172
5.592
-1.245
375.0 , 375.0
209
0.301
0.517
-3.266
-0.672
0.391
375.0 , 375.0
210
0.258
0.443
-2.800
-0.576
0.335
375.0 , 375.0
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F66 p
Page 101
211
-0.651
-0.007
0.342
0.009
-0.846
375.0 , 375.0
212
-0.253
-1.745
5.597
2.269
-0.329
375.0 , 375.0
213
-1.560
-0.456
3.483
0.593
-2.027
375.0 , 375.0
214
-0.764
-3.933
13.994
5.113
-0.994
375.0 , 375.0
215
-1.624
-0.567
4.183
0.737
-2.111
375.0 , 375.0
216
-0.829
-4.044
14.694
5.257
-1.078
375.0 , 375.0
217
-1.518
-0.118
2.314
0.154
-1.973
375.0 , 375.0
218
-0.072
-1.243
3.925
1.616
-0.094
375.0 , 375.0
219
-1.582
-0.229
3.014
0.298
-2.057
375.0 , 375.0
220
-0.137
-1.354
4.625
1.760
-0.177
375.0 , 375.0
221
0.385
0.685
-4.234
-0.890
0.501
375.0 , 375.0
222
0.330
0.587
-3.629
-0.763
0.429
375.0 , 375.0
223
-0.579
0.137
-0.487
-0.178
-0.752
375.0 , 375.0
224
-0.181
-1.601
4.768
2.082
-0.236
375.0 , 375.0
225
-1.488
-0.312
2.654
0.406
-1.934
375.0 , 375.0
226
-0.692
-3.789
13.165
4.926
-0.900
375.0 , 375.0
227
-1.570
-0.459
3.561
0.597
-2.041
375.0 , 375.0
228
-0.775
-3.936
14.072
5.117
-1.007
375.0 , 375.0
201
-0.031
0.134
-1.171
-0.175
-0.040
375.0 , 375.0
202
-0.026
0.115
-1.003
-0.150
-0.034
375.0 , 375.0
203
-0.864
0.170
-2.503
-0.222
-1.123
375.0 , 375.0
204
0.355
-2.390
8.306
3.108
0.462
375.0 , 375.0
205
-1.702
0.226
-4.003
-0.293
-2.212
375.0 , 375.0
206
0.737
-4.896
17.616
6.365
0.958
375.0 , 375.0
207
-1.695
0.197
-3.753
-0.256
-2.204
375.0 , 375.0
208
0.743
-4.925
17.867
6.402
0.966
375.0 , 375.0
209
-0.092
0.570
-3.923
-0.741
-0.120
375.0 , 375.0
210
-0.079
0.488
-3.363
-0.635
-0.103
375.0 , 375.0
211
-0.917
0.544
-4.863
-0.707
-1.192
375.0 , 375.0
212
0.302
-2.017
5.947
2.622
0.393
375.0 , 375.0
213
-1.754
0.599
-6.363
-0.778
-2.281
375.0 , 375.0
214
0.684
-4.523
15.257
5.880
0.889
375.0 , 375.0
215
-1.735
0.477
-5.522
-0.620
-2.255
375.0 , 375.0
216
0.704
-4.645
16.097
6.038
0.915
375.0 , 375.0
217
-1.857
0.971
-7.968
-1.263
-2.414
375.0 , 375.0
218
0.279
-1.195
3.378
1.553
0.363
375.0 , 375.0
219
-1.837
0.849
-7.127
-1.104
-2.388
375.0 , 375.0
220
0.299
-1.317
4.219
1.712
0.389
375.0 , 375.0
221
-0.119
0.753
-5.082
-0.979
-0.155
375.0 , 375.0
222
-0.102
0.646
-4.356
-0.839
-0.133
375.0 , 375.0
223
-0.940
0.701
-5.856
-0.911
-1.221
375.0 , 375.0
224
0.280
-1.860
4.953
2.418
0.363
375.0 , 375.0
225
-1.777
0.756
-7.356
-0.983
-2.310
375.0 , 375.0
226
0.661
-4.366
14.263
5.675
0.860
375.0 , 375.0
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F67 p
227
-1.752
0.595
-6.267
228
0.687
-4.527
201
0.077
0.090
202
0.066
203
Page 102
-0.773
-2.277
375.0 , 375.0
15.352
5.885
0.893
375.0 , 375.0
-1.476
-0.116
0.100
375.0 , 375.0
0.077
-1.265
-0.100
0.086
375.0 , 375.0
-0.809
-0.180
1.867
0.234
-1.052
375.0 , 375.0
204
-0.126
-1.322
3.131
1.718
-0.164
375.0 , 375.0
205
-1.684
-0.437
4.999
0.568
-2.190
375.0 , 375.0
206
-0.318
-2.720
7.527
3.536
-0.413
375.0 , 375.0
207
-1.701
-0.456
5.315
0.593
-2.211
375.0 , 375.0
208
-0.335
-2.739
7.843
3.561
-0.435
375.0 , 375.0
209
0.258
0.291
-4.451
-0.379
0.335
375.0 , 375.0
210
0.221
0.250
-3.815
-0.324
0.287
375.0 , 375.0
211
-0.654
-0.007
-0.683
0.009
-0.851
375.0 , 375.0
212
0.029
-1.149
0.581
1.493
0.037
375.0 , 375.0
213
-1.530
-0.264
2.449
0.343
-1.988
375.0 , 375.0
214
-0.163
-2.547
4.977
3.311
-0.212
375.0 , 375.0
215
-1.585
-0.326
3.403
0.424
-2.060
375.0 , 375.0
216
-0.218
-2.610
5.931
3.392
-0.284
375.0 , 375.0
217
-1.294
-0.196
1.731
0.255
-1.682
375.0 , 375.0
218
0.069
-0.322
-1.748
0.418
0.090
375.0 , 375.0
219
-1.349
-0.258
2.684
0.336
-1.754
375.0 , 375.0
220
0.014
-0.384
-0.794
0.500
0.018
375.0 , 375.0
221
0.333
0.377
-5.704
-0.490
0.433
375.0 , 375.0
222
0.286
0.323
-4.889
-0.420
0.371
375.0 , 375.0
223
-0.590
0.066
-1.757
-0.086
-0.766
375.0 , 375.0
224
0.094
-1.076
-0.493
1.398
0.122
375.0 , 375.0
225
-1.465
-0.191
1.375
0.248
-1.904
375.0 , 375.0
226
-0.098
-2.474
3.903
3.216
-0.128
375.0 , 375.0
227
-1.536
-0.272
2.597
0.353
-1.997
375.0 , 375.0
228
-0.170
-2.555
5.125
3.321
-0.221
375.0 , 375.0
201
-0.146
0.076
-1.389
-0.098
-0.189
375.0 , 375.0
202
-0.125
0.065
-1.191
-0.084
-0.162
375.0 , 375.0
203
-1.011
0.329
-4.473
-0.427
-1.315
375.0 , 375.0
204
0.205
-0.883
2.084
1.148
0.266
375.0 , 375.0
205
-1.898
0.593
-7.755
-0.771
-2.467
375.0 , 375.0
206
0.534
-1.831
5.358
2.381
0.695
375.0 , 375.0
207
-1.866
0.577
-7.458
-0.750
-2.426
375.0 , 375.0
208
0.566
-1.847
5.656
2.402
0.735
375.0 , 375.0
209
-0.456
0.249
-4.179
-0.324
-0.593
375.0 , 375.0
210
-0.391
0.214
-3.582
-0.278
-0.509
375.0 , 375.0
211
-1.278
0.478
-6.865
-0.621
-1.661
375.0 , 375.0
212
-0.062
-0.734
-0.308
0.955
-0.080
375.0 , 375.0
213
-2.164
0.742
-10.147
-0.964
-2.813
375.0 , 375.0
214
0.268
-1.682
2.967
2.187
0.348
375.0 , 375.0
S1
F68 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
215
F69 p
F70 p
-2.066
0.688
-9.251
216
0.366
-1.736
3.862
217
-1.938
0.706
-9.582
218
-0.258
-0.358
-1.557
219
-1.840
0.652
-8.687
220
-0.160
-0.411
221
-0.588
0.322
222
-0.504
223
Page 103
-2.686
375.0 , 375.0
2.257
0.476
375.0 , 375.0
-0.917
-2.519
375.0 , 375.0
0.465
-0.335
375.0 , 375.0
-0.848
-2.392
375.0 , 375.0
-0.662
0.535
-0.208
375.0 , 375.0
-5.354
-0.419
-0.764
375.0 , 375.0
0.276
-4.589
-0.359
-0.655
375.0 , 375.0
-1.390
0.540
-7.871
-0.702
-1.808
375.0 , 375.0
224
-0.174
-0.672
-1.315
0.874
-0.227
375.0 , 375.0
225
-2.277
0.804
-11.154
-1.045
-2.960
375.0 , 375.0
226
0.155
-1.620
1.960
2.106
0.202
375.0 , 375.0
227
-2.151
0.735
-10.007
-0.956
-2.796
375.0 , 375.0
228
0.281
-1.689
3.107
2.196
0.366
375.0 , 375.0
201
0.136
-0.088
-1.550
0.115
0.177
375.0 , 375.0
202
0.116
-0.076
-1.329
0.098
0.151
375.0 , 375.0
203
-0.948
-0.172
0.431
0.224
-1.232
375.0 , 375.0
204
0.617
-2.254
-9.633
2.930
0.802
375.0 , 375.0
205
-2.012
-0.269
2.191
0.350
-2.615
375.0 , 375.0
206
1.118
-4.432
-17.938
5.762
1.453
375.0 , 375.0
207
-2.041
-0.250
2.524
0.325
-2.653
375.0 , 375.0
208
1.089
-4.414
-17.606
5.738
1.416
375.0 , 375.0
209
0.493
-0.370
-6.502
0.480
0.641
375.0 , 375.0
210
0.422
-0.317
-5.573
0.412
0.549
375.0 , 375.0
211
-0.642
-0.414
-3.813
0.538
-0.834
375.0 , 375.0
212
0.923
-2.495
-13.878
3.244
1.200
375.0 , 375.0
213
-1.706
-0.510
-2.053
0.664
-2.217
375.0 , 375.0
214
1.424
-4.674
-22.183
6.076
1.851
375.0 , 375.0
215
-1.811
-0.431
-0.660
0.561
-2.355
375.0 , 375.0
216
1.318
-4.594
-20.789
5.973
1.714
375.0 , 375.0
217
-2.066
0.010
1.353
-0.013
-2.686
375.0 , 375.0
218
0.746
-1.994
-12.216
2.592
0.970
375.0 , 375.0
219
-2.172
0.089
2.746
-0.116
-2.823
375.0 , 375.0
220
0.641
-1.915
-10.823
2.489
0.833
375.0 , 375.0
221
0.643
-0.487
-8.588
0.633
0.835
375.0 , 375.0
222
0.551
-0.418
-7.361
0.543
0.716
375.0 , 375.0
223
-0.513
-0.514
-5.601
0.669
-0.667
375.0 , 375.0
224
1.052
-2.596
-15.666
3.375
1.367
375.0 , 375.0
225
-1.577
-0.611
-3.841
0.795
-2.050
375.0 , 375.0
226
1.552
-4.774
-23.971
6.207
2.018
375.0 , 375.0
227
-1.715
-0.507
-2.001
0.659
-2.229
375.0 , 375.0
228
1.415
-4.670
-22.130
6.071
1.839
375.0 , 375.0
201
0.112
0.001
-1.680
-0.002
0.146
375.0 , 375.0
202
0.096
0.001
-1.440
-0.002
0.125
375.0 , 375.0
S1
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
203
F71 p
-1.537
-0.002
3.981
0.003
204
0.105
-0.099
-1.498
205
-3.170
-0.005
9.403
206
0.114
-0.199
207
-3.194
208
209
Page 104
-1.998
375.0 , 375.0
0.128
0.136
375.0 , 375.0
0.007
-4.120
375.0 , 375.0
-1.555
0.258
0.148
375.0 , 375.0
-0.006
9.763
0.007
-4.152
375.0 , 375.0
0.090
-0.199
-1.195
0.259
0.116
375.0 , 375.0
0.452
0.007
-7.270
-0.009
0.588
375.0 , 375.0
210
0.388
0.006
-6.232
-0.008
0.504
375.0 , 375.0
211
-1.245
0.003
-0.810
-0.004
-1.619
375.0 , 375.0
212
0.396
-0.094
-6.289
0.122
0.515
375.0 , 375.0
213
-2.878
0.000
4.611
0.001
-3.741
375.0 , 375.0
214
0.405
-0.194
-6.347
0.252
0.527
375.0 , 375.0
215
-2.975
-0.002
6.169
0.002
-3.867
375.0 , 375.0
216
0.308
-0.196
-4.789
0.254
0.401
375.0 , 375.0
217
-2.096
0.008
3.326
-0.010
-2.725
375.0 , 375.0
218
0.389
-0.016
-6.266
0.021
0.506
375.0 , 375.0
219
-2.193
0.006
4.884
-0.008
-2.851
375.0 , 375.0
220
0.292
-0.018
-4.708
0.023
0.380
375.0 , 375.0
221
0.595
0.008
-9.624
-0.011
0.774
375.0 , 375.0
222
0.510
0.007
-8.249
-0.009
0.663
375.0 , 375.0
223
-1.123
0.004
-2.827
-0.005
-1.460
375.0 , 375.0
224
0.519
-0.093
-8.307
0.121
0.674
375.0 , 375.0
225
-2.756
0.001
2.594
-0.001
-3.582
375.0 , 375.0
226
0.528
-0.193
-8.364
0.251
0.686
375.0 , 375.0
227
-2.883
-0.001
4.656
0.001
-3.748
375.0 , 375.0
228
0.400
-0.195
-6.302
0.253
0.520
375.0 , 375.0
201
0.083
-0.003
-1.004
0.004
0.107
375.0 , 375.0
202
0.071
-0.002
-0.861
0.003
0.092
375.0 , 375.0
203
-1.558
-0.009
4.578
0.011
-2.025
375.0 , 375.0
204
0.033
-0.128
-0.265
0.166
0.043
375.0 , 375.0
205
-3.187
-0.015
10.016
0.020
-4.143
375.0 , 375.0
206
-0.004
-0.254
0.331
0.330
-0.006
375.0 , 375.0
207
-3.204
-0.015
10.231
0.019
-4.166
375.0 , 375.0
208
-0.022
-0.253
0.547
0.329
-0.029
375.0 , 375.0
209
0.293
-0.018
-3.735
0.024
0.380
375.0 , 375.0
210
0.251
-0.016
-3.202
0.020
0.326
375.0 , 375.0
211
-1.378
-0.022
2.237
0.029
-1.791
375.0 , 375.0
212
0.213
-0.141
-2.606
0.184
0.277
375.0 , 375.0
213
-3.007
-0.028
7.675
0.037
-3.909
375.0 , 375.0
214
0.176
-0.267
-2.010
0.347
0.228
375.0 , 375.0
215
-3.069
-0.025
8.475
0.032
-3.990
375.0 , 375.0
216
0.113
-0.263
-1.209
0.342
0.147
375.0 , 375.0
217
-2.335
-0.014
6.485
0.018
-3.036
375.0 , 375.0
218
0.212
-0.062
-2.536
0.081
0.275
375.0 , 375.0
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F72 p
Page 105
219
-2.398
-0.010
7.286
0.013
-3.117
375.0 , 375.0
220
0.149
-0.058
-1.735
0.076
0.194
375.0 , 375.0
221
0.381
-0.025
-4.886
0.033
0.495
375.0 , 375.0
222
0.326
-0.022
-4.188
0.028
0.424
375.0 , 375.0
223
-1.302
-0.028
1.250
0.036
-1.693
375.0 , 375.0
224
0.289
-0.147
-3.592
0.191
0.375
375.0 , 375.0
225
-2.931
-0.034
6.689
0.045
-3.811
375.0 , 375.0
226
0.251
-0.273
-2.996
0.355
0.327
375.0 , 375.0
227
-3.013
-0.029
7.736
0.038
-3.917
375.0 , 375.0
228
0.170
-0.267
-1.949
0.348
0.220
375.0 , 375.0
201
0.111
0.003
-1.652
-0.004
0.144
375.0 , 375.0
202
0.095
0.002
-1.416
-0.003
0.123
375.0 , 375.0
203
-1.549
-0.004
4.045
0.005
-2.014
375.0 , 375.0
204
0.095
-0.139
-1.415
0.181
0.123
375.0 , 375.0
205
-3.193
-0.010
9.505
0.014
-4.151
375.0 , 375.0
206
0.095
-0.281
-1.415
0.365
0.123
375.0 , 375.0
207
-3.217
-0.011
9.859
0.014
-4.182
375.0 , 375.0
208
0.071
-0.281
-1.061
0.366
0.092
375.0 , 375.0
209
0.444
0.011
-7.122
-0.015
0.577
375.0 , 375.0
210
0.380
0.010
-6.105
-0.012
0.495
375.0 , 375.0
211
-1.264
0.003
-0.644
-0.004
-1.643
375.0 , 375.0
212
0.380
-0.132
-6.104
0.172
0.495
375.0 , 375.0
213
-2.908
-0.003
4.817
0.004
-3.780
375.0 , 375.0
214
0.380
-0.274
-6.103
0.356
0.495
375.0 , 375.0
215
-3.003
-0.006
6.343
0.007
-3.904
375.0 , 375.0
216
0.285
-0.276
-4.577
0.359
0.371
375.0 , 375.0
217
-2.185
0.008
3.722
-0.011
-2.840
375.0 , 375.0
218
0.380
-0.049
-6.100
0.064
0.495
375.0 , 375.0
219
-2.280
0.006
5.248
-0.007
-2.964
375.0 , 375.0
220
0.285
-0.051
-4.574
0.067
0.371
375.0 , 375.0
221
0.584
0.015
-9.425
-0.020
0.759
375.0 , 375.0
222
0.500
0.013
-8.079
-0.017
0.651
375.0 , 375.0
223
-1.144
0.007
-2.618
-0.009
-1.487
375.0 , 375.0
224
0.500
-0.128
-8.078
0.167
0.651
375.0 , 375.0
225
-2.788
0.000
2.843
-0.001
-3.624
375.0 , 375.0
226
0.500
-0.270
-8.077
0.351
0.651
375.0 , 375.0
227
-2.913
-0.003
4.863
0.004
-3.787
375.0 , 375.0
228
0.375
-0.273
-6.057
0.355
0.488
375.0 , 375.0
201
0.109
0.001
-1.656
-0.002
0.142
375.0 , 375.0
202
0.094
0.001
-1.420
-0.002
0.122
375.0 , 375.0
203
-1.496
-0.005
3.840
0.007
-1.945
375.0 , 375.0
204
0.094
-0.143
-1.421
0.186
0.122
375.0 , 375.0
205
-3.086
-0.012
9.100
0.015
-4.011
375.0 , 375.0
206
0.094
-0.287
-1.421
0.373
0.122
375.0 , 375.0
S1
F73 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F74 p
207
-3.109
-0.012
9.455
208
0.070
-0.287
209
0.441
0.004
210
0.378
211
Page 106
0.015
-4.042
375.0 , 375.0
-1.066
0.373
0.091
375.0 , 375.0
-7.104
-0.005
0.573
375.0 , 375.0
0.004
-6.089
-0.005
0.491
375.0 , 375.0
-1.212
-0.003
-0.829
0.004
-1.575
375.0 , 375.0
212
0.378
-0.140
-6.090
0.183
0.491
375.0 , 375.0
213
-2.801
-0.009
4.431
0.012
-3.642
375.0 , 375.0
214
0.378
-0.284
-6.091
0.370
0.491
375.0 , 375.0
215
-2.896
-0.010
5.953
0.013
-3.764
375.0 , 375.0
216
0.283
-0.285
-4.568
0.371
0.369
375.0 , 375.0
217
-2.097
0.004
3.412
-0.005
-2.726
375.0 , 375.0
218
0.378
-0.058
-6.090
0.075
0.491
375.0 , 375.0
219
-2.191
0.003
4.934
-0.004
-2.849
375.0 , 375.0
220
0.283
-0.059
-4.568
0.076
0.369
375.0 , 375.0
221
0.580
0.004
-9.397
-0.005
0.753
375.0 , 375.0
222
0.497
0.004
-8.055
-0.005
0.646
375.0 , 375.0
223
-1.093
-0.003
-2.795
0.004
-1.421
375.0 , 375.0
224
0.497
-0.140
-8.055
0.183
0.646
375.0 , 375.0
225
-2.682
-0.009
2.465
0.012
-3.487
375.0 , 375.0
226
0.497
-0.284
-8.056
0.370
0.646
375.0 , 375.0
227
-2.807
-0.010
4.479
0.013
-3.649
375.0 , 375.0
228
0.373
-0.285
-6.043
0.371
0.484
375.0 , 375.0
201
-0.112
0.000
-1.684
0.000
-0.146
375.0 , 375.0
202
-0.096
0.000
-1.444
0.000
-0.125
375.0 , 375.0
203
-1.730
-0.002
-6.872
0.003
-2.250
375.0 , 375.0
204
-0.093
-0.104
-1.466
0.135
-0.121
375.0 , 375.0
205
-3.365
-0.005
-12.300
0.006
-4.374
375.0 , 375.0
206
-0.090
-0.208
-1.489
0.270
-0.116
375.0 , 375.0
207
-3.341
-0.005
-11.939
0.006
-4.343
375.0 , 375.0
208
-0.066
-0.208
-1.128
0.270
-0.085
375.0 , 375.0
209
-0.454
0.000
-7.284
0.000
-0.590
375.0 , 375.0
210
-0.389
0.000
-6.244
0.000
-0.505
375.0 , 375.0
211
-2.023
-0.002
-11.672
0.003
-2.630
375.0 , 375.0
212
-0.386
-0.104
-6.266
0.135
-0.501
375.0 , 375.0
213
-3.658
-0.005
-17.100
0.006
-4.755
375.0 , 375.0
214
-0.382
-0.208
-6.289
0.270
-0.497
375.0 , 375.0
215
-3.560
-0.005
-15.539
0.006
-4.629
375.0 , 375.0
216
-0.285
-0.208
-4.728
0.270
-0.371
375.0 , 375.0
217
-2.876
-0.002
-15.799
0.002
-3.739
375.0 , 375.0
218
-0.390
-0.024
-6.278
0.031
-0.507
375.0 , 375.0
219
-2.779
-0.002
-14.238
0.002
-3.612
375.0 , 375.0
220
-0.293
-0.024
-4.717
0.031
-0.381
375.0 , 375.0
221
-0.596
0.000
-9.643
0.000
-0.775
375.0 , 375.0
222
-0.511
0.000
-8.266
0.000
-0.665
375.0 , 375.0
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F75 p
223
-2.146
-0.002
224
-0.508
225
-3.780
226
Page 107
-13.694
0.003
-2.789
375.0 , 375.0
-0.104
-8.288
0.135
-0.660
375.0 , 375.0
-0.005
-19.122
0.006
-4.914
375.0 , 375.0
-0.505
-0.208
-8.311
0.270
-0.656
375.0 , 375.0
227
-3.652
-0.005
-17.055
0.006
-4.748
375.0 , 375.0
228
-0.377
-0.208
-6.244
0.270
-0.490
375.0 , 375.0
201
-0.083
-0.004
-1.423
0.005
-0.107
375.0 , 375.0
202
-0.071
-0.004
-1.219
0.005
-0.092
375.0 , 375.0
203
-1.692
-0.008
-6.527
0.010
-2.200
375.0 , 375.0
204
-0.035
-0.136
-0.634
0.176
-0.045
375.0 , 375.0
205
-3.314
-0.012
-11.835
0.015
-4.308
375.0 , 375.0
206
0.001
-0.268
-0.048
0.348
0.002
375.0 , 375.0
207
-3.296
-0.011
-11.531
0.014
-4.285
375.0 , 375.0
208
0.019
-0.267
0.257
0.347
0.025
375.0 , 375.0
209
-0.290
-0.027
-5.652
0.035
-0.377
375.0 , 375.0
210
-0.248
-0.023
-4.845
0.030
-0.323
375.0 , 375.0
211
-1.870
-0.027
-10.153
0.035
-2.431
375.0 , 375.0
212
-0.212
-0.155
-4.259
0.201
-0.276
375.0 , 375.0
213
-3.492
-0.031
-15.461
0.040
-4.539
375.0 , 375.0
214
-0.176
-0.287
-3.673
0.373
-0.229
375.0 , 375.0
215
-3.429
-0.025
-14.249
0.033
-4.458
375.0 , 375.0
216
-0.114
-0.281
-2.462
0.365
-0.149
375.0 , 375.0
217
-2.836
-0.024
-14.511
0.032
-3.687
375.0 , 375.0
218
-0.208
-0.069
-4.237
0.090
-0.270
375.0 , 375.0
219
-2.774
-0.019
-13.299
0.024
-3.606
375.0 , 375.0
220
-0.146
-0.064
-3.026
0.083
-0.190
375.0 , 375.0
221
-0.378
-0.036
-7.433
0.047
-0.491
375.0 , 375.0
222
-0.324
-0.031
-6.371
0.041
-0.421
375.0 , 375.0
223
-1.946
-0.035
-11.679
0.046
-2.529
375.0 , 375.0
224
-0.288
-0.163
-5.785
0.212
-0.374
375.0 , 375.0
225
-3.567
-0.039
-16.987
0.051
-4.637
375.0 , 375.0
226
-0.252
-0.295
-5.200
0.384
-0.328
375.0 , 375.0
227
-3.486
-0.031
-15.394
0.041
-4.532
375.0 , 375.0
228
-0.171
-0.287
-3.607
0.374
-0.222
375.0 , 375.0
201
-0.111
-0.006
-1.661
0.007
-0.144
375.0 , 375.0
202
-0.095
-0.005
-1.423
0.006
-0.123
375.0 , 375.0
203
-1.740
-0.013
-6.883
0.017
-2.263
375.0 , 375.0
204
-0.095
-0.154
-1.421
0.200
-0.123
375.0 , 375.0
205
-3.386
-0.021
-12.343
0.027
-4.402
375.0 , 375.0
206
-0.095
-0.302
-1.419
0.393
-0.123
375.0 , 375.0
207
-3.362
-0.020
-11.988
0.025
-4.371
375.0 , 375.0
208
-0.071
-0.301
-1.063
0.392
-0.092
375.0 , 375.0
209
-0.444
-0.022
-7.158
0.029
-0.577
375.0 , 375.0
210
-0.380
-0.019
-6.136
0.025
-0.495
375.0 , 375.0
S1
F76 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F77 p
211
-2.026
-0.027
212
-0.380
213
-3.672
214
Page 108
-11.596
0.035
-2.634
375.0 , 375.0
-0.168
-6.133
0.218
-0.495
375.0 , 375.0
-0.035
-17.056
0.046
-4.773
375.0 , 375.0
-0.380
-0.317
-6.131
0.412
-0.495
375.0 , 375.0
215
-3.576
-0.030
-15.522
0.040
-4.649
375.0 , 375.0
216
-0.285
-0.312
-4.597
0.406
-0.371
375.0 , 375.0
217
-2.948
-0.018
-15.962
0.023
-3.833
375.0 , 375.0
218
-0.380
-0.079
-6.133
0.103
-0.495
375.0 , 375.0
219
-2.853
-0.013
-14.428
0.017
-3.709
375.0 , 375.0
220
-0.285
-0.074
-4.599
0.097
-0.371
375.0 , 375.0
221
-0.585
-0.029
-9.474
0.038
-0.761
375.0 , 375.0
222
-0.502
-0.025
-8.121
0.033
-0.652
375.0 , 375.0
223
-2.147
-0.033
-13.581
0.043
-2.791
375.0 , 375.0
224
-0.502
-0.174
-8.118
0.226
-0.652
375.0 , 375.0
225
-3.793
-0.041
-19.041
0.054
-4.931
375.0 , 375.0
226
-0.502
-0.323
-8.116
0.420
-0.652
375.0 , 375.0
227
-3.667
-0.035
-17.010
0.045
-4.768
375.0 , 375.0
228
-0.376
-0.317
-6.086
0.411
-0.489
375.0 , 375.0
201
-0.109
-0.001
-1.651
0.002
-0.142
375.0 , 375.0
202
-0.094
-0.001
-1.415
0.002
-0.122
375.0 , 375.0
203
-1.684
-0.010
-6.675
0.013
-2.189
375.0 , 375.0
204
-0.094
-0.152
-1.416
0.197
-0.122
375.0 , 375.0
205
-3.274
-0.019
-11.935
0.024
-4.257
375.0 , 375.0
206
-0.094
-0.302
-1.417
0.393
-0.122
375.0 , 375.0
207
-3.251
-0.019
-11.581
0.024
-4.226
375.0 , 375.0
208
-0.070
-0.302
-1.063
0.392
-0.091
375.0 , 375.0
209
-0.441
-0.013
-7.081
0.016
-0.573
375.0 , 375.0
210
-0.378
-0.011
-6.070
0.014
-0.491
375.0 , 375.0
211
-1.968
-0.020
-11.330
0.025
-2.559
375.0 , 375.0
212
-0.378
-0.161
-6.071
0.210
-0.491
375.0 , 375.0
213
-3.559
-0.028
-16.590
0.037
-4.626
375.0 , 375.0
214
-0.378
-0.312
-6.071
0.405
-0.491
375.0 , 375.0
215
-3.464
-0.026
-15.072
0.033
-4.504
375.0 , 375.0
216
-0.283
-0.309
-4.554
0.402
-0.369
375.0 , 375.0
217
-2.855
-0.009
-15.571
0.012
-3.711
375.0 , 375.0
218
-0.378
-0.072
-6.071
0.094
-0.491
375.0 , 375.0
219
-2.760
-0.007
-14.053
0.009
-3.588
375.0 , 375.0
220
-0.283
-0.070
-4.554
0.090
-0.369
375.0 , 375.0
221
-0.580
-0.017
-9.368
0.022
-0.753
375.0 , 375.0
222
-0.497
-0.014
-8.029
0.019
-0.646
375.0 , 375.0
223
-2.087
-0.023
-13.289
0.030
-2.713
375.0 , 375.0
224
-0.497
-0.165
-8.030
0.214
-0.646
375.0 , 375.0
225
-3.678
-0.032
-18.549
0.042
-4.781
375.0 , 375.0
226
-0.497
-0.315
-8.031
0.410
-0.646
375.0 , 375.0
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F78 p
Page 109
227
-3.553
-0.028
-16.542
0.037
-4.619
375.0 , 375.0
228
-0.373
-0.312
-6.024
0.405
-0.484
375.0 , 375.0
201
-0.069
-0.108
-1.717
0.140
-0.089
375.0 , 375.0
202
-0.059
-0.092
-1.471
0.120
-0.076
375.0 , 375.0
203
-1.193
-0.344
-4.391
0.448
-1.551
375.0 , 375.0
204
-0.437
-2.589
-10.703
3.366
-0.568
375.0 , 375.0
205
-2.328
-0.596
-7.310
0.775
-3.026
375.0 , 375.0
206
-0.816
-5.086
-19.934
6.612
-1.060
375.0 , 375.0
207
-2.313
-0.573
-6.942
0.745
-3.007
375.0 , 375.0
208
-0.801
-5.063
-19.566
6.582
-1.041
375.0 , 375.0
209
-0.304
-0.437
-6.971
0.568
-0.395
375.0 , 375.0
210
-0.260
-0.374
-5.975
0.487
-0.339
375.0 , 375.0
211
-1.395
-0.626
-8.894
0.814
-1.813
375.0 , 375.0
212
-0.639
-2.871
-15.206
3.733
-0.830
375.0 , 375.0
213
-2.529
-0.878
-11.813
1.142
-3.288
375.0 , 375.0
214
-1.017
-5.368
-24.437
6.978
-1.322
375.0 , 375.0
215
-2.464
-0.785
-10.320
1.020
-3.203
375.0 , 375.0
216
-0.952
-5.274
-22.944
6.857
-1.238
375.0 , 375.0
217
-2.741
-0.638
-11.892
0.830
-3.564
375.0 , 375.0
218
-0.613
-2.048
-12.636
2.663
-0.797
375.0 , 375.0
219
-2.676
-0.545
-10.399
0.708
-3.479
375.0 , 375.0
220
-0.548
-1.955
-11.143
2.541
-0.712
375.0 , 375.0
221
-0.403
-0.575
-9.184
0.748
-0.524
375.0 , 375.0
222
-0.346
-0.493
-7.872
0.641
-0.449
375.0 , 375.0
223
-1.480
-0.745
-10.791
0.969
-1.924
375.0 , 375.0
224
-0.724
-2.990
-17.103
3.887
-0.941
375.0 , 375.0
225
-2.614
-0.997
-13.711
1.296
-3.399
375.0 , 375.0
226
-1.102
-5.487
-26.335
7.133
-1.433
375.0 , 375.0
227
-2.528
-0.874
-11.743
1.136
-3.286
375.0 , 375.0
228
-1.016
-5.364
-24.367
6.973
-1.321
375.0 , 375.0
201
0.064
0.013
-0.825
-0.016
0.084
375.0 , 375.0
202
0.055
0.011
-0.707
-0.014
0.072
375.0 , 375.0
203
-0.542
0.006
1.585
-0.008
-0.704
375.0 , 375.0
204
0.057
-0.090
-0.713
0.117
0.074
375.0 , 375.0
205
-1.138
0.001
3.877
-0.002
-1.480
375.0 , 375.0
206
0.058
-0.191
-0.718
0.248
0.076
375.0 , 375.0
207
-1.152
-0.002
4.054
0.002
-1.498
375.0 , 375.0
208
0.045
-0.194
-0.541
0.252
0.058
375.0 , 375.0
209
0.162
0.034
-1.922
-0.044
0.211
375.0 , 375.0
210
0.139
0.029
-1.648
-0.037
0.181
375.0 , 375.0
211
-0.458
0.024
0.644
-0.031
-0.595
375.0 , 375.0
212
0.141
-0.072
-1.653
0.094
0.183
375.0 , 375.0
213
-1.054
0.019
2.936
-0.025
-1.371
375.0 , 375.0
214
0.142
-0.173
-1.659
0.225
0.185
375.0 , 375.0
S1
F79 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
215
F80 p
F81 p
-1.089
0.012
3.348
216
0.108
-0.180
-1.247
217
-3.144
0.029
13.630
218
0.139
0.014
-1.643
219
-3.179
0.022
220
0.104
221
0.204
222
223
Page 110
-1.416
375.0 , 375.0
0.234
0.140
375.0 , 375.0
-0.037
-4.088
375.0 , 375.0
-0.018
0.181
375.0 , 375.0
14.042
-0.028
-4.133
375.0 , 375.0
0.007
-1.231
-0.009
0.136
375.0 , 375.0
0.043
-2.384
-0.056
0.266
375.0 , 375.0
0.175
0.037
-2.044
-0.048
0.228
375.0 , 375.0
-0.422
0.032
0.248
-0.042
-0.548
375.0 , 375.0
224
0.177
-0.064
-2.049
0.083
0.230
375.0 , 375.0
225
-1.018
0.028
2.540
-0.036
-1.324
375.0 , 375.0
226
0.178
-0.164
-2.055
0.214
0.232
375.0 , 375.0
227
-1.062
0.018
3.051
-0.024
-1.381
375.0 , 375.0
228
0.135
-0.174
-1.544
0.226
0.175
375.0 , 375.0
201
0.105
0.004
-1.285
-0.005
0.137
375.0 , 375.0
202
0.090
0.004
-1.102
-0.005
0.117
375.0 , 375.0
203
-1.020
-0.001
3.550
0.002
-1.327
375.0 , 375.0
204
0.091
-0.098
-1.116
0.127
0.118
375.0 , 375.0
205
-2.131
-0.006
8.202
0.008
-2.770
375.0 , 375.0
206
0.092
-0.200
-1.131
0.259
0.119
375.0 , 375.0
207
-2.153
-0.007
8.478
0.009
-2.799
375.0 , 375.0
208
0.069
-0.201
-0.855
0.261
0.090
375.0 , 375.0
209
0.298
0.020
-3.418
-0.025
0.388
375.0 , 375.0
210
0.256
0.017
-2.929
-0.022
0.332
375.0 , 375.0
211
-0.855
0.012
1.723
-0.016
-1.111
375.0 , 375.0
212
0.256
-0.085
-2.944
0.110
0.333
375.0 , 375.0
213
-1.965
0.007
6.375
-0.009
-2.555
375.0 , 375.0
214
0.257
-0.186
-2.958
0.242
0.334
375.0 , 375.0
215
-2.029
0.003
7.107
-0.004
-2.638
375.0 , 375.0
216
0.193
-0.191
-2.226
0.248
0.251
375.0 , 375.0
217
-3.028
0.017
12.369
-0.022
-3.936
375.0 , 375.0
218
0.254
0.000
-2.914
0.000
0.330
375.0 , 375.0
219
-3.092
0.013
13.101
-0.016
-4.019
375.0 , 375.0
220
0.190
-0.004
-2.182
0.005
0.247
375.0 , 375.0
221
0.379
0.027
-4.315
-0.035
0.493
375.0 , 375.0
222
0.325
0.023
-3.699
-0.030
0.423
375.0 , 375.0
223
-0.785
0.018
0.953
-0.023
-1.021
375.0 , 375.0
224
0.326
-0.079
-3.713
0.102
0.424
375.0 , 375.0
225
-1.896
0.013
5.605
-0.017
-2.464
375.0 , 375.0
226
0.327
-0.180
-3.727
0.235
0.425
375.0 , 375.0
227
-1.977
0.008
6.530
-0.010
-2.570
375.0 , 375.0
228
0.245
-0.186
-2.803
0.242
0.319
375.0 , 375.0
201
0.113
0.003
-1.378
-0.004
0.147
375.0 , 375.0
202
0.097
0.002
-1.181
-0.003
0.126
375.0 , 375.0
S1
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
203
F82 p
-0.985
-0.001
3.333
0.001
204
0.096
-0.099
-1.167
205
-2.068
-0.004
7.848
206
0.094
-0.201
207
-2.092
208
209
Page 111
-1.281
375.0 , 375.0
0.129
0.124
375.0 , 375.0
0.005
-2.688
375.0 , 375.0
-1.154
0.261
0.122
375.0 , 375.0
-0.005
8.143
0.006
-2.719
375.0 , 375.0
0.070
-0.201
-0.859
0.262
0.091
375.0 , 375.0
0.328
0.001
-3.756
-0.002
0.426
375.0 , 375.0
210
0.281
0.001
-3.220
-0.002
0.365
375.0 , 375.0
211
-0.802
-0.002
1.295
0.003
-1.042
375.0 , 375.0
212
0.279
-0.100
-3.206
0.131
0.363
375.0 , 375.0
213
-1.884
-0.005
5.809
0.007
-2.449
375.0 , 375.0
214
0.278
-0.202
-3.193
0.263
0.361
375.0 , 375.0
215
-1.954
-0.006
6.614
0.007
-2.540
375.0 , 375.0
216
0.207
-0.202
-2.388
0.263
0.270
375.0 , 375.0
217
-3.004
0.003
12.044
-0.004
-3.905
375.0 , 375.0
218
0.282
-0.015
-3.238
0.020
0.367
375.0 , 375.0
219
-3.074
0.002
12.849
-0.003
-3.997
375.0 , 375.0
220
0.212
-0.016
-2.433
0.020
0.276
375.0 , 375.0
221
0.419
0.000
-4.757
0.000
0.544
375.0 , 375.0
222
0.359
0.000
-4.078
0.000
0.466
375.0 , 375.0
223
-0.724
-0.003
0.437
0.004
-0.941
375.0 , 375.0
224
0.357
-0.102
-4.064
0.132
0.464
375.0 , 375.0
225
-1.806
-0.006
4.951
0.008
-2.348
375.0 , 375.0
226
0.356
-0.203
-4.051
0.264
0.462
375.0 , 375.0
227
-1.896
-0.006
5.970
0.008
-2.464
375.0 , 375.0
228
0.266
-0.203
-3.031
0.264
0.346
375.0 , 375.0
201
0.113
0.000
-1.379
0.000
0.147
375.0 , 375.0
202
0.097
0.000
-1.182
0.000
0.126
375.0 , 375.0
203
-0.987
-0.003
3.352
0.004
-1.283
375.0 , 375.0
204
0.080
-0.102
-0.935
0.133
0.105
375.0 , 375.0
205
-2.071
-0.006
7.887
0.008
-2.692
375.0 , 375.0
206
0.064
-0.205
-0.688
0.266
0.083
375.0 , 375.0
207
-2.095
-0.006
8.182
0.008
-2.724
375.0 , 375.0
208
0.039
-0.205
-0.392
0.266
0.051
375.0 , 375.0
209
0.329
0.010
-3.761
-0.013
0.428
375.0 , 375.0
210
0.282
0.008
-3.223
-0.011
0.367
375.0 , 375.0
211
-0.802
0.005
1.311
-0.007
-1.043
375.0 , 375.0
212
0.265
-0.094
-2.976
0.122
0.345
375.0 , 375.0
213
-1.886
0.002
5.845
-0.003
-2.452
375.0 , 375.0
214
0.248
-0.196
-2.729
0.255
0.323
375.0 , 375.0
215
-1.957
0.000
6.651
0.000
-2.543
375.0 , 375.0
216
0.178
-0.199
-1.923
0.258
0.231
375.0 , 375.0
217
-2.993
0.013
11.946
-0.017
-3.890
375.0 , 375.0
218
0.270
-0.008
-3.088
0.011
0.351
375.0 , 375.0
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F83 p
219
-3.063
0.011
12.752
220
0.199
-0.010
221
0.419
0.014
222
0.359
223
Page 112
-0.014
-3.982
375.0 , 375.0
-2.283
0.013
0.259
375.0 , 375.0
-4.763
-0.018
0.544
375.0 , 375.0
0.012
-4.083
-0.016
0.466
375.0 , 375.0
-0.725
0.009
0.452
-0.011
-0.943
375.0 , 375.0
224
0.342
-0.090
-3.835
0.118
0.445
375.0 , 375.0
225
-1.809
0.006
4.986
-0.007
-2.352
375.0 , 375.0
226
0.325
-0.193
-3.588
0.251
0.423
375.0 , 375.0
227
-1.899
0.003
6.007
-0.003
-2.469
375.0 , 375.0
228
0.235
-0.196
-2.568
0.255
0.306
375.0 , 375.0
201
0.032
-0.108
-1.005
0.140
0.042
375.0 , 375.0
202
0.028
-0.092
-0.862
0.120
0.036
375.0 , 375.0
203
-0.755
0.022
1.401
-0.029
-0.981
375.0 , 375.0
204
0.232
-1.516
-5.487
1.971
0.301
375.0 , 375.0
205
-1.537
0.136
3.663
-0.177
-1.998
375.0 , 375.0
206
0.436
-2.940
-10.113
3.823
0.566
375.0 , 375.0
207
-1.544
0.160
3.878
-0.207
-2.007
375.0 , 375.0
208
0.429
-2.917
-9.898
3.792
0.557
375.0 , 375.0
209
0.113
-0.357
-2.895
0.464
0.147
375.0 , 375.0
210
0.097
-0.306
-2.482
0.398
0.126
375.0 , 375.0
211
-0.685
-0.192
-0.219
0.249
-0.891
375.0 , 375.0
212
0.301
-1.730
-7.107
2.249
0.392
375.0 , 375.0
213
-1.468
-0.077
2.043
0.100
-1.908
375.0 , 375.0
214
0.505
-3.154
-11.733
4.100
0.657
375.0 , 375.0
215
-1.492
-0.001
2.663
0.001
-1.939
375.0 , 375.0
216
0.481
-3.078
-11.113
4.001
0.625
375.0 , 375.0
217
-1.904
0.138
4.595
-0.179
-2.475
375.0 , 375.0
218
0.261
-0.891
-4.685
1.158
0.339
375.0 , 375.0
219
-1.928
0.215
5.216
-0.279
-2.507
375.0 , 375.0
220
0.236
-0.814
-4.065
1.059
0.307
375.0 , 375.0
221
0.148
-0.461
-3.691
0.599
0.193
375.0 , 375.0
222
0.127
-0.395
-3.163
0.513
0.165
375.0 , 375.0
223
-0.655
-0.280
-0.901
0.365
-0.852
375.0 , 375.0
224
0.331
-1.819
-7.789
2.364
0.431
375.0 , 375.0
225
-1.438
-0.166
1.361
0.216
-1.869
375.0 , 375.0
226
0.535
-3.243
-12.415
4.216
0.696
375.0 , 375.0
227
-1.469
-0.067
2.152
0.087
-1.910
375.0 , 375.0
228
0.503
-3.144
-11.624
4.087
0.654
375.0 , 375.0
201
-0.064
0.013
-0.825
-0.016
-0.084
375.0 , 375.0
202
-0.055
0.011
-0.707
-0.014
-0.072
375.0 , 375.0
203
-0.653
0.016
-2.999
-0.020
-0.849
375.0 , 375.0
204
-0.054
-0.082
-0.699
0.107
-0.070
375.0 , 375.0
205
-1.250
0.020
-5.291
-0.027
-1.626
375.0 , 375.0
206
-0.052
-0.175
-0.691
0.227
-0.068
375.0 , 375.0
S1
F84 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F85 p
207
-1.237
0.018
-5.114
208
-0.038
-0.177
209
-0.162
0.034
210
-0.139
211
Page 113
-0.023
-1.608
375.0 , 375.0
-0.514
0.231
-0.050
375.0 , 375.0
-1.922
-0.044
-0.211
375.0 , 375.0
0.029
-1.648
-0.037
-0.181
375.0 , 375.0
-0.737
0.034
-3.940
-0.044
-0.958
375.0 , 375.0
212
-0.138
-0.064
-1.640
0.083
-0.179
375.0 , 375.0
213
-1.334
0.038
-6.232
-0.050
-1.735
375.0 , 375.0
214
-0.136
-0.157
-1.632
0.204
-0.177
375.0 , 375.0
215
-1.300
0.031
-5.820
-0.041
-1.689
375.0 , 375.0
216
-0.101
-0.164
-1.220
0.213
-0.132
375.0 , 375.0
217
-3.429
0.029
-16.925
-0.037
-4.457
375.0 , 375.0
218
-0.139
0.014
-1.643
-0.018
-0.181
375.0 , 375.0
219
-3.394
0.022
-16.513
-0.028
-4.412
375.0 , 375.0
220
-0.104
0.007
-1.231
-0.009
-0.136
375.0 , 375.0
221
-0.204
0.043
-2.384
-0.056
-0.266
375.0 , 375.0
222
-0.175
0.037
-2.044
-0.048
-0.228
375.0 , 375.0
223
-0.773
0.042
-4.336
-0.055
-1.005
375.0 , 375.0
224
-0.174
-0.056
-2.036
0.072
-0.226
375.0 , 375.0
225
-1.370
0.047
-6.628
-0.061
-1.782
375.0 , 375.0
226
-0.172
-0.148
-2.028
0.193
-0.224
375.0 , 375.0
227
-1.327
0.037
-6.117
-0.049
-1.725
375.0 , 375.0
228
-0.128
-0.158
-1.517
0.205
-0.167
375.0 , 375.0
201
-0.105
0.004
-1.285
-0.005
-0.137
375.0 , 375.0
202
-0.090
0.004
-1.102
-0.005
-0.117
375.0 , 375.0
203
-1.202
0.008
-5.753
-0.011
-1.563
375.0 , 375.0
204
-0.092
-0.089
-1.129
0.116
-0.120
375.0 , 375.0
205
-2.314
0.013
-10.404
-0.017
-3.008
375.0 , 375.0
206
-0.095
-0.182
-1.156
0.237
-0.123
375.0 , 375.0
207
-2.292
0.012
-10.129
-0.016
-2.979
375.0 , 375.0
208
-0.072
-0.183
-0.881
0.238
-0.094
375.0 , 375.0
209
-0.298
0.020
-3.419
-0.025
-0.388
375.0 , 375.0
210
-0.256
0.017
-2.931
-0.022
-0.332
375.0 , 375.0
211
-1.368
0.022
-7.582
-0.028
-1.778
375.0 , 375.0
212
-0.258
-0.076
-2.958
0.099
-0.335
375.0 , 375.0
213
-2.480
0.026
-12.233
-0.034
-3.223
375.0 , 375.0
214
-0.260
-0.169
-2.985
0.219
-0.339
375.0 , 375.0
215
-2.416
0.022
-11.500
-0.029
-3.140
375.0 , 375.0
216
-0.197
-0.173
-2.252
0.225
-0.255
375.0 , 375.0
217
-3.545
0.017
-18.228
-0.022
-4.609
375.0 , 375.0
218
-0.254
0.000
-2.916
0.000
-0.330
375.0 , 375.0
219
-3.481
0.013
-17.495
-0.016
-4.526
375.0 , 375.0
220
-0.190
-0.004
-2.183
0.005
-0.247
375.0 , 375.0
221
-0.379
0.027
-4.316
-0.035
-0.493
375.0 , 375.0
222
-0.325
0.023
-3.700
-0.030
-0.423
375.0 , 375.0
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F86 p
223
-1.437
0.028
224
-0.328
-0.070
225
-2.549
0.032
226
-0.330
-0.163
227
-2.468
228
201
-8.351
Page 114
-0.036
-1.868
375.0 , 375.0
-3.727
0.091
-0.426
375.0 , 375.0
-13.002
-0.042
-3.314
375.0 , 375.0
-3.754
0.212
-0.429
375.0 , 375.0
0.027
-12.077
-0.035
-3.208
375.0 , 375.0
-0.249
-0.168
-2.829
0.219
-0.323
375.0 , 375.0
-0.113
0.003
-1.376
-0.004
-0.147
375.0 , 375.0
202
-0.097
0.002
-1.180
-0.003
-0.126
375.0 , 375.0
203
-1.181
0.006
-5.694
-0.007
-1.536
375.0 , 375.0
204
-0.095
-0.090
-1.156
0.116
-0.123
375.0 , 375.0
205
-2.265
0.009
-10.209
-0.011
-2.945
375.0 , 375.0
206
-0.092
-0.182
-1.132
0.236
-0.120
375.0 , 375.0
207
-2.241
0.008
-9.914
-0.011
-2.913
375.0 , 375.0
208
-0.068
-0.182
-0.837
0.237
-0.089
375.0 , 375.0
209
-0.328
0.001
-3.754
-0.002
-0.426
375.0 , 375.0
210
-0.281
0.001
-3.217
-0.002
-0.365
375.0 , 375.0
211
-1.365
0.004
-7.732
-0.006
-1.774
375.0 , 375.0
212
-0.278
-0.091
-3.193
0.118
-0.362
375.0 , 375.0
213
-2.449
0.008
-12.246
-0.010
-3.183
375.0 , 375.0
214
-0.276
-0.183
-3.169
0.238
-0.359
375.0 , 375.0
215
-2.379
0.007
-11.442
-0.009
-3.092
375.0 , 375.0
216
-0.206
-0.183
-2.365
0.238
-0.268
375.0 , 375.0
217
-3.572
0.000
-18.483
0.000
-4.643
375.0 , 375.0
218
-0.282
-0.015
-3.235
0.020
-0.367
375.0 , 375.0
219
-3.502
-0.001
-17.679
0.001
-4.552
375.0 , 375.0
220
-0.212
-0.016
-2.431
0.020
-0.276
375.0 , 375.0
221
-0.419
0.000
-4.753
0.000
-0.544
375.0 , 375.0
222
-0.359
0.000
-4.074
0.000
-0.466
375.0 , 375.0
223
-1.443
0.003
-8.589
-0.004
-1.876
375.0 , 375.0
224
-0.356
-0.092
-4.050
0.120
-0.463
375.0 , 375.0
225
-2.527
0.006
-13.103
-0.008
-3.285
375.0 , 375.0
226
-0.354
-0.184
-4.026
0.239
-0.460
375.0 , 375.0
227
-2.437
0.006
-12.084
-0.008
-3.168
375.0 , 375.0
228
-0.264
-0.184
-3.008
0.239
-0.344
375.0 , 375.0
201
-0.113
0.000
-1.378
0.000
-0.147
375.0 , 375.0
202
-0.097
0.000
-1.181
0.000
-0.126
375.0 , 375.0
203
-1.183
0.003
-5.715
-0.004
-1.538
375.0 , 375.0
204
-0.076
-0.093
-1.014
0.121
-0.099
375.0 , 375.0
205
-2.268
0.006
-10.250
-0.008
-2.949
375.0 , 375.0
206
-0.056
-0.186
-0.847
0.241
-0.072
375.0 , 375.0
207
-2.244
0.006
-9.955
-0.008
-2.917
375.0 , 375.0
208
-0.031
-0.186
-0.551
0.241
-0.041
375.0 , 375.0
209
-0.329
0.010
-3.756
-0.013
-0.428
375.0 , 375.0
210
-0.282
0.008
-3.220
-0.011
-0.367
375.0 , 375.0
S1
F87 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F88 p
211
-1.368
0.012
212
-0.261
-0.084
213
-2.453
0.015
214
-0.240
-0.177
215
-2.383
0.013
216
-0.170
-0.179
217
-3.562
0.004
218
-0.270
-0.008
219
-3.492
220
221
-7.754
Page 115
-0.015
-1.778
375.0 , 375.0
-3.053
0.110
-0.340
375.0 , 375.0
-12.289
-0.019
-3.189
375.0 , 375.0
-2.885
0.230
-0.313
375.0 , 375.0
-11.484
-0.017
-3.098
375.0 , 375.0
-2.080
0.233
-0.221
375.0 , 375.0
-18.391
-0.005
-4.631
375.0 , 375.0
-3.085
0.011
-0.351
375.0 , 375.0
0.002
-17.586
-0.002
-4.540
375.0 , 375.0
-0.199
-0.010
-2.280
0.013
-0.259
375.0 , 375.0
-0.419
0.014
-4.757
-0.018
-0.544
375.0 , 375.0
222
-0.359
0.012
-4.078
-0.016
-0.466
375.0 , 375.0
223
-1.444
0.015
-8.612
-0.020
-1.878
375.0 , 375.0
224
-0.338
-0.081
-3.911
0.105
-0.439
375.0 , 375.0
225
-2.530
0.018
-13.147
-0.024
-3.289
375.0 , 375.0
226
-0.317
-0.174
-3.743
0.226
-0.412
375.0 , 375.0
227
-2.440
0.015
-12.127
-0.020
-3.172
375.0 , 375.0
228
-0.227
-0.177
-2.724
0.230
-0.296
375.0 , 375.0
201
-0.101
-0.094
-0.910
0.122
-0.131
375.0 , 375.0
202
-0.086
-0.080
-0.780
0.105
-0.112
375.0 , 375.0
203
-0.878
-0.216
-3.215
0.281
-1.142
375.0 , 375.0
204
-0.440
-1.047
-4.236
1.361
-0.572
375.0 , 375.0
205
-1.670
-0.352
-5.651
0.458
-2.172
375.0 , 375.0
206
-0.794
-2.013
-7.692
2.617
-1.032
375.0 , 375.0
207
-1.649
-0.332
-5.456
0.432
-2.143
375.0 , 375.0
208
-0.772
-1.993
-7.497
2.591
-1.004
375.0 , 375.0
209
-0.305
-0.315
-2.578
0.410
-0.397
375.0 , 375.0
210
-0.262
-0.270
-2.209
0.351
-0.340
375.0 , 375.0
211
-1.054
-0.406
-4.645
0.528
-1.370
375.0 , 375.0
212
-0.615
-1.236
-5.665
1.607
-0.800
375.0 , 375.0
213
-1.846
-0.542
-7.080
0.705
-2.399
375.0 , 375.0
214
-0.969
-2.203
-9.121
2.864
-1.259
375.0 , 375.0
215
-1.780
-0.475
-6.527
0.617
-2.314
375.0 , 375.0
216
-0.903
-2.135
-8.569
2.776
-1.174
375.0 , 375.0
217
-2.300
-0.757
-9.855
0.985
-2.990
375.0 , 375.0
218
-0.406
-0.857
-4.371
1.113
-0.527
375.0 , 375.0
219
-2.235
-0.690
-9.303
0.897
-2.905
375.0 , 375.0
220
-0.340
-0.789
-3.819
1.026
-0.442
375.0 , 375.0
221
-0.391
-0.407
-3.280
0.530
-0.508
375.0 , 375.0
222
-0.335
-0.349
-2.812
0.454
-0.435
375.0 , 375.0
223
-1.127
-0.485
-5.247
0.631
-1.465
375.0 , 375.0
224
-0.688
-1.316
-6.268
1.710
-0.895
375.0 , 375.0
225
-1.919
-0.621
-7.682
0.808
-2.494
375.0 , 375.0
226
-1.042
-2.282
-9.724
2.967
-1.355
375.0 , 375.0
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 116
227
-1.835
-0.534
-6.979
0.694
-2.386
375.0 , 375.0
228
-0.958
-2.195
-9.021
2.853
-1.246
375.0 , 375.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 117
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Uni-Axial)
4.1.1 Formula
if footing is checked in Buoyancy Fz means Fz - Fb
Fz
My X
Fz
- Uni Axial : Rx =
, Ry =
2
Np
Np
Xi
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va -> OK
Max(Hxi , Hyi)
b. Horizontal - Hmax =
< Ha -> OK
Np
c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift
Mx Y
2
Yi
Np(EA)
Fl (mm)
Fw (mm)
Xi (m )
Yi (m )
F65
750
750
F66
750
750
F67
750
750
F68
750
750
F69
750
750
F70
750
750
F71
750
750
F72
750
750
F73
750
750
F74
750
750
F75
750
750
F76
750
750
F77
750
750
F78
750
750
F79
750
750
F80
750
750
F81
750
750
F82
750
750
F83
750
750
F84
750
750
F85
750
750
F86
750
750
F87
750
750
F88
750
750
Unit( tonf )
Ft.Name
L.Comb.
F65
124
F66
125
Pile
R Max
R Min
PS-12
D.300 12M
X-Dir
4.078
4.078
Y-Dir
4.078
4.078
PS-12
X-Dir
6.559
6.559
Ru
Uf
Ra
Ua
Result
4.078
58.022
13.4
OK
6.559
77.361
17.866
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F67
F68
F69
F70
F71
F72
F73
F74
F75
F76
F77
F78
F79
F80
F81
F82
F83
F84
F85
F86
F87
F88
124
125
126
124
124
124
124
125
125
125
125
126
124
124
124
124
126
117
117
117
117
126
PS-12
D.300 12M
Y-Dir
6.559
6.559
X-Dir
5.128
5.128
Y-Dir
5.128
5.128
PS-12
D.300 12M
X-Dir
8.981
8.981
Y-Dir
8.981
8.981
PS-12
D.300 12M
X-Dir
17.569
17.569
Y-Dir
17.569
17.569
PS-12
D.300 12M
X-Dir
7.928
7.928
Y-Dir
7.928
7.928
PS-12
D.300 12M
X-Dir
4.544
4.544
Y-Dir
4.544
4.544
PS-12
D.300 12M
X-Dir
7.786
7.786
Y-Dir
7.786
7.786
PS-12
D.300 12M
X-Dir
7.766
7.766
Y-Dir
7.766
7.766
PS-12
D.300 12M
X-Dir
14.727
14.727
Y-Dir
14.727
14.727
PS-12
D.300 12M
X-Dir
12.998
12.998
Y-Dir
12.998
12.998
PS-12
D.300 12M
X-Dir
14.646
14.646
Y-Dir
14.646
14.646
PS-12
D.300 12M
X-Dir
14.32
14.32
Y-Dir
14.32
14.32
PS-12
D.300 12M
X-Dir
19.153
19.153
Y-Dir
19.153
19.153
PS-12
D.300 12M
X-Dir
2.757
2.757
Y-Dir
2.757
2.757
PS-12
D.300 12M
X-Dir
4.136
4.136
Y-Dir
4.136
4.136
PS-12
D.300 12M
X-Dir
4.452
4.452
Y-Dir
4.452
4.452
PS-12
D.300 12M
X-Dir
4.456
4.456
Y-Dir
4.456
4.456
PS-12
D.300 12M
X-Dir
9.472
9.472
Y-Dir
9.472
9.472
PS-12
D.300 12M
X-Dir
9.557
9.557
Y-Dir
9.557
9.557
PS-12
D.300 12M
X-Dir
10.635
10.635
Y-Dir
10.635
10.635
PS-12
D.300 12M
X-Dir
10.859
10.859
Y-Dir
10.859
10.859
PS-12
D.300 12M
X-Dir
10.817
10.817
Y-Dir
10.817
10.817
PS-12
X-Dir
7.717
7.717
Page 118
5.128
58.022
13.4
OK
8.981
77.361
17.866
OK
17.569
77.361
17.866
OK
7.928
58.022
13.4
OK
4.544
58.022
13.4
OK
7.786
58.022
13.4
OK
7.766
58.022
13.4
OK
14.727
77.361
17.866
OK
12.998
77.361
17.866
OK
14.646
77.361
17.866
OK
14.32
77.361
17.866
OK
19.153
77.361
17.866
OK
2.757
58.022
13.4
OK
4.136
58.022
13.4
OK
4.452
58.022
13.4
OK
4.456
58.022
13.4
OK
9.472
77.361
17.866
OK
9.557
77.361
17.866
OK
10.635
77.361
17.866
OK
10.859
77.361
17.866
OK
10.817
77.361
17.866
OK
7.717
77.361
17.866
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Y-Dir
7.717
Page 119
7.717
L.Comb.
Pile
Hmax (tonf)
Ha (tonf)
Result
F65
108
PS-12
D.300 12M
2.685
5.333
OK
F66
108
PS-12
D.300 12M
3.074
5.333
OK
F67
108
PS-12
D.300 12M
1.71
5.333
OK
F68
125
PS-12
D.300 12M
1.528
5.333
OK
F69
126
PS-12
D.300 12M
3.071
5.333
OK
F70
107
PS-12
D.300 12M
1.993
5.333
OK
F71
107
PS-12
D.300 12M
2.001
5.333
OK
F72
107
PS-12
D.300 12M
2.008
5.333
OK
F73
107
PS-12
D.300 12M
1.94
5.333
OK
F74
125
PS-12
D.300 12M
2.469
5.333
OK
F75
125
PS-12
D.300 12M
2.297
5.333
OK
F76
125
PS-12
D.300 12M
2.475
5.333
OK
F77
125
PS-12
D.300 12M
2.402
5.333
OK
F78
126
PS-12
D.300 12M
3.532
5.333
OK
F79
121
PS-12
D.300 12M
1.463
5.333
OK
F80
121
PS-12
D.300 12M
1.404
5.333
OK
F81
121
PS-12
D.300 12M
1.393
5.333
OK
F82
121
PS-12
D.300 12M
1.387
5.333
OK
F83
126
PS-12
D.300 12M
2.109
5.333
OK
F84
117
PS-12
D.300 12M
1.651
5.333
OK
F85
117
PS-12
D.300 12M
1.748
5.333
OK
F86
117
PS-12
D.300 12M
1.77
5.333
OK
F87
117
PS-12
D.300 12M
1.766
5.333
OK
F88
126
PS-12
D.300 12M
1.499
5.333
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 120
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
5.1.1 Data
Ft.Name
Sec.Na
Dir.
F65 p
S1
S1
L.Comb.
Fl or Fw
Sl or Sw
Fz
201
750.00
750.00
0.968
0.13
0.968
202
750.00
750.00
0.829
0.11
0.829
203
750.00
750.00
-2.312
-1.07
-2.312
204
750.00
750.00
-7.567
-0.55
-7.567
205
750.00
750.00
-5.454
-2.25
-5.454
206
750.00
750.00
-15.964
-1.22
-15.964
207
750.00
750.00
-5.661
-2.28
-5.661
208
750.00
750.00
-16.172
-1.24
-16.172
209
750.00
750.00
3.266
0.39
3.266
210
750.00
750.00
2.800
0.34
2.800
211
750.00
750.00
-0.342
-0.85
-0.342
212
750.00
750.00
-5.597
-0.33
-5.597
213
750.00
750.00
-3.483
-2.03
-3.483
214
750.00
750.00
-13.994
-0.99
-13.994
215
750.00
750.00
-4.183
-2.11
-4.183
216
750.00
750.00
-14.694
-1.08
-14.694
217
750.00
750.00
-2.314
-1.97
-2.314
218
750.00
750.00
-3.925
-0.09
-3.925
219
750.00
750.00
-3.014
-2.06
-3.014
220
750.00
750.00
-4.625
-0.18
-4.625
221
750.00
750.00
4.234
0.50
4.234
222
750.00
750.00
3.629
0.43
3.629
223
750.00
750.00
0.487
-0.75
0.487
224
750.00
750.00
-4.768
-0.24
-4.768
225
750.00
750.00
-2.654
-1.93
-2.654
226
750.00
750.00
-13.165
-0.90
-13.165
227
750.00
750.00
-3.561
-2.04
-3.561
228
750.00
750.00
-14.072
-1.01
-14.072
201
750.00
750.00
0.968
-0.151
0.968
202
750.00
750.00
0.829
-0.129
0.829
203
750.00
750.00
-2.312
0.455
-2.312
204
750.00
750.00
-7.567
2.715
-7.567
205
750.00
750.00
-5.454
1.039
-5.454
206
750.00
750.00
-15.964
5.559
-15.964
207
750.00
750.00
-5.661
1.072
-5.661
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F66 p
S1
Page 121
208
750.00
750.00
-16.172
5.592
-16.172
209
750.00
750.00
3.266
-0.672
3.266
210
750.00
750.00
2.800
-0.576
2.800
211
750.00
750.00
-0.342
0.009
-0.342
212
750.00
750.00
-5.597
2.269
-5.597
213
750.00
750.00
-3.483
0.593
-3.483
214
750.00
750.00
-13.994
5.113
-13.994
215
750.00
750.00
-4.183
0.737
-4.183
216
750.00
750.00
-14.694
5.257
-14.694
217
750.00
750.00
-2.314
0.154
-2.314
218
750.00
750.00
-3.925
1.616
-3.925
219
750.00
750.00
-3.014
0.298
-3.014
220
750.00
750.00
-4.625
1.760
-4.625
221
750.00
750.00
4.234
-0.890
4.234
222
750.00
750.00
3.629
-0.763
3.629
223
750.00
750.00
0.487
-0.178
0.487
224
750.00
750.00
-4.768
2.082
-4.768
225
750.00
750.00
-2.654
0.406
-2.654
226
750.00
750.00
-13.165
4.926
-13.165
227
750.00
750.00
-3.561
0.597
-3.561
228
750.00
750.00
-14.072
5.117
-14.072
201
750.00
750.00
1.171
-0.04
1.171
202
750.00
750.00
1.003
-0.03
1.003
203
750.00
750.00
2.503
-1.12
2.503
204
750.00
750.00
-8.306
0.46
-8.306
205
750.00
750.00
4.003
-2.21
4.003
206
750.00
750.00
-17.616
0.96
-17.616
207
750.00
750.00
3.753
-2.20
3.753
208
750.00
750.00
-17.867
0.97
-17.867
209
750.00
750.00
3.923
-0.12
3.923
210
750.00
750.00
3.363
-0.10
3.363
211
750.00
750.00
4.863
-1.19
4.863
212
750.00
750.00
-5.947
0.39
-5.947
213
750.00
750.00
6.363
-2.28
6.363
214
750.00
750.00
-15.257
0.89
-15.257
215
750.00
750.00
5.522
-2.25
5.522
216
750.00
750.00
-16.097
0.91
-16.097
217
750.00
750.00
7.968
-2.41
7.968
218
750.00
750.00
-3.378
0.36
-3.378
219
750.00
750.00
7.127
-2.39
7.127
220
750.00
750.00
-4.219
0.39
-4.219
221
750.00
750.00
5.082
-0.15
5.082
222
750.00
750.00
4.356
-0.13
4.356
223
750.00
750.00
5.856
-1.22
5.856
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
750.00
750.00
225
750.00
226
750.00
227
Page 122
-4.953
0.36
-4.953
750.00
7.356
-2.31
7.356
750.00
-14.263
0.86
-14.263
750.00
750.00
6.267
-2.28
6.267
228
750.00
750.00
-15.352
0.89
-15.352
201
750.00
750.00
1.171
-0.175
1.171
202
750.00
750.00
1.003
-0.150
1.003
203
750.00
750.00
2.503
-0.222
2.503
204
750.00
750.00
-8.306
3.108
-8.306
205
750.00
750.00
4.003
-0.293
4.003
206
750.00
750.00
-17.616
6.365
-17.616
207
750.00
750.00
3.753
-0.256
3.753
208
750.00
750.00
-17.867
6.402
-17.867
209
750.00
750.00
3.923
-0.741
3.923
210
750.00
750.00
3.363
-0.635
3.363
211
750.00
750.00
4.863
-0.707
4.863
212
750.00
750.00
-5.947
2.622
-5.947
213
750.00
750.00
6.363
-0.778
6.363
214
750.00
750.00
-15.257
5.880
-15.257
215
750.00
750.00
5.522
-0.620
5.522
216
750.00
750.00
-16.097
6.038
-16.097
217
750.00
750.00
7.968
-1.263
7.968
218
750.00
750.00
-3.378
1.553
-3.378
219
750.00
750.00
7.127
-1.104
7.127
220
750.00
750.00
-4.219
1.712
-4.219
221
750.00
750.00
5.082
-0.979
5.082
222
750.00
750.00
4.356
-0.839
4.356
223
750.00
750.00
5.856
-0.911
5.856
224
750.00
750.00
-4.953
2.418
-4.953
225
750.00
750.00
7.356
-0.983
7.356
226
750.00
750.00
-14.263
5.675
-14.263
227
750.00
750.00
6.267
-0.773
6.267
228
750.00
750.00
-15.352
5.885
-15.352
201
750.00
750.00
1.476
0.10
1.476
202
750.00
750.00
1.265
0.09
1.265
203
750.00
750.00
-1.867
-1.05
-1.867
204
750.00
750.00
-3.131
-0.16
-3.131
205
750.00
750.00
-4.999
-2.19
-4.999
206
750.00
750.00
-7.527
-0.41
-7.527
207
750.00
750.00
-5.315
-2.21
-5.315
208
750.00
750.00
-7.843
-0.43
-7.843
209
750.00
750.00
4.451
0.33
4.451
210
750.00
750.00
3.815
0.29
3.815
211
750.00
750.00
0.683
-0.85
0.683
F67 p
S1
224
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 123
212
750.00
750.00
-0.581
0.04
-0.581
213
750.00
750.00
-2.449
-1.99
-2.449
214
750.00
750.00
-4.977
-0.21
-4.977
215
750.00
750.00
-3.403
-2.06
-3.403
216
750.00
750.00
-5.931
-0.28
-5.931
217
750.00
750.00
-1.731
-1.68
-1.731
218
750.00
750.00
1.748
0.09
1.748
219
750.00
750.00
-2.684
-1.75
-2.684
220
750.00
750.00
0.794
0.02
0.794
221
750.00
750.00
5.704
0.43
5.704
222
750.00
750.00
4.889
0.37
4.889
223
750.00
750.00
1.757
-0.77
1.757
224
750.00
750.00
0.493
0.12
0.493
225
750.00
750.00
-1.375
-1.90
-1.375
226
750.00
750.00
-3.903
-0.13
-3.903
227
750.00
750.00
-2.597
-2.00
-2.597
228
750.00
750.00
-5.125
-0.22
-5.125
201
750.00
750.00
1.476
-0.116
1.476
202
750.00
750.00
1.265
-0.100
1.265
203
750.00
750.00
-1.867
0.234
-1.867
204
750.00
750.00
-3.131
1.718
-3.131
205
750.00
750.00
-4.999
0.568
-4.999
206
750.00
750.00
-7.527
3.536
-7.527
207
750.00
750.00
-5.315
0.593
-5.315
208
750.00
750.00
-7.843
3.561
-7.843
209
750.00
750.00
4.451
-0.379
4.451
210
750.00
750.00
3.815
-0.324
3.815
211
750.00
750.00
0.683
0.009
0.683
212
750.00
750.00
-0.581
1.493
-0.581
213
750.00
750.00
-2.449
0.343
-2.449
214
750.00
750.00
-4.977
3.311
-4.977
215
750.00
750.00
-3.403
0.424
-3.403
216
750.00
750.00
-5.931
3.392
-5.931
217
750.00
750.00
-1.731
0.255
-1.731
218
750.00
750.00
1.748
0.418
1.748
219
750.00
750.00
-2.684
0.336
-2.684
220
750.00
750.00
0.794
0.500
0.794
221
750.00
750.00
5.704
-0.490
5.704
222
750.00
750.00
4.889
-0.420
4.889
223
750.00
750.00
1.757
-0.086
1.757
224
750.00
750.00
0.493
1.398
0.493
225
750.00
750.00
-1.375
0.248
-1.375
226
750.00
750.00
-3.903
3.216
-3.903
227
750.00
750.00
-2.597
0.353
-2.597
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F68 p
S1
S1
Page 124
228
750.00
750.00
-5.125
3.321
-5.125
201
750.00
750.00
1.389
-0.19
1.389
202
750.00
750.00
1.191
-0.16
1.191
203
750.00
750.00
4.473
-1.31
4.473
204
750.00
750.00
-2.084
0.27
-2.084
205
750.00
750.00
7.755
-2.47
7.755
206
750.00
750.00
-5.358
0.69
-5.358
207
750.00
750.00
7.458
-2.43
7.458
208
750.00
750.00
-5.656
0.74
-5.656
209
750.00
750.00
4.179
-0.59
4.179
210
750.00
750.00
3.582
-0.51
3.582
211
750.00
750.00
6.865
-1.66
6.865
212
750.00
750.00
0.308
-0.08
0.308
213
750.00
750.00
10.147
-2.81
10.147
214
750.00
750.00
-2.967
0.35
-2.967
215
750.00
750.00
9.251
-2.69
9.251
216
750.00
750.00
-3.862
0.48
-3.862
217
750.00
750.00
9.582
-2.52
9.582
218
750.00
750.00
1.557
-0.34
1.557
219
750.00
750.00
8.687
-2.39
8.687
220
750.00
750.00
0.662
-0.21
0.662
221
750.00
750.00
5.354
-0.76
5.354
222
750.00
750.00
4.589
-0.66
4.589
223
750.00
750.00
7.871
-1.81
7.871
224
750.00
750.00
1.315
-0.23
1.315
225
750.00
750.00
11.154
-2.96
11.154
226
750.00
750.00
-1.960
0.20
-1.960
227
750.00
750.00
10.007
-2.80
10.007
228
750.00
750.00
-3.107
0.37
-3.107
201
750.00
750.00
1.389
-0.098
1.389
202
750.00
750.00
1.191
-0.084
1.191
203
750.00
750.00
4.473
-0.427
4.473
204
750.00
750.00
-2.084
1.148
-2.084
205
750.00
750.00
7.755
-0.771
7.755
206
750.00
750.00
-5.358
2.381
-5.358
207
750.00
750.00
7.458
-0.750
7.458
208
750.00
750.00
-5.656
2.402
-5.656
209
750.00
750.00
4.179
-0.324
4.179
210
750.00
750.00
3.582
-0.278
3.582
211
750.00
750.00
6.865
-0.621
6.865
212
750.00
750.00
0.308
0.955
0.308
213
750.00
750.00
10.147
-0.964
10.147
214
750.00
750.00
-2.967
2.187
-2.967
215
750.00
750.00
9.251
-0.895
9.251
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F69 p
S1
S1
Page 125
216
750.00
750.00
-3.862
2.257
-3.862
217
750.00
750.00
9.582
-0.917
9.582
218
750.00
750.00
1.557
0.465
1.557
219
750.00
750.00
8.687
-0.848
8.687
220
750.00
750.00
0.662
0.535
0.662
221
750.00
750.00
5.354
-0.419
5.354
222
750.00
750.00
4.589
-0.359
4.589
223
750.00
750.00
7.871
-0.702
7.871
224
750.00
750.00
1.315
0.874
1.315
225
750.00
750.00
11.154
-1.045
11.154
226
750.00
750.00
-1.960
2.106
-1.960
227
750.00
750.00
10.007
-0.956
10.007
228
750.00
750.00
-3.107
2.196
-3.107
201
750.00
750.00
1.550
0.18
1.550
202
750.00
750.00
1.329
0.15
1.329
203
750.00
750.00
-0.431
-1.23
-0.431
204
750.00
750.00
9.633
0.80
9.633
205
750.00
750.00
-2.191
-2.62
-2.191
206
750.00
750.00
17.938
1.45
17.938
207
750.00
750.00
-2.524
-2.65
-2.524
208
750.00
750.00
17.606
1.42
17.606
209
750.00
750.00
6.502
0.64
6.502
210
750.00
750.00
5.573
0.55
5.573
211
750.00
750.00
3.813
-0.83
3.813
212
750.00
750.00
13.878
1.20
13.878
213
750.00
750.00
2.053
-2.22
2.053
214
750.00
750.00
22.183
1.85
22.183
215
750.00
750.00
0.660
-2.35
0.660
216
750.00
750.00
20.789
1.71
20.789
217
750.00
750.00
-1.353
-2.69
-1.353
218
750.00
750.00
12.216
0.97
12.216
219
750.00
750.00
-2.746
-2.82
-2.746
220
750.00
750.00
10.823
0.83
10.823
221
750.00
750.00
8.588
0.84
8.588
222
750.00
750.00
7.361
0.72
7.361
223
750.00
750.00
5.601
-0.67
5.601
224
750.00
750.00
15.666
1.37
15.666
225
750.00
750.00
3.841
-2.05
3.841
226
750.00
750.00
23.971
2.02
23.971
227
750.00
750.00
2.001
-2.23
2.001
228
750.00
750.00
22.130
1.84
22.130
201
750.00
750.00
1.550
0.115
1.550
202
750.00
750.00
1.329
0.098
1.329
203
750.00
750.00
-0.431
0.224
-0.431
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F70 p
S1
204
750.00
750.00
205
750.00
206
750.00
207
Page 126
9.633
2.930
9.633
750.00
-2.191
0.350
-2.191
750.00
17.938
5.762
17.938
750.00
750.00
-2.524
0.325
-2.524
208
750.00
750.00
17.606
5.738
17.606
209
750.00
750.00
6.502
0.480
6.502
210
750.00
750.00
5.573
0.412
5.573
211
750.00
750.00
3.813
0.538
3.813
212
750.00
750.00
13.878
3.244
13.878
213
750.00
750.00
2.053
0.664
2.053
214
750.00
750.00
22.183
6.076
22.183
215
750.00
750.00
0.660
0.561
0.660
216
750.00
750.00
20.789
5.973
20.789
217
750.00
750.00
-1.353
-0.013
-1.353
218
750.00
750.00
12.216
2.592
12.216
219
750.00
750.00
-2.746
-0.116
-2.746
220
750.00
750.00
10.823
2.489
10.823
221
750.00
750.00
8.588
0.633
8.588
222
750.00
750.00
7.361
0.543
7.361
223
750.00
750.00
5.601
0.669
5.601
224
750.00
750.00
15.666
3.375
15.666
225
750.00
750.00
3.841
0.795
3.841
226
750.00
750.00
23.971
6.207
23.971
227
750.00
750.00
2.001
0.659
2.001
228
750.00
750.00
22.130
6.071
22.130
201
750.00
750.00
1.680
0.15
1.680
202
750.00
750.00
1.440
0.12
1.440
203
750.00
750.00
-3.981
-2.00
-3.981
204
750.00
750.00
1.498
0.14
1.498
205
750.00
750.00
-9.403
-4.12
-9.403
206
750.00
750.00
1.555
0.15
1.555
207
750.00
750.00
-9.763
-4.15
-9.763
208
750.00
750.00
1.195
0.12
1.195
209
750.00
750.00
7.270
0.59
7.270
210
750.00
750.00
6.232
0.50
6.232
211
750.00
750.00
0.810
-1.62
0.810
212
750.00
750.00
6.289
0.52
6.289
213
750.00
750.00
-4.611
-3.74
-4.611
214
750.00
750.00
6.347
0.53
6.347
215
750.00
750.00
-6.169
-3.87
-6.169
216
750.00
750.00
4.789
0.40
4.789
217
750.00
750.00
-3.326
-2.73
-3.326
218
750.00
750.00
6.266
0.51
6.266
219
750.00
750.00
-4.884
-2.85
-4.884
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 127
220
750.00
750.00
4.708
0.38
4.708
221
750.00
750.00
9.624
0.77
9.624
222
750.00
750.00
8.249
0.66
8.249
223
750.00
750.00
2.827
-1.46
2.827
224
750.00
750.00
8.307
0.67
8.307
225
750.00
750.00
-2.594
-3.58
-2.594
226
750.00
750.00
8.364
0.69
8.364
227
750.00
750.00
-4.656
-3.75
-4.656
228
750.00
750.00
6.302
0.52
6.302
201
750.00
750.00
1.680
-0.002
1.680
202
750.00
750.00
1.440
-0.002
1.440
203
750.00
750.00
-3.981
0.003
-3.981
204
750.00
750.00
1.498
0.128
1.498
205
750.00
750.00
-9.403
0.007
-9.403
206
750.00
750.00
1.555
0.258
1.555
207
750.00
750.00
-9.763
0.007
-9.763
208
750.00
750.00
1.195
0.259
1.195
209
750.00
750.00
7.270
-0.009
7.270
210
750.00
750.00
6.232
-0.008
6.232
211
750.00
750.00
0.810
-0.004
0.810
212
750.00
750.00
6.289
0.122
6.289
213
750.00
750.00
-4.611
0.001
-4.611
214
750.00
750.00
6.347
0.252
6.347
215
750.00
750.00
-6.169
0.002
-6.169
216
750.00
750.00
4.789
0.254
4.789
217
750.00
750.00
-3.326
-0.010
-3.326
218
750.00
750.00
6.266
0.021
6.266
219
750.00
750.00
-4.884
-0.008
-4.884
220
750.00
750.00
4.708
0.023
4.708
221
750.00
750.00
9.624
-0.011
9.624
222
750.00
750.00
8.249
-0.009
8.249
223
750.00
750.00
2.827
-0.005
2.827
224
750.00
750.00
8.307
0.121
8.307
225
750.00
750.00
-2.594
-0.001
-2.594
226
750.00
750.00
8.364
0.251
8.364
227
750.00
750.00
-4.656
0.001
-4.656
228
750.00
750.00
6.302
0.253
6.302
201
750.00
750.00
1.004
0.11
1.004
202
750.00
750.00
0.861
0.09
0.861
203
750.00
750.00
-4.578
-2.03
-4.578
204
750.00
750.00
0.265
0.04
0.265
205
750.00
750.00
-10.016
-4.14
-10.016
206
750.00
750.00
-0.331
-0.01
-0.331
207
750.00
750.00
-10.231
-4.17
-10.231
F71 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 128
208
750.00
750.00
-0.547
-0.03
-0.547
209
750.00
750.00
3.735
0.38
3.735
210
750.00
750.00
3.202
0.33
3.202
211
750.00
750.00
-2.237
-1.79
-2.237
212
750.00
750.00
2.606
0.28
2.606
213
750.00
750.00
-7.675
-3.91
-7.675
214
750.00
750.00
2.010
0.23
2.010
215
750.00
750.00
-8.475
-3.99
-8.475
216
750.00
750.00
1.209
0.15
1.209
217
750.00
750.00
-6.485
-3.04
-6.485
218
750.00
750.00
2.536
0.28
2.536
219
750.00
750.00
-7.286
-3.12
-7.286
220
750.00
750.00
1.735
0.19
1.735
221
750.00
750.00
4.886
0.50
4.886
222
750.00
750.00
4.188
0.42
4.188
223
750.00
750.00
-1.250
-1.69
-1.250
224
750.00
750.00
3.592
0.38
3.592
225
750.00
750.00
-6.689
-3.81
-6.689
226
750.00
750.00
2.996
0.33
2.996
227
750.00
750.00
-7.736
-3.92
-7.736
228
750.00
750.00
1.949
0.22
1.949
201
750.00
750.00
1.004
0.004
1.004
202
750.00
750.00
0.861
0.003
0.861
203
750.00
750.00
-4.578
0.011
-4.578
204
750.00
750.00
0.265
0.166
0.265
205
750.00
750.00
-10.016
0.020
-10.016
206
750.00
750.00
-0.331
0.330
-0.331
207
750.00
750.00
-10.231
0.019
-10.231
208
750.00
750.00
-0.547
0.329
-0.547
209
750.00
750.00
3.735
0.024
3.735
210
750.00
750.00
3.202
0.020
3.202
211
750.00
750.00
-2.237
0.029
-2.237
212
750.00
750.00
2.606
0.184
2.606
213
750.00
750.00
-7.675
0.037
-7.675
214
750.00
750.00
2.010
0.347
2.010
215
750.00
750.00
-8.475
0.032
-8.475
216
750.00
750.00
1.209
0.342
1.209
217
750.00
750.00
-6.485
0.018
-6.485
218
750.00
750.00
2.536
0.081
2.536
219
750.00
750.00
-7.286
0.013
-7.286
220
750.00
750.00
1.735
0.076
1.735
221
750.00
750.00
4.886
0.033
4.886
222
750.00
750.00
4.188
0.028
4.188
223
750.00
750.00
-1.250
0.036
-1.250
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F72 p
S1
S1
Page 129
224
750.00
750.00
3.592
0.191
3.592
225
750.00
750.00
-6.689
0.045
-6.689
226
750.00
750.00
2.996
0.355
2.996
227
750.00
750.00
-7.736
0.038
-7.736
228
750.00
750.00
1.949
0.348
1.949
201
750.00
750.00
1.652
0.14
1.652
202
750.00
750.00
1.416
0.12
1.416
203
750.00
750.00
-4.045
-2.01
-4.045
204
750.00
750.00
1.415
0.12
1.415
205
750.00
750.00
-9.505
-4.15
-9.505
206
750.00
750.00
1.415
0.12
1.415
207
750.00
750.00
-9.859
-4.18
-9.859
208
750.00
750.00
1.061
0.09
1.061
209
750.00
750.00
7.122
0.58
7.122
210
750.00
750.00
6.105
0.49
6.105
211
750.00
750.00
0.644
-1.64
0.644
212
750.00
750.00
6.104
0.49
6.104
213
750.00
750.00
-4.817
-3.78
-4.817
214
750.00
750.00
6.103
0.49
6.103
215
750.00
750.00
-6.343
-3.90
-6.343
216
750.00
750.00
4.577
0.37
4.577
217
750.00
750.00
-3.722
-2.84
-3.722
218
750.00
750.00
6.100
0.49
6.100
219
750.00
750.00
-5.248
-2.96
-5.248
220
750.00
750.00
4.574
0.37
4.574
221
750.00
750.00
9.425
0.76
9.425
222
750.00
750.00
8.079
0.65
8.079
223
750.00
750.00
2.618
-1.49
2.618
224
750.00
750.00
8.078
0.65
8.078
225
750.00
750.00
-2.843
-3.62
-2.843
226
750.00
750.00
8.077
0.65
8.077
227
750.00
750.00
-4.863
-3.79
-4.863
228
750.00
750.00
6.057
0.49
6.057
201
750.00
750.00
1.652
-0.004
1.652
202
750.00
750.00
1.416
-0.003
1.416
203
750.00
750.00
-4.045
0.005
-4.045
204
750.00
750.00
1.415
0.181
1.415
205
750.00
750.00
-9.505
0.014
-9.505
206
750.00
750.00
1.415
0.365
1.415
207
750.00
750.00
-9.859
0.014
-9.859
208
750.00
750.00
1.061
0.366
1.061
209
750.00
750.00
7.122
-0.015
7.122
210
750.00
750.00
6.105
-0.012
6.105
211
750.00
750.00
0.644
-0.004
0.644
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F73 p
S1
Page 130
212
750.00
750.00
6.104
0.172
6.104
213
750.00
750.00
-4.817
0.004
-4.817
214
750.00
750.00
6.103
0.356
6.103
215
750.00
750.00
-6.343
0.007
-6.343
216
750.00
750.00
4.577
0.359
4.577
217
750.00
750.00
-3.722
-0.011
-3.722
218
750.00
750.00
6.100
0.064
6.100
219
750.00
750.00
-5.248
-0.007
-5.248
220
750.00
750.00
4.574
0.067
4.574
221
750.00
750.00
9.425
-0.020
9.425
222
750.00
750.00
8.079
-0.017
8.079
223
750.00
750.00
2.618
-0.009
2.618
224
750.00
750.00
8.078
0.167
8.078
225
750.00
750.00
-2.843
-0.001
-2.843
226
750.00
750.00
8.077
0.351
8.077
227
750.00
750.00
-4.863
0.004
-4.863
228
750.00
750.00
6.057
0.355
6.057
201
750.00
750.00
1.656
0.14
1.656
202
750.00
750.00
1.420
0.12
1.420
203
750.00
750.00
-3.840
-1.94
-3.840
204
750.00
750.00
1.421
0.12
1.421
205
750.00
750.00
-9.100
-4.01
-9.100
206
750.00
750.00
1.421
0.12
1.421
207
750.00
750.00
-9.455
-4.04
-9.455
208
750.00
750.00
1.066
0.09
1.066
209
750.00
750.00
7.104
0.57
7.104
210
750.00
750.00
6.089
0.49
6.089
211
750.00
750.00
0.829
-1.58
0.829
212
750.00
750.00
6.090
0.49
6.090
213
750.00
750.00
-4.431
-3.64
-4.431
214
750.00
750.00
6.091
0.49
6.091
215
750.00
750.00
-5.953
-3.76
-5.953
216
750.00
750.00
4.568
0.37
4.568
217
750.00
750.00
-3.412
-2.73
-3.412
218
750.00
750.00
6.090
0.49
6.090
219
750.00
750.00
-4.934
-2.85
-4.934
220
750.00
750.00
4.568
0.37
4.568
221
750.00
750.00
9.397
0.75
9.397
222
750.00
750.00
8.055
0.65
8.055
223
750.00
750.00
2.795
-1.42
2.795
224
750.00
750.00
8.055
0.65
8.055
225
750.00
750.00
-2.465
-3.49
-2.465
226
750.00
750.00
8.056
0.65
8.056
227
750.00
750.00
-4.479
-3.65
-4.479
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 131
228
750.00
750.00
6.043
0.48
6.043
201
750.00
750.00
1.656
-0.002
1.656
202
750.00
750.00
1.420
-0.002
1.420
203
750.00
750.00
-3.840
0.007
-3.840
204
750.00
750.00
1.421
0.186
1.421
205
750.00
750.00
-9.100
0.015
-9.100
206
750.00
750.00
1.421
0.373
1.421
207
750.00
750.00
-9.455
0.015
-9.455
208
750.00
750.00
1.066
0.373
1.066
209
750.00
750.00
7.104
-0.005
7.104
210
750.00
750.00
6.089
-0.005
6.089
211
750.00
750.00
0.829
0.004
0.829
212
750.00
750.00
6.090
0.183
6.090
213
750.00
750.00
-4.431
0.012
-4.431
214
750.00
750.00
6.091
0.370
6.091
215
750.00
750.00
-5.953
0.013
-5.953
216
750.00
750.00
4.568
0.371
4.568
217
750.00
750.00
-3.412
-0.005
-3.412
218
750.00
750.00
6.090
0.075
6.090
219
750.00
750.00
-4.934
-0.004
-4.934
220
750.00
750.00
4.568
0.076
4.568
221
750.00
750.00
9.397
-0.005
9.397
222
750.00
750.00
8.055
-0.005
8.055
223
750.00
750.00
2.795
0.004
2.795
224
750.00
750.00
8.055
0.183
8.055
225
750.00
750.00
-2.465
0.012
-2.465
226
750.00
750.00
8.056
0.370
8.056
227
750.00
750.00
-4.479
0.013
-4.479
228
750.00
750.00
6.043
0.371
6.043
201
750.00
750.00
1.684
-0.15
1.684
202
750.00
750.00
1.444
-0.12
1.444
203
750.00
750.00
6.872
-2.25
6.872
204
750.00
750.00
1.466
-0.12
1.466
205
750.00
750.00
12.300
-4.37
12.300
206
750.00
750.00
1.489
-0.12
1.489
207
750.00
750.00
11.939
-4.34
11.939
208
750.00
750.00
1.128
-0.09
1.128
209
750.00
750.00
7.284
-0.59
7.284
210
750.00
750.00
6.244
-0.51
6.244
211
750.00
750.00
11.672
-2.63
11.672
212
750.00
750.00
6.266
-0.50
6.266
213
750.00
750.00
17.100
-4.75
17.100
214
750.00
750.00
6.289
-0.50
6.289
215
750.00
750.00
15.539
-4.63
15.539
F74 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 132
216
750.00
750.00
4.728
-0.37
4.728
217
750.00
750.00
15.799
-3.74
15.799
218
750.00
750.00
6.278
-0.51
6.278
219
750.00
750.00
14.238
-3.61
14.238
220
750.00
750.00
4.717
-0.38
4.717
221
750.00
750.00
9.643
-0.78
9.643
222
750.00
750.00
8.266
-0.66
8.266
223
750.00
750.00
13.694
-2.79
13.694
224
750.00
750.00
8.288
-0.66
8.288
225
750.00
750.00
19.122
-4.91
19.122
226
750.00
750.00
8.311
-0.66
8.311
227
750.00
750.00
17.055
-4.75
17.055
228
750.00
750.00
6.244
-0.49
6.244
201
750.00
750.00
1.684
0.000
1.684
202
750.00
750.00
1.444
0.000
1.444
203
750.00
750.00
6.872
0.003
6.872
204
750.00
750.00
1.466
0.135
1.466
205
750.00
750.00
12.300
0.006
12.300
206
750.00
750.00
1.489
0.270
1.489
207
750.00
750.00
11.939
0.006
11.939
208
750.00
750.00
1.128
0.270
1.128
209
750.00
750.00
7.284
0.000
7.284
210
750.00
750.00
6.244
0.000
6.244
211
750.00
750.00
11.672
0.003
11.672
212
750.00
750.00
6.266
0.135
6.266
213
750.00
750.00
17.100
0.006
17.100
214
750.00
750.00
6.289
0.270
6.289
215
750.00
750.00
15.539
0.006
15.539
216
750.00
750.00
4.728
0.270
4.728
217
750.00
750.00
15.799
0.002
15.799
218
750.00
750.00
6.278
0.031
6.278
219
750.00
750.00
14.238
0.002
14.238
220
750.00
750.00
4.717
0.031
4.717
221
750.00
750.00
9.643
0.000
9.643
222
750.00
750.00
8.266
0.000
8.266
223
750.00
750.00
13.694
0.003
13.694
224
750.00
750.00
8.288
0.135
8.288
225
750.00
750.00
19.122
0.006
19.122
226
750.00
750.00
8.311
0.270
8.311
227
750.00
750.00
17.055
0.006
17.055
228
750.00
750.00
6.244
0.270
6.244
201
750.00
750.00
1.423
-0.11
1.423
202
750.00
750.00
1.219
-0.09
1.219
203
750.00
750.00
6.527
-2.20
6.527
F75 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 133
204
750.00
750.00
0.634
-0.05
0.634
205
750.00
750.00
11.835
-4.31
11.835
206
750.00
750.00
0.048
0.00
0.048
207
750.00
750.00
11.531
-4.29
11.531
208
750.00
750.00
-0.257
0.02
-0.257
209
750.00
750.00
5.652
-0.38
5.652
210
750.00
750.00
4.845
-0.32
4.845
211
750.00
750.00
10.153
-2.43
10.153
212
750.00
750.00
4.259
-0.28
4.259
213
750.00
750.00
15.461
-4.54
15.461
214
750.00
750.00
3.673
-0.23
3.673
215
750.00
750.00
14.249
-4.46
14.249
216
750.00
750.00
2.462
-0.15
2.462
217
750.00
750.00
14.511
-3.69
14.511
218
750.00
750.00
4.237
-0.27
4.237
219
750.00
750.00
13.299
-3.61
13.299
220
750.00
750.00
3.026
-0.19
3.026
221
750.00
750.00
7.433
-0.49
7.433
222
750.00
750.00
6.371
-0.42
6.371
223
750.00
750.00
11.679
-2.53
11.679
224
750.00
750.00
5.785
-0.37
5.785
225
750.00
750.00
16.987
-4.64
16.987
226
750.00
750.00
5.200
-0.33
5.200
227
750.00
750.00
15.394
-4.53
15.394
228
750.00
750.00
3.607
-0.22
3.607
201
750.00
750.00
1.423
0.005
1.423
202
750.00
750.00
1.219
0.005
1.219
203
750.00
750.00
6.527
0.010
6.527
204
750.00
750.00
0.634
0.176
0.634
205
750.00
750.00
11.835
0.015
11.835
206
750.00
750.00
0.048
0.348
0.048
207
750.00
750.00
11.531
0.014
11.531
208
750.00
750.00
-0.257
0.347
-0.257
209
750.00
750.00
5.652
0.035
5.652
210
750.00
750.00
4.845
0.030
4.845
211
750.00
750.00
10.153
0.035
10.153
212
750.00
750.00
4.259
0.201
4.259
213
750.00
750.00
15.461
0.040
15.461
214
750.00
750.00
3.673
0.373
3.673
215
750.00
750.00
14.249
0.033
14.249
216
750.00
750.00
2.462
0.365
2.462
217
750.00
750.00
14.511
0.032
14.511
218
750.00
750.00
4.237
0.090
4.237
219
750.00
750.00
13.299
0.024
13.299
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F76 p
S1
S1
Page 134
220
750.00
750.00
3.026
0.083
3.026
221
750.00
750.00
7.433
0.047
7.433
222
750.00
750.00
6.371
0.041
6.371
223
750.00
750.00
11.679
0.046
11.679
224
750.00
750.00
5.785
0.212
5.785
225
750.00
750.00
16.987
0.051
16.987
226
750.00
750.00
5.200
0.384
5.200
227
750.00
750.00
15.394
0.041
15.394
228
750.00
750.00
3.607
0.374
3.607
201
750.00
750.00
1.661
-0.14
1.661
202
750.00
750.00
1.423
-0.12
1.423
203
750.00
750.00
6.883
-2.26
6.883
204
750.00
750.00
1.421
-0.12
1.421
205
750.00
750.00
12.343
-4.40
12.343
206
750.00
750.00
1.419
-0.12
1.419
207
750.00
750.00
11.988
-4.37
11.988
208
750.00
750.00
1.063
-0.09
1.063
209
750.00
750.00
7.158
-0.58
7.158
210
750.00
750.00
6.136
-0.49
6.136
211
750.00
750.00
11.596
-2.63
11.596
212
750.00
750.00
6.133
-0.49
6.133
213
750.00
750.00
17.056
-4.77
17.056
214
750.00
750.00
6.131
-0.49
6.131
215
750.00
750.00
15.522
-4.65
15.522
216
750.00
750.00
4.597
-0.37
4.597
217
750.00
750.00
15.962
-3.83
15.962
218
750.00
750.00
6.133
-0.49
6.133
219
750.00
750.00
14.428
-3.71
14.428
220
750.00
750.00
4.599
-0.37
4.599
221
750.00
750.00
9.474
-0.76
9.474
222
750.00
750.00
8.121
-0.65
8.121
223
750.00
750.00
13.581
-2.79
13.581
224
750.00
750.00
8.118
-0.65
8.118
225
750.00
750.00
19.041
-4.93
19.041
226
750.00
750.00
8.116
-0.65
8.116
227
750.00
750.00
17.010
-4.77
17.010
228
750.00
750.00
6.086
-0.49
6.086
201
750.00
750.00
1.661
0.007
1.661
202
750.00
750.00
1.423
0.006
1.423
203
750.00
750.00
6.883
0.017
6.883
204
750.00
750.00
1.421
0.200
1.421
205
750.00
750.00
12.343
0.027
12.343
206
750.00
750.00
1.419
0.393
1.419
207
750.00
750.00
11.988
0.025
11.988
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F77 p
S1
Page 135
208
750.00
750.00
1.063
0.392
1.063
209
750.00
750.00
7.158
0.029
7.158
210
750.00
750.00
6.136
0.025
6.136
211
750.00
750.00
11.596
0.035
11.596
212
750.00
750.00
6.133
0.218
6.133
213
750.00
750.00
17.056
0.046
17.056
214
750.00
750.00
6.131
0.412
6.131
215
750.00
750.00
15.522
0.040
15.522
216
750.00
750.00
4.597
0.406
4.597
217
750.00
750.00
15.962
0.023
15.962
218
750.00
750.00
6.133
0.103
6.133
219
750.00
750.00
14.428
0.017
14.428
220
750.00
750.00
4.599
0.097
4.599
221
750.00
750.00
9.474
0.038
9.474
222
750.00
750.00
8.121
0.033
8.121
223
750.00
750.00
13.581
0.043
13.581
224
750.00
750.00
8.118
0.226
8.118
225
750.00
750.00
19.041
0.054
19.041
226
750.00
750.00
8.116
0.420
8.116
227
750.00
750.00
17.010
0.045
17.010
228
750.00
750.00
6.086
0.411
6.086
201
750.00
750.00
1.651
-0.14
1.651
202
750.00
750.00
1.415
-0.12
1.415
203
750.00
750.00
6.675
-2.19
6.675
204
750.00
750.00
1.416
-0.12
1.416
205
750.00
750.00
11.935
-4.26
11.935
206
750.00
750.00
1.417
-0.12
1.417
207
750.00
750.00
11.581
-4.23
11.581
208
750.00
750.00
1.063
-0.09
1.063
209
750.00
750.00
7.081
-0.57
7.081
210
750.00
750.00
6.070
-0.49
6.070
211
750.00
750.00
11.330
-2.56
11.330
212
750.00
750.00
6.071
-0.49
6.071
213
750.00
750.00
16.590
-4.63
16.590
214
750.00
750.00
6.071
-0.49
6.071
215
750.00
750.00
15.072
-4.50
15.072
216
750.00
750.00
4.554
-0.37
4.554
217
750.00
750.00
15.571
-3.71
15.571
218
750.00
750.00
6.071
-0.49
6.071
219
750.00
750.00
14.053
-3.59
14.053
220
750.00
750.00
4.554
-0.37
4.554
221
750.00
750.00
9.368
-0.75
9.368
222
750.00
750.00
8.029
-0.65
8.029
223
750.00
750.00
13.289
-2.71
13.289
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 136
224
750.00
750.00
8.030
-0.65
8.030
225
750.00
750.00
18.549
-4.78
18.549
226
750.00
750.00
8.031
-0.65
8.031
227
750.00
750.00
16.542
-4.62
16.542
228
750.00
750.00
6.024
-0.48
6.024
201
750.00
750.00
1.651
0.002
1.651
202
750.00
750.00
1.415
0.002
1.415
203
750.00
750.00
6.675
0.013
6.675
204
750.00
750.00
1.416
0.197
1.416
205
750.00
750.00
11.935
0.024
11.935
206
750.00
750.00
1.417
0.393
1.417
207
750.00
750.00
11.581
0.024
11.581
208
750.00
750.00
1.063
0.392
1.063
209
750.00
750.00
7.081
0.016
7.081
210
750.00
750.00
6.070
0.014
6.070
211
750.00
750.00
11.330
0.025
11.330
212
750.00
750.00
6.071
0.210
6.071
213
750.00
750.00
16.590
0.037
16.590
214
750.00
750.00
6.071
0.405
6.071
215
750.00
750.00
15.072
0.033
15.072
216
750.00
750.00
4.554
0.402
4.554
217
750.00
750.00
15.571
0.012
15.571
218
750.00
750.00
6.071
0.094
6.071
219
750.00
750.00
14.053
0.009
14.053
220
750.00
750.00
4.554
0.090
4.554
221
750.00
750.00
9.368
0.022
9.368
222
750.00
750.00
8.029
0.019
8.029
223
750.00
750.00
13.289
0.030
13.289
224
750.00
750.00
8.030
0.214
8.030
225
750.00
750.00
18.549
0.042
18.549
226
750.00
750.00
8.031
0.410
8.031
227
750.00
750.00
16.542
0.037
16.542
228
750.00
750.00
6.024
0.405
6.024
201
750.00
750.00
1.717
-0.09
1.717
202
750.00
750.00
1.471
-0.08
1.471
203
750.00
750.00
4.391
-1.55
4.391
204
750.00
750.00
10.703
-0.57
10.703
205
750.00
750.00
7.310
-3.03
7.310
206
750.00
750.00
19.934
-1.06
19.934
207
750.00
750.00
6.942
-3.01
6.942
208
750.00
750.00
19.566
-1.04
19.566
209
750.00
750.00
6.971
-0.39
6.971
210
750.00
750.00
5.975
-0.34
5.975
211
750.00
750.00
8.894
-1.81
8.894
F78 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 137
212
750.00
750.00
15.206
-0.83
15.206
213
750.00
750.00
11.813
-3.29
11.813
214
750.00
750.00
24.437
-1.32
24.437
215
750.00
750.00
10.320
-3.20
10.320
216
750.00
750.00
22.944
-1.24
22.944
217
750.00
750.00
11.892
-3.56
11.892
218
750.00
750.00
12.636
-0.80
12.636
219
750.00
750.00
10.399
-3.48
10.399
220
750.00
750.00
11.143
-0.71
11.143
221
750.00
750.00
9.184
-0.52
9.184
222
750.00
750.00
7.872
-0.45
7.872
223
750.00
750.00
10.791
-1.92
10.791
224
750.00
750.00
17.103
-0.94
17.103
225
750.00
750.00
13.711
-3.40
13.711
226
750.00
750.00
26.335
-1.43
26.335
227
750.00
750.00
11.743
-3.29
11.743
228
750.00
750.00
24.367
-1.32
24.367
201
750.00
750.00
1.717
0.140
1.717
202
750.00
750.00
1.471
0.120
1.471
203
750.00
750.00
4.391
0.448
4.391
204
750.00
750.00
10.703
3.366
10.703
205
750.00
750.00
7.310
0.775
7.310
206
750.00
750.00
19.934
6.612
19.934
207
750.00
750.00
6.942
0.745
6.942
208
750.00
750.00
19.566
6.582
19.566
209
750.00
750.00
6.971
0.568
6.971
210
750.00
750.00
5.975
0.487
5.975
211
750.00
750.00
8.894
0.814
8.894
212
750.00
750.00
15.206
3.733
15.206
213
750.00
750.00
11.813
1.142
11.813
214
750.00
750.00
24.437
6.978
24.437
215
750.00
750.00
10.320
1.020
10.320
216
750.00
750.00
22.944
6.857
22.944
217
750.00
750.00
11.892
0.830
11.892
218
750.00
750.00
12.636
2.663
12.636
219
750.00
750.00
10.399
0.708
10.399
220
750.00
750.00
11.143
2.541
11.143
221
750.00
750.00
9.184
0.748
9.184
222
750.00
750.00
7.872
0.641
7.872
223
750.00
750.00
10.791
0.969
10.791
224
750.00
750.00
17.103
3.887
17.103
225
750.00
750.00
13.711
1.296
13.711
226
750.00
750.00
26.335
7.133
26.335
227
750.00
750.00
11.743
1.136
11.743
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F79 p
S1
S1
Page 138
228
750.00
750.00
24.367
6.973
24.367
201
750.00
750.00
0.825
0.08
0.825
202
750.00
750.00
0.707
0.07
0.707
203
750.00
750.00
-1.585
-0.70
-1.585
204
750.00
750.00
0.713
0.07
0.713
205
750.00
750.00
-3.877
-1.48
-3.877
206
750.00
750.00
0.718
0.08
0.718
207
750.00
750.00
-4.054
-1.50
-4.054
208
750.00
750.00
0.541
0.06
0.541
209
750.00
750.00
1.922
0.21
1.922
210
750.00
750.00
1.648
0.18
1.648
211
750.00
750.00
-0.644
-0.59
-0.644
212
750.00
750.00
1.653
0.18
1.653
213
750.00
750.00
-2.936
-1.37
-2.936
214
750.00
750.00
1.659
0.19
1.659
215
750.00
750.00
-3.348
-1.42
-3.348
216
750.00
750.00
1.247
0.14
1.247
217
750.00
750.00
-13.630
-4.09
-13.630
218
750.00
750.00
1.643
0.18
1.643
219
750.00
750.00
-14.042
-4.13
-14.042
220
750.00
750.00
1.231
0.14
1.231
221
750.00
750.00
2.384
0.27
2.384
222
750.00
750.00
2.044
0.23
2.044
223
750.00
750.00
-0.248
-0.55
-0.248
224
750.00
750.00
2.049
0.23
2.049
225
750.00
750.00
-2.540
-1.32
-2.540
226
750.00
750.00
2.055
0.23
2.055
227
750.00
750.00
-3.051
-1.38
-3.051
228
750.00
750.00
1.544
0.17
1.544
201
750.00
750.00
0.825
-0.016
0.825
202
750.00
750.00
0.707
-0.014
0.707
203
750.00
750.00
-1.585
-0.008
-1.585
204
750.00
750.00
0.713
0.117
0.713
205
750.00
750.00
-3.877
-0.002
-3.877
206
750.00
750.00
0.718
0.248
0.718
207
750.00
750.00
-4.054
0.002
-4.054
208
750.00
750.00
0.541
0.252
0.541
209
750.00
750.00
1.922
-0.044
1.922
210
750.00
750.00
1.648
-0.037
1.648
211
750.00
750.00
-0.644
-0.031
-0.644
212
750.00
750.00
1.653
0.094
1.653
213
750.00
750.00
-2.936
-0.025
-2.936
214
750.00
750.00
1.659
0.225
1.659
215
750.00
750.00
-3.348
-0.016
-3.348
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F80 p
S1
S1
Page 139
216
750.00
750.00
1.247
0.234
1.247
217
750.00
750.00
-13.630
-0.037
-13.630
218
750.00
750.00
1.643
-0.018
1.643
219
750.00
750.00
-14.042
-0.028
-14.042
220
750.00
750.00
1.231
-0.009
1.231
221
750.00
750.00
2.384
-0.056
2.384
222
750.00
750.00
2.044
-0.048
2.044
223
750.00
750.00
-0.248
-0.042
-0.248
224
750.00
750.00
2.049
0.083
2.049
225
750.00
750.00
-2.540
-0.036
-2.540
226
750.00
750.00
2.055
0.214
2.055
227
750.00
750.00
-3.051
-0.024
-3.051
228
750.00
750.00
1.544
0.226
1.544
201
750.00
750.00
1.285
0.14
1.285
202
750.00
750.00
1.102
0.12
1.102
203
750.00
750.00
-3.550
-1.33
-3.550
204
750.00
750.00
1.116
0.12
1.116
205
750.00
750.00
-8.202
-2.77
-8.202
206
750.00
750.00
1.131
0.12
1.131
207
750.00
750.00
-8.478
-2.80
-8.478
208
750.00
750.00
0.855
0.09
0.855
209
750.00
750.00
3.418
0.39
3.418
210
750.00
750.00
2.929
0.33
2.929
211
750.00
750.00
-1.723
-1.11
-1.723
212
750.00
750.00
2.944
0.33
2.944
213
750.00
750.00
-6.375
-2.55
-6.375
214
750.00
750.00
2.958
0.33
2.958
215
750.00
750.00
-7.107
-2.64
-7.107
216
750.00
750.00
2.226
0.25
2.226
217
750.00
750.00
-12.369
-3.94
-12.369
218
750.00
750.00
2.914
0.33
2.914
219
750.00
750.00
-13.101
-4.02
-13.101
220
750.00
750.00
2.182
0.25
2.182
221
750.00
750.00
4.315
0.49
4.315
222
750.00
750.00
3.699
0.42
3.699
223
750.00
750.00
-0.953
-1.02
-0.953
224
750.00
750.00
3.713
0.42
3.713
225
750.00
750.00
-5.605
-2.46
-5.605
226
750.00
750.00
3.727
0.42
3.727
227
750.00
750.00
-6.530
-2.57
-6.530
228
750.00
750.00
2.803
0.32
2.803
201
750.00
750.00
1.285
-0.005
1.285
202
750.00
750.00
1.102
-0.005
1.102
203
750.00
750.00
-3.550
0.002
-3.550
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F81 p
S1
Page 140
204
750.00
750.00
1.116
0.127
1.116
205
750.00
750.00
-8.202
0.008
-8.202
206
750.00
750.00
1.131
0.259
1.131
207
750.00
750.00
-8.478
0.009
-8.478
208
750.00
750.00
0.855
0.261
0.855
209
750.00
750.00
3.418
-0.025
3.418
210
750.00
750.00
2.929
-0.022
2.929
211
750.00
750.00
-1.723
-0.016
-1.723
212
750.00
750.00
2.944
0.110
2.944
213
750.00
750.00
-6.375
-0.009
-6.375
214
750.00
750.00
2.958
0.242
2.958
215
750.00
750.00
-7.107
-0.004
-7.107
216
750.00
750.00
2.226
0.248
2.226
217
750.00
750.00
-12.369
-0.022
-12.369
218
750.00
750.00
2.914
0.000
2.914
219
750.00
750.00
-13.101
-0.016
-13.101
220
750.00
750.00
2.182
0.005
2.182
221
750.00
750.00
4.315
-0.035
4.315
222
750.00
750.00
3.699
-0.030
3.699
223
750.00
750.00
-0.953
-0.023
-0.953
224
750.00
750.00
3.713
0.102
3.713
225
750.00
750.00
-5.605
-0.017
-5.605
226
750.00
750.00
3.727
0.235
3.727
227
750.00
750.00
-6.530
-0.010
-6.530
228
750.00
750.00
2.803
0.242
2.803
201
750.00
750.00
1.378
0.15
1.378
202
750.00
750.00
1.181
0.13
1.181
203
750.00
750.00
-3.333
-1.28
-3.333
204
750.00
750.00
1.167
0.12
1.167
205
750.00
750.00
-7.848
-2.69
-7.848
206
750.00
750.00
1.154
0.12
1.154
207
750.00
750.00
-8.143
-2.72
-8.143
208
750.00
750.00
0.859
0.09
0.859
209
750.00
750.00
3.756
0.43
3.756
210
750.00
750.00
3.220
0.37
3.220
211
750.00
750.00
-1.295
-1.04
-1.295
212
750.00
750.00
3.206
0.36
3.206
213
750.00
750.00
-5.809
-2.45
-5.809
214
750.00
750.00
3.193
0.36
3.193
215
750.00
750.00
-6.614
-2.54
-6.614
216
750.00
750.00
2.388
0.27
2.388
217
750.00
750.00
-12.044
-3.91
-12.044
218
750.00
750.00
3.238
0.37
3.238
219
750.00
750.00
-12.849
-4.00
-12.849
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 141
220
750.00
750.00
2.433
0.28
2.433
221
750.00
750.00
4.757
0.54
4.757
222
750.00
750.00
4.078
0.47
4.078
223
750.00
750.00
-0.437
-0.94
-0.437
224
750.00
750.00
4.064
0.46
4.064
225
750.00
750.00
-4.951
-2.35
-4.951
226
750.00
750.00
4.051
0.46
4.051
227
750.00
750.00
-5.970
-2.46
-5.970
228
750.00
750.00
3.031
0.35
3.031
201
750.00
750.00
1.378
-0.004
1.378
202
750.00
750.00
1.181
-0.003
1.181
203
750.00
750.00
-3.333
0.001
-3.333
204
750.00
750.00
1.167
0.129
1.167
205
750.00
750.00
-7.848
0.005
-7.848
206
750.00
750.00
1.154
0.261
1.154
207
750.00
750.00
-8.143
0.006
-8.143
208
750.00
750.00
0.859
0.262
0.859
209
750.00
750.00
3.756
-0.002
3.756
210
750.00
750.00
3.220
-0.002
3.220
211
750.00
750.00
-1.295
0.003
-1.295
212
750.00
750.00
3.206
0.131
3.206
213
750.00
750.00
-5.809
0.007
-5.809
214
750.00
750.00
3.193
0.263
3.193
215
750.00
750.00
-6.614
0.007
-6.614
216
750.00
750.00
2.388
0.263
2.388
217
750.00
750.00
-12.044
-0.004
-12.044
218
750.00
750.00
3.238
0.020
3.238
219
750.00
750.00
-12.849
-0.003
-12.849
220
750.00
750.00
2.433
0.020
2.433
221
750.00
750.00
4.757
0.000
4.757
222
750.00
750.00
4.078
0.000
4.078
223
750.00
750.00
-0.437
0.004
-0.437
224
750.00
750.00
4.064
0.132
4.064
225
750.00
750.00
-4.951
0.008
-4.951
226
750.00
750.00
4.051
0.264
4.051
227
750.00
750.00
-5.970
0.008
-5.970
228
750.00
750.00
3.031
0.264
3.031
201
750.00
750.00
1.379
0.15
1.379
202
750.00
750.00
1.182
0.13
1.182
203
750.00
750.00
-3.352
-1.28
-3.352
204
750.00
750.00
0.935
0.10
0.935
205
750.00
750.00
-7.887
-2.69
-7.887
206
750.00
750.00
0.688
0.08
0.688
207
750.00
750.00
-8.182
-2.72
-8.182
F82 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 142
208
750.00
750.00
0.392
0.05
0.392
209
750.00
750.00
3.761
0.43
3.761
210
750.00
750.00
3.223
0.37
3.223
211
750.00
750.00
-1.311
-1.04
-1.311
212
750.00
750.00
2.976
0.34
2.976
213
750.00
750.00
-5.845
-2.45
-5.845
214
750.00
750.00
2.729
0.32
2.729
215
750.00
750.00
-6.651
-2.54
-6.651
216
750.00
750.00
1.923
0.23
1.923
217
750.00
750.00
-11.946
-3.89
-11.946
218
750.00
750.00
3.088
0.35
3.088
219
750.00
750.00
-12.752
-3.98
-12.752
220
750.00
750.00
2.283
0.26
2.283
221
750.00
750.00
4.763
0.54
4.763
222
750.00
750.00
4.083
0.47
4.083
223
750.00
750.00
-0.452
-0.94
-0.452
224
750.00
750.00
3.835
0.44
3.835
225
750.00
750.00
-4.986
-2.35
-4.986
226
750.00
750.00
3.588
0.42
3.588
227
750.00
750.00
-6.007
-2.47
-6.007
228
750.00
750.00
2.568
0.31
2.568
201
750.00
750.00
1.379
0.000
1.379
202
750.00
750.00
1.182
0.000
1.182
203
750.00
750.00
-3.352
0.004
-3.352
204
750.00
750.00
0.935
0.133
0.935
205
750.00
750.00
-7.887
0.008
-7.887
206
750.00
750.00
0.688
0.266
0.688
207
750.00
750.00
-8.182
0.008
-8.182
208
750.00
750.00
0.392
0.266
0.392
209
750.00
750.00
3.761
-0.013
3.761
210
750.00
750.00
3.223
-0.011
3.223
211
750.00
750.00
-1.311
-0.007
-1.311
212
750.00
750.00
2.976
0.122
2.976
213
750.00
750.00
-5.845
-0.003
-5.845
214
750.00
750.00
2.729
0.255
2.729
215
750.00
750.00
-6.651
0.000
-6.651
216
750.00
750.00
1.923
0.258
1.923
217
750.00
750.00
-11.946
-0.017
-11.946
218
750.00
750.00
3.088
0.011
3.088
219
750.00
750.00
-12.752
-0.014
-12.752
220
750.00
750.00
2.283
0.013
2.283
221
750.00
750.00
4.763
-0.018
4.763
222
750.00
750.00
4.083
-0.016
4.083
223
750.00
750.00
-0.452
-0.011
-0.452
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F83 p
S1
S1
Page 143
224
750.00
750.00
3.835
0.118
3.835
225
750.00
750.00
-4.986
-0.007
-4.986
226
750.00
750.00
3.588
0.251
3.588
227
750.00
750.00
-6.007
-0.003
-6.007
228
750.00
750.00
2.568
0.255
2.568
201
750.00
750.00
1.005
0.04
1.005
202
750.00
750.00
0.862
0.04
0.862
203
750.00
750.00
-1.401
-0.98
-1.401
204
750.00
750.00
5.487
0.30
5.487
205
750.00
750.00
-3.663
-2.00
-3.663
206
750.00
750.00
10.113
0.57
10.113
207
750.00
750.00
-3.878
-2.01
-3.878
208
750.00
750.00
9.898
0.56
9.898
209
750.00
750.00
2.895
0.15
2.895
210
750.00
750.00
2.482
0.13
2.482
211
750.00
750.00
0.219
-0.89
0.219
212
750.00
750.00
7.107
0.39
7.107
213
750.00
750.00
-2.043
-1.91
-2.043
214
750.00
750.00
11.733
0.66
11.733
215
750.00
750.00
-2.663
-1.94
-2.663
216
750.00
750.00
11.113
0.63
11.113
217
750.00
750.00
-4.595
-2.47
-4.595
218
750.00
750.00
4.685
0.34
4.685
219
750.00
750.00
-5.216
-2.51
-5.216
220
750.00
750.00
4.065
0.31
4.065
221
750.00
750.00
3.691
0.19
3.691
222
750.00
750.00
3.163
0.17
3.163
223
750.00
750.00
0.901
-0.85
0.901
224
750.00
750.00
7.789
0.43
7.789
225
750.00
750.00
-1.361
-1.87
-1.361
226
750.00
750.00
12.415
0.70
12.415
227
750.00
750.00
-2.152
-1.91
-2.152
228
750.00
750.00
11.624
0.65
11.624
201
750.00
750.00
1.005
0.140
1.005
202
750.00
750.00
0.862
0.120
0.862
203
750.00
750.00
-1.401
-0.029
-1.401
204
750.00
750.00
5.487
1.971
5.487
205
750.00
750.00
-3.663
-0.177
-3.663
206
750.00
750.00
10.113
3.823
10.113
207
750.00
750.00
-3.878
-0.207
-3.878
208
750.00
750.00
9.898
3.792
9.898
209
750.00
750.00
2.895
0.464
2.895
210
750.00
750.00
2.482
0.398
2.482
211
750.00
750.00
0.219
0.249
0.219
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F84 p
S1
212
750.00
750.00
213
750.00
214
750.00
215
Page 144
7.107
2.249
7.107
750.00
-2.043
0.100
-2.043
750.00
11.733
4.100
11.733
750.00
750.00
-2.663
0.001
-2.663
216
750.00
750.00
11.113
4.001
11.113
217
750.00
750.00
-4.595
-0.179
-4.595
218
750.00
750.00
4.685
1.158
4.685
219
750.00
750.00
-5.216
-0.279
-5.216
220
750.00
750.00
4.065
1.059
4.065
221
750.00
750.00
3.691
0.599
3.691
222
750.00
750.00
3.163
0.513
3.163
223
750.00
750.00
0.901
0.365
0.901
224
750.00
750.00
7.789
2.364
7.789
225
750.00
750.00
-1.361
0.216
-1.361
226
750.00
750.00
12.415
4.216
12.415
227
750.00
750.00
-2.152
0.087
-2.152
228
750.00
750.00
11.624
4.087
11.624
201
750.00
750.00
0.825
-0.08
0.825
202
750.00
750.00
0.707
-0.07
0.707
203
750.00
750.00
2.999
-0.85
2.999
204
750.00
750.00
0.699
-0.07
0.699
205
750.00
750.00
5.291
-1.63
5.291
206
750.00
750.00
0.691
-0.07
0.691
207
750.00
750.00
5.114
-1.61
5.114
208
750.00
750.00
0.514
-0.05
0.514
209
750.00
750.00
1.922
-0.21
1.922
210
750.00
750.00
1.648
-0.18
1.648
211
750.00
750.00
3.940
-0.96
3.940
212
750.00
750.00
1.640
-0.18
1.640
213
750.00
750.00
6.232
-1.73
6.232
214
750.00
750.00
1.632
-0.18
1.632
215
750.00
750.00
5.820
-1.69
5.820
216
750.00
750.00
1.220
-0.13
1.220
217
750.00
750.00
16.925
-4.46
16.925
218
750.00
750.00
1.643
-0.18
1.643
219
750.00
750.00
16.513
-4.41
16.513
220
750.00
750.00
1.231
-0.14
1.231
221
750.00
750.00
2.384
-0.27
2.384
222
750.00
750.00
2.044
-0.23
2.044
223
750.00
750.00
4.336
-1.00
4.336
224
750.00
750.00
2.036
-0.23
2.036
225
750.00
750.00
6.628
-1.78
6.628
226
750.00
750.00
2.028
-0.22
2.028
227
750.00
750.00
6.117
-1.72
6.117
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 145
228
750.00
750.00
1.517
-0.17
1.517
201
750.00
750.00
0.825
-0.016
0.825
202
750.00
750.00
0.707
-0.014
0.707
203
750.00
750.00
2.999
-0.020
2.999
204
750.00
750.00
0.699
0.107
0.699
205
750.00
750.00
5.291
-0.027
5.291
206
750.00
750.00
0.691
0.227
0.691
207
750.00
750.00
5.114
-0.023
5.114
208
750.00
750.00
0.514
0.231
0.514
209
750.00
750.00
1.922
-0.044
1.922
210
750.00
750.00
1.648
-0.037
1.648
211
750.00
750.00
3.940
-0.044
3.940
212
750.00
750.00
1.640
0.083
1.640
213
750.00
750.00
6.232
-0.050
6.232
214
750.00
750.00
1.632
0.204
1.632
215
750.00
750.00
5.820
-0.041
5.820
216
750.00
750.00
1.220
0.213
1.220
217
750.00
750.00
16.925
-0.037
16.925
218
750.00
750.00
1.643
-0.018
1.643
219
750.00
750.00
16.513
-0.028
16.513
220
750.00
750.00
1.231
-0.009
1.231
221
750.00
750.00
2.384
-0.056
2.384
222
750.00
750.00
2.044
-0.048
2.044
223
750.00
750.00
4.336
-0.055
4.336
224
750.00
750.00
2.036
0.072
2.036
225
750.00
750.00
6.628
-0.061
6.628
226
750.00
750.00
2.028
0.193
2.028
227
750.00
750.00
6.117
-0.049
6.117
228
750.00
750.00
1.517
0.205
1.517
201
750.00
750.00
1.285
-0.14
1.285
202
750.00
750.00
1.102
-0.12
1.102
203
750.00
750.00
5.753
-1.56
5.753
204
750.00
750.00
1.129
-0.12
1.129
205
750.00
750.00
10.404
-3.01
10.404
206
750.00
750.00
1.156
-0.12
1.156
207
750.00
750.00
10.129
-2.98
10.129
208
750.00
750.00
0.881
-0.09
0.881
209
750.00
750.00
3.419
-0.39
3.419
210
750.00
750.00
2.931
-0.33
2.931
211
750.00
750.00
7.582
-1.78
7.582
212
750.00
750.00
2.958
-0.34
2.958
213
750.00
750.00
12.233
-3.22
12.233
214
750.00
750.00
2.985
-0.34
2.985
215
750.00
750.00
11.500
-3.14
11.500
F85 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 146
216
750.00
750.00
2.252
-0.26
2.252
217
750.00
750.00
18.228
-4.61
18.228
218
750.00
750.00
2.916
-0.33
2.916
219
750.00
750.00
17.495
-4.53
17.495
220
750.00
750.00
2.183
-0.25
2.183
221
750.00
750.00
4.316
-0.49
4.316
222
750.00
750.00
3.700
-0.42
3.700
223
750.00
750.00
8.351
-1.87
8.351
224
750.00
750.00
3.727
-0.43
3.727
225
750.00
750.00
13.002
-3.31
13.002
226
750.00
750.00
3.754
-0.43
3.754
227
750.00
750.00
12.077
-3.21
12.077
228
750.00
750.00
2.829
-0.32
2.829
201
750.00
750.00
1.285
-0.005
1.285
202
750.00
750.00
1.102
-0.005
1.102
203
750.00
750.00
5.753
-0.011
5.753
204
750.00
750.00
1.129
0.116
1.129
205
750.00
750.00
10.404
-0.017
10.404
206
750.00
750.00
1.156
0.237
1.156
207
750.00
750.00
10.129
-0.016
10.129
208
750.00
750.00
0.881
0.238
0.881
209
750.00
750.00
3.419
-0.025
3.419
210
750.00
750.00
2.931
-0.022
2.931
211
750.00
750.00
7.582
-0.028
7.582
212
750.00
750.00
2.958
0.099
2.958
213
750.00
750.00
12.233
-0.034
12.233
214
750.00
750.00
2.985
0.219
2.985
215
750.00
750.00
11.500
-0.029
11.500
216
750.00
750.00
2.252
0.225
2.252
217
750.00
750.00
18.228
-0.022
18.228
218
750.00
750.00
2.916
0.000
2.916
219
750.00
750.00
17.495
-0.016
17.495
220
750.00
750.00
2.183
0.005
2.183
221
750.00
750.00
4.316
-0.035
4.316
222
750.00
750.00
3.700
-0.030
3.700
223
750.00
750.00
8.351
-0.036
8.351
224
750.00
750.00
3.727
0.091
3.727
225
750.00
750.00
13.002
-0.042
13.002
226
750.00
750.00
3.754
0.212
3.754
227
750.00
750.00
12.077
-0.035
12.077
228
750.00
750.00
2.829
0.219
2.829
201
750.00
750.00
1.376
-0.15
1.376
202
750.00
750.00
1.180
-0.13
1.180
203
750.00
750.00
5.694
-1.54
5.694
F86 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 147
204
750.00
750.00
1.156
-0.12
1.156
205
750.00
750.00
10.209
-2.94
10.209
206
750.00
750.00
1.132
-0.12
1.132
207
750.00
750.00
9.914
-2.91
9.914
208
750.00
750.00
0.837
-0.09
0.837
209
750.00
750.00
3.754
-0.43
3.754
210
750.00
750.00
3.217
-0.37
3.217
211
750.00
750.00
7.732
-1.77
7.732
212
750.00
750.00
3.193
-0.36
3.193
213
750.00
750.00
12.246
-3.18
12.246
214
750.00
750.00
3.169
-0.36
3.169
215
750.00
750.00
11.442
-3.09
11.442
216
750.00
750.00
2.365
-0.27
2.365
217
750.00
750.00
18.483
-4.64
18.483
218
750.00
750.00
3.235
-0.37
3.235
219
750.00
750.00
17.679
-4.55
17.679
220
750.00
750.00
2.431
-0.28
2.431
221
750.00
750.00
4.753
-0.54
4.753
222
750.00
750.00
4.074
-0.47
4.074
223
750.00
750.00
8.589
-1.88
8.589
224
750.00
750.00
4.050
-0.46
4.050
225
750.00
750.00
13.103
-3.28
13.103
226
750.00
750.00
4.026
-0.46
4.026
227
750.00
750.00
12.084
-3.17
12.084
228
750.00
750.00
3.008
-0.34
3.008
201
750.00
750.00
1.376
-0.004
1.376
202
750.00
750.00
1.180
-0.003
1.180
203
750.00
750.00
5.694
-0.007
5.694
204
750.00
750.00
1.156
0.116
1.156
205
750.00
750.00
10.209
-0.011
10.209
206
750.00
750.00
1.132
0.236
1.132
207
750.00
750.00
9.914
-0.011
9.914
208
750.00
750.00
0.837
0.237
0.837
209
750.00
750.00
3.754
-0.002
3.754
210
750.00
750.00
3.217
-0.002
3.217
211
750.00
750.00
7.732
-0.006
7.732
212
750.00
750.00
3.193
0.118
3.193
213
750.00
750.00
12.246
-0.010
12.246
214
750.00
750.00
3.169
0.238
3.169
215
750.00
750.00
11.442
-0.009
11.442
216
750.00
750.00
2.365
0.238
2.365
217
750.00
750.00
18.483
0.000
18.483
218
750.00
750.00
3.235
0.020
3.235
219
750.00
750.00
17.679
0.001
17.679
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F87 p
S1
S1
Page 148
220
750.00
750.00
2.431
0.020
2.431
221
750.00
750.00
4.753
0.000
4.753
222
750.00
750.00
4.074
0.000
4.074
223
750.00
750.00
8.589
-0.004
8.589
224
750.00
750.00
4.050
0.120
4.050
225
750.00
750.00
13.103
-0.008
13.103
226
750.00
750.00
4.026
0.239
4.026
227
750.00
750.00
12.084
-0.008
12.084
228
750.00
750.00
3.008
0.239
3.008
201
750.00
750.00
1.378
-0.15
1.378
202
750.00
750.00
1.181
-0.13
1.181
203
750.00
750.00
5.715
-1.54
5.715
204
750.00
750.00
1.014
-0.10
1.014
205
750.00
750.00
10.250
-2.95
10.250
206
750.00
750.00
0.847
-0.07
0.847
207
750.00
750.00
9.955
-2.92
9.955
208
750.00
750.00
0.551
-0.04
0.551
209
750.00
750.00
3.756
-0.43
3.756
210
750.00
750.00
3.220
-0.37
3.220
211
750.00
750.00
7.754
-1.78
7.754
212
750.00
750.00
3.053
-0.34
3.053
213
750.00
750.00
12.289
-3.19
12.289
214
750.00
750.00
2.885
-0.31
2.885
215
750.00
750.00
11.484
-3.10
11.484
216
750.00
750.00
2.080
-0.22
2.080
217
750.00
750.00
18.391
-4.63
18.391
218
750.00
750.00
3.085
-0.35
3.085
219
750.00
750.00
17.586
-4.54
17.586
220
750.00
750.00
2.280
-0.26
2.280
221
750.00
750.00
4.757
-0.54
4.757
222
750.00
750.00
4.078
-0.47
4.078
223
750.00
750.00
8.612
-1.88
8.612
224
750.00
750.00
3.911
-0.44
3.911
225
750.00
750.00
13.147
-3.29
13.147
226
750.00
750.00
3.743
-0.41
3.743
227
750.00
750.00
12.127
-3.17
12.127
228
750.00
750.00
2.724
-0.30
2.724
201
750.00
750.00
1.378
0.000
1.378
202
750.00
750.00
1.181
0.000
1.181
203
750.00
750.00
5.715
-0.004
5.715
204
750.00
750.00
1.014
0.121
1.014
205
750.00
750.00
10.250
-0.008
10.250
206
750.00
750.00
0.847
0.241
0.847
207
750.00
750.00
9.955
-0.008
9.955
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F88 p
S1
Page 149
208
750.00
750.00
0.551
0.241
0.551
209
750.00
750.00
3.756
-0.013
3.756
210
750.00
750.00
3.220
-0.011
3.220
211
750.00
750.00
7.754
-0.015
7.754
212
750.00
750.00
3.053
0.110
3.053
213
750.00
750.00
12.289
-0.019
12.289
214
750.00
750.00
2.885
0.230
2.885
215
750.00
750.00
11.484
-0.017
11.484
216
750.00
750.00
2.080
0.233
2.080
217
750.00
750.00
18.391
-0.005
18.391
218
750.00
750.00
3.085
0.011
3.085
219
750.00
750.00
17.586
-0.002
17.586
220
750.00
750.00
2.280
0.013
2.280
221
750.00
750.00
4.757
-0.018
4.757
222
750.00
750.00
4.078
-0.016
4.078
223
750.00
750.00
8.612
-0.020
8.612
224
750.00
750.00
3.911
0.105
3.911
225
750.00
750.00
13.147
-0.024
13.147
226
750.00
750.00
3.743
0.226
3.743
227
750.00
750.00
12.127
-0.020
12.127
228
750.00
750.00
2.724
0.230
2.724
201
750.00
750.00
0.910
-0.13
0.910
202
750.00
750.00
0.780
-0.11
0.780
203
750.00
750.00
3.215
-1.14
3.215
204
750.00
750.00
4.236
-0.57
4.236
205
750.00
750.00
5.651
-2.17
5.651
206
750.00
750.00
7.692
-1.03
7.692
207
750.00
750.00
5.456
-2.14
5.456
208
750.00
750.00
7.497
-1.00
7.497
209
750.00
750.00
2.578
-0.40
2.578
210
750.00
750.00
2.209
-0.34
2.209
211
750.00
750.00
4.645
-1.37
4.645
212
750.00
750.00
5.665
-0.80
5.665
213
750.00
750.00
7.080
-2.40
7.080
214
750.00
750.00
9.121
-1.26
9.121
215
750.00
750.00
6.527
-2.31
6.527
216
750.00
750.00
8.569
-1.17
8.569
217
750.00
750.00
9.855
-2.99
9.855
218
750.00
750.00
4.371
-0.53
4.371
219
750.00
750.00
9.303
-2.91
9.303
220
750.00
750.00
3.819
-0.44
3.819
221
750.00
750.00
3.280
-0.51
3.280
222
750.00
750.00
2.812
-0.44
2.812
223
750.00
750.00
5.247
-1.46
5.247
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 150
224
750.00
750.00
6.268
-0.89
6.268
225
750.00
750.00
7.682
-2.49
7.682
226
750.00
750.00
9.724
-1.35
9.724
227
750.00
750.00
6.979
-2.39
6.979
228
750.00
750.00
9.021
-1.25
9.021
201
750.00
750.00
0.910
0.122
0.910
202
750.00
750.00
0.780
0.105
0.780
203
750.00
750.00
3.215
0.281
3.215
204
750.00
750.00
4.236
1.361
4.236
205
750.00
750.00
5.651
0.458
5.651
206
750.00
750.00
7.692
2.617
7.692
207
750.00
750.00
5.456
0.432
5.456
208
750.00
750.00
7.497
2.591
7.497
209
750.00
750.00
2.578
0.410
2.578
210
750.00
750.00
2.209
0.351
2.209
211
750.00
750.00
4.645
0.528
4.645
212
750.00
750.00
5.665
1.607
5.665
213
750.00
750.00
7.080
0.705
7.080
214
750.00
750.00
9.121
2.864
9.121
215
750.00
750.00
6.527
0.617
6.527
216
750.00
750.00
8.569
2.776
8.569
217
750.00
750.00
9.855
0.985
9.855
218
750.00
750.00
4.371
1.113
4.371
219
750.00
750.00
9.303
0.897
9.303
220
750.00
750.00
3.819
1.026
3.819
221
750.00
750.00
3.280
0.530
3.280
222
750.00
750.00
2.812
0.454
2.812
223
750.00
750.00
5.247
0.631
5.247
224
750.00
750.00
6.268
1.710
6.268
225
750.00
750.00
7.682
0.808
7.682
226
750.00
750.00
9.724
2.967
9.724
227
750.00
750.00
6.979
0.694
6.979
228
750.00
750.00
9.021
2.853
9.021
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 151
(Flexure)
(Shear)
f'c
fy1
fy2
f_cl
f_clt
fp_clb
0.85
0.75
250.00
3900.00
3900.00
75.0
75.0
150.0
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
208
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
221
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
208
top
0.024
0.014
0.0000
221
bottom
0.006
0.005
0.0000
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 152
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
208
top
4.050
0.014
0.019
14.025
12.545
81.889
221
bottom
4.050
0.004
0.005
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
208
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
208
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
217
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
208
top
0.027
0.016
0.0000
217
bottom
0.012
0.010
0.0000
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
208
top
4.050
0.016
0.021
14.025
12.545
81.889
217
bottom
4.050
0.008
0.011
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
208
top
5.067
4.050
OK
217
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 153
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
208
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
221
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
208
top
221
bottom
Mu (tonf-m)
Rn
.Req
0.012
0.007
0.0000
0.009
0.007
0.0000
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
208
top
4.050
0.007
0.009
14.025
12.545
81.889
221
bottom
4.050
0.006
0.008
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
208
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F68
- X direction (All Width)
Sec.Nam
L.Comb.
Client : ICA
Page 154
Loc. (m)
Width b (m)
d (cm)
As (cm )
208
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
225
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
L.Comb.
Mu (tonf-m)
Rn
.Req
208
top
0.008
0.005
0.0000
225
bottom
0.017
0.014
0.0000
S1
Sec.Nam
GroupType : Isolated
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
208
top
4.050
0.005
0.006
14.025
12.545
81.889
225
bottom
4.050
0.012
0.015
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
208
top
5.067
4.050
OK
225
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
219
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
226
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
219
top
0.004
0.002
0.0000
226
bottom
0.036
0.029
0.0000
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
219
top
4.050
0.002
0.003
14.025
12.545
81.889
226
bottom
4.050
0.024
0.033
11.997
10.731
70.047
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 155
Using As(cm )
Select As(cm )
Result
219
top
5.067
4.050
OK
226
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
207
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
221
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
207
top
0.015
0.009
0.0000
221
bottom
0.014
0.011
0.0000
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
207
top
4.050
0.009
0.012
14.025
12.545
81.889
221
bottom
4.050
0.010
0.013
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
207
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 156
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
207
top
221
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.495
0.750
51.865
5.067
4 - D13 @ 200
0.495
0.750
44.365
5.067
Mu (tonf-m)
Rn
.Req
207
top
0.015
0.009
0.0000
221
bottom
0.007
0.006
0.0000
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
207
top
4.050
0.009
0.012
14.025
12.545
81.889
221
bottom
4.050
0.005
0.006
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
207
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
207
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
221
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 157
Mu (tonf-m)
Rn
.Req
207
top
0.015
0.009
0.0000
221
bottom
0.014
0.011
0.0000
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
207
top
4.050
0.009
0.012
14.025
12.545
81.889
221
bottom
4.050
0.010
0.013
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
207
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
228
top
228
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.375
0.750
50.595
5.067
4 - D13 @ 200
0.375
0.750
43.095
5.067
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
207
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
221
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
207
top
0.014
0.008
0.0000
221
bottom
0.014
0.011
0.0000
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
207
top
4.050
0.008
0.011
14.025
12.545
81.889
221
bottom
4.050
0.010
0.013
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
207
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 158
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
228
top
225
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.375
0.750
51.865
5.067
4 - D13 @ 200
0.495
0.750
44.365
5.067
Mu (tonf-m)
Rn
.Req
228
top
225
bottom
0.029
0.023
0.0000
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
225
bottom
4.050
0.020
0.026
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
225
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 159
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
225
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
228
top
225
bottom
0.025
0.020
0.0000
L.Comb.
.Req
Rn
S1
Sec.Nam
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
225
bottom
4.050
0.017
0.023
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
225
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
225
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
225
bottom
0.029
0.023
0.0000
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
Page 160
2
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
225
bottom
4.050
0.020
0.026
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
225
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
225
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
225
bottom
0.028
0.022
0.0000
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
225
bottom
4.050
0.019
0.025
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
225
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 161
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
226
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
228
top
226
bottom
Mu (tonf-m)
S1
Sec.Nam
L.Comb.
.Req
Rn
0.040
0.032
0.0000
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
226
bottom
4.050
0.027
0.036
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
226
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F79
- X direction (All Width)
Sec.Nam
L.Comb.
Client : ICA
Page 162
Loc. (m)
Width b (m)
d (cm)
As (cm )
219
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
221
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
L.Comb.
Mu (tonf-m)
Rn
.Req
219
top
0.021
0.012
0.0000
221
bottom
0.004
0.003
0.0000
S1
Sec.Nam
GroupType : Isolated
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
219
top
4.050
0.012
0.016
14.025
12.545
81.889
221
bottom
4.050
0.003
0.004
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
219
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
219
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
226
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
219
top
0.020
0.012
0.0000
226
bottom
0.006
0.005
0.0000
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
219
top
4.050
0.012
0.016
14.025
12.545
81.889
226
bottom
4.050
0.004
0.005
11.997
10.731
70.047
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 163
Using As(cm )
Select As(cm )
Result
219
top
5.067
4.050
OK
226
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
219
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
221
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
219
top
0.019
0.011
0.0000
221
bottom
0.007
0.006
0.0000
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
219
top
4.050
0.011
0.015
14.025
12.545
81.889
221
bottom
4.050
0.005
0.006
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
219
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 164
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
219
top
221
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.495
0.750
51.865
5.067
4 - D13 @ 200
0.495
0.750
44.365
5.067
Mu (tonf-m)
Rn
.Req
219
top
0.019
0.011
0.0000
221
bottom
0.007
0.006
0.0000
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
219
top
4.050
0.011
0.015
14.025
12.545
81.889
221
bottom
4.050
0.005
0.006
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
219
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
219
top
4 - D13 @ 200
0.495
0.750
51.865
5.067
226
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 165
Mu (tonf-m)
Rn
.Req
219
top
0.008
0.005
0.0000
226
bottom
0.019
0.015
0.0000
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
219
top
4.050
0.005
0.006
14.025
12.545
81.889
226
bottom
4.050
0.013
0.017
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
219
top
5.067
4.050
OK
226
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
228
top
228
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.375
0.750
50.595
5.067
4 - D13 @ 200
0.375
0.750
43.095
5.067
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
219
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
219
bottom
0.025
0.020
0.0000
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
219
bottom
4.050
0.017
0.023
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
219
bottom
5.067
4.050
OK
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 166
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
228
top
217
botom
S1
Sec.Nam
Loc. (m)
Width b (m)
d (cm)
As (cm )
4 - D13 @ 200
0.375
0.750
51.865
5.067
4 - D13 @ 200
0.495
0.750
44.365
5.067
Mu (tonf-m)
Rn
.Req
228
top
217
bottom
0.027
0.022
0.0000
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
217
bottom
4.050
0.018
0.024
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
217
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 167
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
217
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
228
top
217
bottom
0.028
0.022
0.0000
L.Comb.
.Req
Rn
S1
Sec.Nam
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
217
bottom
4.050
0.019
0.025
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
217
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
L.Comb.
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
217
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
217
bottom
0.028
0.022
0.0000
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
Page 168
2
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
217
bottom
4.050
0.019
0.025
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
217
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
51.865
5.067
226
botom
4 - D13 @ 200
0.495
0.750
44.365
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
226
bottom
0.015
0.012
0.0000
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
14.025
12.545
81.889
226
bottom
4.050
0.010
0.014
11.997
10.731
70.047
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
226
bottom
5.067
4.050
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.375
0.750
50.595
5.067
228
botom
4 - D13 @ 200
0.375
0.750
43.095
5.067
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Client : ICA
Page 169
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
228
bottom
4.050
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
228
bottom
5.067
4.050
OK
S1
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F66
GroupType : Isolated
Page 170
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F68
GroupType : Isolated
Page 171
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F70
GroupType : Isolated
Page 172
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F72
GroupType : Isolated
Page 173
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F74
GroupType : Isolated
Page 174
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F76
GroupType : Isolated
Page 175
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F78
GroupType : Isolated
Page 176
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F80
GroupType : Isolated
Page 177
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F82
GroupType : Isolated
Page 178
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F84
GroupType : Isolated
Page 179
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F86
GroupType : Isolated
Page 180
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
GroupType : Isolated
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F88
GroupType : Isolated
Page 181
PileType : True
Unit : mm
750
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
750
20.925
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
OK
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 182
5127.377 cm2
Pr.Name
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
750
L.Comb.
bo / d
c / s
Ft.Name
750
Pr.Name
1.5 / 20 Result
F66 Punching Area
2 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
L.Comb.
750
1500 / 443.65 mm Vu
Rectangle Vc1
Shape
0/1
Rectangle Vc1
Shape
1 Pile effect
bo / d
c / s
1500 / 443.65 mm Vu
1.5 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pr.Name
Pw
360 mm Vc
83.698 tonf
750
750
1.5 / 20 Result
F68 Punching Area
6 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F69 Punching Area
9 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
1500 / 443.65 mm Vu
Rectangle Vc1
L.Comb.
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F70 Punching Area
10 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
0/1
83.698 tonf
Shape
10
5 Pile effect
240 mm Vc3
Pr.Name
750
5127.377 cm2
Pl
Ft.Name
165.624 tonf
c / s
750
Page 183
228 Vc2
bo / d
Client : ICA
97.648 tonf
L.Comb.
750
Rectangle Vc1
Shape
bo / d
c / s
1500 / 443.65 mm Vu
1.5 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pr.Name
Pw
360 mm Vc
83.698 tonf
750
750
1.5 / 20 Result
F72 Punching Area
14 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F73 Punching Area
15 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
1500 / 443.65 mm Vu
Rectangle Vc1
L.Comb.
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F74 Punching Area
18 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
0/1
83.698 tonf
Shape
18
11 Pile effect
240 mm Vc3
Pr.Name
750
5127.377 cm2
Pl
Ft.Name
15
165.624 tonf
c / s
750
Page 184
228 Vc2
bo / d
14
Client : ICA
97.648 tonf
L.Comb.
750
Rectangle Vc1
Shape
11
bo / d
c / s
1500 / 443.65 mm Vu
1.5 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pr.Name
Pw
360 mm Vc
83.698 tonf
750
750
1.5 / 20 Result
F76 Punching Area
22 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F77 Punching Area
23 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
1500 / 443.65 mm Vu
Rectangle Vc1
L.Comb.
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F78 Punching Area
26 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
0/1
83.698 tonf
Shape
26
19 Pile effect
240 mm Vc3
Pr.Name
750
5127.377 cm2
Pl
Ft.Name
23
165.624 tonf
c / s
750
Page 185
228 Vc2
bo / d
22
Client : ICA
97.648 tonf
L.Comb.
750
Rectangle Vc1
Shape
19
bo / d
c / s
1500 / 443.65 mm Vu
1.5 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pr.Name
Pw
360 mm Vc
83.698 tonf
750
750
1.5 / 20 Result
F80 Punching Area
28 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F81 Punching Area
29 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
1500 / 443.65 mm Vu
Rectangle Vc1
L.Comb.
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F82 Punching Area
30 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
0/1
83.698 tonf
Shape
30
27 Pile effect
240 mm Vc3
Pr.Name
750
5127.377 cm2
Pl
Ft.Name
29
165.624 tonf
c / s
750
Page 186
228 Vc2
bo / d
28
Client : ICA
97.648 tonf
L.Comb.
750
Rectangle Vc1
Shape
27
bo / d
c / s
1500 / 443.65 mm Vu
1.5 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pr.Name
Pw
360 mm Vc
83.698 tonf
750
750
1.5 / 20 Result
F84 Punching Area
32 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F85 Punching Area
33 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
1500 / 443.65 mm Vu
Rectangle Vc1
L.Comb.
bo / d
c / s
Ft.Name
Pr.Name
1500 / 443.65 mm Vu
1.5 / 20 Result
F86 Punching Area
34 Pile effect
0.000 tonf
OK
5127.377 cm2
0/1
Rectangle Vc1
97.648 tonf
228 Vc2
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
Shape
L.Comb.
750
0/1
83.698 tonf
Shape
34
31 Pile effect
240 mm Vc3
Pr.Name
750
5127.377 cm2
Pl
Ft.Name
33
165.624 tonf
c / s
750
Page 187
228 Vc2
bo / d
32
Client : ICA
97.648 tonf
L.Comb.
750
Rectangle Vc1
Shape
31
bo / d
c / s
1500 / 443.65 mm Vu
1.5 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pr.Name
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
1500 / 443.65 mm Vu
1.5 / 20 Result
F88 Punching Area
36 Pile effect
750
750
0/1
165.624 tonf
Pl
240 mm Vc3
83.698 tonf
Pw
360 mm Vc
83.698 tonf
1500 / 443.65 mm Vu
c / s
where
= ratio of long side to short side of the column, concentrated load or reaction area
5127.377 cm2
228 Vc2
bo / d
OK
97.648 tonf
L.Comb.
0.000 tonf
Rectangle Vc1
Shape
(eq 11-35)
0/1
Pl
Pr.Name
fck bo d
5127.377 cm2
165.624 tonf
Ft.Name
228 Vc2
c / s
Page 188
97.648 tonf
bo / d
36
Client : ICA
Rectangle Vc1
L.Comb.
750
35 Pile effect
Shape
35
1.5 / 20 Result
0.000 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 189
4343.373 cm2
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
1 c / s
1 / 40
Circle Vc1
195.539 tonf
208 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F66 Punching Area
1 c / s
130.359 tonf
-15.223 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
208 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F67 Punching Area
1 c / s
130.359 tonf
-16.918 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
7.180 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Page 190
4343.373 cm2
1 c / s
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F69 Punching Area
1 c / s
130.359 tonf
12.419 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
226 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F70 Punching Area
1 c / s
130.359 tonf
25.236 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F71 Punching Area
1 c / s
130.359 tonf
11.100 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
207 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
-9.282 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Page 191
4343.373 cm2
1 c / s
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F73 Punching Area
1 c / s
130.359 tonf
10.901 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F74 Punching Area
1 c / s
130.359 tonf
10.873 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F75 Punching Area
1 c / s
130.359 tonf
20.387 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
18.252 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Page 192
4343.373 cm2
1 c / s
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F77 Punching Area
1 c / s
130.359 tonf
20.306 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F78 Punching Area
1 c / s
130.359 tonf
19.815 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
226 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F79 Punching Area
1 c / s
130.359 tonf
27.600 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
219 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
-13.093 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Page 193
4343.373 cm2
1 c / s
1 / 40
Circle Vc1
195.539 tonf
219 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F81 Punching Area
1 c / s
130.359 tonf
-12.153 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
219 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F82 Punching Area
1 c / s
130.359 tonf
-11.900 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
219 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F83 Punching Area
1 c / s
130.359 tonf
-11.803 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
226 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
13.680 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Page 194
4343.373 cm2
1 c / s
1 / 40
Circle Vc1
195.539 tonf
217 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F85 Punching Area
1 c / s
130.359 tonf
18.190 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
217 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F86 Punching Area
1 c / s
130.359 tonf
19.493 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
217 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
F87 Punching Area
1 c / s
130.359 tonf
19.748 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
217 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
19.656 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Ft.Name
750
Pile No.
Shape
750
L.Comb.
PileName
1
Diameter
bo
d
Page 195
4343.373 cm2
1 c / s
1 / 40
Circle Vc1
195.539 tonf
217 Vc2
312.731 tonf
130.359 tonf
300mm Vc
2336.25mm Vu
443.65mm Result
130.359 tonf
11.120 tonf
OK
AFES CALCULATION
PEDESTAL FOR FOUNDATION TYPE F2
TITLE
DESCRIPTION
PROJECT/JOB NO.
09-JC-15 (AL-1)
PROJECT/JOB NAME
ICA PROJECT
CLIENT NAME
ICA
SITE NAME
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME
GROUP NAME
LOADCOMBINATION GROUP NAME
REV
DATE
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
CONTENTS
1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA
2. TENSION DESIGN
2.1 FORMULA
2.2 TENSION DESIGN
3. ONE-WAY SHEAR
3.1 FORMULA
3.2 ONE-WAY SHEAR
Page 1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 2
1. INPUT DATA
1.1 General
Design Code
Input Unit
MKS
Bending
Axial
0.85
f'c
250 kgf/cm
Sprial reinf.
0.7
fy (D10 ~ D16)
2
Output Unit
3900 kgf/cm
MKS
Tied reinf.
0.7
0.7
Ec
fy (D19 ~)
2
3900 kgf/cm
Shear
0.75
Es
2
250998 kgf/cm
2000000 kgf/cm
Steel Db
Cover
50 mm
360
240
50
360
240
50
360
240
360
240
50
Pier Name
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
50
360
240
50
360
240
50
360
240
50
360
240
50
360
240
360
240
50
Page 3
Pier Name
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
10
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
11
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
14
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
15
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
18
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
50
360
240
50
360
240
50
360
240
50
360
240
50
360
240
360
240
50
Page 4
Pier Name
19
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
22
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
23
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
26
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
27
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
28
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
50
360
240
50
360
240
50
360
240
50
360
240
50
360
240
360
240
50
Page 5
Pier Name
29
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
30
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
31
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
32
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
33
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
34
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
50
360
240
50
360
240
Page 6
Pier Name
35
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Pier Name
36
Ver Bar
D16, 2 3 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
360 mm
f'c
250 kgf/cm2
Length
240 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
11.91 cm2
dx
172.52 mm
dy
292.52 mm
Name
Fx
Fy
Fz
Mx
My
SW
-0.145
Empty
0.007
0.015
-0.086
DL
0.065
0.068
-0.46
Operation
0.15
0.301
-1.728
Test
0.21
0.421
-2.419
Wlx
-1.136
-0.562
3.927
Wly
-0.639
-2.735
10.496
SLx2
-1.184
-0.374
3.409
SLy2
-0.22
-1.124
4.483
LL
SW
-0.145
Empty
-0.002
0.016
-0.103
DL
-0.02
0.08
-0.588
Operation
-0.046
0.327
-2.069
Test
-0.065
0.458
-2.897
Wlx
-1.047
0.069
-1.875
Wly
0.477
-3.132
11.637
SLx2
-1.185
0.322
-3.07
SLy2
0.239
-1.122
4.494
LL
SW
-0.145
Empty
0.007
0.008
-0.112
DL
0.048
0.056
-0.797
Operation
0.136
0.152
-2.237
Test
0.19
0.213
-3.132
Wlx
-1.094
-0.321
3.915
Wly
-0.24
-1.748
5.495
SLx2
-1.01
-0.297
3.697
SLy2
-0.101
-0.381
1.378
LL
SW
-0.145
Empty
-0.012
0.007
-0.105
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
10
11
14
15
Page 7
DL
-0.092
0.047
-0.742
Operation
-0.234
0.131
-2.098
Test
-0.328
0.183
-2.937
Wlx
-1.108
0.33
-4.103
Wly
0.412
-1.185
4.093
SLx2
-1.031
0.328
-4
SLy2
0.089
-0.381
1.35
LL
SW
-0.145
Empty
0.013
-0.011
-0.186
DL
0.084
-0.052
-0.776
Operation
0.268
-0.212
-3.723
Test
0.375
-0.296
-5.213
Wlx
-1.33
-0.121
2.2
Wly
0.626
-2.723
-10.381
SLx2
-1.659
0.218
4.617
SLy2
0.216
-1.118
-4.429
LL
SW
-0.145
Empty
0.013
-0.21
DL
0.067
0.001
-0.845
Operation
0.256
0.004
-4.203
Test
0.358
0.005
-5.884
Wlx
-2.041
-0.004
6.777
Wly
0.011
-0.125
-0.072
SLx2
-1.656
0.001
6.372
SLy2
0.001
-0.015
-0.023
LL
SW
-0.145
Empty
0.008
-0.001
-0.103
DL
0.051
-0.001
-0.469
Operation
0.158
-0.012
-2.054
Test
0.221
-0.017
-2.876
Wlx
-2.036
-0.008
6.798
Wly
-0.047
-0.157
0.745
SLx2
-1.724
0.001
6.458
SLy2
-0.026
-0.031
0.444
LL
SW
-0.145
Empty
0.013
-0.206
DL
0.066
0.002
-0.829
Operation
0.251
0.006
-4.113
Test
0.351
0.009
-5.758
Wlx
-2.055
-0.008
6.826
Wly
-0.177
0.001
SLx2
-1.71
-0.001
6.551
SLy2
-0.039
0.003
LL
SW
-0.145
Empty
0.012
-0.205
DL
0.066
0.001
-0.833
Operation
0.249
0.002
-4.096
Test
0.348
0.002
-5.734
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
18
19
22
23
26
Page 8
Wlx
-1.987
-0.008
6.575
Wly
-0.18
-0.001
SLx2
-1.65
6.334
SLy2
-0.041
-0.001
LL
SW
-0.145
Empty
-0.013
-0.211
DL
-0.067
-0.847
Operation
-0.257
-4.211
Test
-0.359
-5.896
Wlx
-2.043
-0.003
-6.785
Wly
0.004
-0.13
-0.028
SLx2
-1.658
-0.001
-6.37
SLy2
-0.001
-0.016
-0.023
LL
SW
-0.145
Empty
-0.008
-0.001
-0.159
DL
-0.051
-0.002
-0.712
Operation
-0.156
-0.017
-3.18
Test
-0.219
-0.024
-4.452
Wlx
-2.027
-0.005
-6.635
Wly
0.045
-0.165
0.732
SLx2
-1.725
-0.001
-6.444
SLy2
0.027
-0.031
0.405
LL
SW
-0.145
Empty
-0.013
-0.001
-0.207
DL
-0.066
-0.003
-0.834
Operation
-0.251
-0.013
-4.134
Test
-0.352
-0.018
-5.788
Wlx
-2.057
-0.01
-6.825
Wly
-0.186
0.003
SLx2
-1.712
0.001
-6.551
SLy2
-0.04
0.002
LL
SW
-0.145
Empty
-0.012
-0.204
DL
-0.066
-0.001
-0.83
Operation
-0.249
-0.008
-4.083
Test
-0.348
-0.011
-5.716
Wlx
-1.988
-0.011
-6.575
Wly
-0.188
-0.001
SLx2
-1.651
0.001
-6.334
SLy2
-0.041
-0.001
LL
SW
-0.145
Empty
-0.009
-0.012
-0.198
DL
-0.04
-0.065
-0.883
Operation
-0.177
-0.247
-3.951
Test
-0.248
-0.346
-5.532
Wlx
-1.418
-0.315
-3.649
Wly
-0.473
-3.121
-11.539
SLx2
-1.654
-0.176
-3.945
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
27
28
29
30
31
32
Page 9
SLy2
-0.235
-1.116
-4.441
LL
SW
-0.145
Empty
0.004
0.001
-0.041
DL
0.042
0.008
-0.403
Operation
0.074
0.016
-0.825
Test
0.104
0.023
-1.155
Wlx
-0.746
-0.006
2.865
Wly
0.002
-0.126
-0.007
SLx2
-2.189
10.185
SLy2
-0.01
0.003
LL
SW
-0.145
Empty
0.007
0.001
-0.08
DL
0.068
0.002
-0.693
Operation
0.145
0.012
-1.603
Test
0.203
0.017
-2.244
Wlx
-1.388
-0.006
5.815
Wly
0.001
-0.127
-0.018
SLx2
-2.189
10.199
SLy2
-0.001
-0.011
0.01
LL
SW
-0.145
Empty
0.008
-0.089
DL
0.073
0.002
-0.75
Operation
0.161
-0.001
-1.788
Test
0.226
-0.002
-2.503
Wlx
-1.353
-0.004
5.643
Wly
-0.002
-0.127
0.017
SLx2
-2.19
0.001
10.176
SLy2
0.001
-0.011
-0.012
LL
SW
-0.145
Empty
0.008
-0.089
DL
0.073
-0.751
Operation
0.162
0.007
-1.79
Test
0.226
0.01
-2.506
Wlx
-1.355
-0.004
5.668
Wly
-0.021
-0.128
0.309
SLx2
-2.183
0.003
10.113
SLy2
-0.008
-0.011
0.09
LL
SW
-0.145
Empty
0.003
-0.009
-0.071
DL
0.02
-0.068
-0.502
Operation
0.061
-0.187
-1.421
Test
0.086
-0.261
-1.989
Wlx
-0.978
0.143
2.828
Wly
0.255
-1.78
-5.782
SLx2
-1.334
0.296
4.718
SLy2
0.109
-0.39
-1.469
LL
SW
-0.145
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
33
34
35
36
Page 10
Empty
-0.004
0.001
-0.041
DL
-0.042
0.008
-0.403
Operation
-0.074
0.016
-0.825
Test
-0.104
0.023
-1.155
Wlx
-0.747
0.006
-2.865
Wly
0.002
-0.116
0.01
SLx2
-2.193
-10.185
SLy2
-0.01
0.003
LL
SW
-0.145
Empty
-0.007
0.001
-0.08
DL
-0.068
0.002
-0.693
Operation
-0.145
0.012
-1.604
Test
-0.203
0.017
-2.245
Wlx
-1.39
0.006
-5.814
Wly
-0.003
-0.116
-0.034
SLx2
-2.193
-10.198
SLy2
0.001
-0.011
0.01
LL
SW
-0.145
Empty
-0.008
-0.089
DL
-0.073
0.002
-0.749
Operation
-0.161
-0.001
-1.787
Test
-0.226
-0.002
-2.501
Wlx
-1.355
0.004
-5.643
Wly
0.003
-0.115
0.03
SLx2
-2.194
-0.001
-10.177
SLy2
-0.001
-0.011
-0.012
LL
SW
-0.145
Empty
-0.008
-0.089
DL
-0.073
-0.75
Operation
-0.162
0.007
-1.788
Test
-0.226
0.01
-2.503
Wlx
-1.357
0.004
-5.668
Wly
0.026
-0.116
0.209
SLx2
-2.187
-0.003
-10.114
SLy2
0.008
-0.011
0.09
LL
SW
-0.145
Empty
-0.008
-0.008
-0.063
DL
-0.064
-0.059
-0.442
Operation
-0.154
-0.166
-1.254
Test
-0.215
-0.232
-1.756
Wlx
-0.99
-0.17
-3.044
Wly
-0.442
-1.208
-4.32
SLx2
-1.359
-0.325
-5.097
SLy2
-0.096
-0.391
-1.441
LL
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 11
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
LC#
Fx
Fy
Fz
Mx
My
201
0.101
0.116
-0.764
202
0.086
0.1
-0.655
203
-0.822
-0.35
2.486
204
-0.425
-2.088
7.742
205
-1.731
-0.8
5.628
206
-0.936
-4.276
16.138
207
-1.753
-0.824
5.792
208
-0.958
-4.301
16.302
209
0.301
0.517
-3.063
210
0.258
0.443
-2.626
211
-0.651
-0.007
0.516
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
212
-0.253
-1.745
213
-1.56
214
-0.764
215
Page 12
5.771
-0.456
3.658
-3.933
14.168
-1.624
-0.567
4.314
216
-0.829
-4.044
14.824
217
-1.518
-0.118
2.488
218
-0.072
-1.243
4.099
219
-1.582
-0.229
3.144
220
-0.137
-1.354
4.755
221
0.385
0.685
-4.031
222
0.33
0.587
-3.455
223
-0.579
0.137
-0.313
224
-0.181
-1.601
4.942
225
-1.488
-0.312
2.828
226
-0.692
-3.789
13.339
227
-1.57
-0.459
3.692
228
-0.775
-3.936
14.203
201
-0.031
0.134
-0.967
202
-0.026
0.115
-0.829
203
-0.864
0.17
-2.329
204
0.355
-2.39
8.48
205
-1.702
0.226
-3.829
206
0.737
-4.896
17.79
207
-1.695
0.197
-3.622
208
0.743
-4.925
17.997
209
-0.092
0.57
-3.72
210
-0.079
0.488
-3.188
211
-0.917
0.544
-4.688
212
0.302
-2.017
6.121
213
-1.754
0.599
-6.188
214
0.684
-4.523
15.431
215
-1.735
0.477
-5.391
216
0.704
-4.645
16.228
217
-1.857
0.971
-7.793
218
0.279
-1.195
3.553
219
-1.837
0.849
-6.996
220
0.299
-1.317
4.35
221
-0.119
0.753
-4.879
222
-0.102
0.646
-4.182
223
-0.94
0.701
-5.682
224
0.28
-1.86
5.128
225
-1.777
0.756
-7.182
226
0.661
-4.366
14.437
227
-1.752
0.595
-6.136
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
228
0.687
201
202
Page 13
-4.527
15.483
0.077
0.09
-1.273
0.066
0.077
-1.091
203
-0.809
-0.18
2.041
204
-0.126
-1.322
3.305
205
-1.684
-0.437
5.173
206
-0.318
-2.72
7.701
207
-1.701
-0.456
5.446
208
-0.335
-2.739
7.974
209
0.258
0.291
-4.248
210
0.221
0.25
-3.641
211
-0.654
-0.007
-0.509
212
0.029
-1.149
0.755
213
-1.53
-0.264
2.623
214
-0.163
-2.547
5.151
215
-1.585
-0.326
3.533
216
-0.218
-2.61
6.061
217
-1.294
-0.196
1.905
218
0.069
-0.322
-1.574
219
-1.349
-0.258
2.815
220
0.014
-0.384
-0.664
221
0.333
0.377
-5.501
222
0.286
0.323
-4.715
223
-0.59
0.066
-1.583
224
0.094
-1.076
-0.319
225
-1.465
-0.191
1.549
226
-0.098
-2.474
4.077
227
-1.536
-0.272
2.728
228
-0.17
-2.555
5.256
201
-0.146
0.076
-1.186
202
-0.125
0.065
-1.016
203
-1.011
0.329
-4.299
204
0.205
-0.883
2.258
205
-1.898
0.593
-7.581
206
0.534
-1.831
5.532
207
-1.866
0.577
-7.327
208
0.566
-1.847
5.786
209
-0.456
0.249
-3.976
210
-0.391
0.214
-3.408
211
-1.278
0.478
-6.69
212
-0.062
-0.734
-0.134
213
-2.164
0.742
-9.973
214
0.268
-1.682
3.141
215
-2.066
0.688
-9.121
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
216
0.366
217
218
Page 14
-1.736
3.993
-1.938
0.706
-9.408
-0.258
-0.358
-1.383
219
-1.84
0.652
-8.556
220
-0.16
-0.411
-0.531
221
-0.588
0.322
-5.151
222
-0.504
0.276
-4.415
223
-1.39
0.54
-7.697
224
-0.174
-0.672
-1.14
225
-2.277
0.804
-10.98
226
0.155
-1.62
2.134
227
-2.151
0.735
-9.876
228
0.281
-1.689
3.238
201
0.136
-0.088
-1.347
202
0.116
-0.076
-1.154
203
-0.948
-0.172
0.606
204
0.617
-2.254
-9.459
205
-2.012
-0.269
2.366
206
1.118
-4.432
-17.764
207
-2.041
-0.25
2.654
208
1.089
-4.414
-17.475
209
0.493
-0.37
-6.299
210
0.422
-0.317
-5.399
211
-0.642
-0.414
-3.639
212
0.923
-2.495
-13.704
213
-1.706
-0.51
-1.879
214
1.424
-4.674
-22.008
215
-1.811
-0.431
-0.529
216
1.318
-4.594
-20.659
217
-2.066
0.01
1.527
218
0.746
-1.994
-12.042
219
-2.172
0.089
2.876
220
0.641
-1.915
-10.693
221
0.643
-0.487
-8.385
222
0.551
-0.418
-7.187
223
-0.513
-0.514
-5.427
224
1.052
-2.596
-15.492
225
-1.577
-0.611
-3.667
226
1.552
-4.774
-23.796
227
-1.715
-0.507
-1.87
228
1.415
-4.67
-22
201
0.112
0.001
-1.477
202
0.096
0.001
-1.266
203
-1.537
-0.002
4.156
10
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
204
11
0.105
-0.099
205
-3.17
206
0.114
207
Page 15
-1.324
-0.005
9.577
-0.199
-1.381
-3.194
-0.006
9.894
208
0.09
-0.199
-1.065
209
0.452
0.007
-7.067
210
0.388
0.006
-6.058
211
-1.245
0.003
-0.636
212
0.396
-0.094
-6.115
213
-2.878
4.786
214
0.405
-0.194
-6.173
215
-2.975
-0.002
6.3
216
0.308
-0.196
-4.658
217
-2.096
0.008
3.5
218
0.389
-0.016
-6.092
219
-2.193
0.006
5.015
220
0.292
-0.018
-4.578
221
0.595
0.008
-9.421
222
0.51
0.007
-8.075
223
-1.123
0.004
-2.653
224
0.519
-0.093
-8.132
225
-2.756
0.001
2.768
226
0.528
-0.193
-8.19
227
-2.883
-0.001
4.787
228
0.4
-0.195
-6.171
201
0.083
-0.003
-0.801
202
0.071
-0.002
-0.686
203
-1.558
-0.009
4.752
204
0.033
-0.128
-0.09
205
-3.187
-0.015
10.19
206
-0.004
-0.254
0.506
207
-3.204
-0.015
10.362
208
-0.022
-0.253
0.677
209
0.293
-0.018
-3.532
210
0.251
-0.016
-3.028
211
-1.378
-0.022
2.411
212
0.213
-0.141
-2.432
213
-3.007
-0.028
7.849
214
0.176
-0.267
-1.836
215
-3.069
-0.025
8.606
216
0.113
-0.263
-1.079
217
-2.335
-0.014
6.659
218
0.212
-0.062
-2.362
219
-2.398
-0.01
7.416
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 16
220
0.149
-0.058
-1.605
221
0.381
-0.025
-4.683
222
0.326
-0.022
-4.014
223
-1.302
-0.028
1.424
224
0.289
-0.147
-3.418
225
-2.931
-0.034
6.863
226
0.251
-0.273
-2.822
227
-3.013
-0.029
7.866
228
0.17
-0.267
-1.818
201
0.111
0.003
-1.449
202
0.095
0.002
-1.242
203
-1.549
-0.004
4.219
204
0.095
-0.139
-1.241
205
-3.193
-0.01
9.68
206
0.095
-0.281
-1.24
207
-3.217
-0.011
9.99
208
0.071
-0.281
-0.93
209
0.444
0.011
-6.919
210
0.38
0.01
-5.93
211
-1.264
0.003
-0.47
212
0.38
-0.132
-5.93
213
-2.908
-0.003
4.991
214
0.38
-0.274
-5.929
215
-3.003
-0.006
6.474
216
0.285
-0.276
-4.446
217
-2.185
0.008
3.896
218
0.38
-0.049
-5.926
219
-2.28
0.006
5.379
220
0.285
-0.051
-4.443
221
0.584
0.015
-9.222
222
0.5
0.013
-7.904
223
-1.144
0.007
-2.444
224
0.5
-0.128
-7.904
225
-2.788
3.017
226
0.5
-0.27
-7.903
227
-2.913
-0.003
4.993
228
0.375
-0.273
-5.927
201
0.109
0.001
-1.453
202
0.094
0.001
-1.246
203
-1.496
-0.005
4.014
204
0.094
-0.143
-1.246
205
-3.086
-0.012
9.274
206
0.094
-0.287
-1.247
207
-3.109
-0.012
9.586
14
15
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
18
Page 17
208
0.07
-0.287
-0.936
209
0.441
0.004
-6.901
210
0.378
0.004
-5.915
211
-1.212
-0.003
-0.655
212
0.378
-0.14
-5.916
213
-2.801
-0.009
4.605
214
0.378
-0.284
-5.916
215
-2.896
-0.01
6.084
216
0.283
-0.285
-4.438
217
-2.097
0.004
3.586
218
0.378
-0.058
-5.916
219
-2.191
0.003
5.065
220
0.283
-0.059
-4.438
221
0.58
0.004
-9.194
222
0.497
0.004
-7.88
223
-1.093
-0.003
-2.62
224
0.497
-0.14
-7.881
225
-2.682
-0.009
2.64
226
0.497
-0.284
-7.882
227
-2.807
-0.01
4.61
228
0.373
-0.285
-5.912
201
-0.112
-1.481
202
-0.096
-1.27
203
-1.73
-0.002
-6.698
204
-0.093
-0.104
-1.292
205
-3.365
-0.005
-12.126
206
-0.09
-0.208
-1.314
207
-3.341
-0.005
-11.808
208
-0.066
-0.208
-0.997
209
-0.454
-7.081
210
-0.389
-6.07
211
-2.023
-0.002
-11.498
212
-0.386
-0.104
-6.092
213
-3.658
-0.005
-16.926
214
-0.382
-0.208
-6.114
215
-3.56
-0.005
-15.408
216
-0.285
-0.208
-4.597
217
-2.876
-0.002
-15.625
218
-0.39
-0.024
-6.104
219
-2.779
-0.002
-14.107
220
-0.293
-0.024
-4.587
221
-0.596
-9.44
222
-0.511
-8.092
223
-2.146
-0.002
-13.52
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
224
Page 18
-0.508
-0.104
-8.114
225
-3.78
-0.005
-18.948
226
-0.505
-0.208
-8.136
227
-3.652
-0.005
-16.925
228
-0.377
-0.208
-6.113
201
-0.083
-0.004
-1.219
202
-0.071
-0.004
-1.045
203
-1.692
-0.008
-6.353
204
-0.035
-0.136
-0.46
205
-3.314
-0.012
-11.661
206
0.001
-0.268
0.126
207
-3.296
-0.011
-11.4
208
0.019
-0.267
0.387
209
-0.29
-0.027
-5.449
210
-0.248
-0.023
-4.67
211
-1.87
-0.027
-9.978
212
-0.212
-0.155
-4.085
213
-3.492
-0.031
-15.286
214
-0.176
-0.287
-3.499
215
-3.429
-0.025
-14.119
216
-0.114
-0.281
-2.332
217
-2.836
-0.024
-14.336
218
-0.208
-0.069
-4.063
219
-2.774
-0.019
-13.169
220
-0.146
-0.064
-2.895
221
-0.378
-0.036
-7.23
222
-0.324
-0.031
-6.197
223
-1.946
-0.035
-11.505
224
-0.288
-0.163
-5.611
225
-3.567
-0.039
-16.813
226
-0.252
-0.295
-5.026
227
-3.486
-0.031
-15.264
228
-0.171
-0.287
-3.476
201
-0.111
-0.006
-1.457
202
-0.095
-0.005
-1.249
203
-1.74
-0.013
-6.709
204
-0.095
-0.154
-1.247
205
-3.386
-0.021
-12.169
206
-0.095
-0.302
-1.244
207
-3.362
-0.02
-11.857
208
-0.071
-0.301
-0.932
209
-0.444
-0.022
-6.955
210
-0.38
-0.019
-5.962
211
-2.026
-0.027
-11.422
19
22
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
23
Page 19
212
-0.38
-0.168
-5.959
213
-3.672
-0.035
-16.882
214
-0.38
-0.317
-5.957
215
-3.576
-0.03
-15.391
216
-0.285
-0.312
-4.466
217
-2.948
-0.018
-15.788
218
-0.38
-0.079
-5.959
219
-2.853
-0.013
-14.298
220
-0.285
-0.074
-4.468
221
-0.585
-0.029
-9.271
222
-0.502
-0.025
-7.946
223
-2.147
-0.033
-13.406
224
-0.502
-0.174
-7.944
225
-3.793
-0.041
-18.866
226
-0.502
-0.323
-7.942
227
-3.667
-0.035
-16.88
228
-0.376
-0.317
-5.955
201
-0.109
-0.001
-1.448
202
-0.094
-0.001
-1.241
203
-1.684
-0.01
-6.501
204
-0.094
-0.152
-1.242
205
-3.274
-0.019
-11.761
206
-0.094
-0.302
-1.242
207
-3.251
-0.019
-11.451
208
-0.07
-0.302
-0.932
209
-0.441
-0.013
-6.878
210
-0.378
-0.011
-5.896
211
-1.968
-0.02
-11.156
212
-0.378
-0.161
-5.896
213
-3.559
-0.028
-16.416
214
-0.378
-0.312
-5.897
215
-3.464
-0.026
-14.942
216
-0.283
-0.309
-4.423
217
-2.855
-0.009
-15.397
218
-0.378
-0.072
-5.897
219
-2.76
-0.007
-13.923
220
-0.283
-0.07
-4.423
221
-0.58
-0.017
-9.164
222
-0.497
-0.014
-7.855
223
-2.087
-0.023
-13.115
224
-0.497
-0.165
-7.856
225
-3.678
-0.032
-18.375
226
-0.497
-0.315
-7.857
227
-3.553
-0.028
-16.411
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 20
228
-0.373
-0.312
-5.893
201
-0.069
-0.108
-1.513
202
-0.059
-0.092
-1.297
203
-1.193
-0.344
-4.216
204
-0.437
-2.589
-10.528
205
-2.328
-0.596
-7.136
206
-0.816
-5.086
-19.76
207
-2.313
-0.573
-6.811
208
-0.801
-5.063
-19.435
209
-0.304
-0.437
-6.768
210
-0.26
-0.374
-5.801
211
-1.395
-0.626
-8.72
212
-0.639
-2.871
-15.032
213
-2.529
-0.878
-11.639
214
-1.017
-5.368
-24.263
215
-2.464
-0.785
-10.189
216
-0.952
-5.274
-22.813
217
-2.741
-0.638
-11.718
218
-0.613
-2.048
-12.462
219
-2.676
-0.545
-10.268
220
-0.548
-1.955
-11.012
221
-0.403
-0.575
-8.981
222
-0.346
-0.493
-7.698
223
-1.48
-0.745
-10.617
224
-0.724
-2.99
-16.929
225
-2.614
-0.997
-13.536
226
-1.102
-5.487
-26.16
227
-2.528
-0.874
-11.612
228
-1.016
-5.364
-24.236
201
0.064
0.013
-0.622
202
0.055
0.011
-0.533
203
-0.542
0.006
1.759
204
0.057
-0.09
-0.538
205
-1.138
0.001
4.051
206
0.058
-0.191
-0.544
207
-1.152
-0.002
4.184
208
0.045
-0.194
-0.411
209
0.162
0.034
-1.719
210
0.139
0.029
-1.474
211
-0.458
0.024
0.818
212
0.141
-0.072
-1.479
213
-1.054
0.019
3.11
214
0.142
-0.173
-1.485
215
-1.089
0.012
3.479
26
27
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 21
216
0.108
-0.18
-1.116
217
-3.144
0.029
13.804
218
0.139
0.014
-1.469
219
-3.179
0.022
14.172
220
0.104
0.007
-1.101
221
0.204
0.043
-2.181
222
0.175
0.037
-1.87
223
-0.422
0.032
0.422
224
0.177
-0.064
-1.875
225
-1.018
0.028
2.714
226
0.178
-0.164
-1.881
227
-1.062
0.018
3.182
228
0.135
-0.174
-1.413
201
0.105
0.004
-1.082
202
0.09
0.004
-0.928
203
-1.02
-0.001
3.724
204
0.091
-0.098
-0.942
205
-2.131
-0.006
8.376
206
0.092
-0.2
-0.956
207
-2.153
-0.007
8.608
208
0.069
-0.201
-0.725
209
0.298
0.02
-3.214
210
0.256
0.017
-2.755
211
-0.855
0.012
1.897
212
0.256
-0.085
-2.77
213
-1.965
0.007
6.549
214
0.257
-0.186
-2.784
215
-2.029
0.003
7.238
216
0.193
-0.191
-2.095
217
-3.028
0.017
12.543
218
0.254
-2.74
219
-3.092
0.013
13.232
220
0.19
-0.004
-2.051
221
0.379
0.027
-4.112
222
0.325
0.023
-3.524
223
-0.785
0.018
1.128
224
0.326
-0.079
-3.539
225
-1.896
0.013
5.78
226
0.327
-0.18
-3.553
227
-1.977
0.008
6.661
228
0.245
-0.186
-2.672
201
0.113
0.003
-1.175
202
0.097
0.002
-1.007
203
-0.985
-0.001
3.508
28
29
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
30
Page 22
204
0.096
-0.099
-0.993
205
-2.068
-0.004
8.022
206
0.094
-0.201
-0.98
207
-2.092
-0.005
8.274
208
0.07
-0.201
-0.728
209
0.328
0.001
-3.553
210
0.281
0.001
-3.046
211
-0.802
-0.002
1.469
212
0.279
-0.1
-3.032
213
-1.884
-0.005
5.983
214
0.278
-0.202
-3.018
215
-1.954
-0.006
6.745
216
0.207
-0.202
-2.257
217
-3.004
0.003
12.218
218
0.282
-0.015
-3.064
219
-3.074
0.002
12.98
220
0.212
-0.016
-2.302
221
0.419
-4.554
222
0.359
-3.904
223
-0.724
-0.003
0.611
224
0.357
-0.102
-3.89
225
-1.806
-0.006
5.125
226
0.356
-0.203
-3.876
227
-1.896
-0.006
6.101
228
0.266
-0.203
-2.9
201
0.113
-1.176
202
0.097
-1.008
203
-0.987
-0.003
3.526
204
0.08
-0.102
-0.761
205
-2.071
-0.006
8.061
206
0.064
-0.205
-0.514
207
-2.095
-0.006
8.313
208
0.039
-0.205
-0.262
209
0.329
0.01
-3.557
210
0.282
0.008
-3.049
211
-0.802
0.005
1.485
212
0.265
-0.094
-2.802
213
-1.886
0.002
6.02
214
0.248
-0.196
-2.555
215
-1.957
6.782
216
0.178
-0.199
-1.792
217
-2.993
0.013
12.12
218
0.27
-0.008
-2.914
219
-3.063
0.011
12.883
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
220
0.199
-0.01
221
0.419
222
0.359
223
Page 23
-2.152
0.014
-4.56
0.012
-3.908
-0.725
0.009
0.626
224
0.342
-0.09
-3.661
225
-1.809
0.006
5.16
226
0.325
-0.193
-3.414
227
-1.899
0.003
6.138
228
0.235
-0.196
-2.437
201
0.032
-0.108
-0.802
202
0.028
-0.092
-0.688
203
-0.755
0.022
1.575
204
0.232
-1.516
-5.313
205
-1.537
0.136
3.837
206
0.436
-2.94
-9.939
207
-1.544
0.16
4.009
208
0.429
-2.917
-9.767
209
0.113
-0.357
-2.692
210
0.097
-0.306
-2.308
211
-0.685
-0.192
-0.045
212
0.301
-1.73
-6.933
213
-1.468
-0.077
2.217
214
0.505
-3.154
-11.559
215
-1.492
-0.001
2.794
216
0.481
-3.078
-10.982
217
-1.904
0.138
4.769
218
0.261
-0.891
-4.511
219
-1.928
0.215
5.346
220
0.236
-0.814
-3.934
221
0.148
-0.461
-3.487
222
0.127
-0.395
-2.989
223
-0.655
-0.28
-0.727
224
0.331
-1.819
-7.615
225
-1.438
-0.166
1.536
226
0.535
-3.243
-12.24
227
-1.469
-0.067
2.283
228
0.503
-3.144
-11.493
201
-0.064
0.013
-0.622
202
-0.055
0.011
-0.533
203
-0.653
0.016
-2.825
204
-0.054
-0.082
-0.525
31
32
205
-1.25
0.02
-5.117
206
-0.052
-0.175
-0.517
207
-1.237
0.018
-4.984
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
33
Page 24
208
-0.038
-0.177
-0.384
209
-0.162
0.034
-1.719
210
-0.139
0.029
-1.474
211
-0.737
0.034
-3.766
212
-0.138
-0.064
-1.466
213
-1.334
0.038
-6.058
214
-0.136
-0.157
-1.458
215
-1.3
0.031
-5.689
216
-0.101
-0.164
-1.089
217
-3.429
0.029
-16.751
218
-0.139
0.014
-1.469
219
-3.394
0.022
-16.383
220
-0.104
0.007
-1.101
221
-0.204
0.043
-2.181
222
-0.175
0.037
-1.87
223
-0.773
0.042
-4.162
224
-0.174
-0.056
-1.862
225
-1.37
0.047
-6.454
226
-0.172
-0.148
-1.854
227
-1.327
0.037
-5.986
228
-0.128
-0.158
-1.386
201
-0.105
0.004
-1.082
202
-0.09
0.004
-0.928
203
-1.202
0.008
-5.579
204
-0.092
-0.089
-0.955
205
-2.314
0.013
-10.23
206
-0.095
-0.182
-0.982
207
-2.292
0.012
-9.998
208
-0.072
-0.183
-0.75
209
-0.298
0.02
-3.216
210
-0.256
0.017
-2.756
211
-1.368
0.022
-7.408
212
-0.258
-0.076
-2.784
213
-2.48
0.026
-12.059
214
-0.26
-0.169
-2.811
215
-2.416
0.022
-11.37
216
-0.197
-0.173
-2.122
217
-3.545
0.017
-18.053
218
-0.254
-2.741
219
-3.481
0.013
-17.364
220
-0.19
-0.004
-2.052
221
-0.379
0.027
-4.113
222
-0.325
0.023
-3.526
223
-1.437
0.028
-8.177
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
224
-0.328
225
226
Page 25
-0.07
-3.553
-2.549
0.032
-12.828
-0.33
-0.163
-3.58
227
-2.468
0.027
-11.947
228
-0.249
-0.168
-2.699
201
-0.113
0.003
-1.173
202
-0.097
0.002
-1.006
203
-1.181
0.006
-5.52
204
-0.095
-0.09
-0.982
205
-2.265
0.009
-10.034
206
-0.092
-0.182
-0.958
207
-2.241
0.008
-9.783
208
-0.068
-0.182
-0.706
209
-0.328
0.001
-3.55
210
-0.281
0.001
-3.043
211
-1.365
0.004
-7.558
212
-0.278
-0.091
-3.019
213
-2.449
0.008
-12.072
214
-0.276
-0.183
-2.995
215
-2.379
0.007
-11.311
216
-0.206
-0.183
-2.234
217
-3.572
-18.309
218
-0.282
-0.015
-3.061
219
-3.502
-0.001
-17.548
220
-0.212
-0.016
-2.3
221
-0.419
-4.55
222
-0.359
-3.9
223
-1.443
0.003
-8.414
224
-0.356
-0.092
-3.876
225
-2.527
0.006
-12.929
226
-0.354
-0.184
-3.852
227
-2.437
0.006
-11.954
228
-0.264
-0.184
-2.877
201
-0.113
-1.175
202
-0.097
-1.007
203
-1.183
0.003
-5.541
204
-0.076
-0.093
-0.84
205
-2.268
0.006
-10.076
206
-0.056
-0.186
-0.672
207
-2.244
0.006
-9.824
208
-0.031
-0.186
-0.421
209
-0.329
0.01
-3.553
210
-0.282
0.008
-3.046
211
-1.368
0.012
-7.58
34
35
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
36
212
-0.261
213
214
Page 26
-0.084
-2.878
-2.453
0.015
-12.114
-0.24
-0.177
-2.711
215
-2.383
0.013
-11.353
216
-0.17
-0.179
-1.95
217
-3.562
0.004
-18.217
218
-0.27
-0.008
-2.911
219
-3.492
0.002
-17.455
220
-0.199
-0.01
-2.149
221
-0.419
0.014
-4.554
222
-0.359
0.012
-3.904
223
-1.444
0.015
-8.438
224
-0.338
-0.081
-3.736
225
-2.53
0.018
-12.972
226
-0.317
-0.174
-3.569
227
-2.44
0.015
-11.997
228
-0.227
-0.177
-2.593
201
-0.101
-0.094
-0.707
202
-0.086
-0.08
-0.606
203
-0.878
-0.216
-3.041
204
-0.44
-1.047
-4.062
205
-1.67
-0.352
-5.476
206
-0.794
-2.013
-7.518
207
-1.649
-0.332
-5.325
208
-0.772
-1.993
-7.367
209
-0.305
-0.315
-2.374
210
-0.262
-0.27
-2.035
211
-1.054
-0.406
-4.47
212
-0.615
-1.236
-5.491
213
-1.846
-0.542
-6.906
214
-0.969
-2.203
-8.947
215
-1.78
-0.475
-6.397
216
-0.903
-2.135
-8.438
217
-2.3
-0.757
-9.681
218
-0.406
-0.857
-4.197
219
-2.235
-0.69
-9.172
220
-0.34
-0.789
-3.688
221
-0.391
-0.407
-3.077
222
-0.335
-0.349
-2.638
223
-1.127
-0.485
-5.073
224
-0.688
-1.316
-6.094
225
-1.919
-0.621
-7.508
226
-1.042
-2.282
-9.55
227
-1.835
-0.534
-6.849
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
228
-0.958
-2.195
-8.89
Page 27
0
LC#
Fx
Fy
Fz
Mx
My
201
0.101
0.116
-0.968
-0.012
0.01
202
0.086
0.1
-0.829
-0.01
0.009
203
-0.822
-0.35
2.312
0.035
-0.082
204
-0.425
-2.088
7.567
0.209
-0.042
205
-1.731
-0.8
5.454
0.08
-0.173
206
-0.936
-4.276
15.964
0.428
-0.094
207
-1.753
-0.824
5.661
0.082
-0.175
208
-0.958
-4.301
16.172
0.43
-0.096
209
0.301
0.517
-3.266
-0.052
0.03
210
0.258
0.443
-2.8
-0.044
0.026
211
-0.651
-0.007
0.342
0.001
-0.065
212
-0.253
-1.745
5.597
0.175
-0.025
213
-1.56
-0.456
3.483
0.046
-0.156
214
-0.764
-3.933
13.994
0.393
-0.076
215
-1.624
-0.567
4.183
0.057
-0.162
216
-0.829
-4.044
14.694
0.404
-0.083
217
-1.518
-0.118
2.314
0.012
-0.152
218
-0.072
-1.243
3.925
0.124
-0.007
219
-1.582
-0.229
3.014
0.023
-0.158
220
-0.137
-1.354
4.625
0.135
-0.014
221
0.385
0.685
-4.234
-0.068
0.039
222
0.33
0.587
-3.629
-0.059
0.033
223
-0.579
0.137
-0.487
-0.014
-0.058
224
-0.181
-1.601
4.768
0.16
-0.018
225
-1.488
-0.312
2.654
0.031
-0.149
226
-0.692
-3.789
13.165
0.379
-0.069
227
-1.57
-0.459
3.561
0.046
-0.157
228
-0.775
-3.936
14.072
0.394
-0.077
201
-0.031
0.134
-1.171
-0.013
-0.003
202
-0.026
0.115
-1.003
-0.012
-0.003
203
-0.864
0.17
-2.503
-0.017
-0.086
204
0.355
-2.39
8.306
0.239
0.036
205
-1.702
0.226
-4.003
-0.023
-0.17
206
0.737
-4.896
17.616
0.49
0.074
207
-1.695
0.197
-3.753
-0.02
-0.17
208
0.743
-4.925
17.867
0.492
0.074
209
-0.092
0.57
-3.923
-0.057
-0.009
210
-0.079
0.488
-3.363
-0.049
-0.008
211
-0.917
0.544
-4.863
-0.054
-0.092
212
0.302
-2.017
5.947
0.202
0.03
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
213
Page 28
-1.754
0.599
-6.363
-0.175
214
0.684
-4.523
15.257
0.452
0.068
215
-1.735
0.477
-5.522
-0.048
-0.173
216
0.704
-4.645
16.097
0.464
0.07
217
-1.857
0.971
-7.968
-0.097
-0.186
218
0.279
-1.195
3.378
0.119
0.028
219
-1.837
0.849
-7.127
-0.085
-0.184
220
0.299
-1.317
4.219
0.132
0.03
221
-0.119
0.753
-5.082
-0.075
-0.012
222
-0.102
0.646
-4.356
-0.065
-0.01
223
-0.94
0.701
-5.856
-0.07
-0.094
224
0.28
-1.86
4.953
0.186
0.028
225
-1.777
0.756
-7.356
-0.076
-0.178
226
0.661
-4.366
14.263
0.437
0.066
227
-1.752
0.595
-6.267
-0.059
-0.175
228
0.687
-4.527
15.352
0.453
0.069
201
0.077
0.09
-1.476
-0.009
0.008
202
0.066
0.077
-1.265
-0.008
0.007
203
-0.809
-0.18
1.867
0.018
-0.081
204
-0.126
-1.322
3.131
0.132
-0.013
205
-1.684
-0.437
4.999
0.044
-0.168
206
-0.318
-2.72
7.527
0.272
-0.032
207
-1.701
-0.456
5.315
0.046
-0.17
208
-0.335
-2.739
7.843
0.274
-0.033
209
0.258
0.291
-4.451
-0.029
0.026
210
0.221
0.25
-3.815
-0.025
0.022
211
-0.654
-0.007
-0.683
0.001
-0.065
212
0.029
-1.149
0.581
0.115
0.003
213
-1.53
-0.264
2.449
0.026
-0.153
214
-0.163
-2.547
4.977
0.255
-0.016
215
-1.585
-0.326
3.403
0.033
-0.158
216
-0.218
-2.61
5.931
0.261
-0.022
217
-1.294
-0.196
1.731
0.02
-0.129
218
0.069
-0.322
-1.748
0.032
0.007
219
-1.349
-0.258
2.684
0.026
-0.135
220
0.014
-0.384
-0.794
0.038
0.001
221
0.333
0.377
-5.704
-0.038
0.033
222
0.286
0.323
-4.889
-0.032
0.029
223
-0.59
0.066
-1.757
-0.007
-0.059
224
0.094
-1.076
-0.493
0.108
0.009
225
-1.465
-0.191
1.375
0.019
-0.146
226
-0.098
-2.474
3.903
0.247
-0.01
227
-1.536
-0.272
2.597
0.027
-0.154
228
-0.17
-2.555
5.125
0.255
-0.017
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 29
201
-0.146
0.076
-1.389
-0.008
-0.015
202
-0.125
0.065
-1.191
-0.006
-0.012
203
-1.011
0.329
-4.473
-0.033
-0.101
204
0.205
-0.883
2.084
0.088
0.02
205
-1.898
0.593
-7.755
-0.059
-0.19
206
0.534
-1.831
5.358
0.183
0.053
207
-1.866
0.577
-7.458
-0.058
-0.187
208
0.566
-1.847
5.656
0.185
0.057
209
-0.456
0.249
-4.179
-0.025
-0.046
210
-0.391
0.214
-3.582
-0.021
-0.039
211
-1.278
0.478
-6.865
-0.048
-0.128
212
-0.062
-0.734
-0.308
0.073
-0.006
213
-2.164
0.742
-10.147
-0.074
-0.216
214
0.268
-1.682
2.967
0.168
0.027
215
-2.066
0.688
-9.251
-0.069
-0.207
216
0.366
-1.736
3.862
0.174
0.037
217
-1.938
0.706
-9.582
-0.071
-0.194
218
-0.258
-0.358
-1.557
0.036
-0.026
219
-1.84
0.652
-8.687
-0.065
-0.184
220
-0.16
-0.411
-0.662
0.041
-0.016
221
-0.588
0.322
-5.354
-0.032
-0.059
222
-0.504
0.276
-4.589
-0.028
-0.05
223
-1.39
0.54
-7.871
-0.054
-0.139
224
-0.174
-0.672
-1.315
0.067
-0.017
225
-2.277
0.804
-11.154
-0.08
-0.228
226
0.155
-1.62
1.96
0.162
0.016
227
-2.151
0.735
-10.007
-0.074
-0.215
228
0.281
-1.689
3.107
0.169
0.028
201
0.136
-0.088
-1.55
0.009
0.014
202
0.116
-0.076
-1.329
0.008
0.012
203
-0.948
-0.172
0.431
0.017
-0.095
204
0.617
-2.254
-9.633
0.225
0.062
205
-2.012
-0.269
2.191
0.027
-0.201
206
1.118
-4.432
-17.938
0.443
0.112
207
-2.041
-0.25
2.524
0.025
-0.204
208
1.089
-4.414
-17.606
0.441
0.109
209
0.493
-0.37
-6.502
0.037
0.049
210
0.422
-0.317
-5.573
0.032
0.042
211
-0.642
-0.414
-3.813
0.041
-0.064
212
0.923
-2.495
-13.878
0.25
0.092
213
-1.706
-0.51
-2.053
0.051
-0.171
214
1.424
-4.674
-22.183
0.467
0.142
215
-1.811
-0.431
-0.66
0.043
-0.181
216
1.318
-4.594
-20.789
0.459
0.132
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
217
Page 30
-2.066
0.01
1.353
-0.207
218
0.746
-1.994
-12.216
0.199
0.075
219
-2.172
0.089
2.746
-0.009
-0.217
220
0.641
-1.915
-10.823
0.191
0.064
221
0.643
-0.487
-8.588
0.049
0.064
222
0.551
-0.418
-7.361
0.042
0.055
223
-0.513
-0.514
-5.601
0.051
-0.051
224
1.052
-2.596
-15.666
0.26
0.105
225
-1.577
-0.611
-3.841
0.061
-0.158
226
1.552
-4.774
-23.971
0.477
0.155
227
-1.715
-0.507
-2.001
0.051
-0.171
228
1.415
-4.67
-22.13
0.467
0.141
201
0.112
0.001
-1.68
0.011
202
0.096
0.001
-1.44
0.01
203
-1.537
-0.002
3.981
-0.154
204
0.105
-0.099
-1.498
0.01
0.01
205
-3.17
-0.005
9.403
0.001
-0.317
206
0.114
-0.199
-1.555
0.02
0.011
207
-3.194
-0.006
9.763
0.001
-0.319
208
0.09
-0.199
-1.195
0.02
0.009
209
0.452
0.007
-7.27
-0.001
0.045
210
0.388
0.006
-6.232
-0.001
0.039
211
-1.245
0.003
-0.81
-0.125
212
0.396
-0.094
-6.289
0.009
0.04
213
-2.878
4.611
-0.288
214
0.405
-0.194
-6.347
0.019
0.041
215
-2.975
-0.002
6.169
-0.297
216
0.308
-0.196
-4.789
0.02
0.031
217
-2.096
0.008
3.326
-0.001
-0.21
218
0.389
-0.016
-6.266
0.002
0.039
219
-2.193
0.006
4.884
-0.001
-0.219
220
0.292
-0.018
-4.708
0.002
0.029
221
0.595
0.008
-9.624
-0.001
0.06
222
0.51
0.007
-8.249
-0.001
0.051
223
-1.123
0.004
-2.827
-0.112
224
0.519
-0.093
-8.307
0.009
0.052
225
-2.756
0.001
2.594
-0.276
226
0.528
-0.193
-8.364
0.019
0.053
227
-2.883
-0.001
4.656
-0.288
228
0.4
-0.195
-6.302
0.019
0.04
201
0.083
-0.003
-1.004
0.008
202
0.071
-0.002
-0.861
0.007
203
-1.558
-0.009
4.578
0.001
-0.156
204
0.033
-0.128
-0.265
0.013
0.003
10
11
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
205
-3.187
-0.015
206
-0.004
207
-3.204
208
209
Page 31
10.016
0.002
-0.319
-0.254
0.331
0.025
-0.015
10.231
0.001
-0.32
-0.022
-0.253
0.547
0.025
-0.002
0.293
-0.018
-3.735
0.002
0.029
210
0.251
-0.016
-3.202
0.002
0.025
211
-1.378
-0.022
2.237
0.002
-0.138
212
0.213
-0.141
-2.606
0.014
0.021
213
-3.007
-0.028
7.675
0.003
-0.301
214
0.176
-0.267
-2.01
0.027
0.018
215
-3.069
-0.025
8.475
0.002
-0.307
216
0.113
-0.263
-1.209
0.026
0.011
217
-2.335
-0.014
6.485
0.001
-0.234
218
0.212
-0.062
-2.536
0.006
0.021
219
-2.398
-0.01
7.286
0.001
-0.24
220
0.149
-0.058
-1.735
0.006
0.015
221
0.381
-0.025
-4.886
0.003
0.038
222
0.326
-0.022
-4.188
0.002
0.033
223
-1.302
-0.028
1.25
0.003
-0.13
224
0.289
-0.147
-3.592
0.015
0.029
225
-2.931
-0.034
6.689
0.003
-0.293
226
0.251
-0.273
-2.996
0.027
0.025
227
-3.013
-0.029
7.736
0.003
-0.301
228
0.17
-0.267
-1.949
0.027
0.017
201
0.111
0.003
-1.652
0.011
202
0.095
0.002
-1.416
0.009
203
-1.549
-0.004
4.045
-0.155
204
0.095
-0.139
-1.415
0.014
0.009
205
-3.193
-0.01
9.505
0.001
-0.319
206
0.095
-0.281
-1.415
0.028
0.009
207
-3.217
-0.011
9.859
0.001
-0.322
208
0.071
-0.281
-1.061
0.028
0.007
209
0.444
0.011
-7.122
-0.001
0.044
210
0.38
0.01
-6.105
-0.001
0.038
211
-1.264
0.003
-0.644
-0.126
212
0.38
-0.132
-6.104
0.013
0.038
213
-2.908
-0.003
4.817
-0.291
214
0.38
-0.274
-6.103
0.027
0.038
215
-3.003
-0.006
6.343
0.001
-0.3
216
0.285
-0.276
-4.577
0.028
0.029
217
-2.185
0.008
3.722
-0.001
-0.218
218
0.38
-0.049
-6.1
0.005
0.038
219
-2.28
0.006
5.248
-0.001
-0.228
220
0.285
-0.051
-4.574
0.005
0.029
14
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
221
Page 32
0.584
0.015
-9.425
-0.002
0.058
222
0.5
0.013
-8.079
-0.001
0.05
223
-1.144
0.007
-2.618
-0.001
-0.114
224
0.5
-0.128
-8.078
0.013
0.05
225
-2.788
2.843
-0.279
226
0.5
-0.27
-8.077
0.027
0.05
227
-2.913
-0.003
4.863
-0.291
228
0.375
-0.273
-6.057
0.027
0.038
201
0.109
0.001
-1.656
0.011
202
0.094
0.001
-1.42
0.009
203
-1.496
-0.005
3.84
0.001
-0.15
204
0.094
-0.143
-1.421
0.014
0.009
205
-3.086
-0.012
9.1
0.001
-0.309
206
0.094
-0.287
-1.421
0.029
0.009
207
-3.109
-0.012
9.455
0.001
-0.311
208
0.07
-0.287
-1.066
0.029
0.007
209
0.441
0.004
-7.104
0.044
210
0.378
0.004
-6.089
0.038
211
-1.212
-0.003
-0.829
-0.121
212
0.378
-0.14
-6.09
0.014
0.038
213
-2.801
-0.009
4.431
0.001
-0.28
214
0.378
-0.284
-6.091
0.028
0.038
215
-2.896
-0.01
5.953
0.001
-0.29
216
0.283
-0.285
-4.568
0.029
0.028
217
-2.097
0.004
3.412
-0.21
218
0.378
-0.058
-6.09
0.006
0.038
219
-2.191
0.003
4.934
-0.219
220
0.283
-0.059
-4.568
0.006
0.028
221
0.58
0.004
-9.397
0.058
15
222
0.497
0.004
-8.055
0.05
223
-1.093
-0.003
-2.795
-0.109
224
0.497
-0.14
-8.055
0.014
0.05
225
-2.682
-0.009
2.465
0.001
-0.268
226
0.497
-0.284
-8.056
0.028
0.05
227
-2.807
-0.01
4.479
0.001
-0.281
228
0.373
-0.285
-6.043
0.029
0.037
201
-0.112
-1.684
-0.011
202
-0.096
-1.444
-0.01
203
-1.73
-0.002
-6.872
-0.173
204
-0.093
-0.104
-1.466
0.01
-0.009
205
-3.365
-0.005
-12.3
-0.336
206
-0.09
-0.208
-1.489
0.021
-0.009
207
-3.341
-0.005
-11.939
-0.334
208
-0.066
-0.208
-1.128
0.021
-0.007
18
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
209
-0.454
210
-0.389
211
-2.023
212
-0.386
213
Page 33
-7.284
-0.045
-6.244
-0.039
-0.002
-11.672
-0.202
-0.104
-6.266
0.01
-0.039
-3.658
-0.005
-17.1
-0.366
214
-0.382
-0.208
-6.289
0.021
-0.038
215
-3.56
-0.005
-15.539
-0.356
216
-0.285
-0.208
-4.728
0.021
-0.029
217
-2.876
-0.002
-15.799
-0.288
218
-0.39
-0.024
-6.278
0.002
-0.039
219
-2.779
-0.002
-14.238
-0.278
220
-0.293
-0.024
-4.717
0.002
-0.029
221
-0.596
-9.643
-0.06
222
-0.511
-8.266
-0.051
223
-2.146
-0.002
-13.694
-0.215
224
-0.508
-0.104
-8.288
0.01
-0.051
225
-3.78
-0.005
-19.122
-0.378
226
-0.505
-0.208
-8.311
0.021
-0.05
227
-3.652
-0.005
-17.055
-0.365
228
-0.377
-0.208
-6.244
0.021
-0.038
201
-0.083
-0.004
-1.423
-0.008
202
-0.071
-0.004
-1.219
-0.007
203
-1.692
-0.008
-6.527
0.001
-0.169
204
-0.035
-0.136
-0.634
0.014
-0.003
205
-3.314
-0.012
-11.835
0.001
-0.331
206
0.001
-0.268
-0.048
0.027
207
-3.296
-0.011
-11.531
0.001
-0.33
208
0.019
-0.267
0.257
0.027
0.002
209
-0.29
-0.027
-5.652
0.003
-0.029
210
-0.248
-0.023
-4.845
0.002
-0.025
211
-1.87
-0.027
-10.153
0.003
-0.187
212
-0.212
-0.155
-4.259
0.015
-0.021
213
-3.492
-0.031
-15.461
0.003
-0.349
214
-0.176
-0.287
-3.673
0.029
-0.018
215
-3.429
-0.025
-14.249
0.003
-0.343
216
-0.114
-0.281
-2.462
0.028
-0.011
217
-2.836
-0.024
-14.511
0.002
-0.284
218
-0.208
-0.069
-4.237
0.007
-0.021
219
-2.774
-0.019
-13.299
0.002
-0.277
220
-0.146
-0.064
-3.026
0.006
-0.015
221
-0.378
-0.036
-7.433
0.004
-0.038
222
-0.324
-0.031
-6.371
0.003
-0.032
223
-1.946
-0.035
-11.679
0.004
-0.195
224
-0.288
-0.163
-5.785
0.016
-0.029
19
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
225
-3.567
-0.039
226
-0.252
-0.295
227
-3.486
-0.031
228
-0.171
-0.287
201
-0.111
202
203
-16.987
Page 34
0.004
-0.357
-5.2
0.03
-0.025
-15.394
0.003
-0.349
-3.607
0.029
-0.017
-0.006
-1.661
0.001
-0.011
-0.095
-0.005
-1.423
-0.009
-1.74
-0.013
-6.883
0.001
-0.174
204
-0.095
-0.154
-1.421
0.015
-0.009
205
-3.386
-0.021
-12.343
0.002
-0.339
206
-0.095
-0.302
-1.419
0.03
-0.009
207
-3.362
-0.02
-11.988
0.002
-0.336
208
-0.071
-0.301
-1.063
0.03
-0.007
209
-0.444
-0.022
-7.158
0.002
-0.044
210
-0.38
-0.019
-6.136
0.002
-0.038
211
-2.026
-0.027
-11.596
0.003
-0.203
212
-0.38
-0.168
-6.133
0.017
-0.038
213
-3.672
-0.035
-17.056
0.004
-0.367
214
-0.38
-0.317
-6.131
0.032
-0.038
215
-3.576
-0.03
-15.522
0.003
-0.358
216
-0.285
-0.312
-4.597
0.031
-0.029
217
-2.948
-0.018
-15.962
0.002
-0.295
218
-0.38
-0.079
-6.133
0.008
-0.038
219
-2.853
-0.013
-14.428
0.001
-0.285
220
-0.285
-0.074
-4.599
0.007
-0.029
221
-0.585
-0.029
-9.474
0.003
-0.059
222
-0.502
-0.025
-8.121
0.003
-0.05
223
-2.147
-0.033
-13.581
0.003
-0.215
224
-0.502
-0.174
-8.118
0.017
-0.05
225
-3.793
-0.041
-19.041
0.004
-0.379
226
-0.502
-0.323
-8.116
0.032
-0.05
227
-3.667
-0.035
-17.01
0.003
-0.367
228
-0.376
-0.317
-6.086
0.032
-0.038
201
-0.109
-0.001
-1.651
-0.011
202
-0.094
-0.001
-1.415
-0.009
203
-1.684
-0.01
-6.675
0.001
-0.168
204
-0.094
-0.152
-1.416
0.015
-0.009
205
-3.274
-0.019
-11.935
0.002
-0.327
206
-0.094
-0.302
-1.417
0.03
-0.009
207
-3.251
-0.019
-11.581
0.002
-0.325
208
-0.07
-0.302
-1.063
0.03
-0.007
209
-0.441
-0.013
-7.081
0.001
-0.044
210
-0.378
-0.011
-6.07
0.001
-0.038
211
-1.968
-0.02
-11.33
0.002
-0.197
212
-0.378
-0.161
-6.071
0.016
-0.038
22
23
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
213
-3.559
-0.028
214
-0.378
215
-3.464
216
Page 35
-16.59
0.003
-0.356
-0.312
-6.071
0.031
-0.038
-0.026
-15.072
0.003
-0.346
-0.283
-0.309
-4.554
0.031
-0.028
217
-2.855
-0.009
-15.571
0.001
-0.285
218
-0.378
-0.072
-6.071
0.007
-0.038
219
-2.76
-0.007
-14.053
0.001
-0.276
220
-0.283
-0.07
-4.554
0.007
-0.028
221
-0.58
-0.017
-9.368
0.002
-0.058
222
-0.497
-0.014
-8.029
0.001
-0.05
223
-2.087
-0.023
-13.289
0.002
-0.209
224
-0.497
-0.165
-8.03
0.016
-0.05
225
-3.678
-0.032
-18.549
0.003
-0.368
226
-0.497
-0.315
-8.031
0.032
-0.05
227
-3.553
-0.028
-16.542
0.003
-0.355
228
-0.373
-0.312
-6.024
0.031
-0.037
201
-0.069
-0.108
-1.717
0.011
-0.007
202
-0.059
-0.092
-1.471
0.009
-0.006
203
-1.193
-0.344
-4.391
0.034
-0.119
204
-0.437
-2.589
-10.703
0.259
-0.044
205
-2.328
-0.596
-7.31
0.06
-0.233
206
-0.816
-5.086
-19.934
0.509
-0.082
207
-2.313
-0.573
-6.942
0.057
-0.231
208
-0.801
-5.063
-19.566
0.506
-0.08
209
-0.304
-0.437
-6.971
0.044
-0.03
210
-0.26
-0.374
-5.975
0.037
-0.026
211
-1.395
-0.626
-8.894
0.063
-0.139
212
-0.639
-2.871
-15.206
0.287
-0.064
213
-2.529
-0.878
-11.813
0.088
-0.253
214
-1.017
-5.368
-24.437
0.537
-0.102
215
-2.464
-0.785
-10.32
0.078
-0.246
216
-0.952
-5.274
-22.944
0.527
-0.095
217
-2.741
-0.638
-11.892
0.064
-0.274
218
-0.613
-2.048
-12.636
0.205
-0.061
219
-2.676
-0.545
-10.399
0.054
-0.268
220
-0.548
-1.955
-11.143
0.195
-0.055
221
-0.403
-0.575
-9.184
0.058
-0.04
222
-0.346
-0.493
-7.872
0.049
-0.035
223
-1.48
-0.745
-10.791
0.075
-0.148
224
-0.724
-2.99
-17.103
0.299
-0.072
225
-2.614
-0.997
-13.711
0.1
-0.261
226
-1.102
-5.487
-26.335
0.549
-0.11
227
-2.528
-0.874
-11.743
0.087
-0.253
228
-1.016
-5.364
-24.367
0.536
-0.102
26
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
201
Page 36
0.064
0.013
-0.825
-0.001
0.006
202
0.055
0.011
-0.707
-0.001
0.006
203
-0.542
0.006
1.585
-0.001
-0.054
204
0.057
-0.09
-0.713
0.009
0.006
205
-1.138
0.001
3.877
-0.114
206
0.058
-0.191
-0.718
0.019
0.006
207
-1.152
-0.002
4.054
-0.115
208
0.045
-0.194
-0.541
0.019
0.004
209
0.162
0.034
-1.922
-0.003
0.016
210
0.139
0.029
-1.648
-0.003
0.014
211
-0.458
0.024
0.644
-0.002
-0.046
212
0.141
-0.072
-1.653
0.007
0.014
213
-1.054
0.019
2.936
-0.002
-0.105
214
0.142
-0.173
-1.659
0.017
0.014
215
-1.089
0.012
3.348
-0.001
-0.109
216
0.108
-0.18
-1.247
0.018
0.011
217
-3.144
0.029
13.63
-0.003
-0.314
218
0.139
0.014
-1.643
-0.001
0.014
219
-3.179
0.022
14.042
-0.002
-0.318
220
0.104
0.007
-1.231
-0.001
0.01
221
0.204
0.043
-2.384
-0.004
0.02
222
0.175
0.037
-2.044
-0.004
0.018
223
-0.422
0.032
0.248
-0.003
-0.042
224
0.177
-0.064
-2.049
0.006
0.018
225
-1.018
0.028
2.54
-0.003
-0.102
226
0.178
-0.164
-2.055
0.016
0.018
227
-1.062
0.018
3.051
-0.002
-0.106
228
0.135
-0.174
-1.544
0.017
0.013
201
0.105
0.004
-1.285
0.01
27
202
0.09
0.004
-1.102
0.009
203
-1.02
-0.001
3.55
-0.102
204
0.091
-0.098
-1.116
0.01
0.009
205
-2.131
-0.006
8.202
0.001
-0.213
206
0.092
-0.2
-1.131
0.02
0.009
207
-2.153
-0.007
8.478
0.001
-0.215
208
0.069
-0.201
-0.855
0.02
0.007
209
0.298
0.02
-3.418
-0.002
0.03
210
0.256
0.017
-2.929
-0.002
0.026
211
-0.855
0.012
1.723
-0.001
-0.085
212
0.256
-0.085
-2.944
0.008
0.026
213
-1.965
0.007
6.375
-0.001
-0.197
214
0.257
-0.186
-2.958
0.019
0.026
215
-2.029
0.003
7.107
-0.203
216
0.193
-0.191
-2.226
0.019
0.019
28
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
217
-3.028
0.017
12.369
Page 37
-0.303
218
0.254
-2.914
0.025
219
-3.092
0.013
13.101
-0.001
-0.309
220
0.19
-0.004
-2.182
0.019
221
0.379
0.027
-4.315
-0.003
0.038
222
0.325
0.023
-3.699
-0.002
0.033
223
-0.785
0.018
0.953
-0.002
-0.079
224
0.326
-0.079
-3.713
0.008
0.033
225
-1.896
0.013
5.605
-0.001
-0.19
226
0.327
-0.18
-3.727
0.018
0.033
227
-1.977
0.008
6.53
-0.001
-0.198
228
0.245
-0.186
-2.803
0.019
0.025
201
0.113
0.003
-1.378
0.011
202
0.097
0.002
-1.181
0.01
203
-0.985
-0.001
3.333
-0.099
204
0.096
-0.099
-1.167
0.01
0.01
205
-2.068
-0.004
7.848
-0.207
206
0.094
-0.201
-1.154
0.02
0.009
207
-2.092
-0.005
8.143
-0.209
208
0.07
-0.201
-0.859
0.02
0.007
209
0.328
0.001
-3.756
0.033
210
0.281
0.001
-3.22
0.028
211
-0.802
-0.002
1.295
-0.08
212
0.279
-0.1
-3.206
0.01
0.028
213
-1.884
-0.005
5.809
0.001
-0.188
214
0.278
-0.202
-3.193
0.02
0.028
215
-1.954
-0.006
6.614
0.001
-0.195
216
0.207
-0.202
-2.388
0.02
0.021
217
-3.004
0.003
12.044
-0.3
218
0.282
-0.015
-3.238
0.002
0.028
219
-3.074
0.002
12.849
-0.307
220
0.212
-0.016
-2.433
0.002
0.021
221
0.419
-4.757
0.042
29
222
0.359
-4.078
0.036
223
-0.724
-0.003
0.437
-0.072
224
0.357
-0.102
-4.064
0.01
0.036
225
-1.806
-0.006
4.951
0.001
-0.181
226
0.356
-0.203
-4.051
0.02
0.036
227
-1.896
-0.006
5.97
0.001
-0.19
228
0.266
-0.203
-3.031
0.02
0.027
201
0.113
-1.379
0.011
202
0.097
-1.182
0.01
203
-0.987
-0.003
3.352
-0.099
204
0.08
-0.102
-0.935
0.01
0.008
30
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
205
-2.071
-0.006
7.887
206
0.064
-0.205
207
-2.095
-0.006
208
0.039
209
Page 38
0.001
-0.207
-0.688
0.02
0.006
8.182
0.001
-0.21
-0.205
-0.392
0.02
0.004
0.329
0.01
-3.761
-0.001
0.033
210
0.282
0.008
-3.223
-0.001
0.028
211
-0.802
0.005
1.311
-0.001
-0.08
212
0.265
-0.094
-2.976
0.009
0.027
213
-1.886
0.002
5.845
-0.189
214
0.248
-0.196
-2.729
0.02
0.025
215
-1.957
6.651
-0.196
216
0.178
-0.199
-1.923
0.02
0.018
217
-2.993
0.013
11.946
-0.001
-0.299
218
0.27
-0.008
-3.088
0.001
0.027
219
-3.063
0.011
12.752
-0.001
-0.306
220
0.199
-0.01
-2.283
0.001
0.02
221
0.419
0.014
-4.763
-0.001
0.042
222
0.359
0.012
-4.083
-0.001
0.036
223
-0.725
0.009
0.452
-0.001
-0.073
224
0.342
-0.09
-3.835
0.009
0.034
225
-1.809
0.006
4.986
-0.001
-0.181
226
0.325
-0.193
-3.588
0.019
0.033
227
-1.899
0.003
6.007
-0.19
228
0.235
-0.196
-2.568
0.02
0.024
201
0.032
-0.108
-1.005
0.011
0.003
202
0.028
-0.092
-0.862
0.009
0.003
203
-0.755
0.022
1.401
-0.002
-0.075
204
0.232
-1.516
-5.487
0.152
0.023
205
-1.537
0.136
3.663
-0.014
-0.154
206
0.436
-2.94
-10.113
0.294
0.044
207
-1.544
0.16
3.878
-0.016
-0.154
208
0.429
-2.917
-9.898
0.292
0.043
209
0.113
-0.357
-2.895
0.036
0.011
210
0.097
-0.306
-2.482
0.031
0.01
211
-0.685
-0.192
-0.219
0.019
-0.069
212
0.301
-1.73
-7.107
0.173
0.03
213
-1.468
-0.077
2.043
0.008
-0.147
214
0.505
-3.154
-11.733
0.315
0.051
215
-1.492
-0.001
2.663
-0.149
216
0.481
-3.078
-11.113
0.308
0.048
217
-1.904
0.138
4.595
-0.014
-0.19
218
0.261
-0.891
-4.685
0.089
0.026
219
-1.928
0.215
5.216
-0.021
-0.193
220
0.236
-0.814
-4.065
0.081
0.024
31
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
221
Page 39
0.148
-0.461
-3.691
0.046
0.015
222
0.127
-0.395
-3.163
0.039
0.013
223
-0.655
-0.28
-0.901
0.028
-0.066
224
0.331
-1.819
-7.789
0.182
0.033
225
-1.438
-0.166
1.361
0.017
-0.144
226
0.535
-3.243
-12.415
0.324
0.054
227
-1.469
-0.067
2.152
0.007
-0.147
228
0.503
-3.144
-11.624
0.314
0.05
201
-0.064
0.013
-0.825
-0.001
-0.006
202
-0.055
0.011
-0.707
-0.001
-0.006
203
-0.653
0.016
-2.999
-0.002
-0.065
204
-0.054
-0.082
-0.699
0.008
-0.005
205
-1.25
0.02
-5.291
-0.002
-0.125
206
-0.052
-0.175
-0.691
0.017
-0.005
207
-1.237
0.018
-5.114
-0.002
-0.124
208
-0.038
-0.177
-0.514
0.018
-0.004
209
-0.162
0.034
-1.922
-0.003
-0.016
210
-0.139
0.029
-1.648
-0.003
-0.014
211
-0.737
0.034
-3.94
-0.003
-0.074
212
-0.138
-0.064
-1.64
0.006
-0.014
213
-1.334
0.038
-6.232
-0.004
-0.133
214
-0.136
-0.157
-1.632
0.016
-0.014
215
-1.3
0.031
-5.82
-0.003
-0.13
216
-0.101
-0.164
-1.22
0.016
-0.01
217
-3.429
0.029
-16.925
-0.003
-0.343
218
-0.139
0.014
-1.643
-0.001
-0.014
219
-3.394
0.022
-16.513
-0.002
-0.339
220
-0.104
0.007
-1.231
-0.001
-0.01
221
-0.204
0.043
-2.384
-0.004
-0.02
222
-0.175
0.037
-2.044
-0.004
-0.018
223
-0.773
0.042
-4.336
-0.004
-0.077
224
-0.174
-0.056
-2.036
0.006
-0.017
225
-1.37
0.047
-6.628
-0.005
-0.137
226
-0.172
-0.148
-2.028
0.015
-0.017
227
-1.327
0.037
-6.117
-0.004
-0.133
228
-0.128
-0.158
-1.517
0.016
-0.013
201
-0.105
0.004
-1.285
-0.01
202
-0.09
0.004
-1.102
-0.009
203
-1.202
0.008
-5.753
-0.001
-0.12
204
-0.092
-0.089
-1.129
0.009
-0.009
205
-2.314
0.013
-10.404
-0.001
-0.231
206
-0.095
-0.182
-1.156
0.018
-0.009
207
-2.292
0.012
-10.129
-0.001
-0.229
208
-0.072
-0.183
-0.881
0.018
-0.007
32
33
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 40
209
-0.298
0.02
-3.419
-0.002
-0.03
210
-0.256
0.017
-2.931
-0.002
-0.026
211
-1.368
0.022
-7.582
-0.002
-0.137
212
-0.258
-0.076
-2.958
0.008
-0.026
213
-2.48
0.026
-12.233
-0.003
-0.248
214
-0.26
-0.169
-2.985
0.017
-0.026
215
-2.416
0.022
-11.5
-0.002
-0.242
216
-0.197
-0.173
-2.252
0.017
-0.02
217
-3.545
0.017
-18.228
-0.002
-0.355
218
-0.254
-2.916
-0.025
219
-3.481
0.013
-17.495
-0.001
-0.348
220
-0.19
-0.004
-2.183
-0.019
221
-0.379
0.027
-4.316
-0.003
-0.038
222
-0.325
0.023
-3.7
-0.002
-0.033
223
-1.437
0.028
-8.351
-0.003
-0.144
224
-0.328
-0.07
-3.727
0.007
-0.033
225
-2.549
0.032
-13.002
-0.003
-0.255
226
-0.33
-0.163
-3.754
0.016
-0.033
227
-2.468
0.027
-12.077
-0.003
-0.247
228
-0.249
-0.168
-2.829
0.017
-0.025
201
-0.113
0.003
-1.376
-0.011
202
-0.097
0.002
-1.18
-0.01
203
-1.181
0.006
-5.694
-0.001
-0.118
204
-0.095
-0.09
-1.156
0.009
-0.009
205
-2.265
0.009
-10.209
-0.001
-0.227
206
-0.092
-0.182
-1.132
0.018
-0.009
207
-2.241
0.008
-9.914
-0.001
-0.224
208
-0.068
-0.182
-0.837
0.018
-0.007
209
-0.328
0.001
-3.754
-0.033
210
-0.281
0.001
-3.217
-0.028
211
-1.365
0.004
-7.732
-0.136
212
-0.278
-0.091
-3.193
0.009
-0.028
213
-2.449
0.008
-12.246
-0.001
-0.245
214
-0.276
-0.183
-3.169
0.018
-0.028
215
-2.379
0.007
-11.442
-0.001
-0.238
216
-0.206
-0.183
-2.365
0.018
-0.021
217
-3.572
-18.483
-0.357
218
-0.282
-0.015
-3.235
0.002
-0.028
219
-3.502
-0.001
-17.679
-0.35
220
-0.212
-0.016
-2.431
0.002
-0.021
221
-0.419
-4.753
-0.042
222
-0.359
-4.074
-0.036
223
-1.443
0.003
-8.589
-0.144
224
-0.356
-0.092
-4.05
0.009
-0.036
34
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
225
-2.527
0.006
226
-0.354
-0.184
227
-2.437
0.006
228
-0.264
-0.184
201
-0.113
202
203
-13.103
Page 41
-0.001
-0.253
-4.026
0.018
-0.035
-12.084
-0.001
-0.244
-3.008
0.018
-0.026
-1.378
-0.011
-0.097
-1.181
-0.01
-1.183
0.003
-5.715
-0.118
204
-0.076
-0.093
-1.014
0.009
-0.008
205
-2.268
0.006
-10.25
-0.001
-0.227
206
-0.056
-0.186
-0.847
0.019
-0.006
207
-2.244
0.006
-9.955
-0.001
-0.224
208
-0.031
-0.186
-0.551
0.019
-0.003
209
-0.329
0.01
-3.756
-0.001
-0.033
210
-0.282
0.008
-3.22
-0.001
-0.028
211
-1.368
0.012
-7.754
-0.001
-0.137
212
-0.261
-0.084
-3.053
0.008
-0.026
213
-2.453
0.015
-12.289
-0.001
-0.245
214
-0.24
-0.177
-2.885
0.018
-0.024
215
-2.383
0.013
-11.484
-0.001
-0.238
216
-0.17
-0.179
-2.08
0.018
-0.017
217
-3.562
0.004
-18.391
-0.356
218
-0.27
-0.008
-3.085
0.001
-0.027
219
-3.492
0.002
-17.586
-0.349
220
-0.199
-0.01
-2.28
0.001
-0.02
221
-0.419
0.014
-4.757
-0.001
-0.042
222
-0.359
0.012
-4.078
-0.001
-0.036
223
-1.444
0.015
-8.612
-0.002
-0.144
224
-0.338
-0.081
-3.911
0.008
-0.034
225
-2.53
0.018
-13.147
-0.002
-0.253
226
-0.317
-0.174
-3.743
0.017
-0.032
227
-2.44
0.015
-12.127
-0.002
-0.244
228
-0.227
-0.177
-2.724
0.018
-0.023
201
-0.101
-0.094
-0.91
0.009
-0.01
202
-0.086
-0.08
-0.78
0.008
-0.009
203
-0.878
-0.216
-3.215
0.022
-0.088
204
-0.44
-1.047
-4.236
0.105
-0.044
205
-1.67
-0.352
-5.651
0.035
-0.167
206
-0.794
-2.013
-7.692
0.201
-0.079
207
-1.649
-0.332
-5.456
0.033
-0.165
208
-0.772
-1.993
-7.497
0.199
-0.077
209
-0.305
-0.315
-2.578
0.031
-0.031
210
-0.262
-0.27
-2.209
0.027
-0.026
211
-1.054
-0.406
-4.645
0.041
-0.105
212
-0.615
-1.236
-5.665
0.124
-0.062
35
36
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
213
-1.846
-0.542
-7.08
214
-0.969
-2.203
215
-1.78
-0.475
216
-0.903
217
Page 42
0.054
-0.185
-9.121
0.22
-0.097
-6.527
0.047
-0.178
-2.135
-8.569
0.214
-0.09
-2.3
-0.757
-9.855
0.076
-0.23
218
-0.406
-0.857
-4.371
0.086
-0.041
219
-2.235
-0.69
-9.303
0.069
-0.223
220
-0.34
-0.789
-3.819
0.079
-0.034
221
-0.391
-0.407
-3.28
0.041
-0.039
222
-0.335
-0.349
-2.812
0.035
-0.033
223
-1.127
-0.485
-5.247
0.049
-0.113
224
-0.688
-1.316
-6.268
0.132
-0.069
225
-1.919
-0.621
-7.682
0.062
-0.192
226
-1.042
-2.282
-9.724
0.228
-0.104
227
-1.835
-0.534
-6.979
0.053
-0.184
228
-0.958
-2.195
-9.021
0.219
-0.096
2. TENSION DESIGN
2.1 FORMULA
D1
A = 2(D1+D2) t = Nb As
t = A / (2 * (D1 + D2))
(D1 + t) * (D2 + t)3
(D1 - t) * (D2 - t)3
Ix =
12
12
(D2 + t) * (D1 + t)3
(D2 - t) * (D1 - t)3
Iy =
12
12
- Fz
Mux (D2 / 2)
Tux = (
+
) As
A
Ix
- Fz
Muy (D1 / 2)
Tuy = (
+
) As
A
Iy
Tu = Max(Tux, Tuy)
Tu
Req.As =
, = 0.85
fy
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 43
Dia
Unit(mm , tonf,cm2)
LC#
Dia (D1/D2)
Tu
UsingAs/EA
Req.As/EA
Result
201
105.04 / 225.04
-0.12
1.99
N/A
OK
202
105.04 / 225.04
-0.1
1.99
N/A
OK
203
105.04 / 225.04
0.72
1.99
0.22
OK
204
105.04 / 225.04
1.83
1.99
0.55
OK
205
105.04 / 225.04
1.61
1.99
0.48
OK
206
105.04 / 225.04
3.82
1.99
1.15
OK
207
105.04 / 225.04
1.65
1.99
0.5
OK
208
105.04 / 225.04
3.86
1.99
1.17
OK
209
105.04 / 225.04
-0.4
1.99
N/A
OK
210
105.04 / 225.04
-0.35
1.99
N/A
OK
211
105.04 / 225.04
0.32
1.99
0.1
OK
212
105.04 / 225.04
1.41
1.99
0.42
OK
213
105.04 / 225.04
1.21
1.99
0.36
OK
214
105.04 / 225.04
3.4
1.99
1.03
OK
215
105.04 / 225.04
1.35
1.99
0.41
OK
216
105.04 / 225.04
3.55
1.99
1.07
OK
217
105.04 / 225.04
1.99
0.3
OK
218
105.04 / 225.04
0.99
1.99
0.3
OK
219
105.04 / 225.04
1.14
1.99
0.34
OK
220
105.04 / 225.04
1.14
1.99
0.34
OK
221
105.04 / 225.04
-0.52
1.99
N/A
OK
222
105.04 / 225.04
-0.45
1.99
N/A
OK
223
105.04 / 225.04
0.15
1.99
0.05
OK
224
105.04 / 225.04
1.23
1.99
0.37
OK
225
105.04 / 225.04
1.04
1.99
0.31
OK
226
105.04 / 225.04
3.22
1.99
0.97
OK
227
105.04 / 225.04
1.23
1.99
0.37
OK
228
105.04 / 225.04
3.41
1.99
1.03
OK
201
105.04 / 225.04
-0.16
1.99
N/A
OK
202
105.04 / 225.04
-0.14
1.99
N/A
OK
203
105.04 / 225.04
-0.07
1.99
N/A
OK
204
105.04 / 225.04
2.03
1.99
0.61
OK
205
105.04 / 225.04
0.02
1.99
0.01
OK
206
105.04 / 225.04
4.27
1.99
1.29
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 44
0.02
OK
1.99
1.3
OK
1.99
N/A
OK
-0.43
1.99
N/A
OK
-0.44
1.99
N/A
OK
105.04 / 225.04
1.54
1.99
0.46
OK
105.04 / 225.04
-0.35
1.99
N/A
OK
214
105.04 / 225.04
3.77
1.99
1.14
OK
215
105.04 / 225.04
-0.22
1.99
N/A
OK
216
105.04 / 225.04
3.94
1.99
1.19
OK
217
105.04 / 225.04
-0.58
1.99
N/A
OK
218
105.04 / 225.04
0.89
1.99
0.27
OK
219
105.04 / 225.04
-0.45
1.99
N/A
OK
220
105.04 / 225.04
1.06
1.99
0.32
OK
221
105.04 / 225.04
-0.64
1.99
N/A
OK
222
105.04 / 225.04
-0.55
1.99
N/A
OK
223
105.04 / 225.04
-0.6
1.99
N/A
OK
224
105.04 / 225.04
1.33
1.99
0.4
OK
225
105.04 / 225.04
-0.51
1.99
N/A
OK
226
105.04 / 225.04
3.56
1.99
1.07
OK
227
105.04 / 225.04
-0.34
1.99
N/A
OK
228
105.04 / 225.04
3.79
1.99
1.14
OK
201
105.04 / 225.04
-0.21
1.99
N/A
OK
202
105.04 / 225.04
-0.18
1.99
N/A
OK
203
105.04 / 225.04
0.64
1.99
0.19
OK
204
105.04 / 225.04
0.88
1.99
0.27
OK
205
105.04 / 225.04
1.51
1.99
0.46
OK
206
105.04 / 225.04
1.99
1.99
0.6
OK
207
105.04 / 225.04
1.57
1.99
0.47
OK
208
105.04 / 225.04
2.05
1.99
0.62
OK
209
105.04 / 225.04
-0.64
1.99
N/A
OK
210
105.04 / 225.04
-0.55
1.99
N/A
OK
211
105.04 / 225.04
0.15
1.99
0.05
OK
212
105.04 / 225.04
0.41
1.99
0.12
OK
213
105.04 / 225.04
1.02
1.99
0.31
OK
214
105.04 / 225.04
1.52
1.99
0.46
OK
215
105.04 / 225.04
1.21
1.99
0.36
OK
216
105.04 / 225.04
1.7
1.99
0.51
OK
217
105.04 / 225.04
0.81
1.99
0.24
OK
218
105.04 / 225.04
-0.2
1.99
N/A
OK
219
105.04 / 225.04
0.99
1.99
0.3
OK
220
105.04 / 225.04
-0.03
1.99
N/A
OK
221
105.04 / 225.04
-0.82
1.99
N/A
OK
222
105.04 / 225.04
-0.7
1.99
N/A
OK
207
105.04 / 225.04
0.06
1.99
208
105.04 / 225.04
4.31
209
105.04 / 225.04
-0.5
210
105.04 / 225.04
211
105.04 / 225.04
212
213
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 45
223
105.04 / 225.04
-0.06
1.99
N/A
OK
224
105.04 / 225.04
0.21
1.99
0.06
OK
225
105.04 / 225.04
0.82
1.99
0.25
OK
226
105.04 / 225.04
1.32
1.99
0.4
OK
227
105.04 / 225.04
1.05
1.99
0.32
OK
228
105.04 / 225.04
1.55
1.99
0.47
OK
201
105.04 / 225.04
-0.17
1.99
N/A
OK
202
105.04 / 225.04
-0.15
1.99
N/A
OK
203
105.04 / 225.04
-0.34
1.99
N/A
OK
204
105.04 / 225.04
0.59
1.99
0.18
OK
205
105.04 / 225.04
-0.53
1.99
N/A
OK
206
105.04 / 225.04
1.39
1.99
0.42
OK
207
105.04 / 225.04
-0.49
1.99
N/A
OK
208
105.04 / 225.04
1.44
1.99
0.44
OK
209
105.04 / 225.04
-0.51
1.99
N/A
OK
210
105.04 / 225.04
-0.44
1.99
N/A
OK
211
105.04 / 225.04
-0.63
1.99
N/A
OK
212
105.04 / 225.04
0.15
1.99
0.04
OK
213
105.04 / 225.04
-0.82
1.99
N/A
OK
214
105.04 / 225.04
0.95
1.99
0.29
OK
215
105.04 / 225.04
-0.71
1.99
N/A
OK
216
105.04 / 225.04
1.11
1.99
0.34
OK
217
105.04 / 225.04
-0.82
1.99
N/A
OK
218
105.04 / 225.04
-0.16
1.99
N/A
OK
219
105.04 / 225.04
-0.71
1.99
N/A
OK
220
105.04 / 225.04
1.99
OK
221
105.04 / 225.04
-0.66
1.99
N/A
OK
222
105.04 / 225.04
-0.56
1.99
N/A
OK
223
105.04 / 225.04
-0.75
1.99
N/A
OK
224
105.04 / 225.04
-0.04
1.99
N/A
OK
225
105.04 / 225.04
-0.94
1.99
N/A
OK
226
105.04 / 225.04
0.77
1.99
0.23
OK
227
105.04 / 225.04
-0.8
1.99
N/A
OK
228
105.04 / 225.04
0.98
1.99
0.29
OK
201
105.04 / 225.04
-0.2
1.99
N/A
OK
202
105.04 / 225.04
-0.17
1.99
N/A
OK
203
105.04 / 225.04
0.45
1.99
0.14
OK
204
105.04 / 225.04
-0.99
1.99
N/A
OK
205
105.04 / 225.04
1.18
1.99
0.35
OK
206
105.04 / 225.04
-1.79
1.99
N/A
OK
207
105.04 / 225.04
1.24
1.99
0.37
OK
208
105.04 / 225.04
-1.74
1.99
N/A
OK
209
105.04 / 225.04
-0.89
1.99
N/A
OK
210
105.04 / 225.04
-0.76
1.99
N/A
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 46
211
105.04 / 225.04
-0.38
1.99
N/A
OK
212
105.04 / 225.04
-1.64
1.99
N/A
OK
213
105.04 / 225.04
0.34
1.99
0.1
OK
214
105.04 / 225.04
-2.43
1.99
N/A
OK
215
105.04 / 225.04
0.62
1.99
0.19
OK
216
105.04 / 225.04
-2.22
1.99
N/A
OK
217
105.04 / 225.04
1.06
1.99
0.32
OK
218
105.04 / 225.04
-1.49
1.99
N/A
OK
219
105.04 / 225.04
1.33
1.99
0.4
OK
220
105.04 / 225.04
-1.28
1.99
N/A
OK
221
105.04 / 225.04
-1.17
1.99
N/A
OK
222
105.04 / 225.04
-1.01
1.99
N/A
OK
223
105.04 / 225.04
-0.73
1.99
N/A
OK
224
105.04 / 225.04
-1.91
1.99
N/A
OK
225
105.04 / 225.04
-0.01
1.99
N/A
OK
226
105.04 / 225.04
-2.7
1.99
N/A
OK
227
105.04 / 225.04
0.36
1.99
0.11
OK
228
105.04 / 225.04
-2.42
1.99
N/A
OK
201
105.04 / 225.04
-0.23
1.99
N/A
OK
202
105.04 / 225.04
-0.2
1.99
N/A
OK
203
105.04 / 225.04
1.28
1.99
0.39
OK
204
105.04 / 225.04
-0.21
1.99
N/A
OK
205
105.04 / 225.04
2.84
1.99
0.86
OK
206
105.04 / 225.04
-0.21
1.99
N/A
OK
207
105.04 / 225.04
2.91
1.99
0.88
OK
208
105.04 / 225.04
-0.15
1.99
N/A
OK
209
105.04 / 225.04
-1.03
1.99
N/A
OK
210
105.04 / 225.04
-0.88
1.99
N/A
OK
211
105.04 / 225.04
0.37
1.99
0.11
OK
212
105.04 / 225.04
-0.89
1.99
N/A
OK
213
105.04 / 225.04
1.93
1.99
0.58
OK
214
105.04 / 225.04
-0.89
1.99
N/A
OK
215
105.04 / 225.04
2.23
1.99
0.67
OK
216
105.04 / 225.04
-0.67
1.99
N/A
OK
217
105.04 / 225.04
1.4
1.99
0.42
OK
218
105.04 / 225.04
-0.89
1.99
N/A
OK
219
105.04 / 225.04
1.7
1.99
0.51
OK
220
105.04 / 225.04
-0.67
1.99
N/A
OK
221
105.04 / 225.04
-1.36
1.99
N/A
OK
222
105.04 / 225.04
-1.17
1.99
N/A
OK
223
105.04 / 225.04
-0.02
1.99
N/A
OK
224
105.04 / 225.04
-1.18
1.99
N/A
OK
225
105.04 / 225.04
1.54
1.99
0.47
OK
226
105.04 / 225.04
-1.18
1.99
N/A
OK
10
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 47
227
105.04 / 225.04
1.94
1.99
0.58
OK
228
105.04 / 225.04
-0.89
1.99
N/A
OK
201
105.04 / 225.04
-0.13
1.99
N/A
OK
202
105.04 / 225.04
-0.11
1.99
N/A
OK
203
105.04 / 225.04
1.39
1.99
0.42
OK
204
105.04 / 225.04
-0.01
1.99
N/A
OK
205
105.04 / 225.04
2.95
1.99
0.89
OK
206
105.04 / 225.04
0.12
1.99
0.04
OK
207
105.04 / 225.04
1.99
0.9
OK
208
105.04 / 225.04
0.16
1.99
0.05
OK
209
105.04 / 225.04
-0.5
1.99
N/A
OK
210
105.04 / 225.04
-0.43
1.99
N/A
OK
211
105.04 / 225.04
0.93
1.99
0.28
OK
212
105.04 / 225.04
-0.35
1.99
N/A
OK
213
105.04 / 225.04
2.49
1.99
0.75
OK
214
105.04 / 225.04
-0.26
1.99
N/A
OK
215
105.04 / 225.04
2.65
1.99
0.8
OK
216
105.04 / 225.04
-0.13
1.99
N/A
OK
217
105.04 / 225.04
2.02
1.99
0.61
OK
218
105.04 / 225.04
-0.34
1.99
N/A
OK
219
105.04 / 225.04
2.18
1.99
0.66
OK
220
105.04 / 225.04
-0.23
1.99
N/A
OK
221
105.04 / 225.04
-0.66
1.99
N/A
OK
222
105.04 / 225.04
-0.57
1.99
N/A
OK
223
105.04 / 225.04
0.73
1.99
0.22
OK
224
105.04 / 225.04
-0.48
1.99
N/A
OK
225
105.04 / 225.04
2.3
1.99
0.69
OK
226
105.04 / 225.04
-0.4
1.99
N/A
OK
227
105.04 / 225.04
2.5
1.99
0.75
OK
228
105.04 / 225.04
-0.25
1.99
N/A
OK
201
105.04 / 225.04
-0.23
1.99
N/A
OK
202
105.04 / 225.04
-0.2
1.99
N/A
OK
203
105.04 / 225.04
1.3
1.99
0.39
OK
204
105.04 / 225.04
-0.2
1.99
N/A
OK
205
105.04 / 225.04
2.87
1.99
0.87
OK
206
105.04 / 225.04
-0.16
1.99
N/A
OK
207
105.04 / 225.04
2.94
1.99
0.89
OK
208
105.04 / 225.04
-0.1
1.99
N/A
OK
209
105.04 / 225.04
-1.01
1.99
N/A
OK
210
105.04 / 225.04
-0.86
1.99
N/A
OK
211
105.04 / 225.04
0.4
1.99
0.12
OK
212
105.04 / 225.04
-0.86
1.99
N/A
OK
213
105.04 / 225.04
1.97
1.99
0.6
OK
214
105.04 / 225.04
-0.86
1.99
N/A
OK
11
14
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 48
0.68
OK
1.99
N/A
OK
1.99
0.45
OK
-0.86
1.99
N/A
OK
105.04 / 225.04
1.79
1.99
0.54
OK
220
105.04 / 225.04
-0.65
1.99
N/A
OK
221
105.04 / 225.04
-1.34
1.99
N/A
OK
222
105.04 / 225.04
-1.14
1.99
N/A
OK
223
105.04 / 225.04
0.02
1.99
0.01
OK
224
105.04 / 225.04
-1.14
1.99
N/A
OK
225
105.04 / 225.04
1.6
1.99
0.48
OK
226
105.04 / 225.04
-1.14
1.99
N/A
OK
227
105.04 / 225.04
1.98
1.99
0.6
OK
228
105.04 / 225.04
-0.86
1.99
N/A
OK
201
105.04 / 225.04
-0.23
1.99
N/A
OK
202
105.04 / 225.04
-0.2
1.99
N/A
OK
203
105.04 / 225.04
1.24
1.99
0.37
OK
204
105.04 / 225.04
-0.2
1.99
N/A
OK
205
105.04 / 225.04
2.76
1.99
0.83
OK
206
105.04 / 225.04
-0.16
1.99
N/A
OK
207
105.04 / 225.04
2.83
1.99
0.85
OK
208
105.04 / 225.04
-0.1
1.99
N/A
OK
209
105.04 / 225.04
-1.01
1.99
N/A
OK
210
105.04 / 225.04
-0.86
1.99
N/A
OK
211
105.04 / 225.04
0.35
1.99
0.11
OK
212
105.04 / 225.04
-0.86
1.99
N/A
OK
213
105.04 / 225.04
1.87
1.99
0.56
OK
214
105.04 / 225.04
-0.86
1.99
N/A
OK
215
105.04 / 225.04
2.16
1.99
0.65
OK
216
105.04 / 225.04
-0.65
1.99
N/A
OK
217
105.04 / 225.04
1.41
1.99
0.43
OK
218
105.04 / 225.04
-0.86
1.99
N/A
OK
219
105.04 / 225.04
1.7
1.99
0.51
OK
220
105.04 / 225.04
-0.65
1.99
N/A
OK
221
105.04 / 225.04
-1.33
1.99
N/A
OK
222
105.04 / 225.04
-1.14
1.99
N/A
OK
223
105.04 / 225.04
-0.03
1.99
N/A
OK
224
105.04 / 225.04
-1.14
1.99
N/A
OK
225
105.04 / 225.04
1.49
1.99
0.45
OK
226
105.04 / 225.04
-1.14
1.99
N/A
OK
227
105.04 / 225.04
1.88
1.99
0.57
OK
228
105.04 / 225.04
-0.86
1.99
N/A
OK
201
105.04 / 225.04
-0.24
1.99
N/A
OK
202
105.04 / 225.04
-0.2
1.99
N/A
OK
215
105.04 / 225.04
2.27
1.99
216
105.04 / 225.04
-0.65
217
105.04 / 225.04
1.5
218
105.04 / 225.04
219
15
18
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 49
203
105.04 / 225.04
-0.45
1.99
N/A
OK
204
105.04 / 225.04
-0.21
1.99
N/A
OK
205
105.04 / 225.04
-0.69
1.99
N/A
OK
206
105.04 / 225.04
-0.19
1.99
N/A
OK
207
105.04 / 225.04
-0.64
1.99
N/A
OK
208
105.04 / 225.04
-0.13
1.99
N/A
OK
209
105.04 / 225.04
-1.03
1.99
N/A
OK
210
105.04 / 225.04
-0.88
1.99
N/A
OK
211
105.04 / 225.04
-1.13
1.99
N/A
OK
212
105.04 / 225.04
-0.89
1.99
N/A
OK
213
105.04 / 225.04
-1.38
1.99
N/A
OK
214
105.04 / 225.04
-0.89
1.99
N/A
OK
215
105.04 / 225.04
-1.16
1.99
N/A
OK
216
105.04 / 225.04
-0.67
1.99
N/A
OK
217
105.04 / 225.04
-1.48
1.99
N/A
OK
218
105.04 / 225.04
-0.89
1.99
N/A
OK
219
105.04 / 225.04
-1.25
1.99
N/A
OK
220
105.04 / 225.04
-0.67
1.99
N/A
OK
221
105.04 / 225.04
-1.37
1.99
N/A
OK
222
105.04 / 225.04
-1.17
1.99
N/A
OK
223
105.04 / 225.04
-1.42
1.99
N/A
OK
224
105.04 / 225.04
-1.18
1.99
N/A
OK
225
105.04 / 225.04
-1.66
1.99
N/A
OK
226
105.04 / 225.04
-1.18
1.99
N/A
OK
227
105.04 / 225.04
-1.37
1.99
N/A
OK
228
105.04 / 225.04
-0.89
1.99
N/A
OK
201
105.04 / 225.04
-0.2
1.99
N/A
OK
202
105.04 / 225.04
-0.17
1.99
N/A
OK
203
105.04 / 225.04
-0.41
1.99
N/A
OK
204
105.04 / 225.04
-0.07
1.99
N/A
OK
205
105.04 / 225.04
-0.64
1.99
N/A
OK
206
105.04 / 225.04
0.06
1.99
0.02
OK
207
105.04 / 225.04
-0.59
1.99
N/A
OK
208
105.04 / 225.04
0.12
1.99
0.03
OK
209
105.04 / 225.04
-0.83
1.99
N/A
OK
210
105.04 / 225.04
-0.71
1.99
N/A
OK
211
105.04 / 225.04
-0.94
1.99
N/A
OK
212
105.04 / 225.04
-0.62
1.99
N/A
OK
213
105.04 / 225.04
-1.17
1.99
N/A
OK
214
105.04 / 225.04
-0.53
1.99
N/A
OK
215
105.04 / 225.04
-0.99
1.99
N/A
OK
216
105.04 / 225.04
-0.33
1.99
N/A
OK
217
105.04 / 225.04
-1.28
1.99
N/A
OK
218
105.04 / 225.04
-0.62
1.99
N/A
OK
19
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 50
219
105.04 / 225.04
-1.1
1.99
N/A
OK
220
105.04 / 225.04
-0.45
1.99
N/A
OK
221
105.04 / 225.04
-1.09
1.99
N/A
OK
222
105.04 / 225.04
-0.93
1.99
N/A
OK
223
105.04 / 225.04
-1.16
1.99
N/A
OK
224
105.04 / 225.04
-0.85
1.99
N/A
OK
225
105.04 / 225.04
-1.39
1.99
N/A
OK
226
105.04 / 225.04
-0.77
1.99
N/A
OK
227
105.04 / 225.04
-1.16
1.99
N/A
OK
228
105.04 / 225.04
-0.52
1.99
N/A
OK
201
105.04 / 225.04
-0.23
1.99
N/A
OK
202
105.04 / 225.04
-0.2
1.99
N/A
OK
203
105.04 / 225.04
-0.45
1.99
N/A
OK
204
105.04 / 225.04
-0.2
1.99
N/A
OK
205
105.04 / 225.04
-0.69
1.99
N/A
OK
206
105.04 / 225.04
-0.15
1.99
N/A
OK
207
105.04 / 225.04
-0.64
1.99
N/A
OK
208
105.04 / 225.04
-0.1
1.99
N/A
OK
209
105.04 / 225.04
-1.01
1.99
N/A
OK
210
105.04 / 225.04
-0.87
1.99
N/A
OK
211
105.04 / 225.04
-1.12
1.99
N/A
OK
212
105.04 / 225.04
-0.87
1.99
N/A
OK
213
105.04 / 225.04
-1.36
1.99
N/A
OK
214
105.04 / 225.04
-0.87
1.99
N/A
OK
215
105.04 / 225.04
-1.15
1.99
N/A
OK
216
105.04 / 225.04
-0.65
1.99
N/A
OK
217
105.04 / 225.04
-1.47
1.99
N/A
OK
218
105.04 / 225.04
-0.87
1.99
N/A
OK
219
105.04 / 225.04
-1.26
1.99
N/A
OK
220
105.04 / 225.04
-0.65
1.99
N/A
OK
221
105.04 / 225.04
-1.34
1.99
N/A
OK
222
105.04 / 225.04
-1.15
1.99
N/A
OK
223
105.04 / 225.04
-1.4
1.99
N/A
OK
224
105.04 / 225.04
-1.15
1.99
N/A
OK
225
105.04 / 225.04
-1.65
1.99
N/A
OK
226
105.04 / 225.04
-1.15
1.99
N/A
OK
227
105.04 / 225.04
-1.36
1.99
N/A
OK
228
105.04 / 225.04
-0.86
1.99
N/A
OK
201
105.04 / 225.04
-0.23
1.99
N/A
OK
202
105.04 / 225.04
-0.2
1.99
N/A
OK
203
105.04 / 225.04
-0.43
1.99
N/A
OK
204
105.04 / 225.04
-0.19
1.99
N/A
OK
205
105.04 / 225.04
-0.67
1.99
N/A
OK
206
105.04 / 225.04
-0.15
1.99
N/A
OK
22
23
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 51
207
105.04 / 225.04
-0.62
1.99
N/A
OK
208
105.04 / 225.04
-0.1
1.99
N/A
OK
209
105.04 / 225.04
-1
1.99
N/A
OK
210
105.04 / 225.04
-0.86
1.99
N/A
OK
211
105.04 / 225.04
-1.1
1.99
N/A
OK
212
105.04 / 225.04
-0.86
1.99
N/A
OK
213
105.04 / 225.04
-1.33
1.99
N/A
OK
214
105.04 / 225.04
-0.86
1.99
N/A
OK
215
105.04 / 225.04
-1.12
1.99
N/A
OK
216
105.04 / 225.04
-0.64
1.99
N/A
OK
217
105.04 / 225.04
-1.45
1.99
N/A
OK
218
105.04 / 225.04
-0.86
1.99
N/A
OK
219
105.04 / 225.04
-1.23
1.99
N/A
OK
220
105.04 / 225.04
-0.64
1.99
N/A
OK
221
105.04 / 225.04
-1.33
1.99
N/A
OK
222
105.04 / 225.04
-1.14
1.99
N/A
OK
223
105.04 / 225.04
-1.37
1.99
N/A
OK
224
105.04 / 225.04
-1.14
1.99
N/A
OK
225
105.04 / 225.04
-1.61
1.99
N/A
OK
226
105.04 / 225.04
-1.14
1.99
N/A
OK
227
105.04 / 225.04
-1.33
1.99
N/A
OK
228
105.04 / 225.04
-0.85
1.99
N/A
OK
201
105.04 / 225.04
-0.26
1.99
N/A
OK
202
105.04 / 225.04
-0.22
1.99
N/A
OK
203
105.04 / 225.04
-0.25
1.99
N/A
OK
204
105.04 / 225.04
-1.08
1.99
N/A
OK
205
105.04 / 225.04
-0.28
1.99
N/A
OK
206
105.04 / 225.04
-1.94
1.99
N/A
OK
207
105.04 / 225.04
-0.23
1.99
N/A
OK
208
105.04 / 225.04
-1.89
1.99
N/A
OK
209
105.04 / 225.04
-1.04
1.99
N/A
OK
210
105.04 / 225.04
-0.89
1.99
N/A
OK
211
105.04 / 225.04
-0.92
1.99
N/A
OK
212
105.04 / 225.04
-1.75
1.99
N/A
OK
213
105.04 / 225.04
-0.95
1.99
N/A
OK
214
105.04 / 225.04
-2.62
1.99
N/A
OK
215
105.04 / 225.04
-0.73
1.99
N/A
OK
216
105.04 / 225.04
-2.39
1.99
N/A
OK
217
105.04 / 225.04
-0.88
1.99
N/A
OK
218
105.04 / 225.04
-1.55
1.99
N/A
OK
219
105.04 / 225.04
-0.66
1.99
N/A
OK
220
105.04 / 225.04
-1.33
1.99
N/A
OK
221
105.04 / 225.04
-1.37
1.99
N/A
OK
222
105.04 / 225.04
-1.17
1.99
N/A
OK
26
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 52
223
105.04 / 225.04
-1.2
1.99
N/A
OK
224
105.04 / 225.04
-2.04
1.99
N/A
OK
225
105.04 / 225.04
-1.23
1.99
N/A
OK
226
105.04 / 225.04
-2.9
1.99
N/A
OK
227
105.04 / 225.04
-0.94
1.99
N/A
OK
228
105.04 / 225.04
-2.6
1.99
N/A
OK
201
105.04 / 225.04
-0.11
1.99
N/A
OK
202
105.04 / 225.04
-0.1
1.99
N/A
OK
203
105.04 / 225.04
0.48
1.99
0.15
OK
204
105.04 / 225.04
-0.09
1.99
N/A
OK
205
105.04 / 225.04
1.1
1.99
0.33
OK
206
105.04 / 225.04
-0.07
1.99
N/A
OK
207
105.04 / 225.04
1.14
1.99
0.34
OK
208
105.04 / 225.04
-0.04
1.99
N/A
OK
209
105.04 / 225.04
-0.26
1.99
N/A
OK
210
105.04 / 225.04
-0.22
1.99
N/A
OK
211
105.04 / 225.04
0.29
1.99
0.09
OK
212
105.04 / 225.04
-0.22
1.99
N/A
OK
213
105.04 / 225.04
0.91
1.99
0.28
OK
214
105.04 / 225.04
-0.22
1.99
N/A
OK
215
105.04 / 225.04
1.99
0.3
OK
216
105.04 / 225.04
-0.16
1.99
N/A
OK
217
105.04 / 225.04
3.54
1.99
1.07
OK
218
105.04 / 225.04
-0.22
1.99
N/A
OK
219
105.04 / 225.04
3.62
1.99
1.09
OK
220
105.04 / 225.04
-0.16
1.99
N/A
OK
221
105.04 / 225.04
-0.32
1.99
N/A
OK
222
105.04 / 225.04
-0.27
1.99
N/A
OK
223
105.04 / 225.04
0.21
1.99
0.06
OK
224
105.04 / 225.04
-0.27
1.99
N/A
OK
225
105.04 / 225.04
0.83
1.99
0.25
OK
226
105.04 / 225.04
-0.27
1.99
N/A
OK
227
105.04 / 225.04
0.94
1.99
0.28
OK
228
105.04 / 225.04
-0.2
1.99
N/A
OK
201
105.04 / 225.04
-0.17
1.99
N/A
OK
202
105.04 / 225.04
-0.15
1.99
N/A
OK
203
105.04 / 225.04
1.99
0.3
OK
204
105.04 / 225.04
-0.15
1.99
N/A
OK
205
105.04 / 225.04
2.23
1.99
0.67
OK
206
105.04 / 225.04
-0.13
1.99
N/A
OK
207
105.04 / 225.04
2.28
1.99
0.69
OK
208
105.04 / 225.04
-0.09
1.99
N/A
OK
209
105.04 / 225.04
-0.45
1.99
N/A
OK
210
105.04 / 225.04
-0.39
1.99
N/A
OK
27
28
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 53
0.19
OK
1.99
N/A
OK
1.99
0.56
OK
-0.39
1.99
N/A
OK
105.04 / 225.04
1.99
0.6
OK
216
105.04 / 225.04
-0.29
1.99
N/A
OK
217
105.04 / 225.04
3.28
1.99
0.99
OK
218
105.04 / 225.04
-0.38
1.99
N/A
OK
219
105.04 / 225.04
3.43
1.99
1.03
OK
220
105.04 / 225.04
-0.29
1.99
N/A
OK
221
105.04 / 225.04
-0.57
1.99
N/A
OK
222
105.04 / 225.04
-0.49
1.99
N/A
OK
223
105.04 / 225.04
0.48
1.99
0.14
OK
224
105.04 / 225.04
-0.49
1.99
N/A
OK
225
105.04 / 225.04
1.7
1.99
0.51
OK
226
105.04 / 225.04
-0.49
1.99
N/A
OK
227
105.04 / 225.04
1.88
1.99
0.57
OK
228
105.04 / 225.04
-0.37
1.99
N/A
OK
201
105.04 / 225.04
-0.18
1.99
N/A
OK
202
105.04 / 225.04
-0.16
1.99
N/A
OK
203
105.04 / 225.04
0.95
1.99
0.29
OK
204
105.04 / 225.04
-0.16
1.99
N/A
OK
205
105.04 / 225.04
2.14
1.99
0.65
OK
206
105.04 / 225.04
-0.14
1.99
N/A
OK
207
105.04 / 225.04
2.2
1.99
0.66
OK
208
105.04 / 225.04
-0.09
1.99
N/A
OK
209
105.04 / 225.04
-0.49
1.99
N/A
OK
210
105.04 / 225.04
-0.42
1.99
N/A
OK
211
105.04 / 225.04
0.54
1.99
0.16
OK
212
105.04 / 225.04
-0.42
1.99
N/A
OK
213
105.04 / 225.04
1.73
1.99
0.52
OK
214
105.04 / 225.04
-0.42
1.99
N/A
OK
215
105.04 / 225.04
1.89
1.99
0.57
OK
216
105.04 / 225.04
-0.31
1.99
N/A
OK
217
105.04 / 225.04
3.22
1.99
0.97
OK
218
105.04 / 225.04
-0.43
1.99
N/A
OK
219
105.04 / 225.04
3.38
1.99
1.02
OK
220
105.04 / 225.04
-0.32
1.99
N/A
OK
221
105.04 / 225.04
-0.62
1.99
N/A
OK
222
105.04 / 225.04
-0.54
1.99
N/A
OK
223
105.04 / 225.04
0.36
1.99
0.11
OK
224
105.04 / 225.04
-0.53
1.99
N/A
OK
225
105.04 / 225.04
1.55
1.99
0.47
OK
226
105.04 / 225.04
-0.53
1.99
N/A
OK
211
105.04 / 225.04
0.63
1.99
212
105.04 / 225.04
-0.39
213
105.04 / 225.04
1.85
214
105.04 / 225.04
215
29
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 54
1.76
1.99
0.53
OK
105.04 / 225.04
-0.4
1.99
N/A
OK
105.04 / 225.04
-0.18
1.99
N/A
OK
202
105.04 / 225.04
-0.16
1.99
N/A
OK
203
105.04 / 225.04
0.96
1.99
0.29
OK
204
105.04 / 225.04
-0.12
1.99
N/A
OK
205
105.04 / 225.04
2.15
1.99
0.65
OK
206
105.04 / 225.04
-0.06
1.99
N/A
OK
207
105.04 / 225.04
2.21
1.99
0.67
OK
208
105.04 / 225.04
-0.01
1.99
N/A
OK
209
105.04 / 225.04
-0.49
1.99
N/A
OK
210
105.04 / 225.04
-0.42
1.99
N/A
OK
211
105.04 / 225.04
0.54
1.99
0.16
OK
212
105.04 / 225.04
-0.39
1.99
N/A
OK
213
105.04 / 225.04
1.73
1.99
0.52
OK
214
105.04 / 225.04
-0.35
1.99
N/A
OK
215
105.04 / 225.04
1.9
1.99
0.57
OK
216
105.04 / 225.04
-0.25
1.99
N/A
OK
217
105.04 / 225.04
3.2
1.99
0.96
OK
218
105.04 / 225.04
-0.41
1.99
N/A
OK
219
105.04 / 225.04
3.36
1.99
1.01
OK
220
105.04 / 225.04
-0.3
1.99
N/A
OK
221
105.04 / 225.04
-0.63
1.99
N/A
OK
222
105.04 / 225.04
-0.54
1.99
N/A
OK
223
105.04 / 225.04
0.37
1.99
0.11
OK
224
105.04 / 225.04
-0.5
1.99
N/A
OK
225
105.04 / 225.04
1.56
1.99
0.47
OK
226
105.04 / 225.04
-0.47
1.99
N/A
OK
227
105.04 / 225.04
1.77
1.99
0.53
OK
228
105.04 / 225.04
-0.33
1.99
N/A
OK
201
105.04 / 225.04
-0.14
1.99
N/A
OK
202
105.04 / 225.04
-0.12
1.99
N/A
OK
203
105.04 / 225.04
0.54
1.99
0.16
OK
204
105.04 / 225.04
-0.5
1.99
N/A
OK
205
105.04 / 225.04
1.23
1.99
0.37
OK
206
105.04 / 225.04
-0.89
1.99
N/A
OK
207
105.04 / 225.04
1.27
1.99
0.38
OK
208
105.04 / 225.04
-0.86
1.99
N/A
OK
209
105.04 / 225.04
-0.39
1.99
N/A
OK
210
105.04 / 225.04
-0.33
1.99
N/A
OK
211
105.04 / 225.04
0.24
1.99
0.07
OK
212
105.04 / 225.04
-0.71
1.99
N/A
OK
213
105.04 / 225.04
0.93
1.99
0.28
OK
214
105.04 / 225.04
-1.1
1.99
N/A
OK
227
105.04 / 225.04
228
201
30
31
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 55
0.32
OK
1.99
N/A
OK
1.99
0.46
OK
-0.54
1.99
N/A
OK
105.04 / 225.04
1.65
1.99
0.5
OK
220
105.04 / 225.04
-0.46
1.99
N/A
OK
221
105.04 / 225.04
-0.49
1.99
N/A
OK
222
105.04 / 225.04
-0.42
1.99
N/A
OK
223
105.04 / 225.04
0.11
1.99
0.03
OK
224
105.04 / 225.04
-0.8
1.99
N/A
OK
225
105.04 / 225.04
0.81
1.99
0.24
OK
226
105.04 / 225.04
-1.19
1.99
N/A
OK
227
105.04 / 225.04
0.95
1.99
0.29
OK
228
105.04 / 225.04
-1.08
1.99
N/A
OK
201
105.04 / 225.04
-0.11
1.99
N/A
OK
202
105.04 / 225.04
-0.1
1.99
N/A
OK
203
105.04 / 225.04
-0.24
1.99
N/A
OK
204
105.04 / 225.04
-0.09
1.99
N/A
OK
205
105.04 / 225.04
-0.38
1.99
N/A
OK
206
105.04 / 225.04
-0.07
1.99
N/A
OK
207
105.04 / 225.04
-0.35
1.99
N/A
OK
208
105.04 / 225.04
-0.04
1.99
N/A
OK
209
105.04 / 225.04
-0.26
1.99
N/A
OK
210
105.04 / 225.04
-0.22
1.99
N/A
OK
211
105.04 / 225.04
-0.36
1.99
N/A
OK
212
105.04 / 225.04
-0.22
1.99
N/A
OK
213
105.04 / 225.04
-0.5
1.99
N/A
OK
214
105.04 / 225.04
-0.22
1.99
N/A
OK
215
105.04 / 225.04
-0.45
1.99
N/A
OK
216
105.04 / 225.04
-0.16
1.99
N/A
OK
217
105.04 / 225.04
-1.44
1.99
N/A
OK
218
105.04 / 225.04
-0.22
1.99
N/A
OK
219
105.04 / 225.04
-1.39
1.99
N/A
OK
220
105.04 / 225.04
-0.16
1.99
N/A
OK
221
105.04 / 225.04
-0.32
1.99
N/A
OK
222
105.04 / 225.04
-0.27
1.99
N/A
OK
223
105.04 / 225.04
-0.41
1.99
N/A
OK
224
105.04 / 225.04
-0.27
1.99
N/A
OK
225
105.04 / 225.04
-0.55
1.99
N/A
OK
226
105.04 / 225.04
-0.27
1.99
N/A
OK
227
105.04 / 225.04
-0.49
1.99
N/A
OK
228
105.04 / 225.04
-0.2
1.99
N/A
OK
201
105.04 / 225.04
-0.17
1.99
N/A
OK
202
105.04 / 225.04
-0.15
1.99
N/A
OK
215
105.04 / 225.04
1.04
1.99
216
105.04 / 225.04
-1.02
217
105.04 / 225.04
1.53
218
105.04 / 225.04
219
32
33
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 56
203
105.04 / 225.04
-0.47
1.99
N/A
OK
204
105.04 / 225.04
-0.15
1.99
N/A
OK
205
105.04 / 225.04
-0.8
1.99
N/A
OK
206
105.04 / 225.04
-0.14
1.99
N/A
OK
207
105.04 / 225.04
-0.77
1.99
N/A
OK
208
105.04 / 225.04
-0.1
1.99
N/A
OK
209
105.04 / 225.04
-0.45
1.99
N/A
OK
210
105.04 / 225.04
-0.39
1.99
N/A
OK
211
105.04 / 225.04
-0.71
1.99
N/A
OK
212
105.04 / 225.04
-0.39
1.99
N/A
OK
213
105.04 / 225.04
-1.04
1.99
N/A
OK
214
105.04 / 225.04
-0.39
1.99
N/A
OK
215
105.04 / 225.04
-0.94
1.99
N/A
OK
216
105.04 / 225.04
-0.3
1.99
N/A
OK
217
105.04 / 225.04
-1.61
1.99
N/A
OK
218
105.04 / 225.04
-0.38
1.99
N/A
OK
219
105.04 / 225.04
-1.51
1.99
N/A
OK
220
105.04 / 225.04
-0.29
1.99
N/A
OK
221
105.04 / 225.04
-0.57
1.99
N/A
OK
222
105.04 / 225.04
-0.49
1.99
N/A
OK
223
105.04 / 225.04
-0.81
1.99
N/A
OK
224
105.04 / 225.04
-0.49
1.99
N/A
OK
225
105.04 / 225.04
-1.14
1.99
N/A
OK
226
105.04 / 225.04
-0.49
1.99
N/A
OK
227
105.04 / 225.04
-1.02
1.99
N/A
OK
228
105.04 / 225.04
-0.37
1.99
N/A
OK
201
105.04 / 225.04
-0.18
1.99
N/A
OK
202
105.04 / 225.04
-0.16
1.99
N/A
OK
203
105.04 / 225.04
-0.47
1.99
N/A
OK
204
105.04 / 225.04
-0.15
1.99
N/A
OK
205
105.04 / 225.04
-0.79
1.99
N/A
OK
206
105.04 / 225.04
-0.14
1.99
N/A
OK
207
105.04 / 225.04
-0.75
1.99
N/A
OK
208
105.04 / 225.04
-0.09
1.99
N/A
OK
209
105.04 / 225.04
-0.49
1.99
N/A
OK
210
105.04 / 225.04
-0.42
1.99
N/A
OK
211
105.04 / 225.04
-0.74
1.99
N/A
OK
212
105.04 / 225.04
-0.42
1.99
N/A
OK
213
105.04 / 225.04
-1.05
1.99
N/A
OK
214
105.04 / 225.04
-0.42
1.99
N/A
OK
215
105.04 / 225.04
-0.95
1.99
N/A
OK
216
105.04 / 225.04
-0.31
1.99
N/A
OK
217
105.04 / 225.04
-1.64
1.99
N/A
OK
218
105.04 / 225.04
-0.43
1.99
N/A
OK
34
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 57
219
105.04 / 225.04
-1.54
1.99
N/A
OK
220
105.04 / 225.04
-0.32
1.99
N/A
OK
221
105.04 / 225.04
-0.62
1.99
N/A
OK
222
105.04 / 225.04
-0.53
1.99
N/A
OK
223
105.04 / 225.04
-0.85
1.99
N/A
OK
224
105.04 / 225.04
-0.53
1.99
N/A
OK
225
105.04 / 225.04
-1.17
1.99
N/A
OK
226
105.04 / 225.04
-0.53
1.99
N/A
OK
227
105.04 / 225.04
-1.03
1.99
N/A
OK
228
105.04 / 225.04
-0.39
1.99
N/A
OK
201
105.04 / 225.04
-0.18
1.99
N/A
OK
202
105.04 / 225.04
-0.16
1.99
N/A
OK
203
105.04 / 225.04
-0.48
1.99
N/A
OK
204
105.04 / 225.04
-0.14
1.99
N/A
OK
205
105.04 / 225.04
-0.79
1.99
N/A
OK
206
105.04 / 225.04
-0.09
1.99
N/A
OK
207
105.04 / 225.04
-0.76
1.99
N/A
OK
208
105.04 / 225.04
-0.04
1.99
N/A
OK
209
105.04 / 225.04
-0.49
1.99
N/A
OK
210
105.04 / 225.04
-0.42
1.99
N/A
OK
211
105.04 / 225.04
-0.74
1.99
N/A
OK
212
105.04 / 225.04
-0.4
1.99
N/A
OK
213
105.04 / 225.04
-1.06
1.99
N/A
OK
214
105.04 / 225.04
-0.38
1.99
N/A
OK
215
105.04 / 225.04
-0.95
1.99
N/A
OK
216
105.04 / 225.04
-0.28
1.99
N/A
OK
217
105.04 / 225.04
-1.63
1.99
N/A
OK
218
105.04 / 225.04
-0.41
1.99
N/A
OK
219
105.04 / 225.04
-1.52
1.99
N/A
OK
220
105.04 / 225.04
-0.3
1.99
N/A
OK
221
105.04 / 225.04
-0.62
1.99
N/A
OK
222
105.04 / 225.04
-0.54
1.99
N/A
OK
223
105.04 / 225.04
-0.85
1.99
N/A
OK
224
105.04 / 225.04
-0.52
1.99
N/A
OK
225
105.04 / 225.04
-1.17
1.99
N/A
OK
226
105.04 / 225.04
-0.5
1.99
N/A
OK
227
105.04 / 225.04
-1.04
1.99
N/A
OK
228
105.04 / 225.04
-0.36
1.99
N/A
OK
201
105.04 / 225.04
-0.11
1.99
N/A
OK
202
105.04 / 225.04
-0.1
1.99
N/A
OK
203
105.04 / 225.04
-0.18
1.99
N/A
OK
204
105.04 / 225.04
-0.42
1.99
N/A
OK
205
105.04 / 225.04
-0.27
1.99
N/A
OK
206
105.04 / 225.04
-0.74
1.99
N/A
OK
35
36
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 58
207
105.04 / 225.04
-0.25
1.99
N/A
OK
208
105.04 / 225.04
-0.71
1.99
N/A
OK
209
105.04 / 225.04
-0.31
1.99
N/A
OK
210
105.04 / 225.04
-0.26
1.99
N/A
OK
211
105.04 / 225.04
-0.35
1.99
N/A
OK
212
105.04 / 225.04
-0.61
1.99
N/A
OK
213
105.04 / 225.04
-0.44
1.99
N/A
OK
214
105.04 / 225.04
-0.92
1.99
N/A
OK
215
105.04 / 225.04
-0.37
1.99
N/A
OK
216
105.04 / 225.04
-0.85
1.99
N/A
OK
217
105.04 / 225.04
-0.72
1.99
N/A
OK
218
105.04 / 225.04
-0.5
1.99
N/A
OK
219
105.04 / 225.04
-0.65
1.99
N/A
OK
220
105.04 / 225.04
-0.42
1.99
N/A
OK
221
105.04 / 225.04
-0.39
1.99
N/A
OK
222
105.04 / 225.04
-0.33
1.99
N/A
OK
223
105.04 / 225.04
-0.42
1.99
N/A
OK
224
105.04 / 225.04
-0.69
1.99
N/A
OK
225
105.04 / 225.04
-0.51
1.99
N/A
OK
226
105.04 / 225.04
-1
1.99
N/A
OK
227
105.04 / 225.04
-0.42
1.99
N/A
OK
228
105.04 / 225.04
-0.91
1.99
N/A
OK
3. ONE-WAY SHEAR
3.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 2 fck Bw d
(eq 11-3)
Av fy d
- Vs =
(eq 11-15)
s
- Vu <= Vc + Vs , = 0.75 (eq 11-1)
- When, Value of Vs shall not exceed 8 fck Bw d (Vs max)
Dir.
Unit(tonf)
LC#
Vc
Vs
Vs max
Vu
Result
201
3.906
6.103
15.623
0.101
OK
202
3.906
6.103
15.623
0.086
OK
203
3.906
6.103
15.623
0.822
OK
204
3.906
6.103
15.623
0.425
OK
205
3.906
6.103
15.623
1.731
OK
206
3.906
6.103
15.623
0.936
OK
207
3.906
6.103
15.623
1.753
OK
208
3.906
6.103
15.623
0.958
OK
209
3.906
6.103
15.623
0.301
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 59
210
3.906
6.103
15.623
0.258
OK
211
3.906
6.103
15.623
0.651
OK
212
3.906
6.103
15.623
0.253
OK
213
3.906
6.103
15.623
1.56
OK
214
3.906
6.103
15.623
0.764
OK
215
3.906
6.103
15.623
1.624
OK
216
3.906
6.103
15.623
0.829
OK
217
3.906
6.103
15.623
1.518
OK
218
3.906
6.103
15.623
0.072
OK
219
3.906
6.103
15.623
1.583
OK
220
3.906
6.103
15.623
0.137
OK
221
3.906
6.103
15.623
0.385
OK
222
3.906
6.103
15.623
0.33
OK
223
3.906
6.103
15.623
0.579
OK
224
3.906
6.103
15.623
0.181
OK
225
3.906
6.103
15.623
1.488
OK
226
3.906
6.103
15.623
0.692
OK
227
3.906
6.103
15.623
1.57
OK
228
3.906
6.103
15.623
0.775
OK
201
4.415
3.599
17.66
0.116
OK
202
4.415
3.599
17.66
0.1
OK
203
4.415
3.599
17.66
0.35
OK
204
4.415
3.599
17.66
2.088
OK
205
4.415
3.599
17.66
0.8
OK
206
4.415
3.599
17.66
4.276
OK
207
4.415
3.599
17.66
0.824
OK
208
4.415
3.599
17.66
4.301
OK
209
4.415
3.599
17.66
0.517
OK
210
4.415
3.599
17.66
0.443
OK
211
4.415
3.599
17.66
0.007
OK
212
4.415
3.599
17.66
1.745
OK
213
4.415
3.599
17.66
0.456
OK
214
4.415
3.599
17.66
3.933
OK
215
4.415
3.599
17.66
0.567
OK
216
4.415
3.599
17.66
4.044
OK
217
4.415
3.599
17.66
0.118
OK
218
4.415
3.599
17.66
1.243
OK
219
4.415
3.599
17.66
0.229
OK
220
4.415
3.599
17.66
1.354
OK
221
4.415
3.599
17.66
0.685
OK
222
4.415
3.599
17.66
0.587
OK
223
4.415
3.599
17.66
0.137
OK
224
4.415
3.599
17.66
1.601
OK
225
4.415
3.599
17.66
0.312
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 60
226
4.415
3.599
17.66
3.789
OK
227
4.415
3.599
17.66
0.459
OK
228
4.415
3.599
17.66
3.936
OK
201
3.906
6.103
15.623
0.031
OK
202
3.906
6.103
15.623
0.026
OK
203
3.906
6.103
15.623
0.864
OK
204
3.906
6.103
15.623
0.355
OK
205
3.906
6.103
15.623
1.702
OK
206
3.906
6.103
15.623
0.737
OK
207
3.906
6.103
15.623
1.695
OK
208
3.906
6.103
15.623
0.743
OK
209
3.906
6.103
15.623
0.092
OK
210
3.906
6.103
15.623
0.079
OK
211
3.906
6.103
15.623
0.917
OK
212
3.906
6.103
15.623
0.302
OK
213
3.906
6.103
15.623
1.754
OK
214
3.906
6.103
15.623
0.684
OK
215
3.906
6.103
15.623
1.735
OK
216
3.906
6.103
15.623
0.704
OK
217
3.906
6.103
15.623
1.857
OK
218
3.906
6.103
15.623
0.279
OK
219
3.906
6.103
15.623
1.837
OK
220
3.906
6.103
15.623
0.299
OK
221
3.906
6.103
15.623
0.119
OK
222
3.906
6.103
15.623
0.102
OK
223
3.906
6.103
15.623
0.94
OK
224
3.906
6.103
15.623
0.28
OK
225
3.906
6.103
15.623
1.777
OK
226
3.906
6.103
15.623
0.661
OK
227
3.906
6.103
15.623
1.752
OK
228
3.906
6.103
15.623
0.687
OK
201
4.415
3.599
17.66
0.134
OK
202
4.415
3.599
17.66
0.115
OK
203
4.415
3.599
17.66
0.17
OK
204
4.415
3.599
17.66
2.39
OK
205
4.415
3.599
17.66
0.226
OK
206
4.415
3.599
17.66
4.896
OK
207
4.415
3.599
17.66
0.197
OK
208
4.415
3.599
17.66
4.925
OK
209
4.415
3.599
17.66
0.57
OK
210
4.415
3.599
17.66
0.488
OK
211
4.415
3.599
17.66
0.544
OK
212
4.415
3.599
17.66
2.017
OK
213
4.415
3.599
17.66
0.599
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 61
214
4.415
3.599
17.66
4.523
OK
215
4.415
3.599
17.66
0.477
OK
216
4.415
3.599
17.66
4.645
OK
217
4.415
3.599
17.66
0.971
OK
218
4.415
3.599
17.66
1.195
OK
219
4.415
3.599
17.66
0.849
OK
220
4.415
3.599
17.66
1.317
OK
221
4.415
3.599
17.66
0.753
OK
222
4.415
3.599
17.66
0.646
OK
223
4.415
3.599
17.66
0.701
OK
224
4.415
3.599
17.66
1.86
OK
225
4.415
3.599
17.66
0.756
OK
226
4.415
3.599
17.66
4.366
OK
227
4.415
3.599
17.66
0.595
OK
228
4.415
3.599
17.66
4.527
OK
201
3.906
6.103
15.623
0.077
OK
202
3.906
6.103
15.623
0.066
OK
203
3.906
6.103
15.623
0.809
OK
204
3.906
6.103
15.623
0.126
OK
205
3.906
6.103
15.623
1.684
OK
206
3.906
6.103
15.623
0.318
OK
207
3.906
6.103
15.623
1.701
OK
208
3.906
6.103
15.623
0.335
OK
209
3.906
6.103
15.623
0.258
OK
210
3.906
6.103
15.623
0.221
OK
211
3.906
6.103
15.623
0.654
OK
212
3.906
6.103
15.623
0.029
OK
213
3.906
6.103
15.623
1.53
OK
214
3.906
6.103
15.623
0.163
OK
215
3.906
6.103
15.623
1.585
OK
216
3.906
6.103
15.623
0.218
OK
217
3.906
6.103
15.623
1.294
OK
218
3.906
6.103
15.623
0.069
OK
219
3.906
6.103
15.623
1.349
OK
220
3.906
6.103
15.623
0.014
OK
221
3.906
6.103
15.623
0.333
OK
222
3.906
6.103
15.623
0.286
OK
223
3.906
6.103
15.623
0.59
OK
224
3.906
6.103
15.623
0.094
OK
225
3.906
6.103
15.623
1.465
OK
226
3.906
6.103
15.623
0.098
OK
227
3.906
6.103
15.623
1.536
OK
228
3.906
6.103
15.623
0.17
OK
201
4.415
3.599
17.66
0.09
OK
X
5
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 62
0.077
OK
17.66
0.18
OK
17.66
1.322
OK
3.599
17.66
0.437
OK
4.415
3.599
17.66
2.72
OK
207
4.415
3.599
17.66
0.456
OK
208
4.415
3.599
17.66
2.739
OK
209
4.415
3.599
17.66
0.291
OK
210
4.415
3.599
17.66
0.25
OK
211
4.415
3.599
17.66
0.007
OK
212
4.415
3.599
17.66
1.149
OK
213
4.415
3.599
17.66
0.264
OK
214
4.415
3.599
17.66
2.547
OK
215
4.415
3.599
17.66
0.326
OK
216
4.415
3.599
17.66
2.61
OK
217
4.415
3.599
17.66
0.196
OK
218
4.415
3.599
17.66
0.322
OK
219
4.415
3.599
17.66
0.258
OK
220
4.415
3.599
17.66
0.384
OK
221
4.415
3.599
17.66
0.377
OK
222
4.415
3.599
17.66
0.323
OK
223
4.415
3.599
17.66
0.066
OK
224
4.415
3.599
17.66
1.076
OK
225
4.415
3.599
17.66
0.191
OK
226
4.415
3.599
17.66
2.474
OK
227
4.415
3.599
17.66
0.272
OK
228
4.415
3.599
17.66
2.555
OK
201
3.906
6.103
15.623
0.146
OK
202
3.906
6.103
15.623
0.125
OK
203
3.906
6.103
15.623
1.011
OK
204
3.906
6.103
15.623
0.205
OK
205
3.906
6.103
15.623
1.898
OK
206
3.906
6.103
15.623
0.534
OK
207
3.906
6.103
15.623
1.866
OK
208
3.906
6.103
15.623
0.566
OK
209
3.906
6.103
15.623
0.456
OK
210
3.906
6.103
15.623
0.391
OK
211
3.906
6.103
15.623
1.278
OK
212
3.906
6.103
15.623
0.062
OK
213
3.906
6.103
15.623
2.164
OK
214
3.906
6.103
15.623
0.268
OK
215
3.906
6.103
15.623
2.066
OK
216
3.906
6.103
15.623
0.366
OK
217
3.906
6.103
15.623
1.938
OK
202
4.415
3.599
17.66
203
4.415
3.599
204
4.415
3.599
205
4.415
206
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 63
218
3.906
6.103
15.623
0.258
OK
219
3.906
6.103
15.623
1.84
OK
220
3.906
6.103
15.623
0.16
OK
221
3.906
6.103
15.623
0.588
OK
222
3.906
6.103
15.623
0.504
OK
223
3.906
6.103
15.623
1.39
OK
224
3.906
6.103
15.623
0.174
OK
225
3.906
6.103
15.623
2.277
OK
226
3.906
6.103
15.623
0.155
OK
227
3.906
6.103
15.623
2.151
OK
228
3.906
6.103
15.623
0.281
OK
201
4.415
3.599
17.66
0.076
OK
202
4.415
3.599
17.66
0.065
OK
203
4.415
3.599
17.66
0.329
OK
204
4.415
3.599
17.66
0.883
OK
205
4.415
3.599
17.66
0.593
OK
206
4.415
3.599
17.66
1.831
OK
207
4.415
3.599
17.66
0.577
OK
208
4.415
3.599
17.66
1.847
OK
209
4.415
3.599
17.66
0.249
OK
210
4.415
3.599
17.66
0.214
OK
211
4.415
3.599
17.66
0.478
OK
212
4.415
3.599
17.66
0.734
OK
213
4.415
3.599
17.66
0.742
OK
214
4.415
3.599
17.66
1.682
OK
215
4.415
3.599
17.66
0.688
OK
216
4.415
3.599
17.66
1.736
OK
217
4.415
3.599
17.66
0.706
OK
218
4.415
3.599
17.66
0.358
OK
219
4.415
3.599
17.66
0.652
OK
220
4.415
3.599
17.66
0.411
OK
221
4.415
3.599
17.66
0.322
OK
222
4.415
3.599
17.66
0.276
OK
223
4.415
3.599
17.66
0.54
OK
224
4.415
3.599
17.66
0.672
OK
225
4.415
3.599
17.66
0.804
OK
226
4.415
3.599
17.66
1.62
OK
227
4.415
3.599
17.66
0.735
OK
228
4.415
3.599
17.66
1.689
OK
201
3.906
6.103
15.623
0.136
OK
202
3.906
6.103
15.623
0.116
OK
203
3.906
6.103
15.623
0.948
OK
204
3.906
6.103
15.623
0.617
OK
205
3.906
6.103
15.623
2.012
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 64
206
3.906
6.103
15.623
1.118
OK
207
3.906
6.103
15.623
2.041
OK
208
3.906
6.103
15.623
1.089
OK
209
3.906
6.103
15.623
0.493
OK
210
3.906
6.103
15.623
0.422
OK
211
3.906
6.103
15.623
0.642
OK
212
3.906
6.103
15.623
0.923
OK
213
3.906
6.103
15.623
1.706
OK
214
3.906
6.103
15.623
1.424
OK
215
3.906
6.103
15.623
1.811
OK
216
3.906
6.103
15.623
1.318
OK
217
3.906
6.103
15.623
2.066
OK
218
3.906
6.103
15.623
0.746
OK
219
3.906
6.103
15.623
2.172
OK
220
3.906
6.103
15.623
0.641
OK
221
3.906
6.103
15.623
0.643
OK
222
3.906
6.103
15.623
0.551
OK
223
3.906
6.103
15.623
0.513
OK
224
3.906
6.103
15.623
1.052
OK
225
3.906
6.103
15.623
1.577
OK
226
3.906
6.103
15.623
1.552
OK
227
3.906
6.103
15.623
1.715
OK
228
3.906
6.103
15.623
1.415
OK
201
4.415
3.599
17.66
0.088
OK
202
4.415
3.599
17.66
0.076
OK
203
4.415
3.599
17.66
0.172
OK
204
4.415
3.599
17.66
2.254
OK
205
4.415
3.599
17.66
0.269
OK
206
4.415
3.599
17.66
4.432
OK
207
4.415
3.599
17.66
0.25
OK
208
4.415
3.599
17.66
4.414
OK
209
4.415
3.599
17.66
0.37
OK
210
4.415
3.599
17.66
0.317
OK
211
4.415
3.599
17.66
0.414
OK
212
4.415
3.599
17.66
2.495
OK
213
4.415
3.599
17.66
0.51
OK
214
4.415
3.599
17.66
4.674
OK
215
4.415
3.599
17.66
0.431
OK
216
4.415
3.599
17.66
4.594
OK
217
4.415
3.599
17.66
0.01
OK
218
4.415
3.599
17.66
1.994
OK
219
4.415
3.599
17.66
0.089
OK
220
4.415
3.599
17.66
1.915
OK
221
4.415
3.599
17.66
0.487
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 65
222
4.415
3.599
17.66
0.418
OK
223
4.415
3.599
17.66
0.514
OK
224
4.415
3.599
17.66
2.596
OK
225
4.415
3.599
17.66
0.611
OK
226
4.415
3.599
17.66
4.774
OK
227
4.415
3.599
17.66
0.507
OK
228
4.415
3.599
17.66
4.67
OK
201
3.906
6.103
15.623
0.112
OK
202
3.906
6.103
15.623
0.096
OK
203
3.906
6.103
15.623
1.537
OK
204
3.906
6.103
15.623
0.105
OK
205
3.906
6.103
15.623
3.17
OK
206
3.906
6.103
15.623
0.114
OK
207
3.906
6.103
15.623
3.194
OK
208
3.906
6.103
15.623
0.09
OK
209
3.906
6.103
15.623
0.452
OK
210
3.906
6.103
15.623
0.388
OK
211
3.906
6.103
15.623
1.245
OK
212
3.906
6.103
15.623
0.396
OK
213
3.906
6.103
15.623
2.878
OK
214
3.906
6.103
15.623
0.405
OK
215
3.906
6.103
15.623
2.975
OK
216
3.906
6.103
15.623
0.308
OK
217
3.906
6.103
15.623
2.096
OK
218
3.906
6.103
15.623
0.389
OK
219
3.906
6.103
15.623
2.193
OK
220
3.906
6.103
15.623
0.292
OK
221
3.906
6.103
15.623
0.595
OK
222
3.906
6.103
15.623
0.51
OK
223
3.906
6.103
15.623
1.123
OK
224
3.906
6.103
15.623
0.519
OK
225
3.906
6.103
15.623
2.756
OK
226
3.906
6.103
15.623
0.528
OK
227
3.906
6.103
15.623
2.883
OK
228
3.906
6.103
15.623
0.4
OK
201
4.415
3.599
17.66
0.001
OK
202
4.415
3.599
17.66
0.001
OK
203
4.415
3.599
17.66
0.002
OK
204
4.415
3.599
17.66
0.099
OK
205
4.415
3.599
17.66
0.005
OK
206
4.415
3.599
17.66
0.199
OK
207
4.415
3.599
17.66
0.006
OK
208
4.415
3.599
17.66
0.199
OK
209
4.415
3.599
17.66
0.007
OK
10
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
11
Page 66
210
4.415
3.599
17.66
0.006
OK
211
4.415
3.599
17.66
0.003
OK
212
4.415
3.599
17.66
0.094
OK
213
4.415
3.599
17.66
OK
214
4.415
3.599
17.66
0.194
OK
215
4.415
3.599
17.66
0.002
OK
216
4.415
3.599
17.66
0.196
OK
217
4.415
3.599
17.66
0.008
OK
218
4.415
3.599
17.66
0.016
OK
219
4.415
3.599
17.66
0.006
OK
220
4.415
3.599
17.66
0.018
OK
221
4.415
3.599
17.66
0.008
OK
222
4.415
3.599
17.66
0.007
OK
223
4.415
3.599
17.66
0.004
OK
224
4.415
3.599
17.66
0.093
OK
225
4.415
3.599
17.66
0.001
OK
226
4.415
3.599
17.66
0.193
OK
227
4.415
3.599
17.66
0.001
OK
228
4.415
3.599
17.66
0.195
OK
201
3.906
6.103
15.623
0.083
OK
202
3.906
6.103
15.623
0.071
OK
203
3.906
6.103
15.623
1.558
OK
204
3.906
6.103
15.623
0.033
OK
205
3.906
6.103
15.623
3.187
OK
206
3.906
6.103
15.623
0.004
OK
207
3.906
6.103
15.623
3.205
OK
208
3.906
6.103
15.623
0.022
OK
209
3.906
6.103
15.623
0.293
OK
210
3.906
6.103
15.623
0.251
OK
211
3.906
6.103
15.623
1.378
OK
212
3.906
6.103
15.623
0.213
OK
213
3.906
6.103
15.623
3.007
OK
214
3.906
6.103
15.623
0.176
OK
215
3.906
6.103
15.623
3.069
OK
216
3.906
6.103
15.623
0.113
OK
217
3.906
6.103
15.623
2.335
OK
218
3.906
6.103
15.623
0.212
OK
219
3.906
6.103
15.623
2.398
OK
220
3.906
6.103
15.623
0.149
OK
221
3.906
6.103
15.623
0.381
OK
222
3.906
6.103
15.623
0.326
OK
223
3.906
6.103
15.623
1.302
OK
224
3.906
6.103
15.623
0.289
OK
225
3.906
6.103
15.623
2.931
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 67
226
3.906
6.103
15.623
0.251
OK
227
3.906
6.103
15.623
3.013
OK
228
3.906
6.103
15.623
0.17
OK
201
4.415
3.599
17.66
0.003
OK
202
4.415
3.599
17.66
0.002
OK
203
4.415
3.599
17.66
0.009
OK
204
4.415
3.599
17.66
0.128
OK
205
4.415
3.599
17.66
0.015
OK
206
4.415
3.599
17.66
0.254
OK
207
4.415
3.599
17.66
0.015
OK
208
4.415
3.599
17.66
0.253
OK
209
4.415
3.599
17.66
0.018
OK
210
4.415
3.599
17.66
0.016
OK
211
4.415
3.599
17.66
0.022
OK
212
4.415
3.599
17.66
0.141
OK
213
4.415
3.599
17.66
0.028
OK
214
4.415
3.599
17.66
0.267
OK
215
4.415
3.599
17.66
0.025
OK
216
4.415
3.599
17.66
0.263
OK
217
4.415
3.599
17.66
0.014
OK
218
4.415
3.599
17.66
0.062
OK
219
4.415
3.599
17.66
0.01
OK
220
4.415
3.599
17.66
0.058
OK
221
4.415
3.599
17.66
0.025
OK
222
4.415
3.599
17.66
0.022
OK
223
4.415
3.599
17.66
0.028
OK
224
4.415
3.599
17.66
0.147
OK
225
4.415
3.599
17.66
0.034
OK
226
4.415
3.599
17.66
0.273
OK
227
4.415
3.599
17.66
0.029
OK
228
4.415
3.599
17.66
0.267
OK
201
3.906
6.103
15.623
0.111
OK
202
3.906
6.103
15.623
0.095
OK
203
3.906
6.103
15.623
1.549
OK
204
3.906
6.103
15.623
0.095
OK
205
3.906
6.103
15.623
3.193
OK
206
3.906
6.103
15.623
0.095
OK
207
3.906
6.103
15.623
3.217
OK
208
3.906
6.103
15.623
0.071
OK
209
3.906
6.103
15.623
0.444
OK
210
3.906
6.103
15.623
0.38
OK
211
3.906
6.103
15.623
1.264
OK
212
3.906
6.103
15.623
0.38
OK
213
3.906
6.103
15.623
2.908
OK
14
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 68
214
3.906
6.103
15.623
0.38
OK
215
3.906
6.103
15.623
3.003
OK
216
3.906
6.103
15.623
0.285
OK
217
3.906
6.103
15.623
2.185
OK
218
3.906
6.103
15.623
0.38
OK
219
3.906
6.103
15.623
2.28
OK
220
3.906
6.103
15.623
0.285
OK
221
3.906
6.103
15.623
0.584
OK
222
3.906
6.103
15.623
0.5
OK
223
3.906
6.103
15.623
1.144
OK
224
3.906
6.103
15.623
0.5
OK
225
3.906
6.103
15.623
2.788
OK
226
3.906
6.103
15.623
0.5
OK
227
3.906
6.103
15.623
2.913
OK
228
3.906
6.103
15.623
0.375
OK
201
4.415
3.599
17.66
0.003
OK
202
4.415
3.599
17.66
0.002
OK
203
4.415
3.599
17.66
0.004
OK
204
4.415
3.599
17.66
0.139
OK
205
4.415
3.599
17.66
0.01
OK
206
4.415
3.599
17.66
0.281
OK
207
4.415
3.599
17.66
0.011
OK
208
4.415
3.599
17.66
0.281
OK
209
4.415
3.599
17.66
0.011
OK
210
4.415
3.599
17.66
0.01
OK
211
4.415
3.599
17.66
0.003
OK
212
4.415
3.599
17.66
0.132
OK
213
4.415
3.599
17.66
0.003
OK
214
4.415
3.599
17.66
0.274
OK
215
4.415
3.599
17.66
0.006
OK
216
4.415
3.599
17.66
0.276
OK
217
4.415
3.599
17.66
0.008
OK
218
4.415
3.599
17.66
0.049
OK
219
4.415
3.599
17.66
0.006
OK
220
4.415
3.599
17.66
0.051
OK
221
4.415
3.599
17.66
0.015
OK
222
4.415
3.599
17.66
0.013
OK
223
4.415
3.599
17.66
0.007
OK
224
4.415
3.599
17.66
0.128
OK
225
4.415
3.599
17.66
OK
226
4.415
3.599
17.66
0.27
OK
227
4.415
3.599
17.66
0.003
OK
228
4.415
3.599
17.66
0.273
OK
201
3.906
6.103
15.623
0.109
OK
15
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 69
202
3.906
6.103
15.623
0.094
OK
203
3.906
6.103
15.623
1.496
OK
204
3.906
6.103
15.623
0.094
OK
205
3.906
6.103
15.623
3.086
OK
206
3.906
6.103
15.623
0.094
OK
207
3.906
6.103
15.623
3.109
OK
208
3.906
6.103
15.623
0.07
OK
209
3.906
6.103
15.623
0.441
OK
210
3.906
6.103
15.623
0.378
OK
211
3.906
6.103
15.623
1.212
OK
212
3.906
6.103
15.623
0.378
OK
213
3.906
6.103
15.623
2.801
OK
214
3.906
6.103
15.623
0.378
OK
215
3.906
6.103
15.623
2.896
OK
216
3.906
6.103
15.623
0.283
OK
217
3.906
6.103
15.623
2.097
OK
218
3.906
6.103
15.623
0.378
OK
219
3.906
6.103
15.623
2.192
OK
220
3.906
6.103
15.623
0.283
OK
221
3.906
6.103
15.623
0.58
OK
222
3.906
6.103
15.623
0.497
OK
223
3.906
6.103
15.623
1.093
OK
224
3.906
6.103
15.623
0.497
OK
225
3.906
6.103
15.623
2.682
OK
226
3.906
6.103
15.623
0.497
OK
227
3.906
6.103
15.623
2.807
OK
228
3.906
6.103
15.623
0.373
OK
201
4.415
3.599
17.66
0.001
OK
202
4.415
3.599
17.66
0.001
OK
203
4.415
3.599
17.66
0.005
OK
204
4.415
3.599
17.66
0.143
OK
205
4.415
3.599
17.66
0.012
OK
206
4.415
3.599
17.66
0.287
OK
207
4.415
3.599
17.66
0.012
OK
208
4.415
3.599
17.66
0.287
OK
209
4.415
3.599
17.66
0.004
OK
210
4.415
3.599
17.66
0.004
OK
211
4.415
3.599
17.66
0.003
OK
212
4.415
3.599
17.66
0.14
OK
213
4.415
3.599
17.66
0.009
OK
214
4.415
3.599
17.66
0.284
OK
215
4.415
3.599
17.66
0.01
OK
216
4.415
3.599
17.66
0.285
OK
217
4.415
3.599
17.66
0.004
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 70
218
4.415
3.599
17.66
0.058
OK
219
4.415
3.599
17.66
0.003
OK
220
4.415
3.599
17.66
0.059
OK
221
4.415
3.599
17.66
0.004
OK
222
4.415
3.599
17.66
0.004
OK
223
4.415
3.599
17.66
0.003
OK
224
4.415
3.599
17.66
0.14
OK
225
4.415
3.599
17.66
0.009
OK
226
4.415
3.599
17.66
0.284
OK
227
4.415
3.599
17.66
0.01
OK
228
4.415
3.599
17.66
0.285
OK
201
3.906
6.103
15.623
0.112
OK
202
3.906
6.103
15.623
0.096
OK
203
3.906
6.103
15.623
1.73
OK
204
3.906
6.103
15.623
0.093
OK
205
3.906
6.103
15.623
3.365
OK
206
3.906
6.103
15.623
0.09
OK
207
3.906
6.103
15.623
3.341
OK
208
3.906
6.103
15.623
0.066
OK
209
3.906
6.103
15.623
0.454
OK
210
3.906
6.103
15.623
0.389
OK
211
3.906
6.103
15.623
2.023
OK
212
3.906
6.103
15.623
0.386
OK
213
3.906
6.103
15.623
3.658
OK
214
3.906
6.103
15.623
0.382
OK
215
3.906
6.103
15.623
3.56
OK
216
3.906
6.103
15.623
0.285
OK
217
3.906
6.103
15.623
2.876
OK
218
3.906
6.103
15.623
0.39
OK
219
3.906
6.103
15.623
2.779
OK
220
3.906
6.103
15.623
0.293
OK
221
3.906
6.103
15.623
0.596
OK
222
3.906
6.103
15.623
0.511
OK
223
3.906
6.103
15.623
2.146
OK
224
3.906
6.103
15.623
0.508
OK
225
3.906
6.103
15.623
3.78
OK
226
3.906
6.103
15.623
0.505
OK
227
3.906
6.103
15.623
3.652
OK
228
3.906
6.103
15.623
0.377
OK
201
4.415
3.599
17.66
OK
202
4.415
3.599
17.66
OK
203
4.415
3.599
17.66
0.002
OK
204
4.415
3.599
17.66
0.104
OK
205
4.415
3.599
17.66
0.005
OK
18
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
19
Page 71
206
4.415
3.599
17.66
0.208
OK
207
4.415
3.599
17.66
0.005
OK
208
4.415
3.599
17.66
0.208
OK
209
4.415
3.599
17.66
OK
210
4.415
3.599
17.66
OK
211
4.415
3.599
17.66
0.002
OK
212
4.415
3.599
17.66
0.104
OK
213
4.415
3.599
17.66
0.005
OK
214
4.415
3.599
17.66
0.208
OK
215
4.415
3.599
17.66
0.005
OK
216
4.415
3.599
17.66
0.208
OK
217
4.415
3.599
17.66
0.002
OK
218
4.415
3.599
17.66
0.024
OK
219
4.415
3.599
17.66
0.002
OK
220
4.415
3.599
17.66
0.024
OK
221
4.415
3.599
17.66
OK
222
4.415
3.599
17.66
OK
223
4.415
3.599
17.66
0.002
OK
224
4.415
3.599
17.66
0.104
OK
225
4.415
3.599
17.66
0.005
OK
226
4.415
3.599
17.66
0.208
OK
227
4.415
3.599
17.66
0.005
OK
228
4.415
3.599
17.66
0.208
OK
201
3.906
6.103
15.623
0.083
OK
202
3.906
6.103
15.623
0.071
OK
203
3.906
6.103
15.623
1.692
OK
204
3.906
6.103
15.623
0.035
OK
205
3.906
6.103
15.623
3.314
OK
206
3.906
6.103
15.623
0.001
OK
207
3.906
6.103
15.623
3.296
OK
208
3.906
6.103
15.623
0.019
OK
209
3.906
6.103
15.623
0.29
OK
210
3.906
6.103
15.623
0.248
OK
211
3.906
6.103
15.623
1.87
OK
212
3.906
6.103
15.623
0.212
OK
213
3.906
6.103
15.623
3.492
OK
214
3.906
6.103
15.623
0.176
OK
215
3.906
6.103
15.623
3.429
OK
216
3.906
6.103
15.623
0.114
OK
217
3.906
6.103
15.623
2.836
OK
218
3.906
6.103
15.623
0.208
OK
219
3.906
6.103
15.623
2.774
OK
220
3.906
6.103
15.623
0.146
OK
221
3.906
6.103
15.623
0.378
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 72
222
3.906
6.103
15.623
0.324
OK
223
3.906
6.103
15.623
1.946
OK
224
3.906
6.103
15.623
0.288
OK
225
3.906
6.103
15.623
3.567
OK
226
3.906
6.103
15.623
0.252
OK
227
3.906
6.103
15.623
3.486
OK
228
3.906
6.103
15.623
0.171
OK
201
4.415
3.599
17.66
0.004
OK
202
4.415
3.599
17.66
0.004
OK
203
4.415
3.599
17.66
0.008
OK
204
4.415
3.599
17.66
0.136
OK
205
4.415
3.599
17.66
0.012
OK
206
4.415
3.599
17.66
0.268
OK
207
4.415
3.599
17.66
0.011
OK
208
4.415
3.599
17.66
0.267
OK
209
4.415
3.599
17.66
0.027
OK
210
4.415
3.599
17.66
0.023
OK
211
4.415
3.599
17.66
0.027
OK
212
4.415
3.599
17.66
0.155
OK
213
4.415
3.599
17.66
0.031
OK
214
4.415
3.599
17.66
0.287
OK
215
4.415
3.599
17.66
0.025
OK
216
4.415
3.599
17.66
0.281
OK
217
4.415
3.599
17.66
0.024
OK
218
4.415
3.599
17.66
0.069
OK
219
4.415
3.599
17.66
0.019
OK
220
4.415
3.599
17.66
0.064
OK
221
4.415
3.599
17.66
0.036
OK
222
4.415
3.599
17.66
0.031
OK
223
4.415
3.599
17.66
0.035
OK
224
4.415
3.599
17.66
0.163
OK
225
4.415
3.599
17.66
0.039
OK
226
4.415
3.599
17.66
0.295
OK
227
4.415
3.599
17.66
0.031
OK
228
4.415
3.599
17.66
0.287
OK
201
3.906
6.103
15.623
0.111
OK
202
3.906
6.103
15.623
0.095
OK
203
3.906
6.103
15.623
1.74
OK
204
3.906
6.103
15.623
0.095
OK
205
3.906
6.103
15.623
3.386
OK
206
3.906
6.103
15.623
0.095
OK
207
3.906
6.103
15.623
3.362
OK
208
3.906
6.103
15.623
0.071
OK
209
3.906
6.103
15.623
0.444
OK
22
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 73
210
3.906
6.103
15.623
0.38
OK
211
3.906
6.103
15.623
2.026
OK
212
3.906
6.103
15.623
0.38
OK
213
3.906
6.103
15.623
3.672
OK
214
3.906
6.103
15.623
0.38
OK
215
3.906
6.103
15.623
3.577
OK
216
3.906
6.103
15.623
0.285
OK
217
3.906
6.103
15.623
2.948
OK
218
3.906
6.103
15.623
0.38
OK
219
3.906
6.103
15.623
2.853
OK
220
3.906
6.103
15.623
0.285
OK
221
3.906
6.103
15.623
0.585
OK
222
3.906
6.103
15.623
0.502
OK
223
3.906
6.103
15.623
2.147
OK
224
3.906
6.103
15.623
0.502
OK
225
3.906
6.103
15.623
3.793
OK
226
3.906
6.103
15.623
0.502
OK
227
3.906
6.103
15.623
3.667
OK
228
3.906
6.103
15.623
0.376
OK
201
4.415
3.599
17.66
0.006
OK
202
4.415
3.599
17.66
0.005
OK
203
4.415
3.599
17.66
0.013
OK
204
4.415
3.599
17.66
0.154
OK
205
4.415
3.599
17.66
0.021
OK
206
4.415
3.599
17.66
0.302
OK
207
4.415
3.599
17.66
0.02
OK
208
4.415
3.599
17.66
0.301
OK
209
4.415
3.599
17.66
0.022
OK
210
4.415
3.599
17.66
0.019
OK
211
4.415
3.599
17.66
0.027
OK
212
4.415
3.599
17.66
0.168
OK
213
4.415
3.599
17.66
0.035
OK
214
4.415
3.599
17.66
0.317
OK
215
4.415
3.599
17.66
0.03
OK
216
4.415
3.599
17.66
0.312
OK
217
4.415
3.599
17.66
0.018
OK
218
4.415
3.599
17.66
0.079
OK
219
4.415
3.599
17.66
0.013
OK
220
4.415
3.599
17.66
0.074
OK
221
4.415
3.599
17.66
0.029
OK
222
4.415
3.599
17.66
0.025
OK
223
4.415
3.599
17.66
0.033
OK
224
4.415
3.599
17.66
0.174
OK
225
4.415
3.599
17.66
0.041
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 74
226
4.415
3.599
17.66
0.323
OK
227
4.415
3.599
17.66
0.035
OK
228
4.415
3.599
17.66
0.317
OK
201
3.906
6.103
15.623
0.109
OK
202
3.906
6.103
15.623
0.094
OK
203
3.906
6.103
15.623
1.684
OK
204
3.906
6.103
15.623
0.094
OK
205
3.906
6.103
15.623
3.274
OK
206
3.906
6.103
15.623
0.094
OK
207
3.906
6.103
15.623
3.251
OK
208
3.906
6.103
15.623
0.07
OK
209
3.906
6.103
15.623
0.441
OK
210
3.906
6.103
15.623
0.378
OK
211
3.906
6.103
15.623
1.968
OK
212
3.906
6.103
15.623
0.378
OK
213
3.906
6.103
15.623
3.559
OK
214
3.906
6.103
15.623
0.378
OK
215
3.906
6.103
15.623
3.464
OK
216
3.906
6.103
15.623
0.283
OK
217
3.906
6.103
15.623
2.855
OK
218
3.906
6.103
15.623
0.378
OK
219
3.906
6.103
15.623
2.76
OK
220
3.906
6.103
15.623
0.283
OK
221
3.906
6.103
15.623
0.58
OK
222
3.906
6.103
15.623
0.497
OK
223
3.906
6.103
15.623
2.087
OK
224
3.906
6.103
15.623
0.497
OK
225
3.906
6.103
15.623
3.678
OK
226
3.906
6.103
15.623
0.497
OK
227
3.906
6.103
15.623
3.553
OK
228
3.906
6.103
15.623
0.373
OK
201
4.415
3.599
17.66
0.001
OK
202
4.415
3.599
17.66
0.001
OK
203
4.415
3.599
17.66
0.01
OK
204
4.415
3.599
17.66
0.152
OK
205
4.415
3.599
17.66
0.019
OK
206
4.415
3.599
17.66
0.302
OK
207
4.415
3.599
17.66
0.019
OK
208
4.415
3.599
17.66
0.302
OK
209
4.415
3.599
17.66
0.013
OK
210
4.415
3.599
17.66
0.011
OK
211
4.415
3.599
17.66
0.02
OK
212
4.415
3.599
17.66
0.161
OK
213
4.415
3.599
17.66
0.028
OK
23
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 75
214
4.415
3.599
17.66
0.312
OK
215
4.415
3.599
17.66
0.026
OK
216
4.415
3.599
17.66
0.309
OK
217
4.415
3.599
17.66
0.009
OK
218
4.415
3.599
17.66
0.072
OK
219
4.415
3.599
17.66
0.007
OK
220
4.415
3.599
17.66
0.07
OK
221
4.415
3.599
17.66
0.017
OK
222
4.415
3.599
17.66
0.014
OK
223
4.415
3.599
17.66
0.023
OK
224
4.415
3.599
17.66
0.165
OK
225
4.415
3.599
17.66
0.032
OK
226
4.415
3.599
17.66
0.315
OK
227
4.415
3.599
17.66
0.028
OK
228
4.415
3.599
17.66
0.312
OK
201
3.906
6.103
15.623
0.069
OK
202
3.906
6.103
15.623
0.059
OK
203
3.906
6.103
15.623
1.193
OK
204
3.906
6.103
15.623
0.437
OK
205
3.906
6.103
15.623
2.328
OK
206
3.906
6.103
15.623
0.816
OK
207
3.906
6.103
15.623
2.313
OK
208
3.906
6.103
15.623
0.801
OK
209
3.906
6.103
15.623
0.304
OK
210
3.906
6.103
15.623
0.26
OK
211
3.906
6.103
15.623
1.395
OK
212
3.906
6.103
15.623
0.639
OK
213
3.906
6.103
15.623
2.529
OK
214
3.906
6.103
15.623
1.017
OK
215
3.906
6.103
15.623
2.464
OK
216
3.906
6.103
15.623
0.952
OK
217
3.906
6.103
15.623
2.741
OK
218
3.906
6.103
15.623
0.613
OK
219
3.906
6.103
15.623
2.676
OK
220
3.906
6.103
15.623
0.548
OK
221
3.906
6.103
15.623
0.403
OK
222
3.906
6.103
15.623
0.346
OK
223
3.906
6.103
15.623
1.48
OK
224
3.906
6.103
15.623
0.724
OK
225
3.906
6.103
15.623
2.614
OK
226
3.906
6.103
15.623
1.102
OK
227
3.906
6.103
15.623
2.528
OK
228
3.906
6.103
15.623
1.016
OK
201
4.415
3.599
17.66
0.108
OK
X
26
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
27
Page 76
202
4.415
3.599
17.66
0.092
OK
203
4.415
3.599
17.66
0.344
OK
204
4.415
3.599
17.66
2.589
OK
205
4.415
3.599
17.66
0.596
OK
206
4.415
3.599
17.66
5.086
OK
207
4.415
3.599
17.66
0.573
OK
208
4.415
3.599
17.66
5.063
OK
209
4.415
3.599
17.66
0.437
OK
210
4.415
3.599
17.66
0.374
OK
211
4.415
3.599
17.66
0.626
OK
212
4.415
3.599
17.66
2.871
OK
213
4.415
3.599
17.66
0.878
OK
214
4.415
3.599
17.66
5.368
OK
215
4.415
3.599
17.66
0.785
OK
216
4.415
3.599
17.66
5.274
OK
217
4.415
3.599
17.66
0.638
OK
218
4.415
3.599
17.66
2.048
OK
219
4.415
3.599
17.66
0.545
OK
220
4.415
3.599
17.66
1.955
OK
221
4.415
3.599
17.66
0.575
OK
222
4.415
3.599
17.66
0.493
OK
223
4.415
3.599
17.66
0.745
OK
224
4.415
3.599
17.66
2.99
OK
225
4.415
3.599
17.66
0.997
OK
226
4.415
3.599
17.66
5.487
OK
227
4.415
3.599
17.66
0.874
OK
228
4.415
3.599
17.66
5.364
OK
201
3.906
6.103
15.623
0.064
OK
202
3.906
6.103
15.623
0.055
OK
203
3.906
6.103
15.623
0.542
OK
204
3.906
6.103
15.623
0.057
OK
205
3.906
6.103
15.623
1.138
OK
206
3.906
6.103
15.623
0.058
OK
207
3.906
6.103
15.623
1.152
OK
208
3.906
6.103
15.623
0.045
OK
209
3.906
6.103
15.623
0.162
OK
210
3.906
6.103
15.623
0.139
OK
211
3.906
6.103
15.623
0.458
OK
212
3.906
6.103
15.623
0.141
OK
213
3.906
6.103
15.623
1.054
OK
214
3.906
6.103
15.623
0.142
OK
215
3.906
6.103
15.623
1.089
OK
216
3.906
6.103
15.623
0.108
OK
217
3.906
6.103
15.623
3.144
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 77
218
3.906
6.103
15.623
0.139
OK
219
3.906
6.103
15.623
3.179
OK
220
3.906
6.103
15.623
0.104
OK
221
3.906
6.103
15.623
0.204
OK
222
3.906
6.103
15.623
0.175
OK
223
3.906
6.103
15.623
0.422
OK
224
3.906
6.103
15.623
0.177
OK
225
3.906
6.103
15.623
1.018
OK
226
3.906
6.103
15.623
0.178
OK
227
3.906
6.103
15.623
1.062
OK
228
3.906
6.103
15.623
0.135
OK
201
4.415
3.599
17.66
0.013
OK
202
4.415
3.599
17.66
0.011
OK
203
4.415
3.599
17.66
0.006
OK
204
4.415
3.599
17.66
0.09
OK
205
4.415
3.599
17.66
0.001
OK
206
4.415
3.599
17.66
0.191
OK
207
4.415
3.599
17.66
0.002
OK
208
4.415
3.599
17.66
0.194
OK
209
4.415
3.599
17.66
0.034
OK
210
4.415
3.599
17.66
0.029
OK
211
4.415
3.599
17.66
0.024
OK
212
4.415
3.599
17.66
0.072
OK
213
4.415
3.599
17.66
0.019
OK
214
4.415
3.599
17.66
0.173
OK
215
4.415
3.599
17.66
0.012
OK
216
4.415
3.599
17.66
0.18
OK
217
4.415
3.599
17.66
0.029
OK
218
4.415
3.599
17.66
0.014
OK
219
4.415
3.599
17.66
0.022
OK
220
4.415
3.599
17.66
0.007
OK
221
4.415
3.599
17.66
0.043
OK
222
4.415
3.599
17.66
0.037
OK
223
4.415
3.599
17.66
0.032
OK
224
4.415
3.599
17.66
0.064
OK
225
4.415
3.599
17.66
0.028
OK
226
4.415
3.599
17.66
0.164
OK
227
4.415
3.599
17.66
0.018
OK
228
4.415
3.599
17.66
0.174
OK
201
3.906
6.103
15.623
0.105
OK
202
3.906
6.103
15.623
0.09
OK
203
3.906
6.103
15.623
1.02
OK
204
3.906
6.103
15.623
0.091
OK
205
3.906
6.103
15.623
2.131
OK
28
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 78
206
3.906
6.103
15.623
0.092
OK
207
3.906
6.103
15.623
2.153
OK
208
3.906
6.103
15.623
0.069
OK
209
3.906
6.103
15.623
0.298
OK
210
3.906
6.103
15.623
0.256
OK
211
3.906
6.103
15.623
0.855
OK
212
3.906
6.103
15.623
0.256
OK
213
3.906
6.103
15.623
1.965
OK
214
3.906
6.103
15.623
0.257
OK
215
3.906
6.103
15.623
2.029
OK
216
3.906
6.103
15.623
0.193
OK
217
3.906
6.103
15.623
3.028
OK
218
3.906
6.103
15.623
0.254
OK
219
3.906
6.103
15.623
3.092
OK
220
3.906
6.103
15.623
0.19
OK
221
3.906
6.103
15.623
0.379
OK
222
3.906
6.103
15.623
0.325
OK
223
3.906
6.103
15.623
0.785
OK
224
3.906
6.103
15.623
0.326
OK
225
3.906
6.103
15.623
1.896
OK
226
3.906
6.103
15.623
0.327
OK
227
3.906
6.103
15.623
1.977
OK
228
3.906
6.103
15.623
0.245
OK
201
4.415
3.599
17.66
0.004
OK
202
4.415
3.599
17.66
0.004
OK
203
4.415
3.599
17.66
0.001
OK
204
4.415
3.599
17.66
0.098
OK
205
4.415
3.599
17.66
0.006
OK
206
4.415
3.599
17.66
0.2
OK
207
4.415
3.599
17.66
0.007
OK
208
4.415
3.599
17.66
0.201
OK
209
4.415
3.599
17.66
0.02
OK
210
4.415
3.599
17.66
0.017
OK
211
4.415
3.599
17.66
0.012
OK
212
4.415
3.599
17.66
0.085
OK
213
4.415
3.599
17.66
0.007
OK
214
4.415
3.599
17.66
0.186
OK
215
4.415
3.599
17.66
0.003
OK
216
4.415
3.599
17.66
0.191
OK
217
4.415
3.599
17.66
0.017
OK
218
4.415
3.599
17.66
OK
219
4.415
3.599
17.66
0.013
OK
220
4.415
3.599
17.66
0.004
OK
221
4.415
3.599
17.66
0.027
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 79
222
4.415
3.599
17.66
0.023
OK
223
4.415
3.599
17.66
0.018
OK
224
4.415
3.599
17.66
0.079
OK
225
4.415
3.599
17.66
0.013
OK
226
4.415
3.599
17.66
0.18
OK
227
4.415
3.599
17.66
0.008
OK
228
4.415
3.599
17.66
0.186
OK
201
3.906
6.103
15.623
0.113
OK
202
3.906
6.103
15.623
0.097
OK
203
3.906
6.103
15.623
0.985
OK
204
3.906
6.103
15.623
0.096
OK
205
3.906
6.103
15.623
2.068
OK
206
3.906
6.103
15.623
0.094
OK
207
3.906
6.103
15.623
2.092
OK
208
3.906
6.103
15.623
0.07
OK
209
3.906
6.103
15.623
0.328
OK
210
3.906
6.103
15.623
0.281
OK
211
3.906
6.103
15.623
0.802
OK
212
3.906
6.103
15.623
0.279
OK
213
3.906
6.103
15.623
1.884
OK
214
3.906
6.103
15.623
0.278
OK
215
3.906
6.103
15.623
1.954
OK
216
3.906
6.103
15.623
0.207
OK
217
3.906
6.103
15.623
3.004
OK
218
3.906
6.103
15.623
0.282
OK
219
3.906
6.103
15.623
3.074
OK
220
3.906
6.103
15.623
0.212
OK
221
3.906
6.103
15.623
0.419
OK
222
3.906
6.103
15.623
0.359
OK
223
3.906
6.103
15.623
0.724
OK
224
3.906
6.103
15.623
0.357
OK
225
3.906
6.103
15.623
1.806
OK
226
3.906
6.103
15.623
0.356
OK
227
3.906
6.103
15.623
1.896
OK
228
3.906
6.103
15.623
0.266
OK
201
4.415
3.599
17.66
0.003
OK
202
4.415
3.599
17.66
0.002
OK
203
4.415
3.599
17.66
0.001
OK
204
4.415
3.599
17.66
0.099
OK
205
4.415
3.599
17.66
0.004
OK
206
4.415
3.599
17.66
0.201
OK
207
4.415
3.599
17.66
0.005
OK
208
4.415
3.599
17.66
0.201
OK
209
4.415
3.599
17.66
0.001
OK
29
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
30
Page 80
210
4.415
3.599
17.66
0.001
OK
211
4.415
3.599
17.66
0.002
OK
212
4.415
3.599
17.66
0.1
OK
213
4.415
3.599
17.66
0.005
OK
214
4.415
3.599
17.66
0.202
OK
215
4.415
3.599
17.66
0.006
OK
216
4.415
3.599
17.66
0.202
OK
217
4.415
3.599
17.66
0.003
OK
218
4.415
3.599
17.66
0.015
OK
219
4.415
3.599
17.66
0.002
OK
220
4.415
3.599
17.66
0.016
OK
221
4.415
3.599
17.66
OK
222
4.415
3.599
17.66
OK
223
4.415
3.599
17.66
0.003
OK
224
4.415
3.599
17.66
0.102
OK
225
4.415
3.599
17.66
0.006
OK
226
4.415
3.599
17.66
0.203
OK
227
4.415
3.599
17.66
0.006
OK
228
4.415
3.599
17.66
0.203
OK
201
3.906
6.103
15.623
0.113
OK
202
3.906
6.103
15.623
0.097
OK
203
3.906
6.103
15.623
0.987
OK
204
3.906
6.103
15.623
0.08
OK
205
3.906
6.103
15.623
2.071
OK
206
3.906
6.103
15.623
0.064
OK
207
3.906
6.103
15.623
2.095
OK
208
3.906
6.103
15.623
0.039
OK
209
3.906
6.103
15.623
0.329
OK
210
3.906
6.103
15.623
0.282
OK
211
3.906
6.103
15.623
0.802
OK
212
3.906
6.103
15.623
0.265
OK
213
3.906
6.103
15.623
1.886
OK
214
3.906
6.103
15.623
0.248
OK
215
3.906
6.103
15.623
1.957
OK
216
3.906
6.103
15.623
0.178
OK
217
3.906
6.103
15.623
2.993
OK
218
3.906
6.103
15.623
0.27
OK
219
3.906
6.103
15.623
3.063
OK
220
3.906
6.103
15.623
0.199
OK
221
3.906
6.103
15.623
0.419
OK
222
3.906
6.103
15.623
0.359
OK
223
3.906
6.103
15.623
0.725
OK
224
3.906
6.103
15.623
0.342
OK
225
3.906
6.103
15.623
1.809
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 81
226
3.906
6.103
15.623
0.325
OK
227
3.906
6.103
15.623
1.899
OK
228
3.906
6.103
15.623
0.235
OK
201
4.415
3.599
17.66
OK
202
4.415
3.599
17.66
OK
203
4.415
3.599
17.66
0.003
OK
204
4.415
3.599
17.66
0.102
OK
205
4.415
3.599
17.66
0.006
OK
206
4.415
3.599
17.66
0.205
OK
207
4.415
3.599
17.66
0.006
OK
208
4.415
3.599
17.66
0.205
OK
209
4.415
3.599
17.66
0.01
OK
210
4.415
3.599
17.66
0.008
OK
211
4.415
3.599
17.66
0.005
OK
212
4.415
3.599
17.66
0.094
OK
213
4.415
3.599
17.66
0.002
OK
214
4.415
3.599
17.66
0.196
OK
215
4.415
3.599
17.66
OK
216
4.415
3.599
17.66
0.199
OK
217
4.415
3.599
17.66
0.013
OK
218
4.415
3.599
17.66
0.008
OK
219
4.415
3.599
17.66
0.011
OK
220
4.415
3.599
17.66
0.01
OK
221
4.415
3.599
17.66
0.014
OK
222
4.415
3.599
17.66
0.012
OK
223
4.415
3.599
17.66
0.009
OK
224
4.415
3.599
17.66
0.09
OK
225
4.415
3.599
17.66
0.006
OK
226
4.415
3.599
17.66
0.193
OK
227
4.415
3.599
17.66
0.003
OK
228
4.415
3.599
17.66
0.196
OK
201
3.906
6.103
15.623
0.032
OK
202
3.906
6.103
15.623
0.028
OK
203
3.906
6.103
15.623
0.755
OK
204
3.906
6.103
15.623
0.232
OK
205
3.906
6.103
15.623
1.537
OK
206
3.906
6.103
15.623
0.436
OK
207
3.906
6.103
15.623
1.544
OK
208
3.906
6.103
15.623
0.429
OK
209
3.906
6.103
15.623
0.113
OK
210
3.906
6.103
15.623
0.097
OK
211
3.906
6.103
15.623
0.685
OK
212
3.906
6.103
15.623
0.301
OK
213
3.906
6.103
15.623
1.468
OK
31
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 82
214
3.906
6.103
15.623
0.505
OK
215
3.906
6.103
15.623
1.492
OK
216
3.906
6.103
15.623
0.481
OK
217
3.906
6.103
15.623
1.904
OK
218
3.906
6.103
15.623
0.261
OK
219
3.906
6.103
15.623
1.928
OK
220
3.906
6.103
15.623
0.236
OK
221
3.906
6.103
15.623
0.148
OK
222
3.906
6.103
15.623
0.127
OK
223
3.906
6.103
15.623
0.655
OK
224
3.906
6.103
15.623
0.331
OK
225
3.906
6.103
15.623
1.438
OK
226
3.906
6.103
15.623
0.535
OK
227
3.906
6.103
15.623
1.469
OK
228
3.906
6.103
15.623
0.503
OK
201
4.415
3.599
17.66
0.108
OK
202
4.415
3.599
17.66
0.092
OK
203
4.415
3.599
17.66
0.022
OK
204
4.415
3.599
17.66
1.516
OK
205
4.415
3.599
17.66
0.136
OK
206
4.415
3.599
17.66
2.94
OK
207
4.415
3.599
17.66
0.16
OK
208
4.415
3.599
17.66
2.917
OK
209
4.415
3.599
17.66
0.357
OK
210
4.415
3.599
17.66
0.306
OK
211
4.415
3.599
17.66
0.192
OK
212
4.415
3.599
17.66
1.73
OK
213
4.415
3.599
17.66
0.077
OK
214
4.415
3.599
17.66
3.154
OK
215
4.415
3.599
17.66
0.001
OK
216
4.415
3.599
17.66
3.078
OK
217
4.415
3.599
17.66
0.138
OK
218
4.415
3.599
17.66
0.891
OK
219
4.415
3.599
17.66
0.215
OK
220
4.415
3.599
17.66
0.814
OK
221
4.415
3.599
17.66
0.461
OK
222
4.415
3.599
17.66
0.395
OK
223
4.415
3.599
17.66
0.28
OK
224
4.415
3.599
17.66
1.819
OK
225
4.415
3.599
17.66
0.166
OK
226
4.415
3.599
17.66
3.243
OK
227
4.415
3.599
17.66
0.067
OK
228
4.415
3.599
17.66
3.144
OK
201
3.906
6.103
15.623
0.064
OK
32
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 83
202
3.906
6.103
15.623
0.055
OK
203
3.906
6.103
15.623
0.653
OK
204
3.906
6.103
15.623
0.054
OK
205
3.906
6.103
15.623
1.25
OK
206
3.906
6.103
15.623
0.052
OK
207
3.906
6.103
15.623
1.237
OK
208
3.906
6.103
15.623
0.038
OK
209
3.906
6.103
15.623
0.162
OK
210
3.906
6.103
15.623
0.139
OK
211
3.906
6.103
15.623
0.737
OK
212
3.906
6.103
15.623
0.138
OK
213
3.906
6.103
15.623
1.334
OK
214
3.906
6.103
15.623
0.136
OK
215
3.906
6.103
15.623
1.3
OK
216
3.906
6.103
15.623
0.101
OK
217
3.906
6.103
15.623
3.429
OK
218
3.906
6.103
15.623
0.139
OK
219
3.906
6.103
15.623
3.394
OK
220
3.906
6.103
15.623
0.104
OK
221
3.906
6.103
15.623
0.204
OK
222
3.906
6.103
15.623
0.175
OK
223
3.906
6.103
15.623
0.773
OK
224
3.906
6.103
15.623
0.174
OK
225
3.906
6.103
15.623
1.37
OK
226
3.906
6.103
15.623
0.172
OK
227
3.906
6.103
15.623
1.327
OK
228
3.906
6.103
15.623
0.128
OK
201
4.415
3.599
17.66
0.013
OK
202
4.415
3.599
17.66
0.011
OK
203
4.415
3.599
17.66
0.016
OK
204
4.415
3.599
17.66
0.082
OK
205
4.415
3.599
17.66
0.02
OK
206
4.415
3.599
17.66
0.175
OK
207
4.415
3.599
17.66
0.018
OK
208
4.415
3.599
17.66
0.178
OK
209
4.415
3.599
17.66
0.034
OK
210
4.415
3.599
17.66
0.029
OK
211
4.415
3.599
17.66
0.034
OK
212
4.415
3.599
17.66
0.064
OK
213
4.415
3.599
17.66
0.038
OK
214
4.415
3.599
17.66
0.157
OK
215
4.415
3.599
17.66
0.031
OK
216
4.415
3.599
17.66
0.164
OK
217
4.415
3.599
17.66
0.029
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 84
218
4.415
3.599
17.66
0.014
OK
219
4.415
3.599
17.66
0.022
OK
220
4.415
3.599
17.66
0.007
OK
221
4.415
3.599
17.66
0.043
OK
222
4.415
3.599
17.66
0.037
OK
223
4.415
3.599
17.66
0.042
OK
224
4.415
3.599
17.66
0.056
OK
225
4.415
3.599
17.66
0.047
OK
226
4.415
3.599
17.66
0.148
OK
227
4.415
3.599
17.66
0.038
OK
228
4.415
3.599
17.66
0.158
OK
201
3.906
6.103
15.623
0.105
OK
202
3.906
6.103
15.623
0.09
OK
203
3.906
6.103
15.623
1.202
OK
204
3.906
6.103
15.623
0.092
OK
205
3.906
6.103
15.623
2.314
OK
206
3.906
6.103
15.623
0.095
OK
207
3.906
6.103
15.623
2.292
OK
208
3.906
6.103
15.623
0.072
OK
209
3.906
6.103
15.623
0.298
OK
210
3.906
6.103
15.623
0.256
OK
211
3.906
6.103
15.623
1.368
OK
212
3.906
6.103
15.623
0.258
OK
213
3.906
6.103
15.623
2.48
OK
214
3.906
6.103
15.623
0.26
OK
215
3.906
6.103
15.623
2.416
OK
216
3.906
6.103
15.623
0.197
OK
217
3.906
6.103
15.623
3.545
OK
218
3.906
6.103
15.623
0.254
OK
219
3.906
6.103
15.623
3.481
OK
220
3.906
6.103
15.623
0.19
OK
221
3.906
6.103
15.623
0.379
OK
222
3.906
6.103
15.623
0.325
OK
223
3.906
6.103
15.623
1.437
OK
224
3.906
6.103
15.623
0.328
OK
225
3.906
6.103
15.623
2.549
OK
226
3.906
6.103
15.623
0.33
OK
227
3.906
6.103
15.623
2.468
OK
228
3.906
6.103
15.623
0.249
OK
201
4.415
3.599
17.66
0.004
OK
202
4.415
3.599
17.66
0.004
OK
203
4.415
3.599
17.66
0.008
OK
204
4.415
3.599
17.66
0.089
OK
205
4.415
3.599
17.66
0.013
OK
33
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
34
Page 85
206
4.415
3.599
17.66
0.182
OK
207
4.415
3.599
17.66
0.012
OK
208
4.415
3.599
17.66
0.183
OK
209
4.415
3.599
17.66
0.02
OK
210
4.415
3.599
17.66
0.017
OK
211
4.415
3.599
17.66
0.022
OK
212
4.415
3.599
17.66
0.076
OK
213
4.415
3.599
17.66
0.026
OK
214
4.415
3.599
17.66
0.169
OK
215
4.415
3.599
17.66
0.022
OK
216
4.415
3.599
17.66
0.173
OK
217
4.415
3.599
17.66
0.017
OK
218
4.415
3.599
17.66
OK
219
4.415
3.599
17.66
0.013
OK
220
4.415
3.599
17.66
0.004
OK
221
4.415
3.599
17.66
0.027
OK
222
4.415
3.599
17.66
0.023
OK
223
4.415
3.599
17.66
0.028
OK
224
4.415
3.599
17.66
0.07
OK
225
4.415
3.599
17.66
0.032
OK
226
4.415
3.599
17.66
0.163
OK
227
4.415
3.599
17.66
0.027
OK
228
4.415
3.599
17.66
0.168
OK
201
3.906
6.103
15.623
0.113
OK
202
3.906
6.103
15.623
0.097
OK
203
3.906
6.103
15.623
1.181
OK
204
3.906
6.103
15.623
0.095
OK
205
3.906
6.103
15.623
2.265
OK
206
3.906
6.103
15.623
0.092
OK
207
3.906
6.103
15.623
2.241
OK
208
3.906
6.103
15.623
0.068
OK
209
3.906
6.103
15.623
0.328
OK
210
3.906
6.103
15.623
0.281
OK
211
3.906
6.103
15.623
1.365
OK
212
3.906
6.103
15.623
0.278
OK
213
3.906
6.103
15.623
2.449
OK
214
3.906
6.103
15.623
0.276
OK
215
3.906
6.103
15.623
2.379
OK
216
3.906
6.103
15.623
0.206
OK
217
3.906
6.103
15.623
3.572
OK
218
3.906
6.103
15.623
0.282
OK
219
3.906
6.103
15.623
3.502
OK
220
3.906
6.103
15.623
0.212
OK
221
3.906
6.103
15.623
0.419
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 86
222
3.906
6.103
15.623
0.359
OK
223
3.906
6.103
15.623
1.443
OK
224
3.906
6.103
15.623
0.356
OK
225
3.906
6.103
15.623
2.527
OK
226
3.906
6.103
15.623
0.354
OK
227
3.906
6.103
15.623
2.437
OK
228
3.906
6.103
15.623
0.264
OK
201
4.415
3.599
17.66
0.003
OK
202
4.415
3.599
17.66
0.002
OK
203
4.415
3.599
17.66
0.006
OK
204
4.415
3.599
17.66
0.09
OK
205
4.415
3.599
17.66
0.009
OK
206
4.415
3.599
17.66
0.182
OK
207
4.415
3.599
17.66
0.008
OK
208
4.415
3.599
17.66
0.182
OK
209
4.415
3.599
17.66
0.001
OK
210
4.415
3.599
17.66
0.001
OK
211
4.415
3.599
17.66
0.004
OK
212
4.415
3.599
17.66
0.091
OK
213
4.415
3.599
17.66
0.008
OK
214
4.415
3.599
17.66
0.183
OK
215
4.415
3.599
17.66
0.007
OK
216
4.415
3.599
17.66
0.183
OK
217
4.415
3.599
17.66
OK
218
4.415
3.599
17.66
0.015
OK
219
4.415
3.599
17.66
0.001
OK
220
4.415
3.599
17.66
0.016
OK
221
4.415
3.599
17.66
OK
222
4.415
3.599
17.66
OK
223
4.415
3.599
17.66
0.003
OK
224
4.415
3.599
17.66
0.092
OK
225
4.415
3.599
17.66
0.006
OK
226
4.415
3.599
17.66
0.184
OK
227
4.415
3.599
17.66
0.006
OK
228
4.415
3.599
17.66
0.184
OK
201
3.906
6.103
15.623
0.113
OK
202
3.906
6.103
15.623
0.097
OK
203
3.906
6.103
15.623
1.183
OK
204
3.906
6.103
15.623
0.076
OK
205
3.906
6.103
15.623
2.268
OK
206
3.906
6.103
15.623
0.056
OK
207
3.906
6.103
15.623
2.244
OK
208
3.906
6.103
15.623
0.031
OK
209
3.906
6.103
15.623
0.329
OK
35
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 87
210
3.906
6.103
15.623
0.282
OK
211
3.906
6.103
15.623
1.368
OK
212
3.906
6.103
15.623
0.261
OK
213
3.906
6.103
15.623
2.453
OK
214
3.906
6.103
15.623
0.24
OK
215
3.906
6.103
15.623
2.383
OK
216
3.906
6.103
15.623
0.17
OK
217
3.906
6.103
15.623
3.562
OK
218
3.906
6.103
15.623
0.27
OK
219
3.906
6.103
15.623
3.492
OK
220
3.906
6.103
15.623
0.199
OK
221
3.906
6.103
15.623
0.419
OK
222
3.906
6.103
15.623
0.359
OK
223
3.906
6.103
15.623
1.444
OK
224
3.906
6.103
15.623
0.338
OK
225
3.906
6.103
15.623
2.53
OK
226
3.906
6.103
15.623
0.317
OK
227
3.906
6.103
15.623
2.44
OK
228
3.906
6.103
15.623
0.227
OK
201
4.415
3.599
17.66
OK
202
4.415
3.599
17.66
OK
203
4.415
3.599
17.66
0.003
OK
204
4.415
3.599
17.66
0.093
OK
205
4.415
3.599
17.66
0.006
OK
206
4.415
3.599
17.66
0.186
OK
207
4.415
3.599
17.66
0.006
OK
208
4.415
3.599
17.66
0.186
OK
209
4.415
3.599
17.66
0.01
OK
210
4.415
3.599
17.66
0.008
OK
211
4.415
3.599
17.66
0.012
OK
212
4.415
3.599
17.66
0.084
OK
213
4.415
3.599
17.66
0.015
OK
214
4.415
3.599
17.66
0.177
OK
215
4.415
3.599
17.66
0.013
OK
216
4.415
3.599
17.66
0.179
OK
217
4.415
3.599
17.66
0.004
OK
218
4.415
3.599
17.66
0.008
OK
219
4.415
3.599
17.66
0.002
OK
220
4.415
3.599
17.66
0.01
OK
221
4.415
3.599
17.66
0.014
OK
222
4.415
3.599
17.66
0.012
OK
223
4.415
3.599
17.66
0.015
OK
224
4.415
3.599
17.66
0.081
OK
225
4.415
3.599
17.66
0.018
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 88
226
4.415
3.599
17.66
0.174
OK
227
4.415
3.599
17.66
0.015
OK
228
4.415
3.599
17.66
0.177
OK
201
3.906
6.103
15.623
0.101
OK
202
3.906
6.103
15.623
0.086
OK
203
3.906
6.103
15.623
0.878
OK
204
3.906
6.103
15.623
0.44
OK
205
3.906
6.103
15.623
1.67
OK
206
3.906
6.103
15.623
0.794
OK
207
3.906
6.103
15.623
1.649
OK
208
3.906
6.103
15.623
0.772
OK
209
3.906
6.103
15.623
0.305
OK
210
3.906
6.103
15.623
0.262
OK
211
3.906
6.103
15.623
1.054
OK
212
3.906
6.103
15.623
0.615
OK
213
3.906
6.103
15.623
1.846
OK
214
3.906
6.103
15.623
0.969
OK
215
3.906
6.103
15.623
1.78
OK
216
3.906
6.103
15.623
0.903
OK
217
3.906
6.103
15.623
2.3
OK
218
3.906
6.103
15.623
0.406
OK
219
3.906
6.103
15.623
2.235
OK
220
3.906
6.103
15.623
0.34
OK
221
3.906
6.103
15.623
0.391
OK
222
3.906
6.103
15.623
0.335
OK
223
3.906
6.103
15.623
1.127
OK
224
3.906
6.103
15.623
0.688
OK
225
3.906
6.103
15.623
1.919
OK
226
3.906
6.103
15.623
1.042
OK
227
3.906
6.103
15.623
1.835
OK
228
3.906
6.103
15.623
0.958
OK
201
4.415
3.599
17.66
0.094
OK
202
4.415
3.599
17.66
0.08
OK
203
4.415
3.599
17.66
0.216
OK
204
4.415
3.599
17.66
1.047
OK
205
4.415
3.599
17.66
0.352
OK
206
4.415
3.599
17.66
2.013
OK
207
4.415
3.599
17.66
0.332
OK
208
4.415
3.599
17.66
1.993
OK
209
4.415
3.599
17.66
0.315
OK
210
4.415
3.599
17.66
0.27
OK
211
4.415
3.599
17.66
0.406
OK
212
4.415
3.599
17.66
1.236
OK
213
4.415
3.599
17.66
0.542
OK
36
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 89
214
4.415
3.599
17.66
2.203
OK
215
4.415
3.599
17.66
0.475
OK
216
4.415
3.599
17.66
2.135
OK
217
4.415
3.599
17.66
0.757
OK
218
4.415
3.599
17.66
0.857
OK
219
4.415
3.599
17.66
0.69
OK
220
4.415
3.599
17.66
0.789
OK
221
4.415
3.599
17.66
0.407
OK
222
4.415
3.599
17.66
0.349
OK
223
4.415
3.599
17.66
0.485
OK
224
4.415
3.599
17.66
1.316
OK
225
4.415
3.599
17.66
0.621
OK
226
4.415
3.599
17.66
2.282
OK
227
4.415
3.599
17.66
0.534
OK
228
4.415
3.599
17.66
2.195
OK
AFES CALCULATION
FOOTING FOR FOUNDATION TYPE F3
TITLE
DESCRIPTION
PROJECT/JOB NO.
09-JC-15 (AL-1)
PROJECT/JOB NAME
ICA PROJECT
CLIENT NAME
ICA
SITE NAME
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME
DATE
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
FOUNDATION LISTS
Group Name
No.
FA
Description
F89
No.
2
Description
F90
Page 1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
CONTENTS
1. GENERAL
1.1 MATERIALS & UNIT WEIGHT
1.2 SUBSOIL CONDITION & SAFETY FACTORS
1.3 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE
Page 2
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
1. GENERAL
1.1 MATERIALS & UNIT WEIGHT
Items
Value
250.000 kgf/cm2
150.000 kgf/cm2
3900.000 kgf/cm2
3900.000 kgf/cm2
1.700 ton/m3
2.400 ton/m3
250998.000 kgf/cm2
- Pile Capacity
Items
Value
Pile Name
Footing List
F89, F90
Diameter
300 mm
Length
12 m
Thick
9 mm
Shape
Circle
Capacity ( Ha , Ua , Va )
4 , 13.4 , 58 tonf
Description
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
33.33 %
1.7
Friction factor ()
0.3
Page 3
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
1.3 LOAD COMBINATION
Index
SW
SELF WEIGHT
Empty
EMPTY LOAD
DL
DEAD LOAD
Operation
OPERATION LOAD
Test
TEST LOAD
Wlx
Wly
SLx2
SLy2
10
LL
LIVE LOAD
Comb . ID
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
.6 SW + .6 DL + .6 Operation + .7 SLx2
122
.6 SW + .6 DL + .6 Operation + .7 SLy2
123
124
125
126
127
128
129
130
Page 4
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Comb . ID
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
Page 5
2. DRAWING
REFERENCE DWGS
A06
A01A02 A03 A04 A05
3000
6000
6440
16
NO.
DWG NO.
DWG TITLE
2000
6000
11500
38
F8940
F90
5000
15
6000
11
10
16
F2324
F27
15
F7323
F77
6000
12
NOTES
* OUTPUT UNIT : mm
6000
13
37
F2939
F31
17
F2425
F28
10000
14
14
F7222
F76
08
07
8000
06
05
02
01
6000
8000
03
11
F7119
F75
10
F7018
F74
9F6926
F78
1F652F66
7F63
3F61
8F64
4F62
31
36
F83
F88
5F67
6F68
30
35
F82
F87
6000
04
12
F2120
F25
29
34
F81
F86
28
33
F80
F85
09
2000
6000
6000
5500
13000
13
F2221
F26
PROCESS PIPING
VESSELS STRUCT.
ELEC.
INST.
27
32
F79
F84
SCALE
AS SHOWN
JOB NO.
09-JC-15 (AL-1)
MICROFILM NO.
OUTPUT UNIT : mm
REFERENCE DWGS
NO.
TOP
D13@200
D13@200
900
1650
825
375
375
DWG TITLE
CL FOOTING
BOTTOM
75
TYP.
750
DWG NO.
NOTES
D13@200
D13@200
FOUNDATION PLAN
(2 EA)
* OUTPUT UNIT : mm
590
195
220
50
TYP.
150
D10
SQUAD CHECK
220
590
600
75
100
D16
195
200
D10
@200
300
700
375x2
120 PROJ.
25 GR.
375
* PILE
2-300 PS-12 D.300 12M
* ANCHOR BOLT
1X4-M24 ANC. BOLTS (TYPE TYPE L)
16-D16
150
PEDESTAL
PROCESS PIPING
VESSELS STRUCT.
ELEC.
INST.
SECTION
SCALE
REV.
DATE
DESCRIPTION
AS SHOWN
JOB NO.
09-JC-15 (AL-1)
MICROFILM NO.
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 9
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name
750
1650
590 590
F89
Ft. Type
ISO
Area
1.238 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.743 m3
Ft. Weight
1.783 tonf
Soil Height
300.00 mm
Soil Volume
0.267 m3
Soil Weight
0.454 tonf
Buoyancy
Not Consider
2.237 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F89
All Direct
0.743 m3
0.267 m3
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
1.238 m2
1.783 tonf
0.454 tonf
2.822 tonf
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
( mm ) Ft. Name
750
1650
590 590
Page 10
F90
Ft. Type
ISO
Area
1.238 m2
Ft. Thickness
600.00 mm
Ft. Volume
0.743 m3
Ft. Weight
1.783 tonf
Soil Height
300.00 mm
Soil Volume
0.267 m3
Soil Weight
0.454 tonf
Buoyancy
Not Consider
2.237 tonf
P = 3.25 ton
300
700
P = 11.54 ton
Footing
Weight
600
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F90
All Direct
0.743 m3
0.267 m3
0.585 tonf
Sec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
1.783 tonf
0.454 tonf
2.822 tonf
S1
1.238 m
Ft.Name
Pr.Name
Shape
Pw
Ph
F89
38
Rectangle
590.000
Pl
590.000
700.000
Area
0.348
Weight
0.585
Off X
0.000
Off Y
0.000
F90
40
Rectangle
590.000
590.000
700.000
0.348
0.585
0.000
0.000
Fy
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch)
are based on the right hand rule.
My
Fx
Mx
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Index
SW
SELF WEIGHT
Empty
EMPTY LOAD
DL
DEAD LOAD
Operation
OPERATION LOAD
Test
TEST LOAD
Wlx
Wly
SLx2
SLy2
10
LL
LIVE LOAD
Page 11
Ft.Name
F89
Pr.Name
Load Case
Fy
Fz
Mx
My
-0.58
-0.39
-0.01
-2.2
0.02
-0.05
-7.87
0.03
-0.07
-11.02
-3.25
-0.02
11.08
-0.05
-0.27
0.04
-1.66
6.39
-0.08
-0.11
10
0.000
0.000
-2.237
0.000
0.000
-0.58
-0.39
-0.01
-2.18
-0.02
-0.05
-7.82
-0.03
-0.07
-10.94
-3.25
-0.03
-11.12
-0.05
-0.28
-0.29
-1.66
-6.39
-0.08
-0.11
10
0.000
0.000
-2.237
0.000
0.000
38
Footing SW
F90
Fx
40
Footing SW
In Footing Bottom
In Footing Bottom Center
with Pier Self Weight,
with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 12
Fx
Fy
Fz
Mx
My
0.003
-0.017
-2.590
0.000
0.000
102
0.003
-0.017
-2.590
0.000
0.000
103
-3.249
-0.033
8.486
0.000
0.000
104
-0.043
-0.287
-2.547
0.000
0.000
105
-2.436
-0.029
5.717
0.000
0.000
106
-0.032
-0.220
-2.558
0.000
0.000
107
-3.250
-0.026
9.522
0.000
0.000
108
-0.044
-0.280
-1.511
0.000
0.000
109
0.022
-0.066
-10.070
0.000
0.000
110
0.022
-0.066
-10.070
0.000
0.000
111
-3.230
-0.082
1.006
0.000
0.000
112
-0.024
-0.336
-10.027
0.000
0.000
113
-2.417
-0.078
-1.763
0.000
0.000
114
-0.013
-0.269
-10.038
0.000
0.000
115
-3.239
-0.056
5.034
0.000
0.000
116
-0.033
-0.310
-5.999
0.000
0.000
117
-1.141
-0.068
-5.598
0.000
0.000
118
0.022
-0.123
-10.147
0.000
0.000
119
-0.850
-0.068
-6.716
0.000
0.000
120
0.022
-0.109
-10.128
0.000
0.000
121
-1.150
-0.042
-1.570
0.000
0.000
122
0.013
-0.097
-6.119
0.000
0.000
123
0.030
-0.086
-13.220
0.000
0.000
124
0.030
-0.086
-13.220
0.000
0.000
125
-3.222
-0.102
-2.144
0.000
0.000
126
-0.016
-0.356
-13.177
0.000
0.000
127
-2.409
-0.098
-4.913
0.000
0.000
128
-0.004
-0.289
-13.188
0.000
0.000
129
-3.234
-0.068
3.144
0.000
0.000
130
-0.028
-0.322
-7.889
0.000
0.000
201
0.004
-0.024
-3.626
0.000
0.000
202
0.004
-0.020
-3.108
0.000
0.000
203
-2.598
-0.033
5.753
0.000
0.000
204
-0.033
-0.236
-3.074
0.000
0.000
205
-5.200
-0.046
14.614
0.000
0.000
206
-0.070
-0.452
-3.039
0.000
0.000
207
-5.201
-0.041
15.391
0.000
0.000
208
-0.071
-0.447
-2.262
0.000
0.000
209
0.031
-0.092
-14.098
0.000
0.000
210
0.026
-0.079
-12.084
0.000
0.000
211
-2.575
-0.092
-3.223
0.000
0.000
212
-0.010
-0.295
-12.050
0.000
0.000
213
-5.177
-0.105
5.638
0.000
0.000
214
-0.047
-0.511
-12.015
0.000
0.000
215
-5.183
-0.085
8.659
0.000
0.000
216
-0.054
-0.491
-8.994
0.000
0.000
217
-2.465
-0.084
-2.501
0.000
0.000
218
0.026
-0.202
-12.249
0.000
0.000
219
-2.472
-0.064
0.521
0.000
0.000
220
0.020
-0.182
-9.228
0.000
0.000
221
0.042
-0.120
-18.508
0.000
0.000
Pr.Name L.Comb.
101
F89
38
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F90
40
Page 13
222
0.036
-0.103
-15.864
0.000
0.000
223
-2.566
-0.116
-7.003
0.000
0.000
224
-0.001
-0.319
-15.830
0.000
0.000
225
-5.167
-0.129
1.858
0.000
0.000
226
-0.038
-0.535
-15.795
0.000
0.000
227
-5.176
-0.103
5.824
0.000
0.000
228
-0.047
-0.509
-11.829
0.000
0.000
101
-0.003
-0.015
-2.574
0.000
0.000
102
-0.003
-0.015
-2.574
0.000
0.000
103
-3.255
-0.045
-13.694
0.000
0.000
104
-0.049
-0.297
-2.866
0.000
0.000
105
-2.442
-0.038
-10.914
0.000
0.000
106
-0.038
-0.227
-2.793
0.000
0.000
107
-3.254
-0.039
-12.664
0.000
0.000
108
-0.048
-0.291
-1.836
0.000
0.000
109
-0.023
-0.061
-9.999
0.000
0.000
110
-0.023
-0.061
-9.999
0.000
0.000
111
-3.275
-0.091
-21.119
0.000
0.000
112
-0.069
-0.343
-10.291
0.000
0.000
113
-2.462
-0.083
-18.339
0.000
0.000
114
-0.058
-0.273
-10.218
0.000
0.000
115
-3.266
-0.067
-17.119
0.000
0.000
116
-0.060
-0.319
-6.291
0.000
0.000
117
-1.186
-0.059
-14.471
0.000
0.000
118
-0.023
-0.118
-10.075
0.000
0.000
119
-0.895
-0.059
-13.353
0.000
0.000
120
-0.023
-0.104
-10.056
0.000
0.000
121
-1.176
-0.035
-10.472
0.000
0.000
122
-0.014
-0.094
-6.075
0.000
0.000
123
-0.032
-0.080
-13.126
0.000
0.000
124
-0.032
-0.080
-13.126
0.000
0.000
125
-3.284
-0.110
-24.246
0.000
0.000
126
-0.078
-0.362
-13.418
0.000
0.000
127
-2.471
-0.102
-21.466
0.000
0.000
128
-0.067
-0.292
-13.345
0.000
0.000
129
-3.271
-0.078
-18.996
0.000
0.000
130
-0.065
-0.330
-8.168
0.000
0.000
201
-0.004
-0.021
-3.604
0.000
0.000
202
-0.004
-0.018
-3.089
0.000
0.000
203
-2.605
-0.042
-11.985
0.000
0.000
204
-0.040
-0.244
-3.322
0.000
0.000
205
-5.207
-0.066
-20.881
0.000
0.000
206
-0.077
-0.469
-3.556
0.000
0.000
207
-5.206
-0.061
-20.109
0.000
0.000
208
-0.076
-0.465
-2.784
0.000
0.000
209
-0.032
-0.085
-13.999
0.000
0.000
210
-0.028
-0.073
-11.999
0.000
0.000
211
-2.629
-0.097
-20.895
0.000
0.000
212
-0.064
-0.299
-12.232
0.000
0.000
213
-5.231
-0.121
-29.791
0.000
0.000
214
-0.101
-0.524
-12.466
0.000
0.000
215
-5.224
-0.103
-26.791
0.000
0.000
216
-0.094
-0.506
-9.466
0.000
0.000
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 14
217
-2.519
-0.069
-21.582
0.000
0.000
218
-0.028
-0.196
-12.161
0.000
0.000
219
-2.512
-0.050
-18.583
0.000
0.000
220
-0.021
-0.178
-9.161
0.000
0.000
221
-0.045
-0.112
-18.376
0.000
0.000
222
-0.038
-0.096
-15.751
0.000
0.000
223
-2.640
-0.120
-24.647
0.000
0.000
224
-0.075
-0.322
-15.985
0.000
0.000
225
-5.242
-0.144
-33.543
0.000
0.000
226
-0.112
-0.547
-16.218
0.000
0.000
227
-5.232
-0.120
-29.605
0.000
0.000
228
-0.102
-0.523
-12.281
0.000
0.000
Fy
Fz
Mx
My
0.003
-0.017
-3.175
0.022
0.004
102
0.003
-0.017
-3.175
0.022
0.004
103
-3.249
-0.033
7.901
0.043
-4.224
104
-0.043
-0.287
-3.132
0.373
-0.056
105
-2.436
-0.029
5.132
0.038
-3.167
106
-0.032
-0.220
-3.143
0.285
-0.041
107
-3.250
-0.026
9.171
0.034
-4.225
108
-0.044
-0.280
-1.862
0.364
-0.057
109
0.022
-0.066
-10.655
0.086
0.029
110
0.022
-0.066
-10.655
0.086
0.029
111
-3.230
-0.082
0.421
0.107
-4.199
112
-0.024
-0.336
-10.612
0.437
-0.031
113
-2.417
-0.078
-2.348
0.101
-3.142
114
-0.013
-0.269
-10.623
0.349
-0.016
115
-3.239
-0.056
4.683
0.072
-4.210
116
-0.033
-0.310
-6.350
0.402
-0.043
117
-1.141
-0.068
-6.183
0.089
-1.483
118
0.022
-0.123
-10.732
0.160
0.029
119
-0.850
-0.068
-7.301
0.088
-1.105
120
0.022
-0.109
-10.713
0.142
0.029
121
-1.150
-0.042
-1.921
0.054
-1.494
122
0.013
-0.097
-6.470
0.126
0.017
123
0.030
-0.086
-13.805
0.112
0.039
124
0.030
-0.086
-13.805
0.112
0.039
125
-3.222
-0.102
-2.729
0.133
-4.189
126
-0.016
-0.356
-13.762
0.463
-0.021
127
-2.409
-0.098
-5.498
0.127
-3.132
128
-0.004
-0.289
-13.773
0.375
-0.006
129
-3.234
-0.068
2.793
0.088
-4.204
130
-0.028
-0.322
-8.240
0.418
-0.036
201
0.004
-0.024
-4.445
0.031
0.005
202
0.004
-0.020
-3.810
0.027
0.005
203
-2.598
-0.033
5.051
0.043
-3.377
204
-0.033
-0.236
-3.775
0.307
-0.043
205
-5.200
-0.046
13.912
0.060
-6.759
206
-0.070
-0.452
-3.741
0.588
-0.091
207
-5.201
-0.041
14.864
0.053
-6.761
101
F89
38
Fx
Pr.Name L.Comb.
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F90
40
Page 15
208
-0.071
-0.447
-2.789
0.581
-0.092
209
0.031
-0.092
-14.917
0.120
0.040
210
0.026
-0.079
-12.786
0.103
0.034
211
-2.575
-0.092
-3.925
0.120
-3.348
212
-0.010
-0.295
-12.751
0.384
-0.014
213
-5.177
-0.105
4.936
0.136
-6.730
214
-0.047
-0.511
-12.717
0.665
-0.061
215
-5.183
-0.085
8.132
0.111
-6.738
216
-0.054
-0.491
-9.521
0.639
-0.070
217
-2.465
-0.084
-3.202
0.109
-3.205
218
0.026
-0.202
-12.951
0.263
0.034
219
-2.472
-0.064
-0.006
0.083
-3.213
220
0.020
-0.182
-9.754
0.237
0.026
221
0.042
-0.120
-19.327
0.157
0.055
222
0.036
-0.103
-16.566
0.134
0.047
223
-2.566
-0.116
-7.705
0.151
-3.335
224
-0.001
-0.319
-16.531
0.415
-0.001
225
-5.167
-0.129
1.156
0.167
-6.717
226
-0.038
-0.535
-16.497
0.696
-0.049
227
-5.176
-0.103
5.297
0.134
-6.729
228
-0.047
-0.509
-12.356
0.662
-0.061
101
-0.003
-0.015
-3.159
0.020
-0.004
102
-0.003
-0.015
-3.159
0.020
-0.004
103
-3.255
-0.045
-14.279
0.059
-4.232
104
-0.049
-0.297
-3.451
0.386
-0.064
105
-2.442
-0.038
-11.499
0.049
-3.175
106
-0.038
-0.227
-3.378
0.294
-0.049
107
-3.254
-0.039
-13.015
0.051
-4.230
108
-0.048
-0.291
-2.187
0.378
-0.062
109
-0.023
-0.061
-10.584
0.079
-0.030
110
-0.023
-0.061
-10.584
0.079
-0.030
111
-3.275
-0.091
-21.704
0.118
-4.258
112
-0.069
-0.343
-10.876
0.446
-0.090
113
-2.462
-0.083
-18.924
0.109
-3.201
114
-0.058
-0.273
-10.803
0.354
-0.075
115
-3.266
-0.067
-17.470
0.087
-4.246
116
-0.060
-0.319
-6.642
0.414
-0.078
117
-1.186
-0.059
-15.056
0.077
-1.541
118
-0.023
-0.118
-10.659
0.154
-0.030
119
-0.895
-0.059
-13.938
0.077
-1.164
120
-0.023
-0.104
-10.641
0.135
-0.030
121
-1.176
-0.035
-10.823
0.045
-1.529
122
-0.014
-0.094
-6.426
0.122
-0.018
123
-0.032
-0.080
-13.711
0.104
-0.042
124
-0.032
-0.080
-13.711
0.104
-0.042
125
-3.284
-0.110
-24.831
0.143
-4.269
126
-0.078
-0.362
-14.003
0.471
-0.101
127
-2.471
-0.102
-22.051
0.133
-3.212
128
-0.067
-0.292
-13.930
0.379
-0.086
129
-3.271
-0.078
-19.346
0.101
-4.253
130
-0.065
-0.330
-8.518
0.429
-0.085
201
-0.004
-0.021
-4.422
0.027
-0.005
202
-0.004
-0.018
-3.791
0.023
-0.005
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 16
203
-2.605
-0.042
-12.687
0.055
-3.387
204
-0.040
-0.244
-4.024
0.317
-0.053
205
-5.207
-0.066
-21.583
0.086
-6.769
206
-0.077
-0.469
-4.258
0.610
-0.100
207
-5.206
-0.061
-20.635
0.080
-6.768
208
-0.076
-0.465
-3.310
0.604
-0.099
209
-0.032
-0.085
-14.817
0.111
-0.042
210
-0.028
-0.073
-12.701
0.095
-0.036
211
-2.629
-0.097
-21.597
0.126
-3.418
212
-0.064
-0.299
-12.934
0.388
-0.084
213
-5.231
-0.121
-30.493
0.158
-6.800
214
-0.101
-0.524
-13.168
0.682
-0.132
215
-5.224
-0.103
-27.317
0.134
-6.791
216
-0.094
-0.506
-9.993
0.658
-0.123
217
-2.519
-0.069
-22.284
0.089
-3.275
218
-0.028
-0.196
-12.863
0.255
-0.036
219
-2.512
-0.050
-19.109
0.066
-3.266
220
-0.021
-0.178
-9.687
0.231
-0.027
221
-0.045
-0.112
-19.195
0.146
-0.058
222
-0.038
-0.096
-16.453
0.125
-0.050
223
-2.640
-0.120
-25.349
0.156
-3.432
224
-0.075
-0.322
-16.687
0.418
-0.098
225
-5.242
-0.144
-34.245
0.187
-6.814
226
-0.112
-0.547
-16.920
0.711
-0.146
227
-5.232
-0.120
-30.132
0.156
-6.802
228
-0.102
-0.523
-12.807
0.680
-0.133
3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
p
Fx
Fy
Fz
Mx
My
Ft.Name
L.Comb.
C.G. of Loads
F89 p
101
0.003
-0.017
-5.412
0.022
0.004
375.0 , 825.0
102
0.003
-0.017
-5.412
0.022
0.004
375.0 , 825.0
103
-3.249
-0.033
5.664
0.043
-4.224
375.0 , 825.0
104
-0.043
-0.287
-5.369
0.373
-0.056
375.0 , 825.0
105
-2.436
-0.029
2.895
0.038
-3.167
375.0 , 825.0
106
-0.032
-0.220
-5.380
0.285
-0.041
375.0 , 825.0
107
-3.250
-0.026
7.829
0.034
-4.225
375.0 , 825.0
108
-0.044
-0.280
-3.204
0.364
-0.057
375.0 , 825.0
109
0.022
-0.066
-12.892
0.086
0.029
375.0 , 825.0
110
0.022
-0.066
-12.892
0.086
0.029
375.0 , 825.0
111
-3.230
-0.082
-1.816
0.107
-4.199
375.0 , 825.0
112
-0.024
-0.336
-12.849
0.437
-0.031
375.0 , 825.0
113
-2.417
-0.078
-4.585
0.101
-3.142
375.0 , 825.0
114
-0.013
-0.269
-12.860
0.349
-0.016
375.0 , 825.0
115
-3.239
-0.056
3.341
0.072
-4.210
375.0 , 825.0
116
-0.033
-0.310
-7.692
0.402
-0.043
375.0 , 825.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
117
F90 p
-1.141
-0.068
-8.420
0.089
118
0.022
-0.123
-12.969
119
-0.850
-0.068
-9.538
120
0.022
-0.109
121
-1.150
-0.042
122
0.013
123
0.030
124
Page 17
-1.483
375.0 , 825.0
0.160
0.029
375.0 , 825.0
0.088
-1.105
375.0 , 825.0
-12.950
0.142
0.029
375.0 , 825.0
-3.263
0.054
-1.494
375.0 , 825.0
-0.097
-7.812
0.126
0.017
375.0 , 825.0
-0.086
-16.042
0.112
0.039
375.0 , 825.0
0.030
-0.086
-16.042
0.112
0.039
375.0 , 825.0
125
-3.222
-0.102
-4.966
0.133
-4.189
375.0 , 825.0
126
-0.016
-0.356
-15.999
0.463
-0.021
375.0 , 825.0
127
-2.409
-0.098
-7.735
0.127
-3.132
375.0 , 825.0
128
-0.004
-0.289
-16.010
0.375
-0.006
375.0 , 825.0
129
-3.234
-0.068
1.451
0.088
-4.204
375.0 , 825.0
130
-0.028
-0.322
-9.582
0.418
-0.036
375.0 , 825.0
101
-0.003
-0.015
-5.396
0.019
-0.004
375.0 , 825.0
102
-0.003
-0.015
-5.396
0.019
-0.004
375.0 , 825.0
103
-3.255
-0.045
-16.516
0.058
-4.232
375.0 , 825.0
104
-0.049
-0.297
-5.688
0.386
-0.064
375.0 , 825.0
105
-2.442
-0.038
-13.736
0.049
-3.175
375.0 , 825.0
106
-0.038
-0.227
-5.615
0.294
-0.049
375.0 , 825.0
107
-3.254
-0.039
-14.358
0.051
-4.230
375.0 , 825.0
108
-0.048
-0.291
-3.530
0.378
-0.062
375.0 , 825.0
109
-0.023
-0.061
-12.821
0.079
-0.030
375.0 , 825.0
110
-0.023
-0.061
-12.821
0.079
-0.030
375.0 , 825.0
111
-3.275
-0.091
-23.941
0.118
-4.258
375.0 , 825.0
112
-0.069
-0.343
-13.113
0.446
-0.090
375.0 , 825.0
113
-2.462
-0.083
-21.161
0.109
-3.201
375.0 , 825.0
114
-0.058
-0.273
-13.040
0.354
-0.075
375.0 , 825.0
115
-3.266
-0.067
-18.813
0.087
-4.246
375.0 , 825.0
116
-0.060
-0.319
-7.985
0.414
-0.078
375.0 , 825.0
117
-1.186
-0.059
-17.293
0.077
-1.541
375.0 , 825.0
118
-0.023
-0.118
-12.897
0.154
-0.030
375.0 , 825.0
119
-0.895
-0.059
-16.175
0.077
-1.164
375.0 , 825.0
120
-0.023
-0.104
-12.878
0.135
-0.030
375.0 , 825.0
121
-1.176
-0.035
-12.165
0.045
-1.529
375.0 , 825.0
122
-0.014
-0.094
-7.768
0.122
-0.018
375.0 , 825.0
123
-0.032
-0.080
-15.948
0.104
-0.042
375.0 , 825.0
124
-0.032
-0.080
-15.948
0.104
-0.042
375.0 , 825.0
125
-3.284
-0.110
-27.068
0.143
-4.269
375.0 , 825.0
126
-0.078
-0.362
-16.240
0.471
-0.101
375.0 , 825.0
127
-2.471
-0.102
-24.288
0.133
-3.212
375.0 , 825.0
128
-0.067
-0.292
-16.167
0.379
-0.086
375.0 , 825.0
129
-3.271
-0.078
-20.689
0.101
-4.253
375.0 , 825.0
130
-0.065
-0.330
-9.861
0.429
-0.085
375.0 , 825.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 18
Ft.Name
Sec.Na
L.Comb.
201
F89 p
Fx
Fy
Fz
Mx
0.004
-0.024
-4.445
0.031
202
0.004
-0.020
-3.810
203
-2.598
-0.033
5.051
204
-0.033
-0.236
205
-5.200
-0.046
206
-0.070
207
-5.201
208
209
My
C.G. of Loads
0.005
375.0 , 825.0
0.027
0.005
375.0 , 825.0
0.043
-3.377
375.0 , 825.0
-3.775
0.307
-0.043
375.0 , 825.0
13.912
0.060
-6.759
375.0 , 825.0
-0.452
-3.741
0.588
-0.091
375.0 , 825.0
-0.041
14.864
0.053
-6.761
375.0 , 825.0
-0.071
-0.447
-2.789
0.581
-0.092
375.0 , 825.0
0.031
-0.092
-14.917
0.120
0.040
375.0 , 825.0
210
0.026
-0.079
-12.786
0.103
0.034
375.0 , 825.0
211
-2.575
-0.092
-3.925
0.120
-3.348
375.0 , 825.0
212
-0.010
-0.295
-12.751
0.384
-0.014
375.0 , 825.0
213
-5.177
-0.105
4.936
0.136
-6.730
375.0 , 825.0
214
-0.047
-0.511
-12.717
0.665
-0.061
375.0 , 825.0
215
-5.183
-0.085
8.132
0.111
-6.738
375.0 , 825.0
216
-0.054
-0.491
-9.521
0.639
-0.070
375.0 , 825.0
217
-2.465
-0.084
-3.202
0.109
-3.205
375.0 , 825.0
218
0.026
-0.202
-12.951
0.263
0.034
375.0 , 825.0
219
-2.472
-0.064
-0.006
0.083
-3.213
375.0 , 825.0
220
0.020
-0.182
-9.754
0.237
0.026
375.0 , 825.0
221
0.042
-0.120
-19.327
0.157
0.055
375.0 , 825.0
222
0.036
-0.103
-16.566
0.134
0.047
375.0 , 825.0
223
-2.566
-0.116
-7.705
0.151
-3.335
375.0 , 825.0
224
-0.001
-0.319
-16.531
0.415
-0.001
375.0 , 825.0
225
-5.167
-0.129
1.156
0.167
-6.717
375.0 , 825.0
226
-0.038
-0.535
-16.497
0.696
-0.049
375.0 , 825.0
227
-5.176
-0.103
5.297
0.134
-6.729
375.0 , 825.0
228
-0.047
-0.509
-12.356
0.662
-0.061
375.0 , 825.0
201
-0.004
-0.021
-4.422
0.027
-0.005
375.0 , 825.0
202
-0.004
-0.018
-3.791
0.023
-0.005
375.0 , 825.0
203
-2.605
-0.042
-12.687
0.055
-3.387
375.0 , 825.0
204
-0.040
-0.244
-4.024
0.317
-0.053
375.0 , 825.0
205
-5.207
-0.066
-21.583
0.086
-6.769
375.0 , 825.0
206
-0.077
-0.469
-4.258
0.610
-0.100
375.0 , 825.0
207
-5.206
-0.061
-20.635
0.080
-6.768
375.0 , 825.0
208
-0.076
-0.465
-3.310
0.604
-0.099
375.0 , 825.0
209
-0.032
-0.085
-14.817
0.111
-0.042
375.0 , 825.0
210
-0.028
-0.073
-12.701
0.095
-0.036
375.0 , 825.0
211
-2.629
-0.097
-21.597
0.126
-3.418
375.0 , 825.0
212
-0.064
-0.299
-12.934
0.388
-0.084
375.0 , 825.0
S1
F90 p
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 19
213
-5.231
-0.121
-30.493
0.158
-6.800
375.0 , 825.0
214
-0.101
-0.524
-13.168
0.682
-0.132
375.0 , 825.0
215
-5.224
-0.103
-27.317
0.134
-6.791
375.0 , 825.0
216
-0.094
-0.506
-9.993
0.658
-0.123
375.0 , 825.0
217
-2.519
-0.069
-22.284
0.089
-3.275
375.0 , 825.0
218
-0.028
-0.196
-12.863
0.255
-0.036
375.0 , 825.0
219
-2.512
-0.050
-19.109
0.066
-3.266
375.0 , 825.0
220
-0.021
-0.178
-9.687
0.231
-0.027
375.0 , 825.0
221
-0.045
-0.112
-19.195
0.146
-0.058
375.0 , 825.0
222
-0.038
-0.096
-16.453
0.125
-0.050
375.0 , 825.0
223
-2.640
-0.120
-25.349
0.156
-3.432
375.0 , 825.0
224
-0.075
-0.322
-16.687
0.418
-0.098
375.0 , 825.0
225
-5.242
-0.144
-34.245
0.187
-6.814
375.0 , 825.0
226
-0.112
-0.547
-16.920
0.711
-0.146
375.0 , 825.0
227
-5.232
-0.120
-30.132
0.156
-6.802
375.0 , 825.0
228
-0.102
-0.523
-12.807
0.680
-0.133
375.0 , 825.0
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 20
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Uni-Axial)
4.1.1 Formula
if footing is checked in Buoyancy Fz means Fz - Fb
Fz
My X
Fz
- Uni Axial : Rx =
, Ry =
2
Np
Np
Xi
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va -> OK
Max(Hxi , Hyi)
b. Horizontal - Hmax =
< Ha -> OK
Np
c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift
Mx Y
2
Yi
Np(EA)
Fl (mm)
Fw (mm)
Xi (m )
Yi (m )
F89
750
1650
0.41
F90
750
1650
0.41
Unit( tonf )
Ft.Name
F89
F90
L.Comb.
124
125
Pile
PS-12
D.300 12M
PS-12
D.300 12M
R Max
R Min
X-Dir
8.021
8.021
Y-Dir
8.145
7.897
X-Dir
13.534
13.534
Y-Dir
13.693
13.375
Ru
Uf
Ra
Ua
Result
8.145
58.022
13.4
OK
13.693
77.361
17.866
OK
L.Comb.
Pile
Hmax (tonf)
Ha (tonf)
Result
F89
107
PS-12
D.300 12M
1.625
5.333
OK
F90
125
PS-12
D.300 12M
1.642
5.333
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 21
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
5.1.1 Data
Ft.Name
Sec.Na
Dir.
F89 p
S1
S1
L.Comb.
Fl or Fw
Sl or Sw
Fz
201
750.00
1650.00
4.445
0.01
4.445
202
750.00
1650.00
3.810
0.00
3.810
203
750.00
1650.00
-5.051
-3.38
-5.051
204
750.00
1650.00
3.775
-0.04
3.775
205
750.00
1650.00
-13.912
-6.76
-13.912
206
750.00
1650.00
3.741
-0.09
3.741
207
750.00
1650.00
-14.864
-6.76
-14.864
208
750.00
1650.00
2.789
-0.09
2.789
209
750.00
1650.00
14.917
0.04
14.917
210
750.00
1650.00
12.786
0.03
12.786
211
750.00
1650.00
3.925
-3.35
3.925
212
750.00
1650.00
12.751
-0.01
12.751
213
750.00
1650.00
-4.936
-6.73
-4.936
214
750.00
1650.00
12.717
-0.06
12.717
215
750.00
1650.00
-8.132
-6.74
-8.132
216
750.00
1650.00
9.521
-0.07
9.521
217
750.00
1650.00
3.202
-3.20
3.202
218
750.00
1650.00
12.951
0.03
12.951
219
750.00
1650.00
0.006
-3.21
0.006
220
750.00
1650.00
9.754
0.03
9.754
221
750.00
1650.00
19.327
0.05
19.327
222
750.00
1650.00
16.566
0.05
16.566
223
750.00
1650.00
7.705
-3.34
7.705
224
750.00
1650.00
16.531
0.00
16.531
225
750.00
1650.00
-1.156
-6.72
-1.156
226
750.00
1650.00
16.497
-0.05
16.497
227
750.00
1650.00
-5.297
-6.73
-5.297
228
750.00
1650.00
12.356
-0.06
12.356
201
1650.00
750.00
4.445
0.031
4.445
202
1650.00
750.00
3.810
0.027
3.810
203
1650.00
750.00
-5.051
0.043
-5.051
204
1650.00
750.00
3.775
0.307
3.775
205
1650.00
750.00
-13.912
0.060
-13.912
206
1650.00
750.00
3.741
0.588
3.741
207
1650.00
750.00
-14.864
0.053
-14.864
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
F90 p
S1
Page 22
208
1650.00
750.00
2.789
0.581
2.789
209
1650.00
750.00
14.917
0.120
14.917
210
1650.00
750.00
12.786
0.103
12.786
211
1650.00
750.00
3.925
0.120
3.925
212
1650.00
750.00
12.751
0.384
12.751
213
1650.00
750.00
-4.936
0.136
-4.936
214
1650.00
750.00
12.717
0.665
12.717
215
1650.00
750.00
-8.132
0.111
-8.132
216
1650.00
750.00
9.521
0.639
9.521
217
1650.00
750.00
3.202
0.109
3.202
218
1650.00
750.00
12.951
0.263
12.951
219
1650.00
750.00
0.006
0.083
0.006
220
1650.00
750.00
9.754
0.237
9.754
221
1650.00
750.00
19.327
0.157
19.327
222
1650.00
750.00
16.566
0.134
16.566
223
1650.00
750.00
7.705
0.151
7.705
224
1650.00
750.00
16.531
0.415
16.531
225
1650.00
750.00
-1.156
0.167
-1.156
226
1650.00
750.00
16.497
0.696
16.497
227
1650.00
750.00
-5.297
0.134
-5.297
228
1650.00
750.00
12.356
0.662
12.356
201
750.00
1650.00
4.422
-0.01
4.422
202
750.00
1650.00
3.791
0.00
3.791
203
750.00
1650.00
12.687
-3.39
12.687
204
750.00
1650.00
4.024
-0.05
4.024
205
750.00
1650.00
21.583
-6.77
21.583
206
750.00
1650.00
4.258
-0.10
4.258
207
750.00
1650.00
20.635
-6.77
20.635
208
750.00
1650.00
3.310
-0.10
3.310
209
750.00
1650.00
14.817
-0.04
14.817
210
750.00
1650.00
12.701
-0.04
12.701
211
750.00
1650.00
21.597
-3.42
21.597
212
750.00
1650.00
12.934
-0.08
12.934
213
750.00
1650.00
30.493
-6.80
30.493
214
750.00
1650.00
13.168
-0.13
13.168
215
750.00
1650.00
27.317
-6.79
27.317
216
750.00
1650.00
9.993
-0.12
9.993
217
750.00
1650.00
22.284
-3.27
22.284
218
750.00
1650.00
12.863
-0.04
12.863
219
750.00
1650.00
19.109
-3.27
19.109
220
750.00
1650.00
9.687
-0.03
9.687
221
750.00
1650.00
19.195
-0.06
19.195
222
750.00
1650.00
16.453
-0.05
16.453
223
750.00
1650.00
25.349
-3.43
25.349
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
S1
Page 23
224
750.00
1650.00
16.687
-0.10
16.687
225
750.00
1650.00
34.245
-6.81
34.245
226
750.00
1650.00
16.920
-0.15
16.920
227
750.00
1650.00
30.132
-6.80
30.132
228
750.00
1650.00
12.807
-0.13
12.807
201
1650.00
750.00
4.422
0.027
4.422
202
1650.00
750.00
3.791
0.023
3.791
203
1650.00
750.00
12.687
0.055
12.687
204
1650.00
750.00
4.024
0.317
4.024
205
1650.00
750.00
21.583
0.086
21.583
206
1650.00
750.00
4.258
0.610
4.258
207
1650.00
750.00
20.635
0.080
20.635
208
1650.00
750.00
3.310
0.604
3.310
209
1650.00
750.00
14.817
0.111
14.817
210
1650.00
750.00
12.701
0.095
12.701
211
1650.00
750.00
21.597
0.126
21.597
212
1650.00
750.00
12.934
0.388
12.934
213
1650.00
750.00
30.493
0.158
30.493
214
1650.00
750.00
13.168
0.682
13.168
215
1650.00
750.00
27.317
0.134
27.317
216
1650.00
750.00
9.993
0.658
9.993
217
1650.00
750.00
22.284
0.089
22.284
218
1650.00
750.00
12.863
0.255
12.863
219
1650.00
750.00
19.109
0.066
19.109
220
1650.00
750.00
9.687
0.231
9.687
221
1650.00
750.00
19.195
0.146
19.195
222
1650.00
750.00
16.453
0.125
16.453
223
1650.00
750.00
25.349
0.156
25.349
224
1650.00
750.00
16.687
0.418
16.687
225
1650.00
750.00
34.245
0.187
34.245
226
1650.00
750.00
16.920
0.711
16.920
227
1650.00
750.00
30.132
0.156
30.132
228
1650.00
750.00
12.807
0.680
12.807
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 24
(Flexure)
(Shear)
f'c
fy1
fy2
f_cl
f_clt
fp_clb
0.85
0.75
250.00
3900.00
3900.00
75.0
75.0
150.0
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
9 - D13 @ 200
0.375
1.650
51.865
11.401
228
botom
9 - D13 @ 200
0.375
1.650
44.365
11.401
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Page 25
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
8.910
30.855
27.598
180.156
228
bottom
8.910
26.393
23.608
154.104
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
11.401
8.910
OK
228
bottom
11.401
8.910
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
207
top
4 - D13 @ 200
1.120
0.750
50.595
5.067
221
botom
4 - D13 @ 200
0.530
0.750
43.095
5.067
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
207
top
1.161
0.711
0.0002
221
bottom
1.525
1.288
0.0003
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
207
top
4.050
0.693
0.924
13.681
12.238
79.884
221
bottom
4.050
1.071
1.427
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
207
top
5.067
4.050
OK
221
bottom
5.067
4.050
OK
S1
Sec.Nam
GroupType : Isolated
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
9 - D13 @ 200
0.375
1.650
51.865
11.401
228
botom
9 - D13 @ 200
0.375
1.650
44.365
11.401
S1
Sec.Nam
L.Comb.
Mu (tonf-m)
Rn
.Req
228
top
228
bottom
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
8.910
30.855
27.598
180.156
228
bottom
8.910
26.393
23.608
154.104
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
11.401
8.910
OK
228
bottom
11.401
8.910
OK
S1
Sec.Nam
L.Comb.
Loc. (m)
Width b (m)
d (cm)
As (cm )
228
top
4 - D13 @ 200
0.825
0.750
50.595
5.067
225
botom
4 - D13 @ 200
0.530
0.750
43.095
5.067
S1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Sec.Nam
L.Comb.
Mu (tonf-m)
Client : ICA
Page 26
.Req
Rn
228
top
225
bottom
2.686
2.269
0.0006
S1
Sec.Nam
L.Comb.
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
228
top
4.050
13.681
12.238
79.884
225
bottom
4.050
1.890
2.520
11.653
10.424
68.042
S1
Sec.Nam
L.Comb.
Using As(cm )
Select As(cm )
Result
228
top
5.067
4.050
OK
225
bottom
5.067
4.050
OK
S1
GroupType : Isolated
PileType : True
Unit : mm
1650
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
1650
46.034
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
9.49
OK
Sec.Nam
L.Comb.
S1
221
Loc. (mm)
1120
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Footing Name : F90
GroupType : Isolated
Page 27
PileType : True
Unit : mm
1650
750
Sec.Nam
L.Comb.
S1
201
Loc. (mm)
0
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
443.6
1650
46.034
OK
d (mm)
Bw (mm)
Vc (tonf)
Vu (tonf)
Result
431
750
20.326
16.915
OK
Sec.Nam
L.Comb.
S1
225
Loc. (mm)
1120
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 28
Pr.Name
221 Vc2
165.624 tonf
Pl
590 mm Vc3
83.698 tonf
Pw
590 mm Vc
83.698 tonf
1650
bo / d
c / s
Ft.Name
Pr.Name
1 / 20 Result
F90 Punching Area
40 Pile effect
4.266 tonf
OK
7752.374 cm2
0.441 / 2
125.547 tonf
225 Vc2
165.624 tonf
Pl
590 mm Vc3
83.698 tonf
Pw
590 mm Vc
83.698 tonf
L.Comb.
1650
1500 / 443.65 mm Vu
Rectangle Vc1
Shape
40
0.441 / 2
125.547 tonf
L.Comb.
750
38 Pile effect
7752.374 cm2
Rectangle Vc1
Shape
38
bo / d
c / s
1500 / 443.65 mm Vu
1 / 20 Result
7.559 tonf
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 29
fck bo d
(eq 11-35)
<- Vc3
where
= ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior columns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area
Pile No.
Shape
1650
L.Comb.
PileName
Diameter
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
221 Vc2
312.731 tonf
130.359 tonf
300mm Vc
130.359 tonf
bo
d
Ft.Name
750
Pile No.
Shape
1650
L.Comb.
PileName
Diameter
2336.25mm Vu
443.65mm Result
F90 Punching Area
1 c / s
11.403 tonf
OK
4343.373 cm2
1 / 40
Circle Vc1
195.539 tonf
225 Vc2
312.731 tonf
130.359 tonf
300mm Vc
130.359 tonf
bo
d
2336.25mm Vu
443.65mm Result
18.673 tonf
OK
AFES CALCULATION
PEDESTAL FOR FOUNDATION TYPE F3
TITLE
DESCRIPTION
PROJECT/JOB NO.
09-JC-15 (AL-1)
PROJECT/JOB NAME
ICA PROJECT
CLIENT NAME
ICA
SITE NAME
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME
GROUP NAME
LOADCOMBINATION GROUP NAME
REV
DATE
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
CONTENTS
1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA
2. TENSION DESIGN
2.1 FORMULA
2.2 TENSION DESIGN
3. ONE-WAY SHEAR
3.1 FORMULA
3.2 ONE-WAY SHEAR
Page 1
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 2
1. INPUT DATA
1.1 General
Design Code
Input Unit
MKS
Bending
Axial
Output Unit
Sprial reinf.
0.85
f'c
0.7
fy (D10 ~ D16)
2
250 kgf/cm
3900 kgf/cm
Shear
0.7
Ec
2
3900 kgf/cm
Tied reinf.
0.7
fy (D19 ~)
MKS
0.75
Es
2
250998 kgf/cm
2000000 kgf/cm
Steel Db
Cover
50 mm
590
590
50
590
590
Pier Name
38
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
Pier Name
40
Ver Bar
D16, 5 5 EA
Pier Shape
Rectangle
Tie Bar
D10 @ 200 mm
Width
590 mm
f'c
250 kgf/cm2
Length
590 mm
fy
3900 kgf/cm2
Height
700 mm
Using As
31.77 cm2
dx
522.52 mm
dy
522.52 mm
38
40
Name
Fx
Fy
Fz
Mx
My
SW
-0.585
Empty
0.001
-0.003
-0.394
DL
0.002
-0.014
-2.196
Operation
0.02
-0.052
-7.874
Test
0.028
-0.072
-11.024
Wlx
-3.252
-0.016
11.076
Wly
-0.046
-0.27
0.043
SLx2
-1.661
-0.003
6.389
SLy2
-0.082
-0.11
LL
SW
-0.585
Empty
-0.001
-0.002
-0.391
DL
-0.002
-0.013
-2.183
Operation
-0.021
-0.048
-7.816
Test
-0.03
-0.067
-10.943
Wlx
-3.252
-0.03
-11.12
Wly
-0.046
-0.282
-0.292
SLx2
-1.661
0.003
-6.389
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 3
SLy2
-0.082
-0.108
LL
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
38
LC#
Fx
Fy
Fz
Mx
My
201
0.004
-0.024
-3.626
202
0.004
-0.02
-3.108
203
-2.598
-0.033
5.753
204
-0.033
-0.236
-3.074
205
-5.2
-0.046
14.614
206
-0.07
-0.452
-3.039
207
-5.201
-0.041
15.391
208
-0.071
-0.447
-2.262
209
0.031
-0.092
-14.098
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
40
Page 4
210
0.026
-0.079
-12.084
211
-2.575
-0.092
-3.223
212
-0.01
-0.295
-12.05
213
-5.177
-0.105
5.638
214
-0.047
-0.511
-12.015
215
-5.183
-0.085
8.659
216
-0.054
-0.491
-8.994
217
-2.465
-0.084
-2.501
218
0.026
-0.202
-12.249
219
-2.472
-0.064
0.521
220
0.02
-0.182
-9.228
221
0.042
-0.12
-18.508
222
0.036
-0.103
-15.864
223
-2.566
-0.116
-7.003
224
-0.001
-0.319
-15.83
225
-5.167
-0.129
1.858
226
-0.038
-0.535
-15.795
227
-5.176
-0.103
5.824
228
-0.047
-0.509
-11.829
201
-0.004
-0.021
-3.604
202
-0.004
-0.018
-3.089
203
-2.605
-0.042
-11.985
204
-0.04
-0.244
-3.322
205
-5.207
-0.066
-20.881
206
-0.077
-0.469
-3.556
207
-5.206
-0.061
-20.109
208
-0.076
-0.465
-2.784
209
-0.032
-0.085
-13.999
210
-0.028
-0.073
-11.999
211
-2.629
-0.097
-20.895
212
-0.064
-0.299
-12.232
213
-5.231
-0.121
-29.791
214
-0.101
-0.524
-12.466
215
-5.224
-0.103
-26.791
216
-0.094
-0.506
-9.466
217
-2.519
-0.069
-21.582
218
-0.028
-0.196
-12.161
219
-2.512
-0.05
-18.583
220
-0.021
-0.178
-9.161
221
-0.045
-0.112
-18.376
222
-0.038
-0.096
-15.751
223
-2.64
-0.12
-24.647
224
-0.075
-0.322
-15.985
225
-5.242
-0.144
-33.543
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
226
-0.112
227
228
-0.547
-16.218
-5.232
-0.12
-29.605
-0.102
-0.523
-12.281
LC#
Fx
Fy
Fz
Mx
My
201
0.004
-0.024
-4.445
0.002
202
0.004
-0.02
-3.81
0.002
203
-2.598
-0.033
5.051
0.003
-0.26
204
-0.033
-0.236
-3.775
0.024
-0.003
205
-5.2
-0.046
13.912
0.005
-0.52
206
-0.07
-0.452
-3.741
0.045
-0.007
207
-5.201
-0.041
14.864
0.004
-0.52
208
-0.071
-0.447
-2.789
0.045
-0.007
209
0.031
-0.092
-14.917
0.009
0.003
210
0.026
-0.079
-12.786
0.008
0.003
211
-2.575
-0.092
-3.925
0.009
-0.258
212
-0.01
-0.295
-12.751
0.03
-0.001
213
-5.177
-0.105
4.936
0.01
-0.518
214
-0.047
-0.511
-12.717
0.051
-0.005
215
-5.183
-0.085
8.132
0.009
-0.518
216
-0.054
-0.491
-9.521
0.049
-0.005
217
-2.465
-0.084
-3.202
0.008
-0.247
218
0.026
-0.202
-12.951
0.02
0.003
219
-2.472
-0.064
-0.006
0.006
-0.247
220
0.02
-0.182
-9.754
0.018
0.002
221
0.042
-0.12
-19.327
0.012
0.004
222
0.036
-0.103
-16.566
0.01
0.004
223
-2.566
-0.116
-7.705
0.012
-0.257
224
-0.001
-0.319
-16.531
0.032
225
-5.167
-0.129
1.156
0.013
-0.517
226
-0.038
-0.535
-16.497
0.054
-0.004
227
-5.176
-0.103
5.297
0.01
-0.518
228
-0.047
-0.509
-12.356
0.051
-0.005
201
-0.004
-0.021
-4.422
0.002
202
-0.004
-0.018
-3.791
0.002
203
-2.605
-0.042
-12.687
0.004
-0.261
204
-0.04
-0.244
-4.024
0.024
-0.004
205
-5.207
-0.066
-21.583
0.007
-0.521
206
-0.077
-0.469
-4.258
0.047
-0.008
207
-5.206
-0.061
-20.635
0.006
-0.521
208
-0.076
-0.465
-3.31
0.046
-0.008
209
-0.032
-0.085
-14.817
0.009
-0.003
210
-0.028
-0.073
-12.701
0.007
-0.003
Page 5
38
40
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
211
-2.629
-0.097
-21.597
212
-0.064
-0.299
213
-5.231
-0.121
214
-0.101
215
Page 6
0.01
-0.263
-12.934
0.03
-0.006
-30.493
0.012
-0.523
-0.524
-13.168
0.052
-0.01
-5.224
-0.103
-27.317
0.01
-0.522
216
-0.094
-0.506
-9.993
0.051
-0.009
217
-2.519
-0.069
-22.284
0.007
-0.252
218
-0.028
-0.196
-12.863
0.02
-0.003
219
-2.512
-0.05
-19.109
0.005
-0.251
220
-0.021
-0.178
-9.687
0.018
-0.002
221
-0.045
-0.112
-19.195
0.011
-0.004
222
-0.038
-0.096
-16.453
0.01
-0.004
223
-2.64
-0.12
-25.349
0.012
-0.264
224
-0.075
-0.322
-16.687
0.032
-0.008
225
-5.242
-0.144
-34.245
0.014
-0.524
226
-0.112
-0.547
-16.92
0.055
-0.011
227
-5.232
-0.12
-30.132
0.012
-0.523
228
-0.102
-0.523
-12.807
0.052
-0.01
2. TENSION DESIGN
2.1 FORMULA
D1
A = 2(D1+D2) t = Nb As
t = A / (2 * (D1 + D2))
(D1 + t) * (D2 + t)3
(D1 - t) * (D2 - t)3
Ix =
12
12
(D2 + t) * (D1 + t)3
(D2 - t) * (D1 - t)3
Iy =
12
12
- Fz
Mux (D2 / 2)
Tux = (
+
) As
A
Ix
- Fz
Muy (D1 / 2)
Tuy = (
+
) As
A
Iy
Tu = Max(Tux, Tuy)
Tu
Req.As =
, = 0.85
fy
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 7
Dia
Unit(mm , tonf,cm2)
LC#
Dia (D1/D2)
Tu
UsingAs/EA
Req.As/EA
Result
201
455.04 / 455.04
-0.28
1.99
N/A
OK
202
455.04 / 455.04
-0.24
1.99
N/A
OK
203
455.04 / 455.04
0.42
1.99
0.13
OK
204
455.04 / 455.04
-0.23
1.99
N/A
OK
205
455.04 / 455.04
1.08
1.99
0.33
OK
206
455.04 / 455.04
-0.22
1.99
N/A
OK
207
455.04 / 455.04
1.14
1.99
0.34
OK
208
455.04 / 455.04
-0.16
1.99
N/A
OK
209
455.04 / 455.04
-0.93
1.99
N/A
OK
210
455.04 / 455.04
-0.8
1.99
N/A
OK
211
455.04 / 455.04
-0.14
1.99
N/A
OK
212
455.04 / 455.04
-0.78
1.99
N/A
OK
213
455.04 / 455.04
0.52
1.99
0.16
OK
214
455.04 / 455.04
-0.77
1.99
N/A
OK
215
455.04 / 455.04
0.72
1.99
0.22
OK
216
455.04 / 455.04
-0.57
1.99
N/A
OK
217
455.04 / 455.04
-0.1
1.99
N/A
OK
218
455.04 / 455.04
-0.8
1.99
N/A
OK
219
455.04 / 455.04
0.1
1.99
0.03
OK
220
455.04 / 455.04
-0.6
1.99
N/A
OK
221
455.04 / 455.04
-1.2
1.99
N/A
OK
222
455.04 / 455.04
-1.03
1.99
N/A
OK
223
455.04 / 455.04
-0.38
1.99
N/A
OK
224
455.04 / 455.04
-1.02
1.99
N/A
OK
225
455.04 / 455.04
0.29
1.99
0.09
OK
226
455.04 / 455.04
-1.01
1.99
N/A
OK
227
455.04 / 455.04
0.54
1.99
0.16
OK
228
455.04 / 455.04
-0.75
1.99
N/A
OK
201
455.04 / 455.04
-0.28
1.99
N/A
OK
202
455.04 / 455.04
-0.24
1.99
N/A
OK
203
455.04 / 455.04
-0.69
1.99
N/A
OK
204
455.04 / 455.04
-0.24
1.99
N/A
OK
205
455.04 / 455.04
-1.13
1.99
N/A
OK
206
455.04 / 455.04
-0.25
1.99
N/A
OK
38
40
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 8
207
455.04 / 455.04
-1.08
1.99
N/A
OK
208
455.04 / 455.04
-0.19
1.99
N/A
OK
209
455.04 / 455.04
-0.92
1.99
N/A
OK
210
455.04 / 455.04
-0.79
1.99
N/A
OK
211
455.04 / 455.04
-1.24
1.99
N/A
OK
212
455.04 / 455.04
-0.8
1.99
N/A
OK
213
455.04 / 455.04
-1.69
1.99
N/A
OK
214
455.04 / 455.04
-0.8
1.99
N/A
OK
215
455.04 / 455.04
-1.49
1.99
N/A
OK
216
455.04 / 455.04
-0.6
1.99
N/A
OK
217
455.04 / 455.04
-1.29
1.99
N/A
OK
218
455.04 / 455.04
-0.8
1.99
N/A
OK
219
455.04 / 455.04
-1.09
1.99
N/A
OK
220
455.04 / 455.04
-0.6
1.99
N/A
OK
221
455.04 / 455.04
-1.2
1.99
N/A
OK
222
455.04 / 455.04
-1.02
1.99
N/A
OK
223
455.04 / 455.04
-1.48
1.99
N/A
OK
224
455.04 / 455.04
-1.03
1.99
N/A
OK
225
455.04 / 455.04
-1.92
1.99
N/A
OK
226
455.04 / 455.04
-1.03
1.99
N/A
OK
227
455.04 / 455.04
-1.67
1.99
N/A
OK
228
455.04 / 455.04
-0.78
1.99
N/A
OK
3. ONE-WAY SHEAR
3.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 2 fck Bw d
(eq 11-3)
Av fy d
- Vs =
(eq 11-15)
s
- Vu <= Vc + Vs , = 0.75 (eq 11-1)
- When, Value of Vs shall not exceed 8 fck Bw d (Vs max)
38
Dir.
Unit(tonf)
LC#
Vc
Vs
Vs max
Vu
Result
201
19.387
16.353
77.548
0.004
OK
202
19.387
16.353
77.548
0.004
OK
203
19.387
16.353
77.548
2.598
OK
204
19.387
16.353
77.548
0.033
OK
205
19.387
16.353
77.548
5.2
OK
206
19.387
16.353
77.548
0.07
OK
207
19.387
16.353
77.548
5.201
OK
208
19.387
16.353
77.548
0.071
OK
209
19.387
16.353
77.548
0.031
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 9
210
19.387
16.353
77.548
0.026
OK
211
19.387
16.353
77.548
2.575
OK
212
19.387
16.353
77.548
0.01
OK
213
19.387
16.353
77.548
5.177
OK
214
19.387
16.353
77.548
0.047
OK
215
19.387
16.353
77.548
5.183
OK
216
19.387
16.353
77.548
0.054
OK
217
19.387
16.353
77.548
2.465
OK
218
19.387
16.353
77.548
0.026
OK
219
19.387
16.353
77.548
2.472
OK
220
19.387
16.353
77.548
0.02
OK
221
19.387
16.353
77.548
0.042
OK
222
19.387
16.353
77.548
0.036
OK
223
19.387
16.353
77.548
2.566
OK
224
19.387
16.353
77.548
0.001
OK
225
19.387
16.353
77.548
5.167
OK
226
19.387
16.353
77.548
0.038
OK
227
19.387
16.353
77.548
5.176
OK
228
19.387
16.353
77.548
0.047
OK
201
19.387
16.353
77.548
0.024
OK
202
19.387
16.353
77.548
0.02
OK
203
19.387
16.353
77.548
0.033
OK
204
19.387
16.353
77.548
0.236
OK
205
19.387
16.353
77.548
0.046
OK
206
19.387
16.353
77.548
0.452
OK
207
19.387
16.353
77.548
0.041
OK
208
19.387
16.353
77.548
0.447
OK
209
19.387
16.353
77.548
0.092
OK
210
19.387
16.353
77.548
0.079
OK
211
19.387
16.353
77.548
0.092
OK
212
19.387
16.353
77.548
0.295
OK
213
19.387
16.353
77.548
0.105
OK
214
19.387
16.353
77.548
0.511
OK
215
19.387
16.353
77.548
0.085
OK
216
19.387
16.353
77.548
0.491
OK
217
19.387
16.353
77.548
0.084
OK
218
19.387
16.353
77.548
0.202
OK
219
19.387
16.353
77.548
0.064
OK
220
19.387
16.353
77.548
0.182
OK
221
19.387
16.353
77.548
0.12
OK
222
19.387
16.353
77.548
0.103
OK
223
19.387
16.353
77.548
0.116
OK
224
19.387
16.353
77.548
0.319
OK
225
19.387
16.353
77.548
0.129
OK
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 10
226
19.387
16.353
77.548
0.535
OK
227
19.387
16.353
77.548
0.103
OK
228
19.387
16.353
77.548
0.509
OK
201
19.387
16.353
77.548
0.004
OK
202
19.387
16.353
77.548
0.004
OK
203
19.387
16.353
77.548
2.605
OK
204
19.387
16.353
77.548
0.04
OK
205
19.387
16.353
77.548
5.207
OK
206
19.387
16.353
77.548
0.077
OK
207
19.387
16.353
77.548
5.206
OK
208
19.387
16.353
77.548
0.076
OK
209
19.387
16.353
77.548
0.032
OK
210
19.387
16.353
77.548
0.028
OK
211
19.387
16.353
77.548
2.629
OK
212
19.387
16.353
77.548
0.064
OK
213
19.387
16.353
77.548
5.231
OK
214
19.387
16.353
77.548
0.101
OK
215
19.387
16.353
77.548
5.224
OK
216
19.387
16.353
77.548
0.094
OK
217
19.387
16.353
77.548
2.519
OK
218
19.387
16.353
77.548
0.028
OK
219
19.387
16.353
77.548
2.512
OK
220
19.387
16.353
77.548
0.021
OK
221
19.387
16.353
77.548
0.045
OK
222
19.387
16.353
77.548
0.038
OK
223
19.387
16.353
77.548
2.64
OK
224
19.387
16.353
77.548
0.075
OK
225
19.387
16.353
77.548
5.242
OK
226
19.387
16.353
77.548
0.112
OK
227
19.387
16.353
77.548
5.232
OK
228
19.387
16.353
77.548
0.102
OK
201
19.387
16.353
77.548
0.021
OK
202
19.387
16.353
77.548
0.018
OK
203
19.387
16.353
77.548
0.042
OK
204
19.387
16.353
77.548
0.244
OK
205
19.387
16.353
77.548
0.066
OK
206
19.387
16.353
77.548
0.469
OK
207
19.387
16.353
77.548
0.061
OK
208
19.387
16.353
77.548
0.465
OK
209
19.387
16.353
77.548
0.085
OK
210
19.387
16.353
77.548
0.073
OK
211
19.387
16.353
77.548
0.097
OK
212
19.387
16.353
77.548
0.299
OK
213
19.387
16.353
77.548
0.121
OK
40
ICA PROJECT
CALCULATION FOUNDATION
PR. W-16,20 & S-1
Page 11
214
19.387
16.353
77.548
0.524
OK
215
19.387
16.353
77.548
0.103
OK
216
19.387
16.353
77.548
0.506
OK
217
19.387
16.353
77.548
0.069
OK
218
19.387
16.353
77.548
0.196
OK
219
19.387
16.353
77.548
0.05
OK
220
19.387
16.353
77.548
0.178
OK
221
19.387
16.353
77.548
0.112
OK
222
19.387
16.353
77.548
0.096
OK
223
19.387
16.353
77.548
0.12
OK
224
19.387
16.353
77.548
0.322
OK
225
19.387
16.353
77.548
0.144
OK
226
19.387
16.353
77.548
0.547
OK
227
19.387
16.353
77.548
0.12
OK
228
19.387
16.353
77.548
0.523
OK
ATTACHMENT - 2
STAAD PRO INPUT AND OUTPUT REPORT
PAGE NO.
****************************************************
*
*
*
STAAD.Pro V8i SELECTseries1
*
*
Version 20.07.06.35
*
*
Proprietary Program of
*
*
Bentley Systems, Inc.
*
*
Date=
AUG 16, 2011
*
*
Time=
11:21:38
*
*
*
*
USER ID: PT. Inti Karya Persada Tehnik
*
****************************************************
1. STAAD SPACE
INPUT FILE: SEC.1.STD
2. START JOB INFORMATION
3. ENGINEER DATE 08-AUG-11
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER KG
7. JOINT COORDINATES
8. 2 0 0 0; 3 6 0 0; 4 0 0 5; 5 6 0 5
9. MEMBER INCIDENCES
10. 2 2 3; 3 4 5; 4 5 3; 5 4 2
11. DEFINE MATERIAL START
12. ISOTROPIC CONCRETE
13. E 2.21467E+009
14. POISSON 0.17
15. DENSITY 2402.62
16. ALPHA 1E-005
17. DAMP 0.05
18. END DEFINE MATERIAL
19. MEMBER PROPERTY AMERICAN
20. 2 3 PRIS YD 0.3 ZD 0.2
21. UNIT METER MTON
22. MEMBER PROPERTY AMERICAN
23. 4 5 PRIS YD 0.4 ZD 0.3
24. UNIT METER KG
25. CONSTANTS
26. MATERIAL CONCRETE ALL
27. SUPPORTS
28. 2 TO 5 PINNED
29. LOAD 1 LOADTYPE DEAD TITLE MX
30. UNIT METER MTON
31. JOINT LOAD
32. 2 TO 5 MX 6.45
33. UNIT METER KG
34. LOAD 2 LOADTYPE DEAD TITLE MZ
35. JOINT LOAD
36. 2 TO 5 MZ 600
37. PERFORM ANALYSIS PRINT STATICS CHECK
STAAD SPACE
-- PAGE NO.
P R O B L E M
S T A T I S T I C S
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS =
4/
4/
2/
2/
9 DOF
2, TOTAL DEGREES OF FREEDOM =
1 DOUBLE KILO-WORDS
12.0/
0.0 MB
12
STAAD SPACE
-- PAGE NO.
( KG
METE ) SUMMARY (LOADING
= 0.0000000E+00
= 0.0000000E+00
= 0.0000000E+00
1 )
0.00
1 )
0.00
1)
( KG
METE ) SUMMARY (LOADING
= 0.0000000E+00
= 0.0000000E+00
= 0.0000000E+00
2 )
2400.00
2 )
-2400.00
STAAD SPACE
-- PAGE NO.
2)
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
STAAD SPACE
-- PAGE NO.
=====================================================================
BEAM
LEN -
NO.
6000. MM
382.
FC -
25.
MPA, SIZE -
200. X
300. MMS
LEVEL
HEIGHT
BAR INFO
FROM
TO
ANCHOR
(MM)
(MM)
(MM)
STA END
_____________________________________________________________________
1
2
69.
231.
B E A M
2 - 12MM
2 - 12MM
N O.
3102.
0.
2 D E S I G N
6000.
2835.
NO
YES
YES
NO
R E S U L T S - SHEAR
0.00 KNS
LOAD
1
0.00 KNS
LOAD
1
___
2J____________________ 6000X 200X 300_____________________
3J____
|
|
||==================================
|
| 2No12 H 231.
0.TO 2835
|
|
|
|
2No12 H 69.3102.TO 6000
|
|
====================================||
|
|
|___________________________________________________________________________|
_________
_________
_________
_________
_________
_________
|
| |
| |
| |
| |
|
|
|
|
oo
| |
oo
| |
oo
| |
| |
|
|
|
| 2#12
| | 2#12
| | 2#12
| |
| |
|
|
|
|
| |
| |
| |
| |
|
|
|
|
| |
| |
| | 2#12
| | 2#12
|
| 2#12
|
|
| |
| |
| |
oo
| |
oo
|
|
oo
|
|
| |
| |
| |
| |
|
|
|
|_________| |_________| |_________| |_________| |_________|
|_________|
STAAD SPACE
-- PAGE NO.
=====================================================================
BEAM
LEN -
NO.
6000. MM
382.
FC -
25.
MPA, SIZE -
200. X
300. MMS
LEVEL
HEIGHT
BAR INFO
FROM
TO
ANCHOR
(MM)
(MM)
(MM)
STA END
_____________________________________________________________________
1
2
69.
231.
B E A M
2 - 12MM
2 - 12MM
N O.
3102.
0.
3 D E S I G N
6000.
2835.
NO
YES
YES
NO
R E S U L T S - SHEAR
0.00 KNS
LOAD
1
0.00 KNS
LOAD
1
___
4J____________________ 6000X 200X 300_____________________
5J____
|
|
||==================================
|
| 2No12 H 231.
0.TO 2835
|
|
|
|
2No12 H 69.3102.TO 6000
|
|
====================================||
|
|
|___________________________________________________________________________|
_________
_________
_________
_________
_________
_________
|
| |
| |
| |
| |
|
|
|
|
oo
| |
oo
| |
oo
| |
| |
|
|
|
| 2#12
| | 2#12
| | 2#12
| |
| |
|
|
|
|
| |
| |
| |
| |
|
|
|
|
| |
| |
| | 2#12
| | 2#12
|
| 2#12
|
|
| |
| |
| |
oo
| |
oo
|
|
oo
|
|
| |
| |
| |
| |
|
|
|
|_________| |_________| |_________| |_________| |_________|
|_________|
STAAD SPACE
-- PAGE NO.
=====================================================================
BEAM
LEN -
NO.
5000. MM
382.
FC -
25.
MPA, SIZE -
300. X
400. MMS
LEVEL
HEIGHT
BAR INFO
FROM
TO
ANCHOR
(MM)
(MM)
(MM)
STA END
_____________________________________________________________________
1
2
71.
329.
B E A M
3 - 16MM
3 - 16MM
N O.
2268.
0.
4 D E S I G N
5000.
2664.
NO
YES
YES
NO
R E S U L T S - SHEAR
0.00 KNS
LOAD
1
0.00 KNS
LOAD
1
___
5J____________________ 5000X 300X 400_____________________
3J____
|
|
||=======================================
|
| 3No16 H 329.
0.TO 2664
|
|
|
|
3No16 H 71.2268.TO 5000
|
|
=========================================||
|
|
|___________________________________________________________________________|
___________
___________
___________
___________
___________
|
|
|
|
|
|
|
|
|
|
|
ooo
|
|
ooo
|
|
ooo
|
|
|
|
|
| 3#16
|
| 3#16
|
| 3#16
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3#16
|
| 3#16
|
| 3#16
|
|
|
|
|
|
ooo
|
|
ooo
|
|
ooo
|
|
|
|
|
|
|
|
|
|
|
|___________|
|___________|
|___________|
|___________|
|___________|
STAAD SPACE
-- PAGE NO.
=====================================================================
BEAM
LEN -
NO.
5000. MM
382.
FC -
25.
MPA, SIZE -
300. X
400. MMS
LEVEL
HEIGHT
BAR INFO
FROM
TO
ANCHOR
(MM)
(MM)
(MM)
STA END
_____________________________________________________________________
1
2
71.
329.
B E A M
3 - 16MM
3 - 16MM
N O.
2268.
0.
5 D E S I G N
5000.
2664.
NO
YES
YES
NO
R E S U L T S - SHEAR
0.00 KNS
LOAD
1
0.00 KNS
LOAD
1
___
4J____________________ 5000X 300X 400_____________________
2J____
|
|
||=======================================
|
| 3No16 H 329.
0.TO 2664
|
|
|
|
3No16 H 71.2268.TO 5000
|
|
=========================================||
|
|
|___________________________________________________________________________|
___________
___________
___________
___________
___________
|
|
|
|
|
|
|
|
|
|
|
ooo
|
|
ooo
|
|
ooo
|
|
|
|
|
| 3#16
|
| 3#16
|
| 3#16
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3#16
|
| 3#16
|
| 3#16
|
|
|
|
|
|
ooo
|
|
ooo
|
|
ooo
|
|
|
|
|
|
|
|
|
|
|
|___________|
|___________|
|___________|
|___________|
|___________|
STAAD SPACE
-- PAGE NO.
1.9 CU.METER
BAR SIZE
NUMBER
-------12
16
WEIGHT
(in lbs)
-------45
112
-----------*** TOTAL=
157
55. FINISH
************************************************************
*
For questions on STAAD.Pro, please contact
*
*
Bentley Systems Offices at the following locations
*
*
*
*
Telephone
Web / Email
*
*
*
* USA:
+1 (714)974-2500
*
* UK
+44(1454)207-000
*
* SINGAPORE +65 6225-6158
*
* EUROPE
+31 23 5560560
*
* INDIA
+91(033)4006-2021
*
* JAPAN
+81(03)5952-6500
http://www.ctc-g.co.jp
*
* CHINA
+86 10 5929 7000
*
* THAILAND +66(0)2645-1018/19 partha.p@reisoftwareth.com *
*
*
* Worldwide
http://selectservices.bentley.com/en-US/
*
*
*
************************************************************
Page 9 of 10
ATTACHMENT - 3
FOUNDATION LOADING DATA
F3
ton
-0.460
-0.588
-0.691
-0.679
-0.797
-0.742
-0.693
-0.677
-0.776
-0.845
-0.469
-2.853
-1.867
-0.829
-0.833
-1.914
-1.952
-0.847
-0.712
-2.461
-2.096
-0.834
-0.830
-1.929
-1.934
-0.883
-0.403
-0.693
-0.750
-0.751
-0.502
-0.403
-0.693
-0.749
-0.750
-0.442
-2.104
-2.196
-2.116
-2.183
M1
ton-m
M2
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
M3
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
F3
ton
-1.728
-2.069
-1.643
-1.643
-2.237
-2.098
-1.674
-1.644
-3.723
-4.203
-2.054
-10.377
-6.275
-4.113
-4.096
-7.188
-7.484
-4.211
-3.180
-8.521
-6.997
-4.134
-4.083
-7.255
-7.403
-3.951
-0.825
-1.603
-1.788
-1.790
-1.421
-0.825
-1.604
-1.787
-1.788
-1.254
-6.600
-7.874
-6.655
-7.816
M1
ton-m
M2
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
M3
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
F3
ton
3.409
-3.070
-0.305
0.296
3.697
-4.000
-0.703
0.384
4.617
6.372
6.458
6.575
6.406
6.551
6.334
6.617
6.468
-6.370
-6.444
-6.599
-6.396
-6.551
-6.334
-6.616
-6.469
-3.945
10.185
10.199
10.176
10.113
4.718
-10.185
-10.198
-10.177
-10.114
-5.097
6.601
6.389
-6.601
-6.389
M1
ton-m
M2
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
M3
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
F3
ton
4.483
4.494
0.562
0.547
1.378
1.350
-0.562
-0.548
-4.429
-0.023
0.444
-0.353
-0.111
0.003
-0.001
0.091
-0.090
-0.023
0.405
-0.289
-0.136
0.002
-0.001
0.088
-0.087
-4.441
0.003
0.010
-0.012
0.090
-1.469
0.003
0.010
-0.012
0.090
-1.441
0.096
-0.110
0.095
-0.108
M1
ton-m
M2
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
M3
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
F3
ton
3.927
-1.875
-0.214
0.184
3.915
-4.103
-0.376
0.225
2.200
6.777
6.798
10.624
10.558
6.826
6.575
10.188
9.522
-6.785
-6.635
-10.755
-10.599
-6.825
-6.575
-10.149
-9.560
-3.649
2.865
5.815
5.643
5.668
2.828
-2.865
-5.814
-5.643
-5.668
-3.044
9.839
11.076
-9.801
-11.120
M1
ton-m
M2
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
M3
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
F3
ton
10.496
11.637
6.120
5.907
5.495
4.093
-6.123
-5.908
-10.381
-0.072
0.745
-0.635
-0.146
0.001
-0.001
0.157
-0.150
-0.028
0.732
-0.584
-0.190
0.003
-0.001
0.121
-0.117
-11.539
-0.007
-0.018
0.017
0.309
-5.782
0.010
-0.034
0.030
0.209
-4.320
0.101
0.043
0.104
-0.292
M1
ton-m
M2
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
M3
ton-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
ATTACHMENT - 4
DRAWING
KEY PLAN
NOTES
LEGEND
REFERENCE DOCUMENT
*****
C-X-W-2201-002
KEY PLAN
NOTES
LEGEND
REFERENCE DOCUMENT
*****
C-X-W-2201-003
KEY PLAN
NOTES
LEGEND
REFERENCE DOCUMENT
*****
C-X-W-2201-004
Document Name
Job Code
Project
Civil Works
: E-X-W-3302-002
: 09-JC-16
: ICA Project
REV.
0
1
DATE
REVISION DETAILS
21-Apr-11
Issued For Review
10-Jan-12 Reviewed with Comments as per MOM No.
WIKA-ICA-MOM-0046-11, Revised as
Marked & Re-IFR
ORIGINATOR
Arswirasti
Agung H