CIVIL WORKS SUMMARY

23
23.1
23.2
23.4
23.5
23.6
23.9
24.10
24.11

Description of the item


Demolish existing Control room, switchgear room, Cable tunnels, toilets, Workshop
Demolish existing Brick wall around the Substation
Existing concrete road must be demolished
Existing perimeter Fencing and gates must be dismantled and disposed off.
Existing internal fencinf and gates around the transformer bays must be dismantled
Dismantle existing gantries and demolish foundations. Gantries to be transported to
Dismantle double circuit lattice Terminal Tower and transported to Reuven Stores.
Demolish double circuit lattice terminal tower foundations.

Unit
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum

Qty

Rate
Supply Install

1
1
1
1
1
1
1
1
GRAND TOTAL

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Price
(R)
R 591,050.94
R 73,313.44
R 157,760.95
R 50,113.44
R 50,113.44
R 107,033.44
R 116,713.44
R 140,913.44
R 1,287,012.51