LOT 15 BILBY STREET, CAMPBELLFIELD, VIC, 3061

BILL OF QUANTITIES
1.0
1.1
1.2
1.3

Description
Site establishment and demolition
Clear existing bushes,vegetation and rubbish
Dismantle and remove existing steel shed (corrugated galvanized iron)
Remove existing concrete slab (5 m x 8 m)

1.4

Demolish sections of 1500 mm wide, 100 mm thick sections of footpath and cart to recycler

2.0

Excavation
Excavate topsoil (depth 100mm ave. depth) and cart to city Council depot.

2.1
2.2
2.3
2.4
2.5
2.6

Excavate site to underside of FCR base as per drawings


Excavate edge beam foundations as per drawing
Excavate portal frame foundations as per drawings
Place & compact FCR in 200mm layer as indicated on drawings
Fill area marked on site with topsoil sourced from site (350mm height)

3.0
3.1
3.2
3.3
3.4
3.5

Drainage, Sewer and Water


Supply & Install 100 mm dia. Water Pipe
Supply & Install 100 mm dia. Sewer Pipe
Supply & Install 300 RCP Drain
Supply & Install 100 PVC Stormwater
Supply & Install 200 PVC Stormwater

4.0
4.1
4.2
4.3
4.4

In-Situ Concrete Works including formwork, rebar and concrete


30 Mpa concrete including reinforcement to Portal frame pad footings
30 Mpa concrete including reinforcement to edge beams
30 Mpa concrete including reinforcement to Warehouse 200 thick floor slab
30 Mpa concrete including reinforcement to Office 150 thick floor slab
30 Mpa concrete including reinforcement graded to falls in Truck Apron and Car Park 200 mm thick slab
30 Mpa concrete including reinforcement in Driveway Crossover 200 mm and 150 mm thick slab

4.5
4.6
5.0
5.1
5.2

Precast Concrete wall panels


Supply and install 150 thick Precast Concrete Wall Panels 6.5 m high
Supply and install 125 thick Precast Concrete Wall Panels 4.5 m high

Quantity

Unit

1
1
1

item
item
item

item

1371
532
9
26
1534
74

m2
m3
m3
m3
m2
m2

55
36
35
14
54

m
m
m
m
m

32
26
73
16

m3
m3
m3
m3

15
32

m3
m3

470.8
102.5806

m2
m2

10.66973939
3.5526986

t
t

6.0
6.1
6.2
6.3

Steelwork delivery & erection


Supply and install structural steelwork to Warehouse including Portal Frames, purlins & bracing
Supply and install structural steelwork to Office beams, including purlins & bracing
Supply and install Roller shutter door to precast concrete walls where indicated on drawings

7.0
7.1
7.2
7.3
7.4

Provisional Costs
Supply & Install Roofing, gutters, flashing and downpipes (Hi-n-Dri Roofing)
Supply & Install electricity cables (Live Wire Electricals)
Supply & Install 100 dia. Water supply and fire service main (Pronto Plumbing)
Supply & Install 600 dia. Stormwater drain. Pits and heavy duty pit cover included (Able Drainage)

82650
28750
21500
43460

$
$
$
$

8.0
8.1
8.2

Subcontractor Costs
Supply & Install Telecom "DataStream"
Supply & Install 150 dia. Sewer with 100 dia. Branches to toilet (Trevor Brown Plumbing)

7500
8750

$
$