Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

List of Figures

Figure 1. 1 Scope of the Project.............................................................................................................................3


Figure 2. 1 Framework of the Power Sector in Indonesia................................................................................ 10
Figure 2. 2 Organizational Structure of MEMR............................................................................................... 11
Figure 2. 3 PLN Organization Chart.................................................................................................................. 11
Figure 2. 4 Organizational Chart of UIP Jaringan Java-Bali ........................................................................... 12
Figure 2. 5 Organization of P3B JB................................................................................................................... 13
Figure 2. 6 Planed Organizational Chart of P3B JB......................................................................................... 13
Figure 2. 7 Flow Chart of Planning, Construction and Operation for the Central and West Java
500kV Transmission Line Project ................................................................................................ 14
Figure 2. 8 Framework of Electricity Supply in Java-Bali Area ..................................................................... 15
Figure 2. 9 Transition of Subsidies in Total Revenue ...................................................................................... 18
Figure 3. 1 Energy Sales Forecasts of each Area.............................................................................................. 20
Figure 3. 2 Map of 4 Regional Area .................................................................................................................. 20
Figure 3. 3 Demand Shape ................................................................................................................................. 21
Figure 3. 4 Demand Shape of each Area........................................................................................................... 21
Figure 3. 5 Composition of Demand Category................................................................................................. 22
Figure 3. 6 Electrification Rate........................................................................................................................... 22
Figure 3. 7 Site Map of Power Development Plan........................................................................................... 26
Figure 3. 8 Regional Demand and Supply Balance.......................................................................................... 28
Figure 3. 9 Frequency Distribution of Difference between Demand and Generation in Jakarta,
Banten Area .................................................................................................................................... 29
Figure 3. 10 Trend of Regional Demand and Capacity Balance..................................................................... 30
Figure 3. 11 Difference between Demand and Generation (Left), Power Flow of Regional
Interconnection (Right) - 1 ............................................................................................................ 31
Figure 3. 12 Difference between Demand and Generation (Left), Power Flow of Regional
Interconnection (Right) - 2 ............................................................................................................ 31
Figure 3. 13 Difference between Demand and Generation (Left), Power Flow of Regional
Interconnection (Right) - 3 ............................................................................................................ 32
Figure 3. 14 Power System Plan in the Draft RUPTL 2011-2020.................................................................. 33
Figure 3. 15 The Image of Power System Expansion...................................................................................... 34
Figure 3. 16 The Map of Locations Triggering the Large-scale Blackouts in the 500kV System
surrounding the Jakarta Metropolitan Area.................................................................................. 35
Figure 3. 17 Image of System Analysis............................................................................................................. 40
Figure 3. 18 Jakarta-Peak Time shown in Daily Load Curve.......................................................................... 41
Figure 3. 19 The Power Flow Analysis Result of the Case without the Projects Line (YR2017) .............. 43
Figure 3. 20 The Power Flow Analysis Result of the Case with the Projects Line (YR2017).................... 44
Figure 3. 21 The Image of Fault Locations analyzed in the Stability Analysis.............................................. 46

You might also like