The document contains 23 tables related to electricity demand forecasts, generation capacity planning, transmission system development, and power system simulation studies for Indonesia. Table 1 lists 5 tables of contents. Tables 2 through 3 contain data on population trends, GDP contributions, electricity sales, tariffs, and existing generation and transmission infrastructure. Tables 3 through 3 contain demand forecasts and generation capacity expansion plans through 2020. Tables 3 through 3 summarize scenarios assessing generation and transmission adequacy. Tables 3 through 3 include parameters and results from power flow and fault current analyses of the transmission system.
The document contains 23 tables related to electricity demand forecasts, generation capacity planning, transmission system development, and power system simulation studies for Indonesia. Table 1 lists 5 tables of contents. Tables 2 through 3 contain data on population trends, GDP contributions, electricity sales, tariffs, and existing generation and transmission infrastructure. Tables 3 through 3 contain demand forecasts and generation capacity expansion plans through 2020. Tables 3 through 3 summarize scenarios assessing generation and transmission adequacy. Tables 3 through 3 include parameters and results from power flow and fault current analyses of the transmission system.
The document contains 23 tables related to electricity demand forecasts, generation capacity planning, transmission system development, and power system simulation studies for Indonesia. Table 1 lists 5 tables of contents. Tables 2 through 3 contain data on population trends, GDP contributions, electricity sales, tariffs, and existing generation and transmission infrastructure. Tables 3 through 3 contain demand forecasts and generation capacity expansion plans through 2020. Tables 3 through 3 summarize scenarios assessing generation and transmission adequacy. Tables 3 through 3 include parameters and results from power flow and fault current analyses of the transmission system.
Table 1. 2 Member List of the Project Team of PLN..........................................................................................4 Table 1. 3 Member List of the Study Team .........................................................................................................4 Table 1. 4 Study Results.........................................................................................................................................5 Table 1. 5 Reporting Schedule ..............................................................................................................................5 Table 2. 1 Transition of the Population in each Area ..........................................................................................6 Table 2. 2 Transition of GDP Growth by Expenditure over the past 4 Years...................................................7 Table 2. 3 GDP Structure Divided into each Field of Industry...........................................................................8 Table 2. 4 Contribution Ratio of GDP by Islands................................................................................................8 Table 2. 5 Transition of Electricity Sales Revenue in PLN ............................................................................. 16 Table 2. 6 Average Selling Price of Electricity by Type of Customer............................................................ 16 Table 2. 7 Electricity Tariff in 2011................................................................................................................... 17 Table 3. 1 Demand Results................................................................................................................................. 19 Table 3. 2 Demand Forecast............................................................................................................................... 19 Table 3. 3 Regional Demand Share ................................................................................................................... 23 Table 3. 4 Regional Demand Share at Peak in Jakarta, Banten Area.............................................................. 23 Table 3. 5 Installed Capacity (2010).................................................................................................................. 24 Table 3. 6 Regional Demand and Capacity Balance (2010)............................................................................ 24 Table 3. 7 Power Development Plan (2011 2020) ........................................................................................ 25 Table 3. 8 Installed Capacity (2020).................................................................................................................. 27 Table 3. 9 Regional Demand and Capacity Balance (2020)............................................................................ 28 Table 3. 10 Major Transmission System Development Plan .......................................................................... 33 Table 3. 11 Summary (Case - 1) ........................................................................................................................ 36 Table 3. 12 Summary (Case - 2) ........................................................................................................................ 37 Table 3. 13 Summary (Case - 3) ........................................................................................................................ 38 Table 3. 14 Indices and Criterion for the System Analysis.............................................................................. 41 Table 3. 15 Regional Pattern of Demand (Left) and Generation (Right) used for the Simulation ............... 41 Table 3. 16 The List of Power Stations operated at Full Output (YR2015 YR2020) ................................ 42 Table 3. 17 Rated Capacities of Conductors for 500kV Transmission Lines ................................................ 42 Table 3. 18 Line Constants ................................................................................................................................. 42 Table 3. 19 Length of each Section of the Projects Transmission Line......................................................... 43 Table 3. 20 Rated Thermal Capacity of the Major existing/ planned Sections.............................................. 44 Table 3. 21 Maximum Allowable Fault Currents............................................................................................. 45 Table 3. 22 Result of Fault Current Analysis of 500 kV Bus after three-Phase Short Circuit Fault. ........... 45 Table 3. 23 Result of Fault Current Analysis of 150 kV Bus after three-Phase Short Circuit Fault. ........... 45 Table 3. 24 Generator Model for Major three Power Stations and Slack: GENROU................................... 46 Table 3. 25 Exciter Model .................................................................................................................................. 47