Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

CURRENT (AMP)

MEASUREMENT
LOG SHEET

DISTRIBUTION POINT A
Source:

CB Make:

Feed:

CB Rating:

Cable Size:
Time

Volta
ge
(Volts
)

Current (Amps)
Phase- A

Phase- B

Remarks

Phase- C

Neutral

AM
(6am
12nn)

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

PM
(12nn
6pm)

Evening
(6pm
12am)

DISTRIBUTION POINT B
Source:

CB Make:

Feed:

CB Rating:

Cable Size:
Time

Voltag
e
(Volts)

Current (Amps)
Phase- A

Phase- B

Remarks

Phase- C

Neutral

AM
(6am
12nn)

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

PM
(12nn
6pm)

Evening
(6pm
12am)

Page 1

CURRENT (AMP)
MEASUREMENT
LOG SHEET

DISTRIBUTION POINT C
Source:

CB Make:

Feed:

CB Rating:

Cable Size:
Time

Voltag
e
(Volts)

Current (Amps)
Phase- A

Phase- B

Remarks

Phase- C

Neutral

AM
(6am
12nn)

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

PM
(12nn
6pm)

Evening
(6pm
12am)

DISTRIBUTION POINT D
Source:

CB Make:

Feed:

CB Rating:

Cable Size:
Time

Voltag
e
(Volts)

Current (Amps)
Phase- A

Phase- B

Remarks

Phase- C

Neutral

AM
(6am
12nn)

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

PM
(12nn
6pm)

Evening
(6pm
12am)

Page 2

CURRENT (AMP)
MEASUREMENT
LOG SHEET

DISTRIBUTION POINT E

(OPTION-1)

OPTION

OPTION
-1

Source:

-2
CB Make:

Feed:

CB Rating:

Cable Size:
Time

Voltage
(Volts)

Current (Amps)
Phase- A

Phase- B

Remarks

Phase- C

Neutral

AM
(6am
12nn)

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

Amps

PM
(12nn
6pm)

Evening
(6pm
12am)

Option-2 for Distribution Point E:

Request from Al-Guraibi Iron Forming & Ornamentation factory the


maximum operating load during their peak season (Summer time).

2. TEST EQUIPMENT USED:


Equipment

Serial Number

TESTED BY:

WITNESS BY:

NAME:

NAME:

DATE:

DATE:

SIGNATURE:

SIGNATURE:

Calibration Due Date

Page 3

You might also like