Corrigendum No. 2 - DSR 2016-17
Category : Roads ‘Sub Category | MORT & H Bituminous Construction
No.1 Code Description Unit | Bompated [Labour
Rate in Re |
e00123 [Carrying out roughness index / road|
MORTH |Gnevenness test by using Digital RTRRMMometer) 356.00 a
(Response Type Road —_ Roughness)
|Measurement) mobile — phone —_App|
(calculating roughness index every 100|
meter using GPS, Accelerometer sensors),
complied with = Road_—- Roughness.
[Measurement process described by
'RC-SP-16, transmitting data and giving
‘computerized test result with the help of| YY
‘software and submitting the reports to the
concerned in hard copies as well
copy if needed, including usin
{technical manpower, including service tax)
letc. complete.
Road surface single lane (8.1/W.8.M,) 3.7!
to 5.50 m Width (Extra charges to bi
Jconsidered for every additional ta
required).
Spoc :As directed by Engineer in a}
Nae Engineer
Public works Cirele, Pune