Installation Check List FP PSS
Installation Check List FP PSS
Electrical Installation
C01_installation-check-list-fp-pss.doc_mfm_2005-10-20
Mechanical Installation
Installation Step
1. Prepare the
installation site
Carry out
OK
Clearances for cabinet access: front access, 60cm, top access, 20cm.
PRSB systems require levelled floor, capable of supporting approx.
600kg. For PRSV systems, the wall must support approx. 100kg.
Explosive atmospheres are to be avoided. Ensure suitable ventilation.
Also, 60V systems are only to be installed in Restricted Access Areas.
2. Installation tools
3. Check AC supply
4. Remove packaging
and check
equipment
5. Remove top and
dummy panels
You have received all the parts, correct cabinet, documentation, batteries
(if applicable), etc. Inspect the equipment for physical or transit damages.
Cable entry from the top. Connection terminals are located behind the
upper dummy panels, the battery shelves (if any) behind the lower ones
Begin (when applicable) placing the batteries on the lower shelf first, and
continue upwards. Do not terminate the battery cables yet
Switch OFF all load fuses (MCB1, MCBx), battery fuses (Fb1, Fbx) and
AC supply fuses in external fuse boards
9. Terminate AC Earth
10. Terminate
AC input cable(s)
11. Terminate
DC Earth
12. Terminate
DC Load cables
For each DC load, connect one of the cables to the common DC output
rail, and the other directly to the MCB or load fuse
13. Terminate
Alarm circuit cables
16. Terminate
Symmetry cable(s)
Eltek Energy AS
Tel. +47 32 20 32 00
Internet: www.eltekenergy.com
Device
hazard
15. Terminate
Battery cables
EMC
regard
Electric
shock
Electric
shock
E-Mail: eltek@eltekenergy.com
1 (2)
200 mm
600 mm
Link 2
(DC Earth)
Battery
Fuse
Chassis
Common
DC Rail
EG
CON4:11
Temp. sensor
Battery
Cable
Symmetry cable
CON3:3435-36
(-48V) Outer
Terminal
Intercell Links
0V Outer
Terminal