(): 1.
(TEL:400-6543)
(TEL:435-5349)
2.
(TEL:435-5081)
3.
(TEL:400-6924)
4. ARO-1
(TEL:435-3054)
5.
(TEL:435-5315)
6.
(TEL:435-6232)
():
88 07 26 1
1.1 ...................................... 1
1.2 ............................... 1
2.1 ...................................... 2
2.2 ...................................... 2
2.3 .............................. 2
3.1 .................................. 3
3.2 ............................ 3
4.1 .................................... 4
4.2 .................................... 4
4.3 ................................ 4
4.4 ................................ 4
5.1 ................ 5
5.2 .......... 5
5.3 ...................... 5
5.4 ...................... 5
5.5 .............................. 5
SPECIFICATION FOR AIR COOLED HEAT EXCHANGE
EQUIPMENT....................................... A1
REQUISITION..................................... A2
GENERAL SPECIFICATION FOR EQUIPMENT NOISE
LEVEL........................................... A3
()SPECIFICATION CHECKLIST..................... A4
()AIR COOLER DATA SHEET....................... A4
()INDUCTION MOTOR DATA SHEET.................. A4
()EQUIPMENT NOISE DATA SHEET.................. A4
...................... B
1
1
1
1
- 1
1
1
1
1
1
1
1
1
1
- 12
2
- 128
- 123
- 17
- 14
- 56
7
8
- 14
88 10 13 01
1
1.1
1.2
NFPA:
NFPA 70
AGMA:
6001-C6010-E
AISC:
S302S329S334LS335
AISI:
SG-671
ASCE:
7.88
API :
SPEC 1BStd605Std611RP631MRP632RP500A
ANSI:
B1.1B1.20.1B4.1B16.5B16.11B17.1
ASME:
SECTION DIV.1IX
ASTM: A123A143A153A164A384A385B633A450
AWS :
D1.1
OSHA:
SSPC:
SP2SP3SP5SP6SP10
NEMA:
MG-1
NFC :
ASA :
1-1
2.1
API STANDARD 661 (1992 )SECTION 1 GENERAL
SECTION 4 DESIGN
2.2
API STANDARD 661 (1992 )SECTION 5
MATERIALS
2.3
SECTION 4 DESIGN SPECIFICATION
FOR AIR COOLED HEAT EXCHANGE EQUIPMENT()
2-1
3.1
API 661 SECTION 2-PROPOSALS
API 661 APENDIX-DATA SHEET
API 661 SECTION 5-MATERIALS
3.2
(REQUISTION)(DATA SHEET)
(SPECIFICATION CHECKINST)
(SPECIFICATION)
3-1
4.1 API STANDARD 661(1992 ) SECTION 6
FABRICATION
4.2 (VENDOR)
(INSTALLATION MANUAL)
4.3
4.4 TUBE BUNDLES
4-1
88 07 26 1
5.1
API 661 SECTION 7-INSPECTION,EXAMINATION AND TESTING
API 661 SECTION 9-SUPPLEMENTAL REQUIREMENTS
5.2 (OWNER)(APPROVAL)
(DRAWING & DOCUMENTS)
5.3 (VENDOR)
(FINAL CERTIFIED DRAWINGS &
DOCUMENTS)(OWNER)
5.4
5.4.1
4.5mm/sec(0-peak)
5.4.2
E00507
6.39
5.4.3
(1)
( ACFM;PsPtHP; RPMDensity
)
(2)
5.4.4.
5.4.5
(1)
()
(2)"S""F" F
P S/50
5-1
88 07 26 1
S
P
FS/50
P
(mm)
(mm)
P
(kg)
20
1.2
30
2.2
50
3.3
85
5.5
14
40
3.5
14
55
5.0
14
14
14
85
115
170
8.2
11.6
18
5.5
5-2
()
JOB NO.:
DOCU NO:
DATE:
REV.
DATE
DESCRIPTION
DESIGN
A1-1
SHT 1 OF 28
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 2 OF 28
TABLE OF CONTENTS
PAGE
REV.
1.0
SCOPE ..........................................
2.0
3.0
REGULATIONS ....................................
4.0
DESIGN .........................................
5.0
MATERIAL ....................................... 19
6.0
NAMEPLATE ...................................... 21
7.0
FABRICATION .................................... 22
8.0
9.0
CLEANING ....................................... 25
10.0
PAINTING ....................................... 26
11.0
12.0
13.0
DATE
DESCRIPTION
DESIGN
A1-2
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 3 OF 28
1.0
SCOPE
1.1 This specification covers the minimum requirements for the design,
materials, manufacturing, testing and inspection of air cooled heat
exchanger.
1.2 This specification does not cover manufacturer's small standard
units such as oil or jacket water coolers normally furnished with
self-contained packaged equipment.
2.0 SELEER RESPONSIBILITY
2.1 Any conflict between the requirements of this specification and
related codes. standard, data sheets, drawings, requisition, etc,
shall be treated as the following precedence of order.
. Requisition
. Data sheets
. This specification
. Reference drawing
. Code / Standard
2.2 Seller shall not make assumption to replace information not
furnished by Buyer. Seller is required to obtain necessary
information from buyer or other reliable sources. Any and all
claims arising from lack of knowledge of required information will
be rejected by Buyer.
2.3 Seller shall submit a list of all appliances, special tools and
accessories that are necessary or incidental to the proper
installation, operation and maintenance of the equipment, even
these items are not included on the drawings, specifications or
data sheets.
2.4 Seller shall list and fully describe all deviations from this
specification and the related codes.
2.5 Except for requirements noted in this specification and in the air
cooled heat exchanger data sheets, the equipment supplied by the
Seller shall be designed to Manufacturer's standards and good
engineering practice.
3.0
REGULATIONS
The following documents, including applicable addenda, constitute a
part of this specification as described herein. The referenced edition
of these documents shall be that which is in effect as of the issue
date of this specification.
REV.
DATE
DESCRIPTION
DESIGN
A1-3
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 4 OF 28
3.1
Code
Comply with all following and local codes including:
AGMA
American Gear Manufacturers Association
6001-C Design of Components
6010-E Practice for Enclosed Speed Reducers or Increasers
AISC
American Institute of Construction
Manual of Steel Construction
ASME/ANSI American National Standards Institute
B16.5
Steel Pipe Flanges, Flanged Valves and Fittings
B16.11
Forged Steel Fittings, Socket-Welding and
Threaded
B46.1
Surface Texture
ASCE
American Society of Civil Engineers
7.88
Building Code Requirements for Minimum Design
Loads in Building and other Structures
ASME
American Society of Mechanical Engineers, 1992 Edition and
up to 94 Addenda
Boiler and Pressure Vessel Code:
Section
Material Specifications
Section,Div1
Pressure Vessels
SectionIX
Welding and Brazing Qualifications
B1.20.1
Pipe Threads, General Purpose
ASTM
American Society of Testing and Materials, 1994 Edition
A123
Specification for Zinc Coating on Products
Fabricated from Rolled, Pressed and Forged Steel
Shapes, Plates, Bars and Strips
A143
Recommended Practice for Safeguarding Against
Embrittlement of Hot Galvanized Structural Steel
Products and Procedure for Detecting Embrittlement.
A153 Specification for Zinc Coating on lron and Steel
Hardware
A164
Specification for Electro-Deposited Coatings of
Zinc or Steel
A385
Recommended Practice for Providing High Quality
Zinc
REV.
DATE
DESCRIPTION
DESIGN
A1-4
CHECK
APPROVAL
()
3.2
3.3
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 5 OF 28
4.0
REV.
DESIGN
4.1 General
4.1.1 Air cooled heat exchanger shall be designed, fabricated,
inspected and tested in accordance with the requirements of
this specification, API 661, and the ASME Boiler and
Pressure Vessel Code, Section , Division 1,
DATE
DESCRIPTION
DESIGN
A1-5
CHECK
APPROVAL
()
4.1.3
4.1.4
4.1.5
4.1.6
4.1.7
4.1.8
REV.
DATE
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 6 OF 28
DESCRIPTION
DESIGN
A1-6
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 7 OF 28
REV.
DATE
DESCRIPTION
DESIGN
A1-7
CHECK
APPROVAL
()
4.3
4.4
REV.
DATE
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 8 OF 28
DESCRIPTION
DESIGN
CHECK
APPROVAL
A1-8
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 9 OF 28
REV.
DATE
DESCRIPTION
DESIGN
CHECK
APPROVAL
A1-9
4.5
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 10 OF 28
REV.
DATE
DESCRIPTION
DESIGN
A1-10
4.6
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 11 OF 28
REV.
DATE
DESCRIPTION
DESIGN
A1-11
4.7
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 12 OF 28
REV.
DATE
DESCRIPTION
DESIGN
A1-12
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 13 OF 28
4.7.5
4.8
REV.
DATE
DESCRIPTION
DESIGN
A1-13
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
4.8.3
4.8.4
4.8.5
4.8.6
4.8.7
4.8.8
4.8.9
4.8.10
4.8.11
4.8.12
4.8.13
4.8.14
4.8.15
4.8.16
4.8.17
REV.
DATE
SHT 14 OF 28
DESCRIPTION
DESIGN
CHECK
APPROVAL
A1-14
()
4.9
REV.
DATE
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 15 OF 28
DESCRIPTION
DESIGN
CHECK
APPROVAL
A1-15
88 8 12 1
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 16 OF 28
REV.
DATE
DESCRIPTION
DESIGN
A1-16
APPROVAL
88 8 12 1
()
CHECK
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 17 OF 28
separate control.
REV.
DATE
DESCRIPTION
DESIGN
A1-17
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 18 OF 28
4.11 Louvers
4.11.1 When louvers are specified. minimum thickness for louver
blades shall be 1.5 mm for C.S. 2.3 mm for aluminum, and
for frames, 3.4 mm for C.S., 4.1 mm for aluminum.
4.11.2 Louver blade pivot pins shall be designed for their loads.
but shall not be less than 3/8 in. (9.5 mm) in diameter.
4.11.3 Louver linkages shall be designed so that equal movement
of all louver blades results from a change of actuator
position.
4.11.4 Maximum acceptable deviation is 1/8 in. (3 mm), measured
as a gap between any two blades with louver actuator in
fully closed position.
4.11.5 Maximum unsupported blade length shall be five feet six
inches (1.7 m).
4.11.6
Bearings shall be provided at all pivot points and
constructed of non- galling materials.
4.11.7 Shaft and pin bearing surfaces shall be treated and/or
coated for corrosion and wear resistance.
4.11.8
All shaft connections shall be attached at adjustable
linkage points by keys, splines or equivalent positive
methods. Set screw connections are prohibited.
4.11.9
4.11.10
4.11.11
4.10.12
4.11.13
REV.
DATE
DESCRIPTION
DESIGN
A1-18
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
5.0
SHT 19 OF 28
5.2
REV.
DATE
DESCRIPTION
DESIGN
A1-19
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
5.2.2
SHT 20 OF 28
Tube Material
5/8
3/4
7/8
1-1/4
1-1/2
Cabon Steel
0.065
0.083
0.109
0.109
0.134
0.134
3-1/2 Ni Steel
0.065
0.083
0.109
0.109
0.134
0.134
C-1/2 Mo Steel
0.065
0.083
0.109
0.109
0.134
0.134
0.065
0.083
0.109
0.109
0.134
0.134
0.049
0.065
0.083
0.083
0.109
0.109
Ferritic SS
0.042
0.058
0.072
0.072
0.095
0.095
Austenitic SS
0.042
0.058
0.072
0.072
0.095
0.095
Brass
0.049
0.065
0.083
0.083
0.109
0.109
Other Cu Alloys
0.049
0.065
0.083
0.083
0.109
0.109
Cu-Ni Alloys
0.049
0.065
0.083
0.083
0.109
0.109
Monel
0.035
0.049
0.065
0.065
0.083
0.083
Aluminum-Br Alloys
0.065
0.083
0.109
0.109
0.134
0.134
Hastelloy
0.035
0.049
0.065
0.065
0.083
0.083
Incoloy
0.035
0.049
0.065
0.065
0.083
0.083
Inconel
0.035
0.049
0.065
0.065
0.083
0.083
Titanium
0.035 0.049
* Less then nine percent Cr
0.065
0.065
0.083
0.083
5.2.3
REV.
DATE
DESCRIPTION
DESIGN
A1-20
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 21 OF 28
5.3 Bolting
5.3.1 Unless indicated otherwise on the exchanger data sheets.
bolting for flange connections, cover plate for headers,
etc. shall conform to ASME Specification SA-193 Gr. B7 for
stud bolts and SA-194 Gr.2H for nuts.
5.3.2 Cover plate bolting smaller than 5/8 in (16 mm) shall not
be used.
5.3.3 Bolts and nuts for structural parts shall be in accordance
with ASME SA-307.
5.4 Gaskets
5.4.1
5.4.2
6.0
REV.
DATE
DESCRIPTION
DESIGN
A1-21
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 22 OF 28
.
The maximum/minimum design metal temperatures
.
The hydrostatic test pressure
.
The effective surface area
.
The ASME Code stamp
.
The Seller's identification or name
6.2 The nameplate shall be mounted on a bracket welded to the bundle
header with a minimum of three inch (75 mm) projection form the
surface.
6.3 Electric motor nameplates shall be of 18-8 stainless steel, or
noncorrodible alloy which shall be fixed to a nonremovable part of
the motor frame and shall show standard NEMA markings, and in
addition:
.
Service Factor (if any)
.
Starting Torque and Current in percent of full load values
.
Make Type, Size of Bearings
.
Make and Class of Lubricant
.
Winding Arrangement (Wye or Delta)
7.0 FABRICATION
7.1 Welding
7.1.1
Welding procedures, welder performance and welding
processes shall be qualified in accordance with ASME
Section IX.
7.1.2
Pressure holding seams, nozzle attachments and similar
joints shall be full penetration welded butt joints.
7.1.3
Backing strips may be used only with Buyer's written
approval. Consumable inserts are not classified as backing
strips.
7.1.4 All fillet welds for supports, lugs, structural steel
bracing etc. shall have continuous weld.
7.1.5 All double fillet welds in constact with a hydrogen stream
shall be vented.
REV.
DATE
DESCRIPTION
DESIGN
CHECK
APPROVAL
A1-22
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 23 OF 28
specifications.
REV.
DATE
DESCRIPTION
DESIGN
A1-23
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 24 OF 28
8.1.5
REV.
DATE
DESCRIPTION
DESIGN
A1-24
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 25 OF 28
8.3.2
8.3.3
8.3.4
8.3.5
8.3.6
8.3.7
8.3.8
8.3.9
REV.
DATE
DESCRIPTION
DESIGN
A1-25
CHECK
APPROVAL
88 8 12 1
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 26 OF 28
CLEANING
9.1 The exchanger bundles shall be thoroughly drained, dried, cleaned
inside and outside and be free of all liquids, dirt and loose
material.
9.2 Carbon steel surfaces other than flange faces and other machined
surfaces shall have scale removed, and be cleaned of oil, grease
or other foreign matter.
9.3 All exterior machined surfaces shall be protected with a suitable
corrosion inhibitor of a type which can be removed with solvent.
The type of corrosion inhibitor shall be indicated on a tag
attached to the equipment.
9.4
Weld-end and socket-weld connections shall be coated with
deoxaluminite or Buyer approved equal, prior to adding the
protective covers.
9.5 Bolts and nuts shall be coated with a rust inhibitor.
9.6 Structural supports, side frames and beams directly supporting the
tube bundles, floor plate and ladders shall be hand or power tool
cleaned in accordance with SSPC-SP2 or SSPC-SP3.
10.0 PAINTING
10.1 Surface preparation, painting and painting material shall be in
accordance with the requirements of Job Specification No.
of
"Specification for painting"
10.2 When galvanizing in lieu of priming is require, galvanizing
specification shall be in accordance with the appropriate ASTM
Specifications.
11.0 PREPARATION FOR SHIPMENT
11.1 Equipment shall not be released for shipment until the shop test
data is approved by the Buyer.
11.2 All units shall be shipped in the as-tested condition so that no
further hydrostatic testing need be required after installation
unless otherwise specified.
11.3 The Buyer's order number and the equipment tag number shall be
prominently marked high on the side of the bay with white paint in
legible block letters as large as the equipment will permit up to
12 in. (300 mm) high.
11.4 Marking paint used on austenitic equipment shall contain no
metallic pigments or free chlorides.
11.5 Post weld heat treated parts shall be marked "PWHT -DO NO WELD."
*
REV.
DATE
DESCRIPTION
DESIGN
A1-26
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 27 OF 28
11.6 All exposed flange faces shall be protected with gasketed covers.
Covers may be of 1/2 in. (13 mm)plywood or 1/8 in.(3 mm)steel
plate and shall be secured with a minimum of four fully sized
bolts.
11.7 Small or fragile parts shall be removed, tagged, wrapped in a
water proof material and packed in a box fastened to unit skid or
baseplate.
11.8 A packing list shall be placed both on the inside and outside of
each individual package or container.
11.9 Equipment shall be protected for at least 18 months of outdoor
storage.
11.10 Seller shall also furnish recommendations for further protective
measures to be applied by the Buyer to the equipment after its
receipt at the construction site.
11.11 All equipment supplied by the Seller shall be permanently tagged
with equipment or item numbers issued by the Buyer. Tag's shall
be non-flexible stainless steel.
11.12 Equipment item numbers shall appear on equipment nameplates,
drawings, data sheets, and on all shipping documents. Instrument
tag numbers shall appear on equipment and on all drawing and
data.
11.13 The unit shall be fully shop assembled to the maximum extent
possible.
12.0 SELLER DOCUMENTATION
12.1 Seller shall furnish all data required to complete the air cooled
heat exchanger data sheet.
12.2 Designs which are not fully defined by the nomenclature in the
Seller's catalog shall be accompanied by drawings sufficient to
describe the details of construction.
12.3 All Seller prepared drawings, documents and correspondence shall
be in the English language.
12.4 All Seller prepared drawings and documents shall be in Metric
units except flanges and pipes which shall be indicated in inches.
12.5 Seller shall state proposed dates for submittal of drawings after
receipt of Purchase Order.
12.6 Outline drawings shall be certified correct and shall show the
following information:
REV.
DATE
DESCRIPTION
DESIGN
A1-27
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 28 OF 28
Thickness of headers.
REV.
DATE
DESCRIPTION
DESIGN
A1-28
CHECK
APPROVAL
88 8 12 1
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
REQUISITION
PURCHASE NO. :
1. DELIVERED TO
BEFORE
2. SHOP INSPECTION
YES
NO
YEAR
4. TECHNICAL ADVICE
(SEPARATE QUOT.)
YES
NO
5. SITE FACILITIES
YES
NO
SHT 1 OF 23
REV.
DATE
DESCRIPTION
DESIGN
A2-1
REQUISITION
ITEM
NO.
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
DESCRIPTION
Vendor shall design, manufacture,
inspect, test and furnish the
following equipment in accordance
with the requirements specified in
this requisition.
SHT 2 OF 23
REMARKS
REV.
DATE
DESCRIPTION
DESIGN
A2-2
CHECK
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
REQUISITION
APPROVAL
SHT 3 OF 23
<NOTES>
1.0
APPLICABLE DOCUMENTS
1.1
1.2
TITLE
REV. Att.No.
Data Sheets
A.
TITLE
REV. Att.No.
REV.
DATE
DESCRIPTION
DESIGN
A2-3
REQUISITION
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 4 OF 23
<NOTES>
B.
TITLE
REV. Att.No.
TITLE
REV. Att.No.
REV.
DATE
DESCRIPTION
DESIGN
A2-4
REQUISITION
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 5 OF 23
<NOTES>
1.3
Project Specifications
SPEC. NO.
TITLE
BASIC ENGINEERING DESIGN DATA
(EXTRACTION-SITE CONDITIONS & UTILITIES)
SPECIFICATION FOR AIR COOLED HEAT
EXCHANGER EQUIPMENT
SPECIFICATION FOR PAINTING
GENERAL SPECIFICATION FOR EQUIPMENT
NOISE LEVEL (EXTRACTION)
AIR-COOLED HEAT EXCHANGER CHECKLIST
OF API STANDARD 661
1.4
REV. Att.No.
REV.
DATE
DESCRIPTION
DESIGN
A2-5
REQUISITION
2.0
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 6 OF 23
SCOPE OF WORK
2.1
2.1.3
REV.
DATE
DESCRIPTION
DESIGN
CHECK
A2-6
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
REQUISITION
2.1.4
2.1.5
Test as specified
2.1.6
2.1.7
2.1.8
2.1.9
APPROVAL
SHT 7 OF 23
10%
REV.
DATE
DESCRIPTION
DESIGN
A2-7
REQUISITION
3.0
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 8 OF 23
GENERAL REQUIREMENTS
3.1 In case of conflicts in the requirement of this requisition, data
sheet, or specifications, the following precedence shall govern:
3.1.1 Minutes of Meeting (Kick-off meeting, if any)
3.1.2 This requisition
3.1.3 Data sheets/Specification Checklist(Data sheets Precede)
3.1.4 Project Specifications
3.1.5 Other related documents specified in this requisition /
specification, and contract.
Nevertheless, any conflict shall be brought to Purchaser's
attention for resolution.
3.2 Vendor shall complete all the attached equipment data sheets,
Specification Checklist, and return along with quotation.
3.3 The quotation shall include a statement that all equipment comply
with
the
requirement
of
Purchaser's
design
data
and
specification. Deviations of design data or specifications may be
accepted, but Vendor should submit full supporting information
and explanation to Purchaser listed under "Exception /
Explanation List". Failure to conform with the above requirement
may cause rejection of quotation.
3.4 The proposal shall include a list of similar (i.e. applied for
same process and/or close service conditions) installation giving
rating condition, approximate date of start-up (not order or
shipping date), location, owner and mailing address.
3.5 Proto type machine and/or proto model shall not be acceptable.
3.6 Purchaser's approval on Vendor documents shall not relieve
Vendor's responsibility for ensuring that the equipment and/or
materials is in compliance with all requirements of the
requisition.
3.7 Spare Parts
3.7.1 Vendor shall submit recommended spare parts with itemized
price list for one (1) year and long-term operation
(separate list required) with quotation. The price shall be
firm within one year, and the parts shall be available to be
purchased within five years after the date of placing
purchase order.
REV.
DATE
DESCRIPTION
DESIGN
A2-8
REQUISITION
3.8
3.9
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 9 OF 23
3.7.2
Vendor shall provide Spare Parts Tabulation Form to
include:
a. Part name, number, size, material, weight and delivery.
b. Total number included, unit price, and Quantity
recommended by manufacturer.
c. Reference drawing number - include vendor reference
drawing numbers of assembly drawings on which the spare
parts appears. (The referenced drawings shall be
attached to the tabulation form.)
Special Tools
3.8.1 When special tools and fixtures are required to erection,
lifting, disassemble, assemble, or maintain the unit, they
shall be included in the quotation and furnished as part of
the initial supply of the machine.
3.8.2 For multiple-unit installations, the requirements for
quantities of special tools and fixtures will be specified
during kick-off meeting.
Protection and Packing
3.9.1 Protection & packing shall be suitable for export (for offshore equipment), export boxing required, and long term
storage
over
12
months.
Vendor's
standard
Procedure/Specification for Protection and Packing shall
be provided with quotation for evaluation and provided for
approval after order.
3.9.2
The composition of all wrappers and bands for surface
protection and packing directly contact to stainless steel
shall be free from sulfur, zinc, lead, copper, chlorine,
aluminum and halogen.
3.9.3 If spare parts and/or special tools are purchased together
with main equipment, they shall be packaged in separate,
rugged boxes and marked with "SPARE PARTS FOR (TAG/ITEM
NUMBER)" or " SPECIAL TOOLS FOR (TAG/ITEM NUMBER)". Spare
parts shall be tagged with part name and number, special
tools shall be stamped or tagged to indicate its intended
use.
3.9.4 Vibration sensitive, small or fragile parts (mechanical,
electrical device or instruments) shall be removed from the
REV.
DATE
DESCRIPTION
DESIGN
A2-9
REQUISITION
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 10 OF 23
4.0
REV.
DATE
DESCRIPTION
DESIGN
A2-10
CHECK
APPROVAL
()
REQUISITION
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 11 OF 23
4.2
5.0
REV.
DATE
DESCRIPTION
DESIGN
A2-11
CHECK
APPROVAL
()
REQUISITION
5.2
5.3
5.4
5.5
5.6
5.7
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 12 OF 23
formula.
F = 0.25 * weight
5.7.3 The plant site is located on seashore with an environment
of salty air and blowing sand. The specified materials in
the data sheets and project specifications (such as ASTM
B209-6000 series for aluminum fins) are preliminary. In
addition to consideration of process services, Vendor shall
review, confirm, and recommend appropriate materials and/or
anti-corrision/ erosion procedures for fins, tubes, plated,
steel structures, fan, and other parts, which are to serve
in such an environment.
REV.
DATE
DESCRIPTION
DESIGN
A2-12
CHECK
APPROVAL
()
REQUISITION
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 13 OF 23
5.8
REV.
DATE
DESCRIPTION
DESIGN
A2-13
CHECK
APPROVAL
()
REQUISITION
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 14 OF 23
General
1.1 All Vendor's calculation sheets. documentation, drawings,
instructions and equipment nameplates shall be prepared in metric
system and in English, except that nozzles and flanges shall be
specified in accordance with ANSI code B16.5 latest edition, unless
otherwise specified or approved.
1.5 All drawings shall be A1 size and all documents shall be A4 size,
all drawing and documents must be folded into a A4 size (21cm x
29.7cm), logically compiled and submitted with drawing list.
REV.
DATE
DESCRIPTION
DESIGN
A2-14
CHECK
APPROVAL
()
REQUISITION
2.0
REV.
SHT 15 OF 23
Identification
2.1 Once purchase order is placed, all Vendor drawings and documents
shall be identified by printing the following in the title box or
adjacent thereto:
- Item No. :
- Client :
- Plant :
- Project No. :
- Requisition No.:
- Purchase Order No. : (To be informed after P.O.)
Drawing No. :
Document
numbering system.
meeting prior to
not be acceptable
thereon".
3.0
PROJECT:
JOB NO.:
DOCU NO:
DATE:
Mailing Address
Once purchase order is placed, all Vendor drawings and documents
mentioned in the list of Vendor Documents shall be sent with a
transmittal letter to
simultaneously.
DATE
DESCRIPTION
DESIGN
A2-15
CHECK
APPROVAL
()
REQUISITION
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 16 OF 23
DATE
DESCRIPTION
DESIGN
A2-16
CHECK
APPROVAL
()
REQUISITION
2.5
2.6
; (
PQR
( V )
; (
3.0
3.2
( V )
3.3
3.4
3.5
3.6
3.7
(
(
(
(
V
V
V
V
(
3.8
3.9
3.10
3.11
3.12
( V )
( V )
(V**)
(V**)
(
)
; (
)
; (
)
; (
)
; (
)
; (
)
; (
)
; ( O )
Fabrication
3.1
( V )
)
;
)
;
)
;
)
;
V )
;
;
;
;
;
SHT 17 OF 23
( V )
2.7
( V )
2.8
( V )
2.9
( V )
2.10 ( V )
2.11 (V**)
2.12 (V**)
2.13 ( )
PROJECT:
JOB NO.:
DOCU NO:
DATE:
3.13 ( V )
;
3.14 ( V )
;
4.0 Installation
4.1
(V* )
; (
) Installation on pipe rack (Erection)
4.2
( V )
; (
) Finish painting
4.3 (
)
; ( O ) Insulation work
4.4
(
)
; ( O ) Fireproofing work
4.5
(
)
; ( O ) Installation of setting bolts/nuts
REV.
DATE
DESCRIPTION
DESIGN
A2-17
CHECK
APPROVAL
()
REQUISITION
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 18 OF 23
REV.
DATE
DESCRIPTION
DESIGN
A2-18
CHECK
APPROVAL
()
REQUISITION
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 19 OF 23
REV.
DATE
DESCRIPTION
DESIGN
A2-19
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
REQUISITION
SHT 20 OF 23
For Approval
Final
For
Quotation
Reqd Submit Date Reqd Submit Date
Reqd
Print Days After Print Days After
Print No.
No.
P.O
No. Approv./P.O
DOCUMENT DESCRIPTION
DATA/SPECIFICATIONS
28
21
28
21
28
21
28
21
28
21
28
21
28
6+1R
28
6+1R
21
6+1R
28
6+1R
21
6+1R
28
6+1R
21
6+1R
28
6+1R
21
6+1R
28
6+1R
21
6+1R
28
6+1R
21
6+1R
28
6+1R
21
6+1R
28
6+1R
21
14(1)
28
6+1R
21
DRAWINGS
2-3
Installation,
Manuals
4
Operation
and
Maintenance
28
(To be continued)
REV.
DATE
DESCRIPTION
DESIGN
A2-20
REQUISITION
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 21 OF 23
3-4
For Approval
Final
For
Quotation
Reqd Submit Date Reqd Submit Date
Reqd
Print Days After Print Days After
Print No.
No.
P.O
No. Approv./P.O
DOCUMENT DESCRIPTION
Parts
Including
28
21
28
21
28
21
14(1)
21
14(2)
14(2)
28
TEST/INSPECTION/MANUFACTURE PROCEDURES/REPORTS
28
21
28
21
28
21
REV.
DATE
DESCRIPTION
DESIGN
A2-21
REQUISITION
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 22 OF 23
INSPECTION/TEST ITEMS
LEVEL IV
ALL
ITEM
NO.
VENDOR
INSPECTOR
(THIRD PARTY)
PURCHASER
MATERIAL CERTIFICATE
PROCEDURE REVIEW
MARKING AND CUTTING
WPS
PQR
WELDER'S AND WELDING OPERATOR'S QUALIFICATION
NDE
POSTWELD HEAT TREATMENT
FORMING
HYDROSTATIC TEST / PNEUMATIC TEST
FABRICATION
MARKING AND CUTTING
WORKMANSHIP TO APPROVED PROCEDURES
WELDING PREPARATION
BACK CHIP PRIOR TO WELDING OPPOSITE SIDE
DEPOSIT ANALYSIS
WELDING OF PRODUCTION TEST PLATES
DIMENSIONS / ORIENATIONS / ELEVATIONS
NDE
POSTWELD HEAT TREATMENT (IF REQUIRED)
IMPACT TEST OF WELD (IF REQUIRED)
FINAL DIMENSIONAL INSPECTION
DIMENSIONS
ORIENTATIONS
ELEVATIONS
INTERFACE CONNECTION
P
P
R
R
05
06
FINAL NDE
FINAL INSPECTION
MARK AND POSITIVE MATERIAL IDENTIFICATION
MANUFACTURING RERORT
PAINTING AND COATING
FLANGE PROTECTION
PROTECTION PRIOR TO PACKING
PREPARATION FOR SHIPMENT
SPARE PARTS
FIELD RUN IN TEST (ONE BAY PER ITEM)
P
P
R
R
01
02
03
04
07
DESCRIPTION
NOTES: 1. LEGEND:
C : CONFORMITY CERTIFIED
O : OBSERVED
P : PERFORM THE INSPECTION/TEST AND PREPARE REPORT
R : REVIEW THE REPORT
W : WITNESS THE INSPECTION/TEST
(To be continued)
REV.
DATE
DESCRIPTION
DESIGN
A2-22
REQUISITION
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
23
SHT 23 OF
2. THE INSPECTION/TEST ITEMS LISTED IN THE ABOVE TABLE SHALL TAKEN INTO
ACCOUNT BY THE VENDOR DURING PREPARATION OF THE INSPECTION/TEST PLAN.
THE INSPECTION/TEST SHALL BE PERFORMED BY THE VENDOR STRICTLY AS PER
THEIR REQUIREMENTS.
3. "WITNESS" MEANS THAT A HOLD POINT SHALL BE APPLIED THAT THE
INSPECTION/TEST SHALL BE CARRIED OUT WITH INSPECTOR'S WITNESS.
4. "OBSERVED" MEANS THAT THE TIMING OF INSPECTION/TEST THAT THE
PURCHASER SHALL BE NOTIFIED IN ADVANCE AND MAY BE PRESENT DURING THE
SPECIFIED ACTIVITY.
REV.
DATE
DESCRIPTION
DESIGN
A2-23
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
REV.
DATE
DESCRIPTION
DESIGN
A3-1
CHECK
SHT 1 OF 7
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
1.0
REV.
SHT 2 OF 7
DATE
DESCRIPTION
DESIGN
A3-2
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 3 OF 7
1.3
Additional Requirements
(1) In case where Equipment Vendor is supplying only a single
equipment item included in a complete train (driven, driver,
gearbox). The above noise
limits shall be reduced as follow
according to train composition:
Two components, subtract 3 dB(A)
three components, subtract 5 dB(A)
four components, subtract 6 dB(A)
(2) Further restrictions shall apply if the noise contains narrowband or impulsive components. The equipment noise limits shall
be reduced by 5 dB(A).
Table 1 TENTATIVE MAXIMUM EQUIPMENT NOISE LIMITS
Unit: dB(A)
EQUIPMENT
Furnaces:
Horizontally fired box
Heaters
Vertical heaters
Deaerators, Steam
boilers.
Electric motors
Air-fin coolers w/driver
& gear reducer
Compressors:
Screw and Centrifugal
w/drivers
Reciprocating w/drivers
Blowers, Fans w/motor
driver
Engines (Gas, Diesel and
Steam)
Turbines (Steam, Gas and
Hydraulic)
Generators
Chillers, Refrigeration
equipment
NOISE LEVEL
85(1)
85
85(1)
85
85
83
85
85
85
85
85
85
85
(to be continued)
REV.
DATE
DESCRIPTION
DESIGN
A3-3
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 4 OF 7
Unit: dB(A)
NOISE LEVEL
Expanders
Gearboxes
83
Pumps w/drivers
85
Control-valves
85
Piping systems
83
Ejectors (Air or
Steam), Condensers
90
Atmospheric vents in
normal or planned
operation
90
Cooling towers
85
85
Elevated flares
85
Ground flares
75
Package units up to
10 area
85
85(1)
REV.
DATE
See'single source
DESCRIPTION
DESIGN
A3-4
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 5 OF 7
2.0
REV.
DESCRIPTION
DESIGN
A3-5
CHECK
APPROVAL
()
REV.
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 6 OF 7
DATE
DESCRIPTION
DESIGN
A3-6
CHECK
APPROVAL
()
PROJECT:
JOB NO.:
DOCU NO:
DATE:
SHT 7 OF 7
4.0
DATE
DESCRIPTION
DESIGN
A3-7
CHECK
APPROVAL
()
SPECIFICATION CHECKLIST
REV.
DATE
DESCRIPTION
DESIGN
A4-1
PROJECT:
JOB NO.:
DOCU NO:
DATE:
CHECK
SHT 1 OF 4
APPROVAL
B-1
85 1 19 040
()
85 1 19 040
(YES/NO
FORM)
()
B-2
B-3
5.4
85 1 19 040
5.4.1
4.5mm/sec(0-peak)
5.4.2
E00507 6.39
5.4.3
(1)
( A,C,F,
M;Ps,Pt,HP;RPM, Density )
(2)
5.4.4
5.4.5
(1)
()
(2) "S"
"F" F P
S/50
()
( 5.45.5 )
R-M-038040
B-4
4.34.4
()
( 4.34.4 )