Professional Documents
Culture Documents
Workbook 13003803.DALLDALL - DALL3909.F263
Workbook 13003803.DALLDALL - DALL3909.F263
Workbook 13003803.DALLDALL - DALL3909.F263
3.00
1310nm
1550nm
1625nm
0.00
XL5V601IL
Telstra
INSERTION LOSS (IL) AND OTDR END TO END LINK LOSS (LL) TABLES
13003803.DALLDALL.DALL3909.F263
WorkBookID :Route:
YY-DR-HF-B113
Section
ServiceNo
N2727628Q
Terminal
"A"
"B"
Date :
ESA
Sheath ID
OTDR
Light Source
Power Meter
Operator
DALL
FDALL3909YY
8652
10685
10685
S.CRAWFORD
DALL
FDALL3909B113
8652
10685
10685
Length (L) km =
1.064
1310nm
A end
B end
Ref
263
0.00
Meas
InputBA
1310nm
A-B
1310nm
Ref
Meas
IL
B-A
Avg
0.00
B -A
1310nm
IL-LL
LL
1310nm
0.64
1.69
0.37
A- B
1550nm
Ref
Meas
InputBA
1550nm
A-B
0.00
0.89
1550nm
Ref
Meas
IL
B-A
Avg
335713435.xlsx
MIN IL =
MAX IL=
1550nm
C = Number of connectors
N = Number of splices
OptiTap=
0.40
C = Number of connectors
Meas
InputBA
1625nm
A-B
Total ODFs=
1625nm
Ref
Meas
IL
B-A
16.70
0.30
0.25
CL=Cursorseperation Length
A- B
B -A
1625nm
IL-LL
Check
LL
1625nm
P/F
0.50
1.59
0.27
MIN IL =
MAX IL=
ODF=
Avg
0.00
1.00
Limit
1x32 Splitter=
0.62
1625nm
Ref
0.00
0.72
IL-LL
LL
0.10
1550nm
B -A
0.47
1.52
0.21
MIN IL =
NOTE(1) : Maximum Insertion LossMAX
fo IL=
CALC MAX OTDR END TO END LINK LOSS (LL) = ( F * C L ) + ( 0.1 * ( N-2) ) + 0.3
Testing completed from customer to exchange, in the time between going from customer to exchange to complete bi-dir testing a Telstra tech must have patched the exchange and customer end as we had traffic on fibre.
^^^^^
A- B
Splitter=
InputAB
Total OptiTaps=
0.00
1.00
Limit
Thru Connectors = 2
Total Optitips= 0
CALC MAX OTDR END TO END LINK LOSS (LL) = ( F * C L ) + ( 0.1 * ( N-2) ) + 0.3
Comment
S.CRAWFORD
Total Splices = 4
InputAB
Calculated Maximum
F=Fibre Attenuation Co-Efficient (dB/km)
No of fibres =
InputAB
Sheet :
7/7/2015
Pass
0.79
Cursor Length (CL)
*Default=OTDR Length(kM)
1.00
Limit
0
0
Line
System ID
VerXL5
Telstra
YY-DR-HF-B113
FDALL3909 YY - FDALL3909 B113
Total Events
EXTRA's
1
2
3
4
5
6
Event ID
Splice No
CONN
YY
DR
HF
B113
CONN
DALL
FDALL3909YY
Event1
CONN
Sheath A
"B" End
DALL
Sheath B
FDALL3909YY
FDALL3909B113
Test By
S.CRAWFORD
and
S.CRAWFORD
Date :
7/7/2015
/2
13003803.DALLDALL.DALL3909.F263
Job No:
0
Project :
CABLE DETAILS
Distance from Distance from
Total Distance Address *** maximum of 42 characters
A
B
1
2
3
4
-
Event2
YY
0.005
PIGTAIL
F263
"A" End
DALL
0.000
0.005
0.205
0.603
1.059
1.064
1.064
1.059
0.859
0.461
0.005
0.000
Event3
DR
0.206
288AFNPEHJ
F263
Event4
HF
0.289
288AFNPEHJ
F263
Section
CONN-YY
YY-DR
DR-HF
HF-B113
B113-CONN
Event5
B113
0.230
36AFNPEHJ
F23
Cable Batch No
Cable Type
PIGTAIL
288AFNPEHJ
288AFNPEHJ
36AFNPEHJ
PIGTAIL
Fibres Used
F263
F263
F263
F23
F1
Survey Length
0.005
0.206
0.289
0.230
0.005
DALL
FDALL3909B113
Event6
CONN
0.005
PIGTAIL
F1