Professional Documents
Culture Documents
Level-II Masonry
Level-II Masonry
Curriculum Level II
Ethiopian TVET-System
Model Curriculum
MASONRY
LEVEL II
Based on
Occupational Standard (OS)
Page No.
Preface
The reformed TVET-System is an outcome-based system. It utilizes the needs of the
labor market and occupational requirements from the world of work as the
benchmark and standard for TVET delivery. The requirements from the world of work
are analyzed and documented taking into account international benchmarking as
Occupational Standards (OS).
In the reformed TVET-System, Curricula and Curriculum Development play an
important role with regard to quality driven TVET-Delivery. Curricula help to facilitate
the learning process in a way, that trainees acquire the set of occupational
competences (skills, knowledge and attitude) required at the working place and
defined in the Occupational Standards (OS). Responsibility for Curriculum
Development will be given to the Regional TVET-Authorities and TVET-Providers.
This curriculum has been developed by a group of experts from different Regional
TVET-Authorities based on the Occupational Standard for Surveying. It has the
character of a model curriculum and is an example on how to transform the
occupational requirements as defined in the respective Occupational Standard into
an adequate curriculum.
The curriculum development process has been actively supported and facilitated by
the Ministry of Education in line with one of its mandates to provide technical
support to the regions and by the TVET-Reform Component of the Engineering
Capacity Building Program.
TVET-Program Design
1.1.
TVET-Program Title: Masonry Level II
1.2.
TVET-Program Description
The Program is designed to develop the necessary knowledge, skills and attitude of
the learners to the standard required by the OS. The contents of this program are in
line with the Occupational Standard (OS). Learners who successfully completed the
Program will be qualified to work as a mason with competencies elaborated in the
respective OS. Graduates of the Program will have the required qualification to work
in the Construction Industry sector in the field of masonry.
The prime objective of this training program is to equip the learners with the
identified competences specified in the OS. Graduates are therefore expected to set
out masonry structures; produce bricks and blocks, erect brick and block structures
,lay multi-thickness walls and piers; repair and rectify masonry structure, use brick
laying and block laying tools and equipment , lay natural stone, and construct masonry
steps and stairs accordance with the performance criteria described in the OS.
Page No.
Page No.
1.7
Entry Requirements
The prospective participants of this program are required to possess the
requirements or directive of the Ministry of Education.
Other requirements:
ability to speak, read and understand English
computer literate
1.8
Mode of Delivery
This TVET-Program is characterized as a formal Program on middle level technical
skills. The mode of delivery is co-operative training. The TVET-institution and
identified companies have forged an agreement to co-operate with regard to
implementation of this program. The time spent by the trainees in the industry will
give them enough exposure to the actual world of work and enable them to get
hands-on experience.
The co-operative approach will be supported with lecture-discussion, simulation and
actual practice. These modalities will be utilized before the trainees are exposed to
the industry environment.
Page No.
CON MAS
2
02 0910
CON MAS 2
M02 0111
CON MAS
2 03 0910
CON MAS 2
M03 0111
CON MAS
2 04 0910
Lay Multi-Thickness
Walls and Piers
CON MAS 2
M04 0111
Page No.
Learning Outcomes
Plan and prepare
Identify and indicate of site
boundaries
Set out first line for building
alignment
Set out right angled corners
Install other building lines
Check Building lines for square
Clean up working area, tools and
equipments
Plan and prepare for work
Mix aggregates and cement
Cast of concrete into moulds
Cure and stack of bricks/blocks
Assess quality of bricks/blocks
Clean up work area, tools and
equipments
Prepare for work
Set out brick/ block work
Construct base brick/ block work
Position door and window frames
Construct brick/block walls
Rake joints
Cleaning up work area, tools and
equipments
Prepare for work
Set out brickwork
Hours
80
80
70
75
CON MAS
2 05 0910
CON MAS 2
M05 0111
Piers
Repairing and
Rectifying Masonry
Structure
CON MAS
2 06 0910
CON MAS 2
M06 0111
CON MAS
2 07 0910
CON MAS 2
M07 0111
Page No.
70
40
80
adhesives
Finish stone surfaces and joints
Clean up work area, tools and
equipments
CON MAS2
08 0910
Construct Masonry
Steps and Stairs
CON MAS 2
M08 0111
Constructing masonry
Steps and Stairs
80
CON MA2
09 0910
Work in Team
Environment
CON MAS2
M09 0111
Working in Team
Environment
20
CONMAS2
10 0910
Participate in
Workplace
Communication
CON MAS2
M10 0111
Participating in
Workplace
Communication
CONMAS2
11 0910
Develop Business
Practice
CON MAS2
M11 0111
Developing Business
Practice
40
Page No.
20
Page No.
Page No.
LEARNING MODULE 1
Page No.
LO7. Cleaning up
7.1 Maintaining tools and equipment
7.2 Performing good housekeeping
LEARNING STRATEGIES:
Lecture-discussion
Demonstration
MODULE ASSESSMENT:
Oral questioning
Written test
Practical test
ASSESSMENT CRITERIA:
LO1: Plan and prepare
Work instructions, including plans, specifications, quality requirements and operational details
are obtained, confirmed and applied.
Safety requirements are followed in accordance with safety plans and policies.
Signage or marks for the fence requirements are identified and implemented.
Tools and equipment selected to carry out tasks are made consistent with requirements of job,
checked for serviceability and any faults are rectified or reported prior to commencement.
Material quantity requirements are calculated in accordance with plans and/or specifications.
Materials appropriate to the work application are identified, obtained, prepared, safely handled
and located ready for use.
Environmental protection requirements are identified for the project in accordance with
environmental plans and regulatory obligations and applied.
LO2: Identify and indicate site boundaries
Survey pegs at corners of site are located and identified in accordance with job drawings and
specifications.
String lines are set accurately into position to identify boundaries of site in accordance with
site plan and survey pegs.
LO3: Set out first line for building alignment
Measurements of building line from boundary or existing building are determined from site
drawings.
Approximate position and length of line, plus building clearance measurement at each end, is
determined for profile location in accordance with site plan and survey pegs.
Pegs and profiles are installed approximately level across and between one another with
adequate provision to mark footing width on profile in accordance with job drawings and
specifications.
Location for line is accurately marked with nails on profiles and line set taut into position to
true alignment with boundary in accordance with job drawings and specifications without error.
LO4: Set out righted corner
Corner of building is determined on set building line to true measurement from adjacent
boundary and marked with peg in accordance with job drawings and specifications.
Right angle is set up to line from corner peg using 3 4 5 methods.
Profiles are installed to approximate level of other profiles and line set taut to right angled
alignment.
LO5: Install other building lines
Profiles for remaining building lines are installed to appropriate locations, approximately level
Masonry (Level lI)
Page No.
LEARNING MODULE 2
Page No.
Page No.
LEARNING STRATEGIES:
Lecture-discussion
Group work
Demonstration
MODULE ASSESSMENT:
Oral questioning
Written test
Practical exercise
ASSESSMENT CRITERIA:
Page No.
LEARNING MODULE 3
Page No.
LEARINING OUTCOMES
At the end of the module the learner will be able to :
LO1: Prepare for work
LO2: Set out brick/ block work
LO3: Construct base brick/ block work
LO4: Position door and window frames
LO5: Construct brick/block walls
LO6: Rake joints
LO7: Cleaning up work area, tools and equipments
MODULE CONTENTS:
LO1.Plan and prepare
1.1. Plan/working drawing interpretation
1.2. Identifying and applying necessary requirements
1.2.1 Safety requirements
1.2.2 Regulatory requirements
1.2.3 Environmental protection
1.3. Types, characteristics and uses of materials, tools and equipment
1.4. Calculating materials quantity requirements
1.5. Materials handling and storage
LO2. Set out brick/ block work
2.1 identifying brick/ block
2.2 erecting work platform
2.3. Identification of structural details & location
2.4 setting out of base brick work, load bearing work, cavity brick wall
LO 3. Construct base brick/ block work
3.1 preparing mortar mix
3.2 laying bricks
3.3 Constructing base work for cavity wall
LO4.Positioning door and window frames
4.1 locating and fixing window frames to cavity and single leaf walls
4.2 locating and fix door jambs/ frames, for cavity and single leaf walls
LO 5. Construct brick/block walls
5.1 constructing brick walls, gables and parapets.
5.2 laying of damp proof courses and flashings.
5.3. checking straightness of wall
5.4.positioning wall ties
5. 5 constructing openings
5.6 .installing flashing and lintel.
5.7 Forming control joints
5.8 Cutting and laying sill bricks
5.12 installing Tie down and lateral support systems
LO6. rake joints
6.1 Raking joints techniques
Masonry (Level lI)
Page No.
Page No.
Brickwork/ block work gauge is determined and set out rod is prepared.
Base brickwork/ block work is constructed for cavity construction to requirements of
regulations and specifications.
LO4: Position door and window
Window frames are located, built in and fixed to cavity walls and single leaf walls to
specification and protected from mortar droppings during construction.
Door jambs/ frames are located, built in and fixed to cavity walls and single leaf walls to
job drawings and specifications.
LO5: Construct brick/block wall
Brick walls are constructed to job specifications and standards.
Damp proof courses and flashings are laid/built in to job specifications.
Ventilation for solid brick construction built to requirements of job specification and
regulations.
Walls are to be straight and true in plumb, line and level within standard tolerances.
Wall ties are positioned to comply with standards
Openings are constructed and flashing is installed to job specifications.
Lintels are installed to job specifications
Control joints are formed in accordance with locations on job drawings and standards.
Weep holes, brick reinforcing, vermin proofing and wall flashings are located and built in to
job specifications.
Gables and parapets are constructed by plans and specifications.
Sill bricks are cut and laid to line in accordance with job specifications.
Tie down and lateral support systems for ceiling/roof structures are installed to walls in
accordance with plans, specifications and standards.
LO6: Rake/rule joints
Joints of laid brickwork/ block work are raked or ruled to correct depth and profile in
accordance with job specifications.
Brickwork/ block work is brushed down prior to drying to remove unwanted mortar.
Excess mortar is removed from brickwork/ block work surfaces and cavities are cleaned
free of mortar and debris in accordance with manufacturers recommendations, job
specification and standards.
LO7: Clean up
Work area is cleared and materials disposed of, reused or recycled in accordance with
legislation/regulations/codes of practice and job specification.
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance
with manufacturers recommendations and standard work practices.
LEARNING MODULE 4
Page No.
Page No.
LEARNING STRATEGIES:
Lecture-discussion
Demonstration
MODULE ASSESSMENT:
Oral questioning
Written test
Practical exercise
ASSESSMENT CRITERIA:
LO1: Plan and prepare
Work instructions, including plans, specifications, quality requirements and operational
details are obtained, confirmed and applied.
Safety requirements are followed in accordance with safety plans and policies.
Plant, tools and equipment selected to carry out tasks that are consistent with the
requirements of the job, checked for serviceability and any faults are rectified or reported
prior to commencement.
Material quantity requirements are calculated in accordance with plans and/or
specifications.
Materials appropriate to the work application are identified, obtained, prepared, safely
handled and located ready for use.
Environmental protection requirements are identified for the project in accordance with
environmental plans and regulatory obligations and applied.
LO2: Set out brickwork
Work platform is erected in accordance with regulatory and workplace requirements.
Location and structural details of brickwork are determined from drawings and
specifications.
Set out area is located and footing is checked for conformity to dimensions and location as
per job drawings, specifications and standards.
Brickwork is set out to location to dimensions from drawings and specifications.
LO3: Construct walls and attached piers
Mortar is mixed and bricks are laid to set out for base and specified bond in accordance
with specifications and standards.
Multi-thickness wall is constructed maintaining bond and completed to job specifications
and standards.
Attached piers are bonded to wall to job specifications.
Walls are to be straight and true in plumb line and level within standard tolerances.
Damp proof courses are built to specifications and standards.
Openings are constructed and lintels are installed to job specifications and standards.
Tie down and lateral support systems for ceiling/roof structures are installed to walls in
accordance with plans, specifications, codes and standards.
LO4: Construct isolated piers
Bricks are laid to set out and specified bond.
Piers are constructed to line, level and plumb and bond is maintained to job specifications.
LO5: Finish joints
Excess mortar is removed from brickwork surfaces and cavities are cleaned free of mortar
Masonry (Level lI)
Page No.
Page No.
LEARNING MODULE 5
Page No.
Page No.
ASSESSMENT CRITERIA:
LO1: Plan and prepare
Quality Assurance requirements for companys construction operations recognized and
adhered to.
OH&S requirements for application tasks and workplace environment recognized and adhered
to.
Material requirements assessed against drawings, work location and specifications.
Appropriate personal protective equipment selected, correctly fitted and used.
Tools and equipment selected to carry out processes consistent with requirements of job and
checked for serviceability.
Safety hazards identified and correct procedures used to minimize risk to self and others.
Working platform/scaffolding erected in accordance with OH&S regulations.
LO2: Locate damaged section of masonry structure
Damaged section located, clearly identified and confirmed with architects requirements.
Extent of damaged section and overall dimensions of replacement stone correctly determined.
LO3: Install lifting/lowering equipment
Appropriate lifting equipment installed and tested to OH&S regulations and job requirements.
LO4: Remove damaged structure
Damaged section accurately and safely cut out to predetermined dimensions without damage
to surrounding stone.
Waste materials safely lowered and removed from site in accordance with job and OH&S
requirements.
Bedding planes to support replacement stone accurately formed to minimize size of
replacement stone.
LO5: Select matching components
Color and type, materials and styles of existing complex stone components associated with
openings, arches, string and plinth courses, straight and curved walling copings identified and
matched with replacement stone to architect's specifications.
LO6: Replace components
Dimensions and profile of replacement components correctly determined and appropriate
templates made.
Replacement components accurately worked to match dimensions and profile.
Replacement components drilled/slotted for dowels/brackets in accordance with fixing
specifications.
Replacement components correctly handled and raised to position for placement.
Components placed, fixed and bedded in location with adhesive or mortar according to
specification.
Vertical joints filled with mortar or sealant, where applicable, to specifications.
Stonework cleaned using dry, liquid or chemical means in accordance with type of stone lay.
LO7: Clean up
Area cleared of waste material, equipment and scaffolding.
Waste and unwanted material disposed of safely.
Unused materials stored/stacked.
Tools and equipment cleaned, maintained and stored.
Page No.
LEARNING MODULE 6
Page No.
Lecture-discussion
Demonstration
Practical exercises
MODULE ASSESSMENT:
Oral questioning
Written test
Practical exercise
ASSESSMENT CRITERIA:
LO1: Plan and prepare
Page No.
Page No.
LEARNING MODULE 7
Page No.
Page No.
Page No.
LEARNING MODULE 8
Page No.
LEARNING STRATEGIES:
Lecture-discussion
Demonstration
MODULE ASSESSMENT:
Oral questioning
Written test
Practical exercise
ASSESSMENT CRITERIA
LO1: Plan and prepare
Work instructions, including plans, specifications, quality requirements and operational details
are obtained, confirmed and applied.
Safety requirements are followed in accordance with safety plans and policies.
Tools and equipment selected to carry out tasks that are consistent with requirements of job,
checked for serviceability and any faults are rectified or reported prior to commencement.
Material quantity requirements are calculated in accordance with plans and/or specifications.
Materials appropriate to work application are identified, obtained, prepared, safely handled
and located ready for use.
Environmental protection requirements are identified for project in accordance with
environmental plans and regulatory obligations and applied.
LO2: Set out brick/block work
Work platform is erected in accordance with regulatory and workplace requirements.
Location and relative level of prepared footing are checked from job drawings and
specifications.
Rise and going of flight and individual steps are calculated to codes and workplace
requirements.
Flight and individual steps are set out from calculations and job drawings.
LO3: Lay brick/blocks forming steps and wing walls
Mortar mix is prepared and checked bricks/blocks are laid to set out to specifications
standards and codes.
Base brickwork is constructed to specifications and requirements of standards and codes.
Steps are formed square, level, plumb and true and laid to specified bond.
Profile of steps is constructed to bond and design, aligned and plumb to specifications.
Parallel wing walls are formed to step alignment in accordance with specifications.
Jointing is carried out to job specifications.
Brickwork /block work is laid to line and set out with gauge and completed to job drawings,
specifications standards and codes.
Brick/block faces are cleaned free of mortar.
LO4: Clean up
Work area is cleared and materials disposed of, reused or recycled in accordance with
legislation/regulations/codes of practice and job specification.
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with
manufacturers recommendations and standard work practices.
Page No.
LEARNING MODULE 9
Page No.
MODULE ASSESSMENT
Assessment Methods
Observation
Written exam
Role playing
ASSESSMENT CRITERIA:
LO1. Describe team role and scope
The role and objective of the team is identified from available sources of information
Team parameters, reporting relationships and responsibilities are identified from team
discussions and appropriate external sources
LO2. Identify own role and responsibility within team
Individual role and responsibilities within the team environment are identified
Roles and responsibility of other team members are identified and recognized
Effective and appropriate forms of communications used and interactions undertaken with team
members who contribute to known team activities and objectives
Effective and appropriate contributions made to complement team activities and objectives,
based on individual skills and competencies and workplace context
Contribute to the development of team work plans based on an understanding of teams role and
objectives and individual competencies of the members
Page No.
LEARNING MODULE 10
Page No.
LEARNING STRATEGIES:
Lecture-discussion
Group discussion
Role playing
ASSESSMENT METHODS:
Oral questioning
Written test
Observation
ASSESSMENT CRITERIA:
Page No.
Effective questioning , active listening and speaking skills are used to gather and convey
information
Appropriate medium is used to transfer information and ideas
Appropriate non- verbal communication is used
Appropriate lines of communication with supervisors and colleagues are identified and
followed
Defined workplace procedures for the location and storage of information are used
Personal interaction is carried out clearly and concisely
LO2: Participate in workplace meetings and discussions
Team meetings are attended on time
Own opinions are clearly expressed and those of others are listened to without interruption
Meeting inputs are consistent with the meeting purpose and established protocols
Workplace interactions are conducted in a courteous manner
Questions about simple routine workplace procedures and maters concerning working
conditions of employment are asked and responded to
Meetings outcomes are interpreted and implemented
LO3: Complete relevant work related documents
Range of forms relating to conditions of employment are completed accurately and legibly
Workplace data is recorded on standard workplace forms and documents
Basic mathematical processes are used for routine calculations
Errors in recording information on forms/ documents are identified and properly acted upon
Reporting requirements to supervisor are completed according to organizational guidelines
Page No.
LEARNING MODULE 11
Logo of TVET
Provider
Page No.
Page No.
Page No.
1.
2
3
4
6
7
8
9
10
11
12
tapes/rules
Claw hammer
hand saws
nail bags
spirit levels
saw stools
sledge hammers
automatic levels
laser levels
Try square
Hose level
Recommended Ratio
(Item: Trainee)
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
5 pcs
5 pcs
25 pcs
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:5
1:5
1:4
Recommended Ratio
(Item: Trainee)
Page No.
5
6
7
8
D.
1.
2
3
4
5
6
7
8
9
10
bricks
Solid blocks
hollow blocks
plastic sheeting
Tools and Equipments
wheel barrows
brick/block machine
moulds
concrete mixer
trolleys
screed boards
rakes
hoses, sprinklers
trowels
brooms
5 pcs
5 pcs
5 pcs
5 pcs
5 pcs
25 pcs
5 pcs
5 pcs
25 pcs
5 pcs
1:5
1:5
1:5
1:5
1:5
1:1
1:5
1:5
1:1
1:5
Recommended Ratio
(Item: Trainee)
5 pcs
5 pcs
25 pcs
25 pcs
25 pcs
5 pcs
25 pcs
25 pcs
5 pcs
Version and Year: 1 JANUARY 2011
Copyright Info/Author:
1:5
1:5
1:1
1:1
1:1
1:5
1:1
1:1
1:5
Page No.
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
dumpy levels
jointing tools
Club hammers
brick hammers
shovels
bolsters
mortar boards
line blocks
line pins
builders lines
jig saws
masons squares
elevators
brick grabs
pointer
trowels
masonry saws
raking tools
5 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
5 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
1:5
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:5
1:1
1:1
1:1
1:1
1:1
Recommended Ratio
(Item: Trainee)
5 pcs
5 pcs
25 pcs
25 pcs
25 pcs
5 pcs
25 pcs
25 pcs
Version and Year: 1 JANUARY 2011
Copyright Info/Author:
1:5
1:5
1:1
1:1
1:1
1:15
1:1
1:1
Page No.
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
spirit levels
dumpy levels
jointing tools
Club hammers
brick hammers
shovels
bolsters
mortar boards
line blocks
line pins
builders lines
jig saws
masons squares
elevators
brick grabs
pointer
trowels
masonry saws
raking tools
5 pcs
5 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
5 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
1:5
1:5
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:5
1:1
1:1
1:1
1:1
1:1
Recommended Ratio
(Item: Trainee)
1:25
1:25
1:25
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
Version and Year: 1 JANUARY 2011
Copyright Info/Author:
1:1
1:1
1:1
1:1
1:1
Page No.
6
7
8
9
10
11
12
13
masonry chisels
rollers
scaffolding
power drills
air compressor
power grinder
hoses
power leads
25 pcs
25 pcs
5 pcs
5 pcs
5 pcs
5 pcs
5 pcs
5 pcs
1:1
1:1
1:5
1:5
1:5
1:5
1:5
1:5
CON MAS2 M06 0111 Using Brick Laying and Block Laying Tools and Equipment
Item
Category/Item
No.
A. Learning Materials
1. charts
Learning Facilities &
B.
Infrastructure
1. Class room
2 laboratory
3 Work shop
C. Consumable Materials
1. profiles
2. straight edges
3. string lines
D. Tools and Equipment
1
concrete mixers
2
Wheelbarrows
3
Brooms
4
Buckets
5
measuring tapes/rules
6
Hoses
7
Shovels
8
plumb rules
9
spirit levels
10 dumpy levels
11
jointing tools
12
Club hammers
13
brick hammers
14
shovels
bolsters
15
16
mortar boards
17
line blocks
18
line pins
19
builders lines
20
jig saws
21
masons squares
22
elevators
Masonry (Level lI)
Recommended Ratio
(Item: Trainee)
1:12
1:25
1:25
1:25
1:25
1:25
1:25
5 pcs
5 pcs
25 pcs
25 pcs
25 pcs
5 pcs
25 pcs
25 pcs
5 pcs
5 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
5 pcs
1:5
1:5
1:1
1:1
1:1
1:5
1:1
1:1
1:5
1:5
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:1
1:5
Page No.
23
24
25
26
27
28
brick grabs
pointer
trowels
masonry saws
raking tools
Try square
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
1:1
1:1
1:1
1:1
1:1
11
Recommended Ratio
(Item: Trainee)
1:25
1:25
1:25
1:25
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
1:1
1:1
1:1
1:1
1:1
1:1
1:4
1:1
1:4
1:1
1:1
1:1
1:5
1:1
1:1
1:4
Page No.
Recommended Ratio
(Item: Trainee)
1:25
1:25
1:25
1:25
25 pcs
25 pcs
25 pcs
5 pcs
5 pcs
5 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
5 pcs
25 pcs
25 pcs
25 pcs
5 pcs
25 pcs
Version and Year: 1 JANUARY 2011
Copyright Info/Author:
1:1
1:1
1:4
1:5
1:5
1:5
1:1
1:1
1:1
1:1
1:1
1:4
1:1
1:4
1:1
1:1
1:5
1:1
1:1
1:1
1:5
1:1
Page No.
23
24
25
26
27
28
dumpy levels
brick grabs
masons squares
pointer
jig saws
raking tools
5 pcs
25 pcs
25 pcs
25 pcs
25 pcs
25 pcs
1:5
1:1
1:1
1:1
1:5
1:1
Page No.
Category/Item
Learning Materials
TTLM
Textbooks
Charts, powerpoint presentation
Reference Books
Journals/Publication/Magazines
Learning Facilities &
B.
Infrastructure
1.
Lecture Room
2.
Library
C. Consumable Materials
1.
White board marker
2.
Chalk
D. Tools and Equipment
1. Computer
2. Printer
Page No.
Category/Item
A.
1.
2.
3
3
Learning Materials
TTLM
Textbooks
Reference Books
Journals/Publication/Magazines
B.
1.
2.
C.
1.
2.
D.
Description/
Specifications
Quantity
Recommended
Ratio
(Item: Trainee)
For Teachers
use
For Teachers
use
For Teachers
use
1. Computer
2. Printer
Category/Item
A.
1.
2.
Learning Materials
TTLM
Textbooks
4
5
B.
1.
2.
C.
1.
2.
D.
Reference Books
Journals/Publication/Magazines
Learning Facilities & Infrastructure
Lecture Room
Library
Consumable Materials
White board marker
Chalk
Tools and Equipment
1. Computer
2. Printer
Masonry (Level lI)
Description/
Specifications
Quantity
For Teachers
use
For Teachers
use
For Teachers
use
Version and Year: 1 JANUARY 2011
Copyright Info/Author:
Page No.
Recommended
Ratio
(Item: Trainee)
Page No.
Module Title:
Module Code:
Page No.
2.3
OCCUPATIONAL MAP
CONSTRUCTION SECTOR
BUILDING CONSTRUCTION SUB-SECTOR
Level V
Construction Management
Level IV
Level III
Level II
Level I
Level II
I
Sanitary
Building Electrical
Installation
Installation
Masonry
Bar Bending
and
Concreting
Carpentry
Sanitary
Installation
Masonry
Bar Bending
and
Concreting
Carpentry
Building Electrical
Installation
Plastering and
Painting
Tiling
Finishing Construction
Works
Page No.
Water Supply System
Structure Construction
Water
Well
Drilling
Water
Well
Drilling
and
and
Construction
Construction
Page No.
Acknowledgement
The Ministry of Education wishes to extend thanks and appreciation to the many
representatives of business, industry, academe and government agencies who
donated their time and expertise to the development of this Model Curriculum for the
TVET Program Masonry Level II
We would like also to express our appreciation to the following Staff and Officers of
Ministry of Education and Engineering Capacity Building Program (ecbp) who
facilitated the development of this curriculum Ato addis Abebe and Ato Bitrhanu
Shanko
Page No.