Professional Documents
Culture Documents
Automation and SCADA Systems by Teamnet Romania
Automation and SCADA Systems by Teamnet Romania
ENGINEERING
Table of Contents:
1. Teamnet Grup ......................................................................................................... 2
2. Teamnet Engineering .......................................................................................... 4
3. Projects with impact on society .................................................................. 12
4. Certifications ......................................................................................................... 24
5. Clients and collaborations .............................................................................. 26
6. Contact .................................................................................................................... 28
Teamnet Grup
OVER 1500
CERTIFICATIONS
TOP 3 DEVELOPERS
+ 110 MILLION
OF INTEGRATED IT SYSTEMS IN
ROMANIA
+20
15 YEARS
FOUNDED IN
EURO TURNOVER
IN 2015
R&D PROJECTS
EXPERIENCE IN TECHNOLOGY
2001
800
EMPLOYEES
2
Founded in 2001, Teamnet Group is in the TOP 3 developers of integrated systems in the region, being at the same time a
strong agent of change of mentality within the countries in the region.
Our experience in various fields such as environment, public administration and eGovernance, public safety, agriculture,
project management and financing from EU funds, sets us apart from the main competitors in the IT industry.
We have taken the commitment of increasing the competitiveness of our clients in the context of the global economy. The
complexity and variety of the portfolio (IT Solutions, Consultancy in Project Management, IT and Business, Outsourcing
Services and Engineering Services) are the main factors helping us to keep this commitment every day.
3
Teamnet Engineering
Teamnet Engineering (TNE) is the Teamnet Group Company specialized in end-to-end management of engineering
projects, from the design phase, to the execution, implementation and commissioning phases. It develops water and
sewerage systems, waste management systems for clients in the private and public field, SCADA systems (Supervisory
Control and Data Acquisition) and industrial automations.
The experience in engineering projects of the Teamnet Group started in 2003, with SCADA projects and continuing with
the implementation of 10 important engineering projects and environment projects. The expertise acquired in these
projects, as well as the existing opportunities on this market have led to the decision of creating a specialised company
for the complete management of engineering projects.
Thus, as of March 2013, Teamnet Engineering became part of the Group. Having a team of specialists in water treatment,
waste management, industrial automation and applied research, the aim of the company was to develop a network of
partners and to participate with them in complex projects in the field.
+15 Projects
Research &
Development
SCADA
Founded in 2003
Waste
management
systems
TNE
Water &
sewerage
systems
Electrical
Engineering &
Industrial Automation
ENGINEERING SERVICES
Teamnet Engineering provides the essential instruments and techniques for the implementation of an environment and
health quality management policy, based on principles of sustainable development. This approach has helped us achieve
the certificates for the internationally renowned standards ISO 14001:2005 for the Environment Management System and
ISO 9001:2008 related to the efficiency of the Quality Management System at organization level.
We approach a wide range of works in the field of civil and industrial constructions,
regardless of their size and complexity. Our involvement may be engaged for design,
supply and assembly of equipment, execution, commissioning, technical assistance
and consultancy in:
Design, execution and assembly for urban infrastructure works: urban constructions (water supply
networks and plants, sewerage networks, central heating networks, roads), hydrotechnical constructions
(drinking and industrial water treatment stations, household wastewater treatment stations,
bank revetments and water-course regularizations) and special constructions (bridges, passages,
undercrossings, fixed consolidations, bores for water supply);
Design, execution and assembly for industrial works : hospitals, office buildings, schools, kindergartens,
drinking or industrial water supply networks and installations, waste and/or technological water sewerage
networks, central heating networks, site arrangement, roads, fencing), hydrotechnical constructions
(industrial water treatment stations, industrial wastewater treatment stations, water-course
regularizations and water catchments) and special constructions (bridges, passages, undercrossings,
consolidations, bores for water supply);
Design, execution and assembly for metal structures, civil and industrial constructions;
Design, supply, assembly and commissioning for mechanical, electrical, automation and communication
equipment for energy and industrial objectives;
Design and execution of solid waste sorting stations, urban and industrial integrated waste management,
supply and assembly of specific equipment;
Design, supply, assembly and commissioning for industrial automation, specific software application,
communication and electrical engineering systems;
Research&Development - Applied research
10
11
LOCATIONS
Bistria
131.000
Beclean
20.000
Salva
20.000
Sngeorz-Bi
12.000
Total beneficiaries
183.000
Bistria
Fully functional treatment system for both wastewater and sludge resulted from the wastewater treatment
process from Salva, Beclean, Sngeorz-Bi wastewater treatment stations
A new water and sewage infrastructure by using the optimized collection and wastewater treatment systems
Advanced water treatment through the rehabilitation of the activated sludge basins, as well as primary and
secondary decanters
The works were carried out within the POS MEDIU 1 program
Salva/Nsud
New wastewater treatment station Nsud/Salva;
Wastewater transfer collector from the existing Nsud wastewater treatment station to the new Salva
wastewater treatment station;
Transformation of the existing wastewater treatment station Nsud in a WASTEWATER TRANSFER
pumping station
The works were carried out within the POS MEDIU 1 program
Sngeorz-Bi
Expansion of the new wastewater treatment plant Sangeorz Bai built under another contract with funding
from CNI funds;
Main transfer collector from the transfer pumping station to the treatment plant Rodna transfer Sngeorz
Bi;
Transformation of the existing wastewater treatment station Rodna in a wastewater transfer and pumping
station
The works were carried out within the POS MEDIU 1 program
Beclean
New wastewater treatment station
Wastewater transfer collector BATA-BECLEAN
The works were carried out within the POS MEDIU 1 program
12
13
LOCATIONS
Salonta
17.735
Marghita
15.770
Beiu
10.667
Scuieni
11.526
Stei
6.529
Total beneficiaries
62.227
This project solves operational and environmental problems caused by waste generation and management, as well as the
development of an integrated waste management system.
1414
15
16
17
Other Projects
Extension and upgrade of water and wastewater infrastructure in Bistria-Nsud County
Development of water and wastewater infrastructure in Brila County
Integrated solid waste management system in Vaslui County - Technical support for the Ministry of the
Environment and Climate Change in Romania
Upgrading the existing water chemical treatment station within S.C. Electrocentrale Oradea S.A. - Permitting
documentation for intervention works; Technical Project; Engineering details.
Retrofitting the demineralised water finishing plant within the Midia Nvodari Thermoelectric Plant - Technical
Project; Engineering details.
Development of the monitoring system of Vidraru Dam
Extension and rehabilitation of wastewater treatment stations in Arge County
Automation system in the LTG2 thick plate rolling mill modernization from Arcelor Mittal Galai
Automation and SCADA system for the wastewater treatment stations WWTP Pechea and Lieti
Rehabilitation of the automation system for the FCC gas compressor installation at Rompetrol Rafinare Navodari
Upgrading the wagon loading system at the CF (SCADA) Ramp, integration and connection with the OpenTAS IT
system ROMINSERV SRL Bucharest
General Electric Power Conversion Franta - REVAMPING OF TANDEM MILL (STEP 2) at Arcelor Mittal Galai:
software and hardware modification inside the PLCs DAP1, DAP2, CMI and main pulpit operator interface for
interface with new equipment to be installed
Automation - software upgrade for 64 PLCs - RFID / bar code (3 digits) codes acceptance at the Michelin Romania
tire plant in Zalau
18
19
Benefits
Monitoring of technological and operation parameters;
Reduction of production failures;
Productivity increase;
Reaching the product quality targets;
Reducing the weld seam effects such as: C- no melting; D- no penetration; F- marginal groove;
Optimizing the use of personnel for each piece of equipment;
Real time product traceability;
20
21
Project objectives
The researches within the project are in line with the trend and the increased demands from the users,
regarding the replacement of the systematic maintenance procedures for industrial machines and equipment
by conditioned maintenance strategies, based on continuous monitoring or behaviour survey, with the purpose
of preventing their malfunction and avoiding the occurrence of economic or ecologic catastrophes.
Project objectives
Modelling the anaerobic digestion and microalgae photosynthetic growth processes and identifying the
second process, based on the experiments carried out on the pilot plant
Study of the process for obtaining methane gas by anaerobic treatment of wastewater based on the
mathematic model, by numerical simulation
Obtaining biomass from microalgae in order to produce compounds with added value;
CO2 bio-mitigation resulted from burning methane and using it as a substrate for the process of photosynthetic
growth of microalgae
Study of using biomass waste left following the extraction of biodiesel as a substrate to produce biogas in
anaerobic step;
Synthesis of control algorithms for both processes (complex and strongly non-linear processes) treated
individually and coupled on the HILS structure adopted within the project
22
23
Certifications
The manner in which we implement the projects but also the environment and health quality management policy have
helped us obtain the certificates for the internationally recognized standards, for the Environment Management System
and for the efficiency of the Quality Management System at organization level.
Quality Management System in compliance with ISO 9001
Environment Management System in compliance with ISO 1400
Occupational Health and Safety Management System in compliance with OHSAS 18001
Information Security Management System in compliance with ISO 27001
Organizational Social Accountability Management System in compliance with SRM 8000
ANRE type B Certification for design and construction of electrical installations
ANRE authorized electricians degree IIIA/IIIB, IIA/IIB
System Integrator and Software Provider Indusoft Web Studio (Schneider)
System Integrator and Software Provider Siemens Germany
System Integrator and Software Provider (RASI) Rockwell Software
We have a solid expertise in design and project management, but also in implementing and performing special works. Our
experience in large-scale projects has helped us in time to obtain certifications such as:
Indusoft Certified Systems Integrator
ANRE National Energy Regulatory Authority
ISWA International Solid Waste Association
ARA
MOLDSWA
24
25
Clieni i colaboratori
Clieni
GE Power France
Bihor County
Council
UEFISCDI
Bucharest
Galati
Town Hall
SC Farming
Metering SRL
Passavant GmbH
Germany
Electrocentrale
Oradea SA
Apa Canal
SA Galai
Arcelor
Mittal Galai
Biogest
Internaional
GmbH Germania
Midia SA
Thermoelectric
Plant
Dunarea de
Jos University
Galati
Tehnopol
SRL Galati
Vega93 SRL
Galai
Arcelor MIttal
Tubular Products
Galai
Rominserv SRL
Bucharest
Rompetrol SA
- Nvodari
Tencard SRL
Brila
Indas SRL
Bucureti
Colaboratori
SC Aquabis SA
27
Contact
Bucharest, Headquarters:
Teamnet International SA
22 Tudor Vladimirescu Blvd,
Green Gate, floors 7-8-9-10,
District 5, 050883, Bucharest - ROMANIA
Tel: +4 021.311.66.31/ +4 021.311.66.32
Fax: +4 021.311.66.34/ +4 021.311.66.36
General information:
office@teamnet.ro
Baia Mare
Sngeorz-Bi
Salva
Scuieni
Marghita
Oradea
Bistria-Nsud
Beclean
Bistria
Electrocentrale Oradea
Vaslui
Salonta
Beiu
tei
Bucureti - Headquarters
Vidraru
Arge
Lieti
Galai
Pitesti
Brila
28
Pechea
Bucureti
Midia Nvodari
30
Teamnet Engineering
English Version
www.teamnet.ro