Professional Documents
Culture Documents
Unpriced BOQ Romula School
Unpriced BOQ Romula School
S / No
Item Description
Unit
l/s
l/s
C
D
E
l/s
l/s
l/s
F
G
H
I
J
K
L
M
N
O
P
............................................. Contractor
l/s
l/s
l/s
l/s
l/s
l/s
l/s
l/s
l/s
l/s
l/s
Page 1 of 35
Quantity
Rate (SSP)
Amount (SSP)
1
1
1
1
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
Main Building
ELEMENT No. 4: ROOF STRUCTURE
Roof Construction
F
no
10
Treat timber surfaces by applying two coats of antitermite/anti-insects (soliginum) to all wood surfaces
............................................. Contractor
Page 2 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
63
m2
21.6
52.4
m2
211.68
35.6
B
C
D
no
no
no
11
2
2
............................................. Contractor
Page 3 of 35
.............................................County Engineer
S / No
F
G
Item Description
Unit
Quantity
no
no
Rate (SSP)
Amount (SSP)
-
Item
m2
m2
m2
14.4
m3
9.1
m3
m3
m2
m2
15.2
m3
m2
15.2
I
J
15.2
m2
27.4
m2
54.7
............................................. Contractor
Page 4 of 35
.............................................County Engineer
S / No
V
W
X
Item Description
Unit
12mm dia Bip tap: complete with a stop valve and water
supply pipe fixed 3m vertically away from tank to hieght not Item
exceeding 0.5m
300mm x 12mm diameter overflow pipe
1000mm x 25mm dia pipe: wash out complete with stop
valves
Rate (SSP)
Amount (SSP)
0.5
no
............................................. Contractor
Quantity
Page 5 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
15
Rate (SSP)
Amount (SSP)
no
C
D
no
no
30
30
m2
m2
20
............................................. Contractor
Page 6 of 35
.............................................County Engineer
S / No
G
H
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
-
40
20
20
............................................. Contractor
Page 7 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
no
m2
16
no
no
19.2
9.6
............................................. Contractor
Page 8 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
9.6
Rate (SSP)
Amount (SSP)
............................................. Contractor
Page 9 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
m2
180
AA
m2
180
120
120
m2
36
m2
36
Skirt
............................................. Contractor
Page 10 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
m2
111.6
m2
341
............................................. Contractor
Page 11 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
m2
m2
Knot prime and stop and apply three gloss oil paint to
timber surfaces not exceeding 100mm girth.
D
m2
28.8
24
m2
28.8
12
Knot prime and stop and apply three gloss oil paint to
timber surfaces not exceeding 100mm girth.
H
Surfaces 75-100mm
TOTAL ELEMENT 11 (FITTINGS & FIXTURES) CARRIED
TO SUMMARY
............................................. Contractor
Page 12 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
no
48
no
no
B
C
............................................. Contractor
Page 13 of 35
Rate (SSP)
Amount (SSP)
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
no
no
no
no
Earthing
E
............................................. Contractor
m2
Page 14 of 35
135
.............................................County Engineer
S / No
Item Description
Unit
Quantity
m2
Rate (SSP)
Amount (SSP)
m3
m3
16.5
m3
57.3
m3
34
m3
m3
3.8
m3
2.5
m3
0.8
m3
0.6
............................................. Contractor
Page 15 of 35
.............................................County Engineer
S / No
L
M
N
Item Description
100mm thick ground floor slab tamped to fabric
reinforcement in suspended slabs
Sawn formwork as described to:
formwork for ring beam
Soffites of suspended slab
Unit
Quantity
Rate (SSP)
Amount (SSP)
m2
14.3
m2
m2
8.2
7.7
1.8
m2
53.5
m2
14.3
17.4
m2
8.39
m2
2.64
m2
4.04
............................................. Contractor
Page 16 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
m
m
m
20.2
12.3
9.2
m2
14
15.4
15.4
ELEMENT NO. 2
ROOF
Roof Construction
The following in roof construction including hoisting
and fixing approximately 3.0mm above ground level.
A
B
C
Sawn
cypress
pressure
preservative:50 x 100mm Purlins
50 x 150mm Rafters
100 x 75mm Wall Plate
Roof Covering
impregnated
with
............................................. Contractor
Page 17 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
-
EXTERNAL WALLS
Blockwork: cement and sand mortar (1:3) mix; with
and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
A
m2
37.9
no
m2
0.5
m2
40.9
m2
27.1
15mm to walls.
Two coats tyrolene rendering on masonry
ELEMENT NO. 4
DOORS
Concrete Work
Precast concrete Class 28/12mm lintel reinforced with
4No. 12 mm high tensile steel bars and 8mm steel
stirrups at 200 mm centres and including all necessary
formwork and hoisting and fixing in position.
A
............................................. Contractor
Page 18 of 35
4.4
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
no
m2
6.4
Casment doors
............................................. Contractor
Page 19 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
ELEMENT NO. 5
INTERNAL FINISHES
Floor Finishes
Cement and sand (1:4) screeds and pavings : one
coat: steel trowell finish : laid on concrete
A
m2
11.8
m2
3.5
Wall Finishes
m2
32.7
m2
6.6
Painting
D
E
m2
46.5
m2
1.84
no
no
............................................. Contractor
Page 20 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
135
Rate (SSP)
Amount (SSP)
m2
m2
m3
12.7
m3
13
m3
39.1
m3
25.5
m3
26.5
m3
m3
............................................. Contractor
Page 21 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
m3
0.6
m3
0.6
m2
9.3
m2
m2
6.7
5
1.8
............................................. Contractor
Page 22 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
m2
39.7
m2
9.3
14.3
m2
5.8
m2
m2
ELEMENT NO. 2
ROOF
Roof Construction
The following in roof construction including hoisting and fixing approximately
3.0mm above ground level.
Sawn cypress pressure impregnated with preservative:A
B
C
50 x 100mm Purlins
50 x 150mm Rafters
100 x 75mm Wall Plate
Roof Covering
............................................. Contractor
m
m
m
Page 23 of 35
13.7
9.2
6
.............................................County Engineer
S / No
Item Description
Unit
Quantity
m2
9.5
12.3
12.3
Eaves
25 x 225mm Wrot Cypress fascia board
Painting
Knot prime stop and apply three coats of gloss oil
paint to timber surfaces.
Knot, prime, stop and apply three coats of gloss oil paint to
wood fascia 200-300mm girth.
............................................. Contractor
Page 24 of 35
Rate (SSP)
Amount (SSP)
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
ELEMENT NO. 3
EXTERNAL WALLS
Blockwork: cement and sand mortar (1:3) mix; with
and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
A
m2
26.8
no
m2
0.4
m2
30.3
m2
21
D
E
15mm to walls.
Two coats tyrolene rendering on masonry
Walls and concrete surfaces
TOTAL ELEMENT NO.3 (EXTERNAL WALLS) TO
SUMMARY
ELEMENT NO. 4
DOORS
Concrete Work
Precast concrete Class 28/12mm lintel reinforced with
4No. 12 mm high tensile steel bars and 8mm steel
stirrups at 200 mm centres and including all necessary
formwork and hoisting and fixing in position.
A
............................................. Contractor
Page 25 of 35
2.85
.............................................County Engineer
S / No
Item Description
Unit
Quantity
no
m2
6.4
............................................. Contractor
Page 26 of 35
Rate (SSP)
Amount (SSP)
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
m2
7.5
m2
21.4
m2
30.8
m2
1.84
ELEMENT NO. 5
INTERNAL FINISHES
Floor Finishes
Cement and sand (1:4) screeds and pavings : one
coat: steel trowell finish : laid on concrete
A
D
E
no
no
ELEMENT NO 1
SUBSTRUCTURE
(All Provisional)
Site Preparation
A
............................................. Contractor
m2
Page 27 of 35
135
.............................................County Engineer
S / No
Item Description
Unit
Quantity
m2
Rate (SSP)
Amount (SSP)
m3
17.1
m3
16.7
m3
58.5
m3
34.6
m3
40.7
m3
3.8
m3
2.5
m3
0.8
m3
0.6
............................................. Contractor
Page 28 of 35
.............................................County Engineer
S / No
L
M
N
Item Description
100mm thick ground floor slab tamped to fabric
reinforcement in suspended slabs
Sawn formwork as described to:
formwork for ring beam
Soffites of suspended slab
............................................. Contractor
Unit
Quantity
m2
14.6
m2
m2
8.3
7.9
Page 29 of 35
Rate (SSP)
Amount (SSP)
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
1.8
m2
31.1
m2
14.6
17.8
m2
8.6
m2
2.7
m2
5.4
............................................. Contractor
Page 30 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
ELEMENT NO. 2
ROOF
Roof Construction
The following in roof construction including hoisting and fixing approximately
3.0mm above ground level.
A
B
C
Sawn
cypress
pressure
preservative:50 x 100mm Purlins
50 x 150mm Rafters
100 x 75mm Wall Plate
Roof Covering
impregnated
with
m
m
m
20.6
12.3
9.5
m2
14.3
15.6
15.6
ELEMENT NO. 3
EXTERNAL WALLS
Blockwork: cement and sand mortar (1:3) mix; with
and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
A
............................................. Contractor
m2
Page 31 of 35
38.8
.............................................County Engineer
S / No
B
Item Description
Extra for 230 x 230 x 2300mm high block piers
Unit
Quantity
Rate (SSP)
Amount (SSP)
no
m2
0.5
m2
41.7
m2
27.5
15mm to walls.
Two coats tyrolene rendering on masonry
ELEMENT NO. 4
DOORS
Concrete Work
Precast concrete Class 28/12mm lintel reinforced with
4No. 12 mm high tensile steel bars and 8mm steel
stirrups at 200 mm centres and including all necessary
formwork and hoisting and fixing in position.
A
4.5
no
no
m2
10
............................................. Contractor
Page 32 of 35
.............................................County Engineer
S / No
Item Description
Unit
Quantity
Rate (SSP)
Amount (SSP)
m2
12.1
m2
33.4
m2
33.4
m2
2.6
ELEMENT NO. 5
INTERNAL FINISHES
Floor Finishes
Cement and sand (1:4) screeds and pavings : one
coat: steel trowell finish : laid on concrete
A
D
E
no
no
Summary
Preliminaries
Main Building
Two Stance VIP Latrine (Boys)
Two Stance VIP Latrine (Girls)
Three Stance VIP Latrine (Staff)
TOTALS
............................................. Contractor
Page 33 of 35
.............................................County Engineer
SUMMARY
S/NO.
BILL NO/ELEMENT
ESTIMATED
AMOUNT (SSP)
TENDER
1
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
PRELIMINARIES
SUBSTRUCTURE
ROOF STRUCTURE
EXTERNAL WALLS
DOORS
INTERNAL FINISHES
2 VIP Latrine without Urinals (For Girls)
PRELIMINARIES
SUBSTRUCTURE
ROOF STRUCTURE
EXTERNAL WALLS
DOORS
EXTERNAL FINISHES
3 Stance VIP Latrine ( for Staff and Disabled)
PRELIMINARIES
SUBSTRUCTURE
ROOF STRUCTURE
EXTERNAL WALLS
DOORS
EXTERNAL FINISHES
1
2
3
4
5
6
1
2
3
4
5
6
TOTALS
Note: The Quantities used are Just Estimates and could not be measured due to security situation.will be adjusted in next certificate
MARY
MEASURED AMOUNT (SSP)
PREV. CERT
THIS CERT.
% DONE TO
DATE
CUMM. TO DATE
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!