PROPOSED PROGRAM FOR THE CONSTRUCTION OF COAL SHED

March
Description

15

16

17

18

A - Grid - C1 Footings (1 to 14) - 14 No's


Excavation
P.C.C
Shuttering, Rod bending &
Footing Concrete.
Fixing of bolts & Pedestal
Concrete.
A to L Grid (C3-8 No's)
Excavation
P.C.C
Shuttering, Rod bending &
Footing Concrete.
Fixing of bolts & Pedestal
Concrete.
L - Grid - C1 Footings (1 to 14) - 14 No's
Excavation
P.C.C
Shuttering, Rod bending &
Footing Concrete.
Fixing of bolts & Pedestal
Concrete.
M to Q Grid - (C3- 6 No's , C2 -8 No's)

19

20

21

22

23

24

25

26

27

28

29

30

31

Excavation
P.C.C
Shuttering, Rod bending &
Footing Concrete.
Fixing of bolts & Pedestal
Concrete.

TRUCTION OF COAL SHED FROM GRID - 1 to 14


April
4

10

11

12

13

14

15

16

17

5800

240

1392000