Professional Documents
Culture Documents
20 - Filling The Hole
20 - Filling The Hole
20 - Filling The Hole
Pipe ID? =
*Corrected Wt.? =
Avg Length Stand? =
Hole Diameter, in? =
DP
Hevi-Wt.
DRILLING APPLICATION
FILLING THE HOLE
DC
STRING B
DP
Hevi-Wt.
DC
15.0
8.5
Mud Wt? =
11.4
Pipe ID? =
*Corrected Wt.? =
Avg Length Stand? =
Hole Diameter, in? =
6.25
Mud Wt? =
DP
Hevi-Wt.
DC
RESULTS-STRING B
DP
Hevi-Wt.
DC
#DIV/0!
0.0
0
#DIV/0!
0.0
0
#DIV/0!
0.0
0
#DIV/0!
0.0
0
#DIV/0!
0.0
0
#DIV/0!
0.0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0'
0'
0'
0'
0'
0'
RESULTS-STRING A
Output, bbl/stk
THE END
0.0000
APPLICATION CREATED IN 1992
MMS Regulation: The annulus shall be filled with mud before the change in mud level decreases the hydrostatic pressures by 75 psi or
every five stands of drill pipe, whichever gives a lower decrease in hydrostatic pressure. *Corrected Weight applies to the drill pipe only.
"Dry Pipe" = slugged pipe. Reference "WCS Manual" Lafayette, La. 1994. Use Table starting in cell J5 for Corrected Weight of drill pipe.