Download as pdf or txt
Download as pdf or txt
You are on page 1of 73

(CNG/NGV)

CNG (Compressed Natural Gas) NGV


(Natural Gas Vehicle)

-CNG

- (

)
- ( 0.5-0.8 )
- 5-15%
650

250 (
)

3
1. (Dedicated)
2. (Dual-Fuel)
3. (Bi-Fuel)


3,000-6,000 /
200-240 4
1. 1
1 /

2.

1.25 /

3.

2.0 /

4.

NGV

3
20
2.7 /

(NGV)
ISO:11439 , CSA/ANSI NGV-2 , UN ECE R110
TISI2311/ISO11439

1,000
20
200-240 15


(Materials and Material Testing)






(Thermoplastic)
(Thermosetting plastic)

(Batch and Production Testing)









3.

(Ambient Cycling) :


4. (Bonfire Test)

5.
(Penetration Test)
10
7.62 .

6.
3
1.8
7. (Flaw Tolerance) :

8. NGV
30 g

8.1. 3.5

- 20 g

- 8 g

- 4.5 g

8.2 3.5
- 10 g

- 5 g

- 4.5 g

(CNG/NGV)
2

1.
()
1.1
(Fix Mixer)
1.2
(Mixer & Lambda Control)
1.3

2.
()
2.1 (Full Group
Multipoint Port)
2.2
(Sequential Injection System)
2.3 (Liquid Sequential
Injection)

2
1.


Maping
2.

2. (Injection)
2.1 (Full Group Multipoint Port)



2.2
(Sequential Injection System)


(Auto Calibrate)

2.2.1 ECU (Electronic Control Unit)


2.2.2 (Reducer Regulator)

2.2.2.1 (Variable Pressure)




Vacuum
Map Sensor

2.2.2.2 (Constant Pressure)

2.2.3 (Injector)

ECU
2

2.2.4 Map Sensor


Vacuum
()

2.2.5
ECU

()

2.3 (Liquid Sequential Injection)



CDI

NGV (Sequential injection)


(21/12/2549)
.
NGV

20
) 8 ()
28 x 3.0 2

12
4

.

2. (Cylinder valve)

3. (Pressure gage)

0 - 400
kPa / bar / psi

Sensor


4

6.
(Tube clamps or brackets)


600

"" "" ""

20

ANSI / NGV 1
20

8

10. (Receptacle dust cover)


20

5
12

CNG

20
2

12


20
12

15.

CNG (CNG

induction
control
devices)
100

Multi point port injection (MPI)


50 Inlet port

20


17. (Electronnic control unit ECU)


CNG



(ECU) CNG

19. ECU (Sensors required by


ECU inaddition to already-exist ones on the engine)

Manual


21. CNG (CNG indicator)


20
CNG


23. (Fuse carrier with
fuses)

25. (Component standards)

ECE R110 ISO


15500

20
) 8 ()
28 x 3.0 2
10

12 4

.


3. (Pressure gage)
0 - 400 kPa / bar
/ psi

Sensor

4

6

5. (Tube fittings)
4

600

) (Manual
master
shut-off
valve)

7.
(

"" "" ""

ANSI / NGV
20


9. (Filling receptacles
check valve)
8

11. (CNG high-pressure soienoid


valve)


20

5
12

CNG

20
2

13. (Gas filter)

12


20
12

100

15. (Automatic
CNG interrupting valve whenengine stops)

20

Manual


17. CNG (CNG indicator)

20
CNG

19. (Hardware for kit installation)


20. (Gas mixer)

21. (Component standards)


ECE R110 ISO 15500

You might also like