Professional Documents
Culture Documents
CNG PDF
CNG PDF
-CNG
- (
)
- ( 0.5-0.8 )
- 5-15%
650
250 (
)
3
1. (Dedicated)
2. (Dual-Fuel)
3. (Bi-Fuel)
3,000-6,000 /
200-240 4
1. 1
1 /
2.
1.25 /
3.
2.0 /
4.
NGV
3
20
2.7 /
(NGV)
ISO:11439 , CSA/ANSI NGV-2 , UN ECE R110
TISI2311/ISO11439
1,000
20
200-240 15
(Materials and Material Testing)
(Thermoplastic)
(Thermosetting plastic)
3.
(Ambient Cycling) :
4. (Bonfire Test)
5.
(Penetration Test)
10
7.62 .
6.
3
1.8
7. (Flaw Tolerance) :
8. NGV
30 g
8.1. 3.5
- 20 g
- 8 g
- 4.5 g
8.2 3.5
- 10 g
- 5 g
- 4.5 g
(CNG/NGV)
2
1.
()
1.1
(Fix Mixer)
1.2
(Mixer & Lambda Control)
1.3
2.
()
2.1 (Full Group
Multipoint Port)
2.2
(Sequential Injection System)
2.3 (Liquid Sequential
Injection)
2
1.
Maping
2.
2. (Injection)
2.1 (Full Group Multipoint Port)
2.2
(Sequential Injection System)
(Auto Calibrate)
2.2.3 (Injector)
ECU
2
2.2.5
ECU
()
CDI
20
) 8 ()
28 x 3.0 2
12
4
.
2. (Cylinder valve)
3. (Pressure gage)
0 - 400
kPa / bar / psi
Sensor
4
6.
(Tube clamps or brackets)
600
20
ANSI / NGV 1
20
8
10. (Receptacle dust cover)
20
5
12
CNG
20
2
12
20
12
15.
CNG (CNG
induction
control
devices)
100
20
17. (Electronnic control unit ECU)
CNG
(ECU) CNG
Manual
21. CNG (CNG indicator)
20
CNG
23. (Fuse carrier with
fuses)
20
) 8 ()
28 x 3.0 2
10
12 4
.
3. (Pressure gage)
0 - 400 kPa / bar
/ psi
Sensor
4
6
5. (Tube fittings)
4
600
) (Manual
master
shut-off
valve)
7.
(
ANSI / NGV
20
9. (Filling receptacles
check valve)
8
20
5
12
CNG
20
2
12
20
12
100
15. (Automatic
CNG interrupting valve whenengine stops)
20
Manual
17. CNG (CNG indicator)
20
CNG