KEBUTUHAN BATUBARA UNTUK PLTU

PLN dan PLTU IPP TERMASUK


PROGRAM 35.000 MW

OLEH :

KEPALA SATUAN BATUBARA PT PLN (Persero)


17 November 2015, JAKARTA

ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

PLN OVERVIEW

Proyek pembangkit Program 35.000 MW direncanakan dibangun di sistem


kelistrikan defisit dan siaga
ELECTRICITY FOR A BETTER LIFE

Sumatera

Maluku dan Papua

9 Proyek (73 MW)


19 Proyek (1.669 MW)
48 Proyek (9.585 MW)

5 Proyek (53 MW)

Kalimantan
11 Proyek (589 MW)
29 Proyek (2.263 MW)

18 Proyek (465 MW)

Sulawesi dan Nusa


Tenggara

20 Proyek (220 MW)

4 Proyek (57 MW)

Jawa dan Bali

44 Proyek (2.808 MW)


35 Proyek (1.294 MW)

48 Proyek (23.859 MW)


1 Proyek (4 MW)

Proyek pada sistem kelistrikan


berstatus Defisit (Cadangan 0%)

PT PLN (Persero)

Proyek pada sistem kelistrikan berstatus


Siaga (Cadangan 0-30%)

Program 35.000 MW

Proyek pada sistem kelistrikan berstatus


Normal (Cadangan >30%)

Realisasi Rasio Elektrifikasi PLN & Non-PLN 2014


NAD
92,3%

Sumut
91%

Kepri
81,3%
Riau
86%

Kalteng
67,2%

Gorontalo
74,7%

Kalbar
79,8%

Sumsel
76,4%

Sumbar
80,1%

Sulbar
74,1%

Jakarta
99,6%

Bengkulu
83,5%
Lampung
81,3%

Kalsel
83,7%

Jateng
87,2%

DIY
82,3%

> 70 %
Sulut
81,8%

50 - 70 %

Malut
90,5%

< 50 %

Sulteng
75,6%
Sultra
66,8%

Bali
85,2%

Banten
92,9%
Jabar
86%

ELECTRICITY FOR A BETTER LIFE

Papua Barat
77,8%

Babel
95,5%

Jambi
80,7%

Category :

Kaltimra
88,4%

Jatim
83,5%

Maluku
82,3%

Sulsel
85,1%
NTB
68,05%

Papua
43,5%
NTT
58,9%

Tambahan Infrastruktur Kelistrikan 2015-2019


Pembangunan Infrastruktur Kelistrikan 20152019: 42,9 GW,

Oleh PLN:

ELECTRICITY FOR A BETTER LIFE

2015

Oleh Swasta:

Pembangkit:

14,4 GW

Pembangkit:

28,5 GW

Transmisi

42 ribu kms

Transmisi

360 kms

Gardu Induk: 743 lokasi

2019

Kebutuhan Capex:
Rp 520 T

Kebutuhan Capex:
Rp 482 T

Untuk menopang pertumbuhan ekonomi 6,7% (Draft RPJMN


Bappenas), dengan pertumbuhan kebutuhan listrik 8,7% dan Rasio
elektrifikasi 99,4%.
54

Development Scheme
ELECTRICITY FOR A BETTER LIFE

PEMBANGUNAN PEMBANGKIT 35.000 + 7.000 MW (SISA


FTP)
ELECTRICITY FOR A BETTER LIFE

PERSENTASI PEMBANGKIT

KAPASITAS PEMBANGKIT (MW)


25,000

23,278
3%
1%

20,000

0%
2%

15,000

6%

PLT BIOMASS

0%

PLTA

0%

PLTB

5%

PLTD

17%

PLTG / MG

10,000

PLTGU

7,225

PLTGU / MG
PLTGU / MGU

54%

5,000
1,955
20

634

50

10

1,6321,160
1,4501,200
736

2,550

PLTM

1,040

PLTMG

PLTP

3%

PLTU
4%

PLTU MT
PS
2%

PLT
BIOMAS PLTA
S
20
634

PLTB

PLTD

50

10

PT PLN (Persero)

PLTG /
PLTGU / PLTGU /
PLTGU
PLTM
MG
MG
MGU
1,955

7,225

1,450

1,200

736

PLTMG

PLTP

PLTU

PLTU
MT

PS

1,632

1,160

23,278

2,550

1,040

3%

MENGAPA MEMBANGUN PLTU BATUBARA ?


ELECTRICITY FOR A BETTER LIFE

HARGA BAHAN BAKAR RP/KWH


3,000
2391.9237

2565.075

2749.8185

2078.6134

2,250
1608.0012

1,500
750

793.6329

911.85

326.1539
341.5385

348.7862
354.4341

550.3066
388.808

330.8685

374.6007

2010

2011

2012

2013

2014

BATUBARA

PT PLN (Persero)

GAS

BBM

Komposisi Fuel Mix Indonesia (TWh)


ELECTRICITY FOR A BETTER LIFE

LNG
Gas

BBM

Batubara

Panas Bumi
Air

Komposisi Fuel Mix Indonesia (%)


ELECTRICITY FOR A BETTER LIFE

Tahun 2015
Prod. Energi 253 TWh

Tahun 2024
Prod. Energi 550 TWh

10

LOKASI PLTU BATUBARA EXSISTING


ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

11

TAMBAHAN PLTU PADA 2015 (PLN & IPP)


ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

12

ESTIMASI REALISASI PENERIMAAN BATUBARA 2015


ELECTRICITY FOR A BETTER LIFE

Sumber : RKAP Perubahan 2015 dan Realisasi s/d September 2015


PT PLN (Persero)

13

Realisasi Konsumsi Batubara s/d September Tahun 2015


ELECTRICITY FOR A BETTER LIFE

Uraian

Jan
2.919.116
1.122.295
1.634.177
5.675.589

PLN
AP
IPP
Total

Feb
2.684.569
906.119
1.416.272
5.006.960

Mar
2.902.241
1.245.569
1.763.873
5.911.683

Realisasi Pemakaian Batubara (MT)


Apr
Mei
Jun
Jul
2.996.711 2.985.355 2.791.019 2.405.136
1.189.877 1.305.701 1.276.709 1.171.411
1.518.898 1.789.496 1.912.663 1.783.116
5.705.486 6.080.552 5.980.391 5.359.663

Agust
2.745.886
1.372.588
1.925.541
6.044.014

Sep
2.743.542
1.308.241
1.913.871
5.965.654

Jumlah
25.173.576
10.898.509
15.657.907
51.729.992

7,000,000
6,000,000

IPP
15,657,907
30%

5,000,000
PLN

4,000,000

AP
3,000,000

IPP
Total

2,000,000

PLN
25,173,576
49%

AP
10,898,509
21%

1,000,000
Jan

Feb

Mar

PT PLN (Persero)

Apr May

Jun

Jul

Aug

Sep

14

Estimasi Konsumsi Batubara Tahun 2015


ELECTRICITY FOR A BETTER LIFE

7,000,000
6,000,000
5,000,000
4,000,000
3,000,000

IPP
21,527,112
31%

2,000,000
1,000,000
Jan

Feb

Mar

Apr
PLN

PT PLN (Persero)

Mei
AP

Jun
IPP

Jul
Total

Agust

Sep

Okt

Nov

Des

PLN
33,587,105
48%

AP
14,910,448
21%

15

TAMBAHAN KAPASITAS TERPASANG PLTU BATUBARA (PLN + IPP)

GW

ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

16

TAMBAHAN PLTU BATUBARA (2015-2019)


KAPASITAS PLTU

MW

MT

000

25828

ELECTRICITY FOR A BETTER LIFE

KEBUTUHAN BATUBARA

150,000
118764.0723

120,000

500

90,000

000

60,000
9331

500
3283

4781

43019.6811

30,000 14358.428421261.527423828.2074

5263
2015

0
2015

PT PLN (Persero)

2016
PLN

2017
IPP

2018+ IPP
PLN

2019

2016
IPP

2017
PLN

2018

2019

TOTAL

17

KEBUTUHAN BATUBARA (PLN + IPP)


ELECTRICITY FOR A BETTER LIFE

200.

Million MT

160.

4.28
21.64

120.
80.

4.12
5.91
17.1

4.24
12.62

58.67

0.56
0.68
6.71
21.74

2.69
2.79
14.05
21.74

21.74

21.74

21.74

49.37

49.37

49.37

49.37

49.37

2015

2016

2017

2018

2019

23.83

40.
0.

PLTU PLN
PLTU FTP

PLTU IPP
PLTU Sewa

PLTU 35000
PLTGB

Sumber : Surat PT PLN (Persero) ke Direktur Pembinaan Minerba No. 0552/EPI.00.01/DIV BAT/2015 tanggal 24 Juli 2015
PT PLN (Persero)

18

ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

COAL OVERVIEW

19

Sebaran Cekungan Batubara di Indonesia


ELECTRICITY FOR A BETTER LIFE

SUMATERA
UTARA
19

SUMATERA
TENGAH

TARAKAN

MELAWI
KUTEI
MEULABOH

SALAWATI

SUMATERA
SELATAN

BENGKULU

SULAWESI
SELATAN

BARITO
ASAM-ASAM

BINTUNI

PAPUA

PT PLN (Persero)

20

LOCATION OF COAL SUPPLIER FOR PLN


ELECTRICITY FOR A BETTER LIFE

9
1
2
10

12

7
11

PT PLN (Persero)

13

5
4

LEGEND:
1. PT Kaltim Prima Coal (PT KPC)
Sanggata, South Borneo
2. PT Kideco Jaya Agung (KJA)
Pasir East Borneo
3. PT Oktasan Baruna Persada (OBP) Kotabara
South Borneo
4. PT Arutmin Indonesia (PT AI)
Satui South Borneo
5. PT Exploitasi Energi Indonesia (PT
EEI)Tapin
South Borneo
6. PT Rizki Anugrah Pratama (PT RAP)
Tapin South Borneo
7. PT Dwi Guna Laksana (PT DGL)
Banjar South Borneo
8. PT Kasih Industri Indonesia (PT KII)
Barito Timur South Borneo
Tebo - Jambi
9. PT Titan Mining Energy (PT TME)
Kutai East Borneo
10. PT Hanson Energy (PT HE)
Ogan Komering Ulu, South Sumatera
11. PT Bukit Asam (PT BA)
Tanjung Enim, South Sumatera
12. PT Golden Great Borneo (PT GGB)
Lahat, South Sumatera
13. PT Adaro Indonesia
Kelanis, South Borneo

21

ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

PETA SEBARAN SPESIFIKASI BATUBARA DI INDONESIA

22

Penentuan Rentang Kualitas Batubara - update


ELECTRICITY FOR A BETTER LIFE

Berdasarkan data pasokan batubara ke


PLTU-PLTU PLN, maka dapat diketahui
rentang umum nilai kalori batubara yang
digunakan pada saat ini.
Selanjutnya, berdasarkan data jumlah
pasokan dan tujuan PLTU, maka dapat
disusun komposisi nilai kalori batubara yang
digunakan pada PLTU PLN eksisting.
Berdasarkan data-d ata tersebut, maka
dapat ditentukan rentang (range) nilai kalori
batubara yang digunakan di dalam laporan
LAPI ITB ini.
< 3200 ; 3200-3800 ; 3800-4400 (untuk
tipikal 3900, 4000, 4200) ; 4400-4900 (untuk
tipikal 4500, 4700, 4800); 4900-5200 (untuk
tipikal 5000), 5200-5500 ; 5500-6000 (untuk
tipikal 5700), serta > 6000 kkal/kg (gar).

PT PLN (Persero)

23

Rekapitulasi Potensi Batubara se-Indonesia Berdasarkan LAPI


ITB
ELECTRICITY FOR A BETTER LIFE

SUMBER : LAPI ITB


PT PLN (Persero)

24

ZONASI BATUBARA
ELECTRICITY FOR A BETTER LIFE

Sumut
Riau
Peranap

Sulbagut

Kalbar
Kaltim

Kalteng

NAD
Meulaboh

Papua
Sulteng

Jambi
Kalsel 1
Sumsel

Bengkulu
Jawa 2
Jawa 1

Kalsel 2
Sulsel

Sultra

Jawa 3

NTB-NTT

PT PLN (Persero)

25

25

RENCANA SKENARIO PASOKAN BATUBARA PLTU 35.000 MW UNTUK


KEBUTUHAN OPERASIONAL SELAMA 30 TAHUN
ELECTRICITY FOR A BETTER LIFE

SUMBER : LAPI ITB


PT PLN (Persero)

26

Rekapitulasi Potensi Batubara se-Indonesia


ELECTRICITY FOR A BETTER LIFE

Catatan : Khusus untuk Provinsi Bengkulu, Kabupaten Bengkulu Utara hanya mencatat jumlah cadangan dan tidak mencatat jumlah sumberdaya batubara.

PETA SEBARAN SPESIFIKASI POTENSI BATUBARA DI INDONESIA

27

RENCANA ZONASI BATUBARA


ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

28

PROYEK PLTU 35.000 MW + 7.000 MW (2015 & 2016)


ELECTRICITY FOR A BETTER LIFE

29

PROYEK PLTU 35.000 MW + 7.000 MW (2017 & 2018)


ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

30

PROYEK PLTU 35.000 MW + 7.000 MW (2019)


ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

31

PASOKAN BATUBARA EKSISTING


ELECTRICITY FOR A BETTER LIFE

PLTU
NAGAN
RAYA

PLTU
PANGKALA
N SUSU

PLTU
MALINAU
PLTU
TJ.BALAI
KARIMUN
PLTU
TJ.KASAM
BATAM

PLTU
AMURANG
PLTU GALANG
BATANG
PLTU
TERNATE
PLTU BANGKA
BARU

PLTU
TELUK
SIRIH

PLTU
NEW
JAYAPUR
A

PLTU
OMBILIN
PLTU ASAM
ASAM

PLTU BUKIT
ASAM

PLTU
AMBON
PLTU
BARRU

PLTU
TARAHAN

PLTU
LONTAR

PLTU
KENDARI

PLTU
INDRAMAYU

PLTU
SURALAY
A
PLTU
PLTU PLH
LABUA RATU
N

PLTU
REMBAN
PLTU G
PLTU
TJ.JATI B
TJ.AWAR
AWAR
PLTU
PLTU
ADIPALA
PAITON
PLTU
PACITAN

PLTU
ROPA
PLTU
ENDOG

PLTU
ENDE

32

ELECTRICITY FOR A BETTER LIFE

TRANSPORTASI
(RE-ROUTE)

PT PLN (Persero)

33

PLTU NAGAN RAYA


ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

Jarak
(NM)

Vol/Thn

CV

CSR

225

4200

1599

KALTENG

246

4200

1559

452

4200

1581

Rata2
Tertimbang

923

4200

1580

Biaya
CIF
Biaya
Harga
Penyediaan
Batubara Transporta (FOB +
Batubara
Transport)
si
FOB
(Miliar Rp)

445,363

309,800

755,163

169.91

457,363

239,200

696,563

171.35

488,643

296,661

785,305

354.96

469,756

284,549

754,305

696.22

RUTE IDEAL
PEMASO Vol/Th
K
n

FOB

FREIGH
T

CIF

Biaya
Penyediaan
Batubara
(Miliar Rp)

261.22
7

261.227

43,40

CV

Jarak
(NM)

18%

3400

15%

4250

1060

423.07
259.400
6

682.476

94,49

20%

4200

1060

507.20
268.800
2

776.002

143,25

433,8
47% 4500
612
505.29
178.274
POTENSI1PENGHEMATAN PERTAHUN
:
4

683.568

296,54

625.870

34
577,68

Mifa +

O
612 NM

166,1
4
138,4
5
184,6
0

Bengkulu

PT PLN (Persero)

Rata2
Tertimban
g

4.20
696.22 923
- 577.68
= 118.55
Milyar
100%
659
449.41
5
176.459
1

PLTU TELUK SIRIH


ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING

CV

4000

823

4200

1069

4081

922

KALTENG
Rata2
Tertimbang

RUTE IDEAL

Jarak
(NM)

PEMASOK Vol/Thn

PEMASOK

364
247
611

Vol/T
hn

BENGKUL
U
122

CV

Jarak
(NM)

4600 237
20%

SUMSEL

4000 823
428

70%

61

10%

BSUMSEL

4200 495

Rata2
611
Tertimbang

100%

Biaya
Harga
Biaya
CIF
Penyediaa
Batubara Transport (FOB +
n
FOB
asi
Transport) Batubara
(Miliar Rp)

4140 673

332,452

242,000

574,452

209.10

457,363

167,400

624,763

154.32

382,948

211,843

594,790

363.42

FOB

FREIGH
T

CIF

Biaya
Penyediaan
Batubara
(Miliar Rp)

544.178

85.977 630.155

77,00

332.452

242.00
574.452
0

245,69

457.363

167.40
624.763
0

38,17

387.288

203.33
590.624
5

360,87

POTENSI PENGHEMATAN PERTAHUN :

363.42 - 360.87 = 2.55 Milyar

35

PLTU PANGKALAN SUSU


ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK Vol/Thn

RUTE IDEAL

CV

CIF
Harga
Biaya
Jarak
(FOB +
Batubara Transport
(NM)
Transport
FOB
asi
)

Biaya
Penyediaan
Batubara
(Miliar Rp)

A Kalsel

600

4200 1.169 445.363 236.900 682.263

409,36

200

4200 1.130 448.914 194.700 643.614

128,72

KALTENG

50

4200 1.111 383.769 172.800 556.569

27,83

Rata2
Tertimbang

850

4200

565,91

PEMASOK

SUMSEL

Lahat

SUMSEL

Vol/Th
n

1.156 442.575 223.200 665.775

CV

Jarak
(NM)

FOB

FREIGH
T

CIF

20% 4250 648

423.07 194.70 617.77


6
0
6

105,02

127,5 15% 4600 648

458.01 194.70 652.71


8
0
8

83,22

30% 4200 648

448.91 194.70 643.61


4
0
4

164,12

170

255

SUMSEL PENGHEMATAN
648 332.45:
297,5 35% 4000PERTAHUN
POTENSI
2

194.70 527.15
0
2

100= 56.72 Milyar / Tahun


Rata2
565.91
- 509.19
850
4200
Tertimbang

Biaya
Penyediaa
n
Batubara
(Miliar Rp)

648

156,83

36
404.350 194.700 599.050 509,19

PLTU LABUAN ANGIN


ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING

PEMASOK

Vol/
Thn

PT.BA

4900

RUTE IDEAL

PEMASOK

FREIGHT

CIF

250

50%

172.200 844.870

211,22

250

4200 1219 457.36


3
50%

181.800 639.163

159,79

500 100% 4550

Vol/Th
n

50

10%

SUMSEL

Bengkulu

CV

Tarahan

150 30%

958 565.017

Jarak
(NM)

FOB

177.000 742.017

FREIGHT

CIF

371,01
Biaya
Penyediaan
Batubara
(Miliar Rp)

4000 1022 332.45


2

195.43
527.886
4

26,39

4600

427 505.29
4

128.34
633.643
9

142,57

4900

696 672.67
0

172.20
844.870
0

126,73

4200 1022 448.91

195.43
644.348
4

48,33

225 45%

Sumsel

FOB

Biaya
Penyediaan
Batubara
(Miliar Rp)

696 672.67
0

KALTENG
Rata2
Tertimbang

CV

Jarak
(NM)

POTENSI PENGHEMATAN
PERTAHUN
4
75 15%
Rata2

500 100% 4570


371.01
Milyar158.276
Tertimbang - 344.02 = 26.99
656 529.766

688.041

344,02
37

PLTU BANGKA BARU


ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

Vol/T
hn

CV

Jarak
(NM)

JAMBI

77

KALSEL

116 60% 4000 593

Rata2
Tertimbang

193

RUTE IDEAL
PEMASOK

Vol/T
hn

40% 4200 198

100%

4080

435

Jarak
CV
(NM)

SUMSEL

125,45 65%

4000

228

SUMSEL

48,25

25%

4250

228

JAMBI

19,3

10%

4200

198

Rata2
Tertimbang

193

100% 4083

FOB

FREIGH
T

CIF

Biaya
Penyediaan
Batubara
(Miliar Rp)

446,220 76,100 522,320

40.22

216,50
551,013
0

63.92

334,513

379,080 160,485

FOB

FREIGHT

539,566

104.14

CIF

Biaya
Penyediaan
Batubara
(Miliar Rp)

332.452

83.000

415.452

52,12

420.383

83.000

503.383

24,29

446.220

76.100

522.320

10,08

225 365.812

82.310

448.122

86,49

POTENSI PENGHEMATAN PERTAHUN :

104.14 - 86.49 = 17.65 Milyar

38

PLTU AMURANG
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
Vol/
Thn

CV

KALSEL

46

20%

4000

862

KALSEL

46

20%

4200

722

KALTIM

66

29%

4200

720

KALTIM

70

31%

4000

593

Rata2
Tertimbang

228 100% 4098

PEMASOK

Jarak
(NM)

FOB

FREIGHT

CIF

341,155

278,500 619,655

28.50

388,790

200,600 589,390

27.11

350,177

237,400 587,577

38.78

358,299

176,000 534,299

37.40

710 358,641

219,417 578,057

RUTE IDEAL
PEMASOK

KALTIM
B KALTIM
KALTIM
KALTIM
Rata2
Tertimbang

Vol/Thn

CV

46

20%

46

20%

66

29%

70

31%

228

100% 4118

Jarak
(NM)

4100

569

4200

477

4200

720

4000

593

Biaya
Penyediaa
n Batubara
(Miliar Rp)

FOB

FREIGH
T

CIF

131.80

Biaya
Penyediaan
Batubara
(Miliar Rp)

341,155 168,877

510,032

23.46

381,565 143,900

525,465

24.17

350,177 237,400

587,577

38.78

358,299 176,000

534,299

37.40

602 357,183 185,860

543,043

123.81

POTENSI PENGHEMATAN PERTAHUN :

131.80 - 123.81 = 7.98 Milyar

39

PLTU KENDARI
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

Vol/T
hn

30

22%

36

26%

35

26%

CV

KALSEL

KALTIM

KALTIM

B KALSEL

RUTE IDEAL
Rata2
PEMASOK
Tertimbang

4000

739

4000

691

4200

723

FOB

CIF

384.259

244.00
0

628.25
9

18,85

401.280

231.00
0

632.28
0

22,76

389.892

239.50
0

629.39
2

22,03

22,61
Biaya
Penyediaa
86,25
n Batubara
(Miliar Rp)

34

25%

4000 691 401.28 231.00 632.28


0
0
0

21,50

74,8

55%

4200 672 418.42 177.10 595.52


3
0
3

44,55

27,2

20% 4200 619 397.11 210.40 607.51


6
0
6

16,52

A Kalsel

Rata2
POTENSI
Tertimbang

Biaya
Penyediaan
Batubara
(Miliar Rp)

FREIGH
T

4200 757
249.00 646.11
397.116
0
6
35 26%
Vol/100 4103
Jarak
FREIGH
136
%
CV 727 393.523
FOB 240.688 634.211
CIF
Thn %
(NM)
T

KALTIM

KALSEL /
S.DANAU

Jarak
(NM)

136 100% 4150


PENGHEMATAN
PERTAHUN
666 409.876:

86.25 - 82.57 = 3.69 Milyar

197.235 607.111

82,57
40

PLTU JERANJANG
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

Vol/
Thn

74

25%

KALSEL

KALSEL
45

KALSEL

RUTE IDEAL

Rata2
PEMASOK
Tertimbang

Jarak
(NM)

4000

430

4000

364

4000

499

4000

303

15%

KALTIM
68

CV

23%

FOB

FREIGH
T

CIF

Biaya
Penyediaa
n Batubara
(Miliar Rp)

319.358

151.90 471.25
0
8

34,87

341.155

138.90 480.05
0
5

21,60

358.299

173.50 531.79
0
9

36,16

388.790

121.80 510.59
0
0

53,61
105 36%
Biaya
Vol/ 100% 4000 Jarak
FREIGH
Penyediaa
292
%
CV
FOB
CIF
390 356.753
144.103
500.856
146,25
Thn
(NM)
T
n Batubara
(Miliar Rp)

KALSEL

4000 430 319.35 151.90


471.258
8
0
116,8 40%

55,04

KALSEL
43,8

4000 364 341.15 138.90


480.055
5
0
15%

21,03

73

4000 384 334.51 144.50


479.013
3
0
25%

34,97

4000 303 388.79 121.80


510.590
0

29,82

KALSEL

KALSEL

POTENSI PENGHEMATAN
PERTAHUN
0 :
58,4 20%

Rata2
Tertimbang

292 100%
146.25 - 140.86
= 4000
5.39383
Milyar
340.303 142.080

482.383

140,86
41

PLTU BARRU
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

Vol/T
hn

90

29%

112

36%

KALSEL

KALSEL

KALTIM
68

RUTE IDEAL

Rata2
Tertimbang
PEMASOK

12%

4250

416

4200

387

4200

266

4200

256

FOB

FREIGH
T

CIF

396.382

128.30 524.68
0
2

47,22

392.910

138.90 531.81
0
0

59,56

430.669 95.100

525.76
9

35,75

397.116 91.400

488.51
6

18,56

Biaya
308
100%
4215
Vol/T
Jarak
FREIGH
Penyediaa
353 402.780
120.272 523.052
161,10
%
CV
FOB
CIF
hn
(NM)
T
n Batubara
(Miliar Rp)

A KALSEL
184,8 60%

4200 272 418.42


96.400 514.823
3

95,14

61,6

20%

4200 266 430.66


95.100 525.769
9

32,39

61,6

4200 256 397.11


91.400 488.516
6
20%

30,09

KALTIM

B KALSEL
Rata2
POTENSI
Tertimbang

Jarak
(NM)

22%

B KALSEL
38

CV

Biaya
Penyediaa
n Batubara
(Miliar Rp)

308 100% 4200PERTAHUN :


PENGHEMATAN
268 416.611

161.10 - 157.62 = 3.48 Milyar

95.140 511.751

157,62
42

PLTU TERNATE
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

Vol/T
hn

KALSEL

4000 1009
10

18%

KALTIM

Rata2
Tertimbang

PEMASOK

695

4000

902

55%

15

27%

55

100% 4000

FREIGH
T

FOB

CIF

384.259

319.60 703.85
0
9

7,04

401.280

229.90 631.18
0
0

18,94

354.748

293.40 648.14
0
8

9,72

809 385.495 263.527 649.022

Biaya
Penyediaa
n Batubara
(Miliar Rp)

33

60%

4000 815 350.17 263.50


613.677
7
0

20,25

11

20%

4000 695 401.28 229.90


631.180
0
0

6,94

11

20%

4000 902 354.74 293.40


648.148
8
0

7,13

KALTIM

FOB

FREIGH
T

35,70

KALTIM

Jarak
CV
(NM)

Biaya
Penyediaa
n Batubara
(Miliar Rp)

Vol/T
hn

KALTIM

Rata2
POTENSI
Tertimbang

4000
30

BKALTIM

RUTE IDEAL

CV

Jarak
(NM)

PENGHEMATAN
55 100% 4000PERTAHUN :

CIF

808 361.312 262.760 624.072

35.70 - 34.32 = 1.37 Milyar

34,32
43

PLTU LABUAN
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING

637 418.423 160.700

579.123

Biaya
Penyediaan
Batubara
(Miliar Rp)
228,75

54,8 672.670

42.100

714.770

375,25

4250

619 418.056 193.600

611.656

99,70

217

10% 4250

619 396.382 163.700

560.082

121,54

133

6%

4250

296 420.383 117.100

537.483

71,49

197

9%

4500

282

521.141 111.500

632.641

124,63

4800
26%
100
Rata2 Tertimbang 2188
4560
%

619

555.884 163.700

719.584

401,53

521.639 128.676

650.315

1.422,89

PEMASOK

CV

A KALSEL

395

TARAHAN

525

18% 4200
24% 4900

KALSEL

163

7%

KALSEL
SUMSEL
BB
Kalsel

RUTE IDEAL

Vol/Thn %

PEMASOK

SUMSEL
SUMSEL
BENGKULU
SUMSEL
SUMSEL MRC
KALSEL
TARAHAN

558

Vol/Thn %

0%

263

12%

328

15%

438

20%

438

20%

0%

CV

Jarak
(NM)

437

Jarak
(NM)

4250

296

4200

359

4600

294

4200

333

4500

333

4700

652

FOB

FOB

FREIGHT

FREIGHT

CIF

CIF

Biaya
Penyediaan
Batubara
(Miliar Rp)

420.383 117.100

537.483

405.338 109.200

514.538

135,10

500.661 107.500

608.161

199,60

485.985 111.500

597.485

261,46

521.141 111.500

632.641

276,84

559.860 178.400

738.260

4900 54,8
672.670
42.100 714.770
33%
100
POTENSI
PENGHEMATAN
PERTAHUN
:87722 634868
Rata2
Tertimbang
2188
4551
238 547146
%
722

1422.89 - 1.389.09= 33.8 Milyar

516,09
1.389,09

44

PLTU PELABUHAN RATU


ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

TARAHAN
BENGKULU

Vol/Thn

288

14%

1090,8

52%

270

13%

150

7%

CV

SUMSEL
B LRC / SUMSEL

B MRC /
SUMSEL
300
Rata2 Tertimbang 2099

RUTE IDEAL

PEMASOK
SUMSEL
SUMSEL
BENGKULU
B MRC / SUMSEL
B MRC / SUMSEL
KALSEL
TARAHAN
Rata2 Tertimbang

14%
100%

Vol/Thn %

Jarak
(NM)

4900

194

4600

418

4200

677

4200

515

4500

515

4547

CV

441

Jarak
(NM)

4250

515

4200

677

4600

418

4200

515

4500

515

4700

799

4900
14%
100
2099
4517
%

194

105

5%

336

16%

945

45%

168

8%

252

12%

0%

294

452

Biaya
Penyediaan
Batubara
(Miliar Rp)

FOB

FREIGHT

CIF

672.670

72.100

744.770

214,49

500.661

140.500

641.161

699,38

427.056

193.000

620.056

167,42

471.568

144.700

616.268

92,44

524.223 144.700 668.923


516084
138768
654852

200,68
1374,40

Biaya Penyediaan
Batubara
(Miliar Rp)

FOB

FREIGHT

CIF

420.383

146.700

567.083

59,52

427.056

193.000

620.056

208,24

500.661

140.500

641.161

605,61

471.568

144.700

616.268

103,48

524.223

144.700

668.923

168,49

559.860

212.400

772.260

672.670

72.100

744.770

218,86

509452

140474

649926

1364

POTENSI PENGHEMATAN PERTAHUN :

1374.40 - 1364.19 = 10.21 Milyar

45

PLTU SURALAYA
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK
TARAHAN
BENGKULU
KALSEL
KALSEL
B LRC / SUMSEL
B MRC / SUMSEL
SUMSEL
KALSEL
Rata2 Tertimbang

Vol/Thn %

192

13%

240

16%

226

15%

360

24%

50

3%

140

9%

168

11%

148
1524

10%
100%

CV
4900

62

4600

450

4250

542

4200

573

4200

327

4500

327

4250

343

4250

675

4397

RUTE IDEAL
PEMASOK
SUMSEL
SUMSEL
BENGKULU
B / SUMSEL
KALSEL
TARAHAN
Rata2 Tertimbang

Vol/Thn %

213

14%

549

36%

305

20%

305

20%

0%

152

10%
100
%

1524

Jarak
(NM)

CV

439

Jarak
(NM)

4250

343

4200

321

4600

321

4500

327

4700

595

4900

62

4417

299

FREIGHT

672.670

41.600

714.270

137,14

131.600

632.261

151,74

579.856

131,05

500.661
427.056

152.800

CIF

Biaya Penyediaan
Batubara
(Miliar Rp)

FOB

471.568

153.300

624.868

224,95

471.568

101.900

573.468

28,67

530.835

101.900

632.735

88,58

420.383

107.500

527.883

88,68

418.056
489490

183.700
127231

601.756
616721

89,06
939,88

FREIGHT

420.383

107.500

527.883

112,63

427.056

106.000

533.056

292,46

500.661

106.000

606.661

184,91

530.835

101.900

632.735

192,86

559.860

165.200

725.060

672.670

41.600

714.270

108,85

486160

98950

CIF

Biaya Penyediaan
Batubara
(Miliar Rp)

FOB

585110

892

POTENSI PENGHEMATAN PERTAHUN :

939.88 - 891.71 = 48.18 Milyar

46

PLTU LONTAR
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING

PEMASOK
TARAHAN
KALTENG
KALSEL
SUMSEL
KALSEL
B LRC / JAMBI
B MRC / SUMSEL
SUMSEL
KALSEL

RUTE IDEAL

Rata2 Tertimbang
PEMASOK
SUMSEL
KALSEL
SUMSEL
BENGKULU
B / SUMSEL
KALSEL
TARAHAN
Rata2 Tertimbang

Vol/Thn

864

44%

100

5%

202

10%

68

3%

300

15%

15

1%

180

9%

90

5%

160

8%
100
%

1979
Vol/Thn %

0%

495

25%

198

10%

198

10%

396

20%

0%

693

35%
100
%

1979

CV

CV

Jarak
(NM)

4900

91

4600

606

4250

529

4250

349

4200

540

4200

416

4500

334

4200

435

4250

643

4564
Jarak
(NM)

4250

349

4200

540

4200

435

4600

330

4500

334

4700

572

4900

91

4545

310

FOB

FREIGH
T

CIF

672.670

48.200

720.870

622,83

383.769 167.600

551.369

55,14

396.382 149.800

546.182

110,33

420.383 106.800

527.183

35,85

418.423 145.900

564.323

169,30

495.324 122.200

617.524

9,26

524.223 103.500

627.723

112,99

405.338 126.500

531.838

47,87

418.056 176.300

594.356

95,10

323

535071 100936

636007

Biaya
(Miliar Rp)

1258,66

Biaya Penyediaan
Batubara
(Miliar Rp)

FOB

FREIGHT

CIF

420.383

106.800

527.183

418.423

145.900

564.323

279,20

405.338

126.500

531.838

105,25

500.661

103.900

604.561

119,64

524.223

103.500

627.723

248,45

559.860

159.900

719.760

672.670

48.200

720.870

499,31

535485

97085

1258.66 - 1251.86 = 6.8 Milyar

632570

1251,86

47

PLTU INDRAMAYU
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING

PEMASOK
TARAHAN
KALTENG
KALSEL
A KALSEL
B MRC / SUMSEL
KALSEL
Rata2 Tertimbang

PEMASOK

RUTE IDEAL

KALSEL
SUMSEL
A KALSEL
SUMSEL
B LRC / SUMSEL
B MRC / SUMSEL
KALSEL
TARAHAN
Rata2 Tertimbang

Vol/Thn %

CV

Jarak
(NM)

4900

201

4600

510

4250

446

4200

484

4500

376

4250
10%
100
1975
4465
%

510

384

19%

250

13%

195

10%

500

25%

450

23%

196

Vol/Th
n

198

10%

296

15%

593

30%

0%

99

5%

296

15%

296

15%

198

10%
100
1975
%

CV

406
Jarak
(NM)

4250 446
4200 368
4200 484
4600 368
4200 376
4500 376
4700 491
4900 201
4395 414

Biaya Penyediaan
Batubara
(Miliar Rp)

FOB

FREIGHT

CIF

672,670

73,400

746,070

286.49

383,769

145,400

529,169

132.29

396,382

130,600

526,982

102.76

418,423

133,400

551,823

275.91

524,223

113,100

637,323

286.80

418,056

145,500

563,556

110.46

485363

119552

604916

1194.71

Biaya Penyediaan
Batubara
(Miliar Rp)

FOB

FREIGHT

CIF

396,382

130,600

526,982

104.08

427,056

112,600

539,656

159.87

418,423

133,400

551,823

326.96

500,661

112,600

613,261

471,568

113,100

584,668

57.74

524,223

113,100

637,323

188.81

559,860

141,400

701,260

207.75

672,670

73,400

746,070

147.35

482681

121140

1194.71 - 1192.55= 2.16 Milyar

603821

1192.55

48

PLTU REMBANG
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK
TARAHAN
LRC / KALTIM
MRC / SUMSEL
A KALSEL
B LRC / KALSEL
B MRC / KALSEL
KALSEL
Rata2 Tertimbang

RUTE IDEAL

PEMASOK
KALSEL
KALSEL
KALSEL
B / KALSEL
KALSEL
TARAHAN
Rata2 Tertimbang

Vol/Thn %

336

15%

145

6%

805

36%

568

25%

52

2%

160

7%

176

8%
100
%

2242

Vol/Thn %

493

22%

67

3%

448

20%

448

20%

673

30%

112

5%
100
%

2242

CV

Jarak
(NM)

4900

394

4200

886

4600

530

4200

281

4200

314

4500

314

4250

379

4474

CV

437
Jarak
(NM)

4250

314

4200

379

4200

281

4500

314

4700

341

4900

394

4456

321

FOB

FREIGHT

672,670
351,931

CIF

Biaya Penyediaan
Batubara
(Miliar Rp)

117,600 790,270
232,500

265.53

584,431

84.74

505,294

150,100 655,394

527.59

418,423

88,000

506,423

287.65

415,362

100,100

515,462

26.80

454,609

100,100

554,709

88.75

418,056

115,200

533,256

93.85

485900

127358

FOB

FREIGHT

CIF

396,382

100,100

496,482

244.88

418,056

115,200

533,256

35.87

418,423

88,000

506,423

227.08

454,609

100,100

554,709

248.73

559,860

106,300

666,160

448.06

117,600 790,270

88.59

672,670
475944

100868

613258

576812

1374.92
Biaya Penyediaan
Batubara
(Miliar Rp)

1293.21

POTENSI PENGHEMATAN PERTAHUN :

1374.92 - 1295.22 = 79.71 Milyar

49

PLTU TANJUNG AWAR - AWAR


ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

TARAHAN
A KALSEL
B LRC / KALSEL
B MRC / KALSEL
KALSEL
Rata2 Tertimbang

PEMASOK

Vol/Thn %

532

28%

993

52%

200

11%

40

2%

135

7%
100
%

1900

Vol/Thn %

CV

4900

426

4200

257

4200

286

4500

286

4200

282

4402

CV

RUTE IDEAL
TARAHAN
A KALSEL
B LRC / KALSEL
B MRC / KALSEL
KALSEL
KALSEL
Rata2 Tertimbang

0%

874

46%

0%

285

15%

608

32%

133

7%
100
%

1900

Jarak
(NM)

310

Jarak
(NM)

4900

426

4200

257

4200

286

4500

286

4700

323

4200

282

4405

284

FOB

FREIGHT

CIF

Biaya Penyediaan
Batubara
(Miliar Rp)

672,670

124,900

797,570

424.31

418,423

87,500

505,923

502.38

415,362

93,700

509,062

101.81

453,812

93,700

547,512

21.90

457,363

92,700

550,063

74.26

492802

FOB

99125

FREIGHT

591926

CIF

1124.66

Biaya Penyediaan
Batubara
(Miliar Rp)

672,670

124,900

797,570

418,423

87,500

505,923

442.18

415,362

93,700

509,062

453,812

93,700

547,512

156.04

559,860

102,200

662,060

402.53

457,363

92,700

550,063

73.16

471717

93498

565215

1074

POTENSI PENGHEMATAN PERTAHUN :

1124.66- 1073.91= 50.75 Milyar

50

PLTU PAITON BARU


ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

TARAHAN
A KALSEL
B LRC / KALSEL
KALTIM
KALSEL

Vol/Thn %

1260 64%
400

20%

180

9%

135

7%
100
%

Rata2 Tertimbang 1975

RUTE IDEAL

PEMASOK
TARAHAN
A KALSEL
B LRC / KALSEL
KALSEL
KALSEL
KALSEL

0%

Vol/Th
n

0%

1185 60%
395

20%

0%

197,5 10%

197,5 10%
100
Rata2 Tertimbang 1975
%

CV

Jarak
(NM)

4900

630

4200

270

4200

288

4200

524

4200

327

4200

CV

FOB

301

Jarak
(NM)

4900 630
4200 270
4200 288
4700 355
4250 325
4200 327
4205 285

FREIGHT

CIF

Biaya
Penyediaan
Batubara
(Miliar Rp)

672,670

171,500 844,170

418,423

85,500

503,923

634.94

498,630

94,100

592,730

237.09

430,669

148,700

579,369

104.29

413,525

103,100

516,625

69.74

435449

FOB

94205

FREIGHT

529654

CIF

1046.07

Biaya Penyediaan
Batubara
(Miliar Rp)

672.670

171.500

844.170

418.423

85.500

503.923

597,15

498.630

94.100

592.730

234,13

559.860

109.600

669.460

396.382

102.700

499.082

98,57

413.525

103.100

516.625

102,03

431771

90700

522471

1031,88

POTENSI PENGHEMATAN PERTAHUN :

1046.07 - 1031.71 = 14.59 Milyar

51

PLTU PACITAN
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

TARAHAN
KALSEL
B MRC / KALSEL
KALSEL
Rata2 Tertimbang

PEMASOK

RUTE IDEAL

TARAHAN

Vol/Thn %

CV

Jarak
(NM)

4900

560

4200

513

4500

524

4200
11%
100
4361
1186
%

582

255

22%

756

64%

40

3%

135

Vol/
Thn

0%

A KALSEL

CV

531
Jarak
(NM)

237.2 20%

161,900 834,570

212.82

418,423

170,200

588,623

445.00

453,812

148,700

602,512

24.10

413,525

162,200

575,725

77.72

473724

FOB

166780

FREIGHT

640504

CIF

759.64

Biaya Penyediaan
Batubara
(Miliar Rp)

4200

513

418,42
3

170,200

588,623

279.24

4500

524

453,81
2

148,700

602,512

142.92

4200

582

413,52
5

162,200

575,725

68.28

4250

610

396,38
2

168,500

564,882

133.99

118.6 10%
KALSEL

672,670

Biaya Penyediaan
Batubara
(Miliar Rp)

CIF

560

237.2 20%
KALSEL

FREIGHT

4900

474.4 40%
B MRC / KALSEL

FOB

672,670

161,900 834,570

4700 641 559,86


175,700 735,560
0
118.6 10%
100
POTENSI
PERTAHUN
:
Rata2
TertimbangPENGHEMATAN
1186
4320
554 434747
165310
600057
%
KALSEL

759.64 - 712.67= 47.97 Milyar

87.24
712

52

PLTU ADIPALA
ELECTRICITY FOR A BETTER LIFE

RUTE EKSISTING
PEMASOK

A KALSEL
B LRC / KALSEL
KALSEL
Rata2 Tertimbang

Vol/Thn %

CV

4900

358

4200

673

4200

731

4200
19%
100
4305
1879
%

756

282

15%

940

50%

301

16%

357

RUTE IDEAL
PEMASOK

TARAHAN
A KALSEL
KALSEL
B LRC / KALSEL
KALSEL
Rata2 Tertimbang

Jarak
(NM)

Vol/Thn %

CV

651

Jarak
(NM)

4900

358

4200

673

4700

786

4200

731

4250
20%
100
1879
4305
%

756

188

10%

940

50%

94

5%

282

15%

376

672

FOB

FREIGHT

672,670

CIF

109,300 781,970

Biaya Penyediaan
Batubara
(Miliar Rp)
220.40

418,423

177,300

595,723

559.68

398,003

196,700

594,703

178.79

413,525

202,400

615,925

219.89

452362

FOB

672,670

174973

FREIGHT

627335

CIF

109,300 781,970

1178.76

Biaya
Penyediaan
Batubara
(Miliar Rp)
146.93

418,423

177,300

595,723

559.68

559,860

209,400

769,260

72.27

398,003

196,700

594,703

167.62

396,382

202,400

598,782

225.02

443448

180035

623483

1171.53

POTENSI PENGHEMATAN PERTAHUN :

1178.76 - 1171.53 = 7.24 Milyar

53

PLTU YANG BEROPERASI TAHUN 2016


ELECTRICITY FOR A BETTER LIFE

STRATEGI PENGIRIMAN BATUBARA


ELECTRICITY FOR A BETTER LIFE

Ada beberapa model sistem pengiriman yang digunakan dalam kajian ini:
A. Direct Shipment
Setiap armada langsung bergerak dari pelabuhan muat ke pelabuhan bongkar
Contoh : Tongkang (yang dapat sandar di PLTU) bergerak dari pel.muat Satui ke pel.bongkar
PLTU tujuan.

PEMASOK

PLTU

Dalam kajian ini umumnya digunakan armada tongkang untuk model direct.

Strategi Pengiriman Batubara


ELECTRICITY FOR A BETTER LIFE

B. Milk Runs

Setiap armada bergerak dari satu pelabuhan muat (supplier) ke beberapa pelabuhan bongkar (berhenti
di beberapa tempat)

PEMASOK

ANCHORAGE

PLTU A

PLTU B
ANCHORAGE

Contoh : Kapal bergerak dari pel.muat Satui ke posisi dekat pel.bongkar PLTU Tidore (jarak kapal
sekitar 6 Nmil dari pel.bongkar PLTU Tidore) dan bongkar sebagian muatan ke Tongkang yang dapat
sandar di PLTU Tidore (Transhipment) kemudian kapal bergerak kembali ke posisi dekat pel.bongkar
PLTU Ampana dan bongkar sisa muatan ke Tongkang (Transhipment) yang dapat sandar di pel.bongkar
PLTU Ampana.

Strategi Pengiriman Batubara


ELECTRICITY FOR A BETTER LIFE

C. Hub-and-spoke

Setiap armada bergerak dari (hanya) satu pelabuhan muat ke (satu) pelabuhan bongkar yang
kemudian didistribusikan kembali (oleh armada lain) ke beberapa pelabuhan bongkar.

PLTU A

PEMASOK

ANCHORAGE

PLTU B

Contoh : Kapal bergerak dari pel.muat Satui ke posisi dekat pel.bongkar PLTU Lombok (jarak kapal
sekitar 6 Nmil dari pel.bongkar PLTU Lombok) yang kemudian muatan dibongkar ke beberapa
Tongkang (yang dapat sandar di pel.bongkar PLTU) ke pel.bongkar PLTU Lombok

Strategi pengiriman batubara


ELECTRICITY FOR A BETTER LIFE

D. Milk

Runs with Hub-and-spoke

Setiap armada bergerak dari (hanya) satu pelabuhan muat yang bergerak ke beberapa pelabuhan bongkar
(berhenti di beberapa tempat) kemudian didistribusikan (oleh armada lain) ke beberapa pelabuhan bongkar.

PEMASOK

ANCHORAGE

PLTU A

PLTU B

ANCHORAGE

PLTU C

Contoh : Kapal bergerak dari pel. Muat Satui ke posisi dekat pel.bongkar PLTU Ropa (jarak kapal sekitar 6
Nmil dari pel.bongkar PLTU Ropa) yang kemudian muatan dibongkar ke Tongkang (yang dapat sandar di pel.
Bongkar PLTU) ke pel.bongkar PLTU Ropa kemudian kapal bergerak ke posisi dekat Pel.bongkar PLTU
Kupang (jarak kapal sekitar 6 Nmil dari pel.bongkar PLTU Kupang) yang kemudian muatan dibongkar ke
beberapa tongkang (yang dapat sandar di pel. Bongkar PLTU) ke pel. Bongkar PLTU Kupang dan pel.
Bongkar PLTU Rote

ELECTRICITY FOR A BETTER LIFE

Terima kasih

ELECTRICITY FOR A BETTER LIFE

RUPTL 2015-2024
PT PLN (PERSERO)

Indonesia Coal Reference (HBA)


2010 Juni 2015
ELECTRICITY FOR A BETTER LIFE

150.

130.

USD/Tonnes

110.

90.

70.

50.
Jan-14

Apr-14

PT PLN (Persero)

Jul-14

Oct-14

Jan-15

Apr-15

Jul-15

Oct-15

Jan-16

Apr-16

Jul-16

Oct-16

Jan-17

Apr-17

Jul-17

Oct-17

Jan-18

Apr-18

Jul-18

Oct-18

Jan-19

Apr-19

61

ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

KAPAN INDONESIA MENGIMPORT BATUBARA

62

2036, INDONESIA IMPORT BATUBARA


ELECTRICITY FOR A BETTER LIFE

Jika pertumbuhan Pembangkit PLTU + ekspor batubara adalah 8.4%, maka :


Kebutuhan PLN + Ekspor batubara Indonesia :

Reserved batubara Indonesia :

7.014 + 24.356 = 31.370 Milyar Ton (2036)

31.360 Milyar Ton

PT PLN (Persero)

63

RUPTL 2015 - 2024


ELECTRICITY FOR A BETTER LIFE

RUPTL 2015 2024 disahkan oleh Menteri ESDM melalui


Keputusan Menteri ESDM tgl 12 Januari 2015,
No 0074.K/021/MEM/2015.
Program 35 GW merupakan salah satu program percepatan pembangunan sektor
tenaga listrik yang sudah tercantum dalam RUPTL 2015 - 2019
64

Tambahan Infrastruktur Kelistrikan 2015-2024


Pembangunan Infrastruktur Kelistrikan 20152024

ELECTRICITY FOR A BETTER LIFE

2015

Oleh PLN:
Pembangkit:
Transmisi

70,4 GW
63 ribu kms

Gardu Induk: 145 GVA

2024

Kebutuhan Capex:
Rp 1586 T

Untuk menopang pertumbuhan ekonomi 6,7% (Draft RPJMN


Bappenas), dengan pertumbuhan kebutuhan listrik 8,7% dan Rasio
elektrifikasi 99,4%.
65

42

Kapasitas Pembangkit PLN dan IPP Tahun 2009-2014


ELECTRICITY FOR A BETTER LIFE

66

Kapasitas Pembangkit PLN dan IPP Tahun 2010-2014


ELECTRICITY FOR A BETTER LIFE

67

Hasil Prakiraan Kebutuhan Listrik 2015-2024


ELECTRICITY FOR A BETTER LIFE

464
TWh
57
23
TWh TWh

Kalimantan: 10,4%
31
TWh

IT :11,1%

83
TWh

Maluku: 10,3%
219
TWh

Sulawesi: 12,4%

Sumatera: 11,6%

Papua: 9,4%
165 324
TWh TWh

Nusa Tenggara: 9,6%


JB : 7,8%
Tahun

2014

2015

2016

2015
2017

2018

2019

2020

2021

2022

2024

Indonesia:
8,7%
2023
2024

Kebutuhan (TWh)

202

219

239

260

283

307

332

361

392

427

464

Rasio Elektrifikasi

82.4

85.7

89,3

91,6

93,8

95,5

96,5

97,0

97,2

97,4

97,6

Rasio Elektrifikasi
(PLN & Non PLN)

84.4

87.7

91.3

93.6

95.8

97.4

98.4

98.9

99.1

99.3

99.4
68

Tambahan Kapasitas Pembangkit


MW

ELECTRICITY FOR A BETTER LIFE

Total tambahan kapasitas 2015-2024


sekitar 70,4 GW.
Alokasi proyek pembangkit PLN dan IPP
hanya untuk proyek-proyek pembangkit
yang telah on going dan committed.
Proyek yang belum ditetapkan
pengembang maupun sumber
pendanaannya disebut proyek
Unallocated.
MW

Per Jenis Pembangkit

Tambahan Kapasitas :
PLTU : 42,0 GW
PLTP : 4,8 GW
PLTGU : 9,2 GW
PLTG/PLTMG : 5,0 GW
PLTA/PLTM : 9,3 GW
Lainnya : 0,1 GW
69

Tambahan Kapasitas Pembangkit


ELECTRICITY FOR A BETTER LIFE

Total tambahan kapasitas 2015-2024 sekitar 70,4 GW.


70

Tambahan Infrastruktur Kelistrikan 2015-2019


Pembangunan Infrastruktur Kelistrikan 20152019: 42,7 GW,

Oleh PLN:

ELECTRICITY FOR A BETTER LIFE

2015

Oleh Swasta:

Pembangkit:

17,8 GW

Pembangkit:

24,9 GW

Transmisi

50 ribu kms

Transmisi

360 kms

Gardu Induk: 743 lokasi

2019

Kebutuhan Capex:
Rp 520 T

Kebutuhan Capex:
Rp 482 T

Untuk menopang pertumbuhan ekonomi 6,7% (Draft RPJMN


Bappenas), dengan pertumbuhan kebutuhan listrik 8,8% dan Rasio
elektrifikasi 97,2%.
71

49

Penambahan Kapasitas tahun 2015 -2019


ELECTRICITY FOR A BETTER LIFE

Pembangkitan

Transmisi dan GI

72

50

Tambahan Infrastruktur Kelistrikan 2015-2019 (tanpa konstruksi)


ELECTRICITY FOR A BETTER LIFE

Sumatera:
PLN : 1.108 MW
IPP : 7.632 MW
Total : 8.740 MW

Kalimantan:
PLN : 916 MW
IPP : 955 MW
Total : 1.871 MW

Sulawesi:
PLN : 2.022 MW
IPP : 682 MW
Total : 2.704 MW

Sulawesi

Java-Bali

Jawa-Bali:
PLN : 5.019 MW
IPP : 15.872 MW
Total : 20.891 MW

Papua:
PLN : 224 MW
IPP : 118 MW
Total : 342 MW

Maluku

Kalimantan

Sumatera

Maluku:
PLN : 259 MW
IPP : 20 MW
Total : 279 MW

Papua

Nusa Tenggara

Nusa Tenggara:
PLN : 675 MW
IPP : 26 MW
Total : 701 MW

Indonesia:
PLN : 10.223 MW
IPP : 25.305 MW
Total : 35.529 MW
51

Jenis Pembangkit 35 GW
ELECTRICITY FOR A BETTER LIFE

74

Komposisi Program 35 GW
ELECTRICITY FOR A BETTER LIFE

75

Program Pembangkitan 35.000 MW


ELECTRICITY FOR A BETTER LIFE

35.000 MW

PLN : 10.223 MW

76

IPP : 25.686 MW

Kapasitas MW

Lokasi

Kapasitas MW

5.019

Jawa-Bali

15.872

1.108

Sumatera

7.632

916

Kalimantan

955

2.022

Sulawesi

682

1.158

Nusa/Maluku/Papua

164

Komposisi Fuel Mix Sumatera (TWh)


ELECTRICITY FOR A BETTER LIFE

LNG

Gas

Batubara
BBM

Panas Bumi
Air

77

Komposisi Fuel Mix Sumatera (%)


ELECTRICITY FOR A BETTER LIFE

Tahun 2015
Prod. Energi 38 TWh

Tahun 2024
Prod. Energi 106 TWh

78

Basis Data Kualitas Batubara


ELECTRICITY FOR A BETTER LIFE

PT PLN (Persero)

79

Komposisi Fuel Mix Jawa-Bali (TWh)


ELECTRICITY FOR A BETTER LIFE

LNG
Gas

BBM

Batubara

Panas Bumi
Air

80

Komposisi Fuel Mix Jawa-Bali (%)


ELECTRICITY FOR A BETTER LIFE

Tahun 2015
Prod. Energi 188 TWh

Tahun 2024
Prod. Energi 377 TWh

81

Komposisi Fuel Mix Indonesia Timur (Wh)


ELECTRICITY FOR A BETTER LIFE

LNG
Gas

BBM

Batubara

Impor

Panas Bumi
Air

82

Komposisi Fuel Mix Indonesia Timur (%)


ELECTRICITY FOR A BETTER LIFE

Tahun 2015
Prod. Energi 26 TWh

Tahun 2024
Prod. Energi 66 TWh

83

Rencana Pengembangan Sistem Kelistrikan Sumatera


ELECTRICITY FOR A BETTER LIFE

Disclaimer: Lokasi Pembangkit maupun GI hanya


indikatif awal

84

Rencana Pengembangan Sistem Kelistrikan Babel


ELECTRICITY FOR A BETTER LIFE

Disclaimer: Lokasi Pembangkit maupun GI


hanya indikatif awal
85

Rencana Pengembangan Sistem Kelistrikan Jawa Bali


ELECTRICITY FOR A BETTER LIFE

Disclaimer: Lokasi Pembangkit maupun GI hanya


indikatif awal

Rencana Pengembangan Sistem Kelistrikan Kalimantan


ELECTRICITY FOR A BETTER LIFE

Disclaimer: Lokasi Pembangkit maupun GI hanya indikatif awal


87

Rencana Pengembangan Sistem Kelistrikan Sulawesi


Disclaimer: Lokasi
Pembangkit maupun GI
hanya indikatif awal

ELECTRICITY FOR A BETTER LIFE

88

Rencana Pengembangan Sistem Kelistrikan Papua


ELECTRICITY FOR A BETTER LIFE

1
2
3

70

SAAT INI: SOURCING BATUBARA UNTUK PLTU PLN


PLTU SUMATERA

ELECTRICITY FOR A BETTER LIFE

1.: Nagan Raya CFPP ( 2 x 110 MW) - CFB


2 : Tj. Balai Karimun CFPP (2 x 7 MW) - Stoker
3 : Galang Batang CFPP (2x 15 MW) - Stoker
4.:Bangka Baru CFPP (2 x 30 MW) - CFB
5.: Tarahan Baru CFPP (2 x 100 MW) - CFB
6 : Bukit Asam CFPP ( 4 x 65 MW) - PC
7 : Teluk Sirih CFPP (2 x 112 MW) - CFB
8.: Ombilin CFPP (2 x 100 MW) PC
9.: Tj. Kasam Batam (2 x 55 MW) CFB

PLTU SULAWESI
PLTU PAPUA

TAMBANG DI KALTIM

TAMBANG DI KALSEL
TAMBANG DI SUMSEL

PLTU JAWA
1.: Labuan CFPP ( 2 x 315 MW) - PC
2 : Suralaya CFPP ( 4 x 400 MW, 3 x 600 MW, 1 x 625 MW) - PC
3 : Lontar CFPP ( 3 x 315 MW) - PC
4 : Indramayu CFPP ( 3 x 330 MW) - PC
5 : Rembang CFPP ( 2 x 315 MW) - PC
6 : Tj. Awar Awar CFPP (2 x 350 MW) - PC
7 : Paiton CFPP (1 x 660 MW) - PC
8 : Pacitan CFPP (2 x 315 MW) - PC
9 : Adipala CFPP (1 x 660 MW) - PC
10.: Pelabuhan Ratu CFPP (3 x 350 MW) - PC
11.: Tanjung Jati B CFPP (4 x 660 MW) PC + FGD

PLTU SULAWESI & NUSRA


1.: Endog CFPP ( 1 x 25 MW) - CFB
2 : Ropa CFPP ( 2 x 7 MW) - Stoker
3 : Barru CFPP (2 x 50 MW) - CFB
4 : Amurang CFPP (2 x 25 MW) - CFB
5.: Ternate CFPP (2 x 7 MW) - Stoker

ELECTRICITY FOR A BETTER LIFE

Kemajuan Pembangunan Pembangkit 7.000 MW (carry over)

Kemajuan Pembangunan Pembangkit 35.000 MW

Kemajuan Pembangunan Transmisi dan Gardu Induk

Action yang Dibutuhkan

PT PLN (Persero)

91

Status Kemajuan Pembangunan Pembangkit 7.000 MW


ELECTRICITY FOR A BETTER LIFE

Komposisi Kepemilikan
berdasarkan Kapasitas
(dalam MW)

Kemajuan Berdasarkan Kepemilikan


0-25%
Kepemilikan

25-50%

50-75%

75-100%

KapaKapaKapaKapaJumlah
Jumlah
Jumlah
Jumlah
sitas
sitas
sitas
sitas
Proyek
Proyek
Proyek
Proyek
(MW)
(MW)
(MW)
(MW)

Total
MW

Total
Proyek

PLN

835

10

172

615

14 2.571

22

4.193

50

IPP

437

10

467

673

3 1.641

10

3.218

29

639
10 1.288
17 4.212
32
25-50%
50-75%
75-100%

7.411

79

43%
57%

Kemajuan Berdasarkan Lokasi


Total
Lokasi

Jumlah proyek yang dapat


diselesaikan (Commercial Operation
Date/COD) di tahun 2015 direncanakan
mencapai 23 proyek setara 3.481 MW

1.272
20
0-25%

KapaKapaKapaKapaJumlah
Jumlah
Jumlah
Jumlah
sitas
sitas
sitas
sitas
Proyek
Proyek
Proyek
Proyek
(MW)
(MW)
(MW)
(MW)

Total
MW

Total
Proyek

Sumatera

660

431

200

1 1.295

2.586

17

Jawa-Bali

65

30

643

2 2.234

2.972

12

Kalimantan

66

70

324

521

981

18

481

10

80

85

108

754

26

Sulawesi &
Nusa Tenggara

Pembangkit 7.000 MW berisi pembangkit-pembangkit


yang telah memasuki tahap
pembangkit
Maluku & Papua
28 konstruksi,
1
36yang meliputi
2
54
3 FTP-1,
118 FTP- 6
2 dan Reguler.
Kelompok mencerminkan kemajuan fisik konstruksi.
Total
1.272
20
639
10 1.288
17 4.212
32 7.411
79
PT PLN (Persero)

92

Daftar Proyek yang akan COD pada tahun 2015


ELECTRICITY FOR A BETTER LIFE

Target pembangkit COD tahun 2015


Juli
Agustus
September
Oktober
November
Desember
Kepemilikan
Total Total
KapaKapaKapaKapaKapaKapaAset
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah MW Proyek
sitas
sitas
sitas
sitas
sitas
sitas
Proyek
Proyek
Proyek
Proyek
Proyek
Proyek
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)

PLN

440

776

430

6 1.653

15

IPP

630

300

659

239

2 1.828

Grand Total

637

440

776

300

659

669

8 3.481

23

Januari Juni 2015:


Recovery PLTU Nagan Raya (100 MW)
Recovery (90 MW) dan regasifikasi (530 MW) PLTG Belawan
Penyelesaian pemadaman di Medan sejak bulan Mei 2015 sehingga pelanggan baru bisa disambung secara bertahap sebesar
74,72 MVA dengan jumlah pelanggan 19.350 dimulai sejak bulan Juni 2015
Penyelesaian transmisi Celukan Bawang, Bali
Penyelesaian PLTMG Pesanggaran, Bali (200 MW)
Penyelesaian AMDAL PLTU Indramayu 4 (1.000 MW)
Penyelesaian 68 kontrak PLTD Tersebar untuk daerah perbatasan dan pulau terluar

PT PLN (Persero)

93

Daftar Proyek PLN yang akan COD pada tahun 2015


ELECTRICITY FOR A BETTER LIFE

No
1
2

Pembangkit
PLTU Ende (FTP1)
PLTU Pangkalan Susu #1,2
(FTP1)

Pemilik

Kapasitas
(MW)

Target COD

PLN

Juli 2015

PLN

440

Agustus 2015

PLTMG Arun

PLN

200

September 2015

PLTU Air Anyer

PLN

30

September 2015

PLTMG Bangkanai (FTP2)

PLN

155

September 2015

PLTU Belitung Baru (FTP1)

PLN

17

September 2015

PLTU Kendari Ekspansi

PLN

10

September 2015

PLTU Tanjung Awar-awar

PLN

350

September 2015

PLTU Tidore (FTP1)

PLN

14

September 2015

10

PLTU Jayapura - Holtekamp

PLN

20

Desember 2015

11

PLTU Lombok (FTP1)

PLN

50

Desember 2015

12

PLTA Orya

PLN

20

Desember 2015

13

PLTM PLTM Tersebar NTT

PLN

0,4

Desember 2015

PLTU Pulang Pisau (FTP1)

PLN

120

Desember 2015

PT PLN (Persero)
14

94

Daftar Proyek IPP yang akan COD pada tahun 2015


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

Pemilik

Kapasitas
(MW)

Target COD

PLTU Celukan Bawang

IPP

380

Juli 2015

PLTP Kamojang 5 (FTP2)

IPP

30

Juli 2015

PLTU Banjarsari

IPP

220

Juli 2015

PLTU Sumsel - 5

IPP

300

Oktober 2015

PLTU Cilacap exp

IPP

614

November 2015

PLTA Wampu (FTP2)

IPP

45

November 2015

PLTU Bau-Bau

IPP

14

Desember 2015

PLTU Keban Agung

IPP

225

Desember 2015

TOTAL

PT PLN (Persero)

1.828

95

ELECTRICITY FOR A BETTER LIFE

Kemajuan Pembangunan Pembangkit 7.000 MW (carry over)

Kemajuan Pembangunan Pembangkit 35.000 MW

Kemajuan Pembangunan Transmisi dan Gardu Induk

Action yang Dibutuhkan

PT PLN (Persero)

96

Status Kemajuan Pembangkit Program 35.000 MW


ELECTRICITY FOR A BETTER LIFE

Komposisi Kepemilikan
berdasarkan Kapasitas
(dalam MW)

Berdasarkan Kepemilikan dan Fase


Perencanaan
Kepemilikan

28%
PLN

284

Total
72%

Pembangkit 35.000 MW termasuk


pembangkit PLTM dan PLTMH
tersebar.
Hingga akhir 2015, direncanakan akan
dilakukan penandatanganan kontrak
EPC atau Power Purchase Agreement
(PPA) untuk 48 proyek setara 21.589
MW

TOTAL

6.909

68

130

9.945

102

15
20.703
66 Fase
4.597
Berdasarkan
Lokasi dan

29

25.584

110

35.529
TOTAL

212

27.612
134
Pengadaan

4.727
34
Konstruksi

Kapasitas Jumlah Kapasitas Jumlah Kapasitas Jumlah Kapasitas Jumlah


(MW)
Proyek
(MW)
Proyek
(MW)
Proyek
(MW)
Proyek

Sumatera

909

17

6.370

36

1.462

8.741

59

Jawa-Bali

1.150

17.494

24

2.247

11

20.891

37

Kalimantan

335

1.036

13

500

1.871

22

Sulawesi &
Nusa Tenggara

751

14

2.242

35

413

3.406

57

Maluku & Papua

45

470

26

105

620

37

3.190

44

27.612

134

4.727

34

35.529

212

Total

PT PLN (Persero)

29

3.190
44
Perencanaan
Lokasi

Konstruksi

Kapasitas Jumlah Kapasitas Jumlah Kapasitas Jumlah Kapasitas Jumlah


(MW)
Proyek
(MW)
Proyek
(MW)
Proyek
(MW)
Proyek
2.906

IPP

Pengadaan

97

Status Kemajuan Pembangunan Pembangkit PLN 10.000 MW yang Merupakan


Bagian dari Pembangkit 35.000 MW
ELECTRICITY FOR A BETTER LIFE

Berdasarkan Lokasi dan Fase


Lokasi

Perencanaan
Kapasitas
Jumlah
(MW)
Proyek

Pengadaan
Kapasitas
Jumlah
(MW)
Proyek

Konstruksi
Kapasitas
Jumlah
(MW)
Proyek

TOTAL
Kapasitas
Jumlah
(MW)
Proyek

Sumatera

655

503

1.158

10

Jawa-Bali

1.150

3.755

114

5.019

10

315

401

716

11

12

2.543

40

Kalimantan

Sulawesi & Nusa Tenggara


751
14
1.780
24
Pembangkit 10.000 MW termasuk pembangkit-pembangkit PLTM dan PLTMH tersebar
Maluku & Papua
TOTAL

PT PLN (Persero)

35

470

26

509

31

2.906

29

6.909

68

130

9.945

102

98

Daftar Proyek yang akan tanda tangan kontrak EPC/PPA


ELECTRICITY FOR A BETTER LIFE

Target penandatangan kontrak EPC dan PPA tahun 2015


Juli
Agustus
September
Oktober
November
Desember
Kepemilikan
Total Total
KapaKapaKapaKapaKapaKapaAset
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah MW Proyek
sitas
sitas
sitas
sitas
sitas
sitas
Proyek
Proyek
Proyek
Proyek
Proyek
Proyek
(MW)

(MW)

(MW)

(MW)

(MW)

(MW)

PLN

550

315

150

2.880

2.474

6.369

15

IPP

40

2.200

1.200

4.100

6.656

1.024

13

15.220

33

Grand Total

590

2.515

1.350

4.100

9.536

13

3.498

20

21.589

48

PT PLN (Persero)

99

Daftar Proyek PLN yang akan melakukan penandatanganan kontrak


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

Pemilik

Kapasitas
(MW)

Target Kontrak

PLTG/MG Gorontalo Peaker

PLN

100

Juli 2015

PLTGU Grati Peaker

PLN

450

Juli 2015

PLTU Lontar Ekspansi

PLN

315

Agustus 2015

PLTGU Lombok Peaker

PLN

150

September 2015

PLTU Kalselteng 2

PLN

200

November 2015

PLTG/PLTMG Mobile Power


Plant Tersebar

PLN

1.565

November 2015

PLTMG Tersebar

PLN

665

November 2015

PLTGU/MGU Tersebar

PLN

450

November 2015

PLTA Asahan III

PLN

174

Desember 2015

10

PLTGU Muara Karang Peaker

PLN

500

Desember 2015

11

PLTGU Jawa 2 (Tj. Priok)

PLN

800

Desember 2015

12

PLTGU Muara Tawar Add On


Unit 2,3,4

PLN

650

Desember 2015

13

PLTU Sulsel Barru 2

PLN

100

Desember 2015

PLTU Palu 3

PLN

100

Desember 2015

PT PLN (Persero)

14

100

Daftar Proyek IPP yang akan melakukan penandatanganan kontrak (1/2)


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

Pemilik

Kapasitas
(MW)

Target Kontrak/PPA

PLTA Hasang (FTP2)

IPP

40

Juli 2015

PLTU Jawa-1 (Exp. Cirebon)

IPP

1.000

Agustus 2015

IPP

200

Agustus 2015

PLTU Kaltim 4 ( Exp-2


Embalut)

PLTU Jawa-8 (Exp. Cilacap)

IPP

1.000

Agustus 2015

PLTU Sumbagsel-1 MT

IPP

300

September 2015

PLTU Bengkulu

IPP

200

September 2015

PLTU Sulbagut 1

IPP

100

September 2015

PLTU Sumsel-1 MT

IPP

600

September 2015

PLTG Bangka Peaker

IPP

100

Oktober 2015

10

PLTU Jawa-5 (FTP2)

IPP

2.000

Oktober 2015

11

PLTU Jawa-7

IPP

2.000

Oktober 2015

12

PLTU Sumsel 9

IPP

1.200

November 2015

13

PLTU Sumsel 10

IPP

600

November 2015

PLTU Kalbar-1

IPP

200

November 2015

PT PLN (Persero)

14

101

Daftar Proyek IPP yang akan melakukan penandatanganan kontrak (2/2)


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

Pemilik

Kapasitas
(MW)

Target Kontrak/PPA

21

PLTG/MG Pontianak Peaker

IPP

100

Desember 2015

IPP

500

Desember 2015

22

PLTGU/MGU Peaker JawaBali 3

23

PLTG/MG Jambi Peaker

IPP

100

Desember 2015

24

PLTU Sulut-3

IPP

100

Desember 2015

25

PLTG/MG TB. Karimun

IPP

40

Desember 2015

26

PLTG/MG Natuna-2

IPP

25

Desember 2015

27

PLTMG Tanjung Pinang 2

IPP

30

Desember 2015

28

PLTMG Dabo Singkep - 1

IPP

16

Desember 2015

29

PLTMG Bengkalis

IPP

18

Desember 2015

30

PLTMG Selat Panjang -1

IPP

15

Desember 2015

31

PLTMG Tanjung batu

IPP

15

Desember 2015

32

PLTG/MG Belitung

IPP

30

Desember 2015

33

PLTG/U Senipah Exp. (ST)

IPP

35

Desember 2015

PT PLN (Persero)

TOTAL

15.220

102

ELECTRICITY FOR A BETTER LIFE

Kemajuan Pembangunan Pembangkit 7.000 MW (carry over)

Kemajuan Pembangunan Pembangkit 35.000 MW

Kemajuan Pembangunan Transmisi dan Gardu Induk

Action yang Dibutuhkan

PT PLN (Persero)

103

Daftar Proyek dengan Kemajuan Konstruksi 0-25%


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

Pemilik

Kapasitas (MW) Kemajuan Konstruksi

PLTU Alor

PLN

21%

PLTU Ampana

PLN

18,60%

PLTGU Batang Hari

PLN

40

2% (terminasi)

PLTU Bima (FTP1)

PLN

20

2%

PLTU Gorontalo (FTP1)

PLN

50

7,84%

PLTU Kaltim (MT)

IPP

55

15%

PLTU Kuala Pambuang

PLN

13,50%

PLTP Lahendong V & VI

IPP

40

20%

PLTU Lati (Ekspansi)

IPP

0%

10

PLTP Lumut Balai (FTP2)

IPP

110

20%

11

PLTU Mamuju

IPP

50

20%

PLN

400

0%

PLTM Tersebar JB

IPP

22%

PLTM Tersebar JB

IPP

0%

12
13
PT PLN (Persero)

14

PLTU Pangkalan Susu #3 & #4


(FTP2)

Back
104

Daftar Proyek dengan Kemajuan Konstruksi 25-50%


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

Pemilik

Kapasitas (MW) Kemajuan Konstruksi

PLTP Karaha Bodas (FTP2)

IPP

30

30%

PLTU Kupang

IPP

30

40%

PLTU Lombok Timur

IPP

50

30%

PLTU Malinau

PLN

46,90%

PLTA Peusangan 1-2

PLN

88

42,88%

PLTMH Tersebar Sumsel

IPP

13

34%

PLTU Sampit

PLN

50

34,20%

PLTP Sarulla I (FTP2)

IPP

330

50%

PLTU Tanah Grogot

IPP

14

42%

10

PLTU Timika

PLN

28

27,50%

Back
PT PLN (Persero)

105

Daftar Proyek dengan Kemajuan Konstruksi 50-75%


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

Pemilik

Kapasitas (MW) Kemajuan Konstruksi

PLTMG Arun Peaker

PLN

200

67,73%

PLTU Atambua

PLN

24

70%

PLTMG Bangkanai (FTP2)

PLN

155

73.93%

PLTU Banten

IPP

625

75%

PLTU Ketapang

PLN

20

64,40%

PLTU Kotabaru

PLN

14

54,71%

PLTU Parit Baru (FTP2)

PLN

100

53,90%

PLTM Tersebar JB

IPP

18

72%

PLTM Tersebar Sultra

PLN

4,8

51%

10

PLTU Rote Ndao

PLN

63,80%

11

PLTU Sintang

PLN

21

71%

12

PLTU Sofifi

PLN

56,20%

13

PLTU Sumbawa Barat

PLN

14

68,10%

Back

PLTU Talaud

PLN

59,60%

106

14
PT PLN (Persero)

Daftar Proyek dengan Kemajuan Konstruksi 75-100%


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

Pemilik

Kapasitas (MW) Kemajuan Konstruksi

PLTU Adipala

PLN

660

98.70%

PLTU Air Anyer

PLN

30

98,22%

PLTU Bau-Bau

IPP

14

95%

PLTU Belitung Baru (FTP1)

PLN

17

97,50%

PLTU Celukan Bawang

IPP

380

97%

PLTU Cilacap exp

IPP

614

90%

PLTU Ende (FTP1)

PLN

93,80%

PLTU Jayapura - Holtekamp

PLN

20

94,90%

PLTP Kamojang 5 (FTP2)

IPP

30

97,00%

10

PLTU Keban Agung

IPP

225

95%

11

PLTU Kendari Ekspansi

PLN

10

81,80%

12

PLTU Ketapang (IPP)

IPP

12

77%

13

PLTU Kupang (FTP1)

PLN

16,5

100%

PLTU Lombok (FTP1)

PLN

50

92,70%

PT PLN (Persero)
14

Back
107

Daftar Proyek dengan Kemajuan Konstruksi 75-100%


ELECTRICITY FOR A BETTER LIFE

No

Pembangkit

20

PLTM Tersebar NTT

PLN

0,4

100%

21

PLTM Tersebar NTT

PLN

0,4

90%

22

PLTM Tersebar Sulsel

IPP

10,5

91%

23

PLTM PLTM Tersebar Sumut

IPP

10,9

84%

24

PLTU Pulang Pisau (FTP1)

PLN

120

87,89%

PLN

220

93,88%

25

PLTU Riau (Amandemen


FTP1)

Pemilik

Kapasitas (MW) Kemajuan Konstruksi

26

PLTU Sumsel - 5

IPP

300

89%

27

PLTU Tanjung Awar-awar

PLN

350

97.53%

28

PLTU Tanjung Redep

PLN

14

75,13%

29

PLTU TB Karimun FTP1

PLN

100,00%

30

PLTU Teluk Balikpapan

PLN

220

93,52%

31

PLTU Tidore (FTP1)

PLN

14

95,30%

32

PLTA Wampu (FTP2)

IPP

45

90%

PT PLN (Persero)

Back
108