Al-Sharg Factory for Steel Industries Co.Ltd.
Al-Tatwar Industrial Area-4, ste rral Work Creer
P.0.Box No. 40300, Zip Code 11499
Males : +966 1 265 3568 cee tees
cin +966 1 265 3578 Issued Date. (23/06/2016
at Riyadh - Delivery to Site. PGSA
jountry Kingdom of Saudi Arabia Delve bee ATHAGED
Customer:
Customer Code _P005 Customer RefNe CONTRACT
Customer Name _Permasteslisa Gartner Saudi Arabia LLC. || Ast Ref.No. Q-ASF-04016-2000RV1
Concerned Pers Accounts Department Liaison Person Zaid ‘Abu Nsair
Voice (001) 217-3761 Ext. 0913 ‘Shipping Methoc
Fax (001) 217-5232 Ext. 0000 Payment Terms = Cash
[City SS Riyadh dN Currency Z-SAR
Country Saudi Arabia Page No 1
Item's Description: Attachments
‘SUPPLY AND DELIVERY OF STEEL ITEM,
LABOR + MATERIAL + ERECTION
MATERIAL. A-36, S-275, GR.60, ASTM A 500 GRADE B. Engineering Deptt. Logistics Deptt.
PROJECT. METRO ELEVATED STATION.
SCOPE OF WORK. STEEL ELEVATED STATION. Drawings Drawings
DESCRIPTION (9 STATION AND EACH ONE IS 148 TONS) pecueni Documents
FINISHING.
SAND BLASTED + PAINTED FIRE PROOF PAINT echidna ars ec
OTHER NECESSARY INFORMATION IS ATTACHED, Drawings: Drawings
Documents Documents
‘Account Deptt, Procurement Deptt
Drawings Drawings
Documents Documents
‘ay [VotM | tiem Gode] Description
73140000 | Ton | Suso0607 | Stee Structure for Elevated Staton
43140000 | Ton | sLsot301 | Erestion for Stool Elvated Staton,
17,725.00 | sam | stso1aa5] Finishing (FIRE PROOF PAINT)
Isaued by user oo
epates by ar Far00g
Finance Defaltment
Printing Date & Time:
Master Number
25/06/2016 2:38:57 PM
3389Company: Al Shargq Factory for steel
System 25/06/2016 2:38:43 PM Pag 1
User Date: 25/06/2016 User ID:Omar
RECORD NOTES REPORT
Note ID: Created/Last Modified:
WO-2774 25/06/2016 2:38:36 PM
SCOPE OF WORK. STEEL ELEVATED STATION.
DESCRIPTION (9 STATION AND EACH ONE IS 146 TONS)
AREA OF SCOPE.
“ELEVATED STATION 3A1
“ELEVATED STATION 3A2
“ELEVATED STATION 3B1
“ELEVATED STATION 3¢2
“ELEVATED STATION 3D1
-ELEVATED STATION 3D2
“ELEVATED STATION 3D3
“ELEVATED STATION 3G1
“ELEVATED STATION 362
NOTE.
1- Design, Fabrication Drawings and NC Files will be Provided
by Client.
2- Tonnage & Quantities are provisional and might change based
on approve drawings.
3- Connecting Bolts and Nelson Studs are included.
4- Erection includes equipment and scaffoldings.
5- Excluded Civil Works, Coring and Third party testing.aN