Description
1 Excavation in footings
F6,F7,F10,F13
Unit
MEASUREMENT SHEET
No
L
B
1.8
1.5
13
1.5
1.3
5.575
0.23
5.7
0.23
7.33
0.23
m
m
m
m
2
2
1
2
2.73
4.25
5
2.185
0.23
0.23
0.23
0.23
2 Soil Filling
living room
bed room
bed room
veranda
puja room
dining
kitchen
wc
toilet
bedroom
staircase
m
m
m
m
m
m
m
m
m
m
m
1
1
1
1
1
1
1
1
1
1
1
5.88
4
3
5.88
2.2
4.115
3
1.3
2.255
4
3.33
4.2
3.07
3.4
1.6
2.085
3
3.355
1
1.3
3.355
2.085
3 Rubble Filling
In Footings
F6,F7,F10,F13
1.8
1.5
13
1.5
1.3
m
m
m
1
1
1
5.88
4
3
4.2
3.07
3.4
F1,F2,F3,F4,F5,F8,F9,F11,F12,
F14,F15,F16,F17
Excavation under wall
long wall
L=(10.105-.23)(1.3+1.5+1.5)=5.575
L=(11.93-.23)(1.5+3*1.5)=5.7
L=(13.56-.23)(.65+.75+3*1.5)=7.33
short wall
L=4.23-1.5=2.73
L=5.88-.65-.75-.23=4.25
L=5.88-.23-.65=5
L=3.355+.23-.65-.75=2.185
F1,F2,F3,F4,F5,F8,F9,F11,F12,
F14,F15,F16,F17
Plinth
living room
bed room
bed room
veranda
puja room
dining
kitchen
wc
toilet
bedroom
staircase
m
m
m
m
m
m
m
m
1
1
1
1
1
1
1
1
5.88
2.2
4.115
3
1.3
2.255
4
3.33
1.6
2.085
3
3.355
1
1.3
3.355
2.085
1.8
1.5
13
1.5
1.3
m
m
m
m
m
m
m
m
m
m
m
1
1
1
1
1
1
1
1
1
1
1
5.88
4
3
5.88
2.2
4.115
3
1.3
2.255
4
3.33
4.2
3.07
3.4
1.6
2.085
3
3.355
1
1.3
3.355
2.085
1.8
1.5
F1,F2,F3,F4,F5,F8,F9,F11,F12,
F14,F15,F16,F17
13
1.5
1.3
F6,F7,F10,F13
2.7
0.1485
F1,F2,F3,F4,F5,F8,F9,F11,F12,
F14,F15,F16,F17
13
1.95
0.092
0.35
0.23
C1,C2,C3,C4,C5,C8,C9,C11,C1
2,C14,C15,C16,C17
13
0.3
0.23
0.35
0.23
4 P.C.C Filling
In footing
F6,F7,F10,F13
F1,F2,F3,F4,F5,F8,F9,F11,F12,
F14,F15,F16,F17
In Plinth
living room
bed room
bed room
veranda
puja room
dining
kitchen
wc
toilet
bedroom
staircase
5 RCC
Footings
F6,F7,F10,F13
C1,C2,C3,C4,C5,C8,C9,C11,C1
2,C14,C15,C16,C17
13
0.3
0.23
PB1+PB2+PB3,PB4+PB5+PB6
PB14+PB15+PB16+PB17
PB24+PB25+PB26+PB27
PB11+PB10,PB12+PB13
PB18
PB19,PB22
PB7+PB8+PB9
PB20+PB21
PB23
m
m
m
m
m
m
m
m
m
2
1
1
2
1
1
1
1
1
9.045
10.43
12.13
9.415
2.085
6.2448
9.415
7.015
3.1
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
m
m
m
m
m
1
1
2
1
2
4.345
3.345
9.045
9.415
9.415
0.23
0.23
0.23
0.23
0.23
FB16+FB17+FB18+FB19+FB2
0
FB21+FB22,FB26+FB27
FB23,FB28
FB24+FB25
FB29
m
m
m
m
m
1
2
2
1
1
11.8
4.4924
2.085
7.015
3.1
0.23
0.23
0.23
0.23
0.23
FB30+FB31+FB32+FB33+FB3
4
13.5
0.23
Offset Slab1
L=4+0.23+0.23+0.6+0.6
B==1.63+0.63
Plinth Beams
Offset slab 2
L=1.5+0.115
13.13
11.305
5.66
2.26
1.615
7.46
B=4+3+0.115+0.115+0.115
+0.115=7.46
BEAM (roof)
SB1
4.345
0.23
SB2
SB3+SB4+SB5,SB6+SB7+SB8
SB9+SB10+SB11
SB12+SB13,SB14+SB15
SB16+SB17+SB18+SB19
SB21+SB20,SB26+SB25
SB22,SB27
SB24+SB23
SB28
m
m
m
m
m
m
m
m
m
1
2
1
2
1
2
2
1
1
3.345
9.045
9.415
9.415
9.715
4.4924
2.085
7.015
3.1
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
SB30+SB31+SB32+SB33+SB
29
13.5
0.23
Roof Slab
L=11.93+0.6+0.6
B=10.105+0.6+0.6
m
m
13.13
11.305
Offset Slab
L=4+0.23+0.23+0.6+0.6
B==1.63+0.63
m
m
5.66
2.26
m
m
2.315
0.885
Offset slab 2
L=1.5+0.115
1.615
7.46
B=4+3+0.115+0.115+0.115
+0.115=7.46
6 Masonary
Ground floor
External walls
L=11.93-1.6-4*0.3+10.1052*0.23-2*0.3+13.56-4*0.30.23+4.46-2*0.3+3.65-0.230.35+5.875-2*0.23=42.65
42.65
0.23
Deductions
Door
Windows
Lintels- Door
Windows
m
m
m
m
1
7
1
7
1.2
1.2
1.5
1.5
0.23
0.23
0.23
0.23
Internal Walls
L=3+0.115+3+3+0.115+3.4
+3.355+2.3+0.115+2.255+(
0.115/2)+2.085+0.115+0.115
+2.2+2.2
27.4275
0.115
Deduction
Door D1
D2
D3
Windows
Lintels- Door
Door2
Door3
Windows
m
m
m
m
m
m
m
m
1
6
2
7
1
6
2
7
1.2
1
0.9
1.2
1.5
1.3
1.2
1.5
0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115
Veranda
L=5.645-1+1.6-0.23-0.3
5.715
0.115
m3
1.2
0.6
1.2
0.6
L=11.93-1.6-4*0.3+10.1052*0.23-2*0.3+13.56-4*0.30.23+4.46-2*0.3+3.65-0.230.35+5.875-2*0.23-2.085
40.565
0.23
Deductions
Door
Windows
Lintels- Door
Windows
m3
m3
m
m
3
7
3
7
1.2
1.2
1.5
1.5
0.23
0.23
0.23
0.23
27.4275
0.115
m
m
m
3
6
2
1
1
0.9
0.115
0.115
0.115
Masonry in steps
varandah steps
First Floor
External Walls
Internal walls
L=3+0.115+3+3+0.115+3.4
+3.355+2.3+0.115+2.255+(
0.115/2)+2.085+0.115+0.115
+2.2+2.2
Deduction
Door D1
D2
D3
Windows
Lintels- Door
Door2
Door3
Windows
m
m
m
m
m
7
1
6
2
7
1.2
1.5
1.3
1.2
1.5
0.115
0.115
0.115
0.115
0.115
19.175
0.115
40.04
7.245
7.36
m
m
m
1
7
2
1.2
1.2
0.6
120.17
m
m
m
m
m
1
6
2
7
2
1.2
1
0.9
1.2
0.6
40.04
7.245
20.82
Balcony
7 Plastering
External 1
External 2
External 3
Deduction
Door
Windows
Ventilators
Internal Walls
Deduction
Door D1
D2
D3
Windows
Ventilators
First floor
External 1
External 2
External 3
Deduction
Door
Windows
Ventilators
m
m
m
3
7
2
1.2
1.2
0.6
111.665
Deduction
Door D1
D2
D3
Windows
Ventilators
m
m
m
m
m
1
6
2
7
2
1.2
1
0.9
1.2
0.6
Celing plaster
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
S12
m
m
m
m
m
m
m
m
m
m
m
m
2
2
2
2
2
1
2
2
2
2
2
2
3.885
2.885
3.885
2.415
2.885
2.085
4
5.415
3.17
3.17
5.415
4
1.37
1.37
3.24
3.24
3.24
2.085
3
4.085
0.885
2.885
1.37
3.04
m
m
m
m
m
m
m
m
m
m
m
m
1
1
1
1
1
1
1
1
1
1
1
1
3.885
2.885
3.885
2.415
2.885
2.085
4
5.415
3.17
3.17
5.415
4
1.37
1.37
3.24
3.24
3.24
2.085
3
4.085
0.885
2.885
1.37
3.04
Internal Walls
Slab
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
S12
m
m
m
Beams (roof)
Vertical
75.4724
Flat
75.4724
Roof Slab
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
m
m
m
m
m
m
m
m
m
m
m
9 Skirting
ground floor
first floor
77.5574
77.5574
1
1
1
1
1
1
1
1
1
1
1
m
m
3.885
2.885
3.885
2.415
2.885
4
5.415
3.17
3.17
5.415
4
1
1
1.37
1.37
3.24
3.24
3.24
3
4.085
0.885
2.885
1.37
3.04
111.17
102.665
10 flooring
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
m
m
m
m
m
m
m
m
m
m
m
2
2
2
2
2
2
2
2
2
2
2
11 Painting
Ground Floor
External
Internal
m
m
SAME AS PLASTERING
SAME AS PLASTERING
3.885
2.885
3.885
2.415
2.885
4
5.415
3.17
3.17
5.415
4
1.37
1.37
3.24
3.24
3.24
3
4.085
0.885
2.885
1.37
3.04
First Floor
External
Internal
m
m
SAME AS PLASTERING
SAME AS PLASTERING
m
m
2
4
2.415
2.55
13 Waterproofing
WC & BATH
ROOF SLAB
m
m
1
1
2.415
2.55
SAME AS ROOF AREA
14 D.P.C
External walls
Internal walls
Veranda
m
m
m
1
1
1
42.65
27.4275
5.715
0.23
0.115
0.2
m
m
m
m
m
m
m
m
m
m
2
4
12
24
4
8
14
14
4
4
1.2
2.025
1
2.025
0.9
2.025
1.2
1.05
0.6
0.405
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
m
m
m
m
m
2
12
4
14
4
1.05
0.85
0.75
1.05
0.45
12 DADO
WC & BATH
ential Bunglow
ering- Farmagudi
ET
D
1.3
14.04
1.3
32.955
0.25
0.961688
0.25
0.32775
0.25
0.421475
0.25
0.25
0.25
0.25
0.31395
0.48875
0.2875
0.251275
TOTAL
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
7.4088
3.684
3.06
2.8224
1.3761
3.7035
3.0195
0.39
0.87945
4.026
2.082915
46.995
3.0523875
50.0473875
32.452665
0.2
2.16
0.2
5.07
0.2
0.2
0.2
4.9392
2.456
2.04
7.23
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
1.8816
0.9174
2.469
2.013
0.26
0.5863
2.684
1.38861
0.1
1.08
0.1
2.535
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
2.4696
1.228
1.02
0.9408
0.4587
1.2345
1.0065
0.13
0.29315
1.342
0.694305
0.2
2.16
0.2
5.07
0.3
1.392682
0.3
3.205223
0.5
0.161
0.5
0.4485
6.9
2.2218
21.63511
28.86511
3.615
10.817555
14.432555
7.23
4.5979057342
0.6095
6.9
6.1893
8.4111
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
2.08035
1.19945
1.39495
2.16545
0.239775
0.718152
1.082725
0.806725
0.3565
10.044077
0.5
0.5
0.5
0.5
0.5
0.499675
0.384675
2.08035
1.082725
2.16545
0.5
0.5
0.5
0.5
0.5
1.357
1.033252
0.47955
0.806725
0.3565
0.5
1.5525
0.15
0.15
22.2652
1.91874
0.15 1.807185
0.5
11.798402
0.499675
25.9911225
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.384675
2.08035
1.082725
2.16545
1.117225
1.033252
0.47955
0.806725
0.3565
0.5
1.5525
0.15
22.2652
0.15
1.91874
0.15
0.307316
11.558627
25.68380625
0.15 1.807185
85.07603475
2.65
25.99518
2.1
1.2
0.2
0.2
0.5796
2.3184
0.069
0.483
22.545175
2.65
8.358531
2.1
2.1
2.1
1.2
0.2
0.2
0.2
0.2
0.2898
1.449
0.4347
1.1592
0.0345
0.1794
0.0552
0.2415
0.2
0.131445
0.15
0.11
0.45
0.32
2.65
24.72437
2.1
1.2
0.2
0.2
1.7388
2.3184
0.207
0.483
2.65
8.358531
2.1
2.1
2.1
0.7245
1.449
0.4347
4.515230625
0.131445
0.43
19.9771675
1.2
0.2
0.2
0.2
0.2
1.1592
0.0345
0.1794
0.0552
0.2415
0.3
0.661538
3.6
144.144
21.735
0.8
5.888
2.1
1.2
0.6
2.52
10.08
0.72
360.51
2.1
2.1
2.1
1.2
0.6
2.52
12.6
3.78
10.08
0.72
120.12
21.735
0.2
4.164
4.080530625
0.6615375
52.34308625
158.447
330.81
2.1
1.2
0.6
7.56
10.08
0.72
334.995
2.1
2.1
2.1
1.2
0.6
2.52
12.6
3.78
10.08
0.72
127.659
305.295
10.6449
7.9049
25.1748
15.6492
18.6948
4.347225
24
44.24055
5.6109
18.2909
14.8371
24.32
213.715275
5.32245
3.95245
12.5874
7.8246
9.3474
4.347225
12
22.12028
2.80545
9.14545
7.41855
12.16
109.03125
0.35
54.29018
0.23
17.8382
72.128382
0.35 52.83068
0.23 17.35865
5.32245
3.95245
12.5874
7.8246
9.3474
12
22.12028
2.80545
9.14545
7.41855
12.16
70.189332
104.684025
356.032989
0.15 16.6755
0.15 15.39975
32.07525
10.6449
7.9049
25.1748
15.6492
18.6948
24
44.24055
5.6109
18.2909
14.8371
24.32
209.36805
158.447
330.81
127.659
305.295
2.255
2.255
AS ROOF AREA
10.89165
23.001
33.89265
6.15825
159.1844
165.34265
9.8095
3.154163
1.143
14.1066625
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.0216
0.0729
0.108
0.4374
0.0324
0.1458
0.1512
0.1323
0.0216
0.01458
1.13778
2.025
2.025
2.025
1.05
0.45
4.2525
20.655
6.075
15.435
0.81
47.2275
Project
Institute
Item No.
Description
1 Earthwork in excavation in Foundation
Earthwork in excavation by mechanical means (hydraulic excavator)/manual
means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sq.m
on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m
disposed earth to be leveled and neatly dressed including providing barricading,
danger lighting guarding as directed
All kinds of soil
2 Rubble packing in footing
Rubble packing with hard laterite stone under floors including watering
ramming and consolidating etc. in pipeline trenches and other foundations
complete.
3 P.C.C. in footing
Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded
granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of
centering, shuttering and finishing in:
All works upto plinth level
4 Earthwork in filling
Supplying and filling in plinth under floors, trenches including watering ramming
consolidating, dressing, complete.
Moorum
ABSTRACT SHEET
Item No.
Description
5 Rubble in filling
Rubble packing with hard laterite stone under floors including watering
ramming and consolidating etc. in pipeline trenches and other foundations
complete.
6 P.C.C in filling
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse
sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size)
excluding cost of centering, shuttering and finishing :
All works upto plinth level
7 Masonry in superstructure
Laterite masonry in neatly dressed stones for 20 cms thick masonry walls in
cm. 1 : 4 (1 cement : 4 coarse sand) in foundation upto plinth level
Extra for laterite masonry in all sizes in superstructure from floor I level upto
floor V level.
8 Masonry in steps
Laterite masonry in neatly dressed stones of size specified in cement mortar 1 :
4 (1 cement : 4 coarse sand) in foundation upto plinth level
9 R.C.C
Providing and laying in position (1:2:4) reinforced cement concrete excluding
the cost of centering, shuttering, finishing and reinforcement. (1 cement:2
coarse sand:4 graded stone agg 20mm nominal size)
All works upto plinth
in walls (any thickness), including attached pilasters, buttresses, plinth and
string courses, fillets, columns, pillars, piers, abutments, posts and structs, etc.
upto floor V level.
in beams, suspended floors, roofs having slope upto 15 landings, balconies,
shelves, chajjas, intels, bands, plain window sills, staircases upto floor five level
providing High yield strength steel (HYSD) (Confirming to IS 1786 of 1986) for RCC work @1% of RCC volume=1.031 cum =
Item No.
ABSTRACT SHEET
Description
Providing High yield strength steel (HYSD) (Confirming to IS 1786 of 1986) for
RCC work including bending, binding & placing in position in all the floors along
with the factory made precast concrete cover blocks of specified sizes whose
compressive strength is not less than that of surrounding concrete in the
structural member.
10 Shuttering
Centering and shuttering including struttings, propping etc. and removal of
formwork for
vertical surfaces such as retaining walls , return walls, walls (any thk) including
attached pilasters, buttresses, plinth and string courses, fillets, etc.
11 Plastering
i) External plaster(20mm thick of cement plater1:4)
ii) Internal plaster(12mm thick of cement plater1:4)
iii) Ceiling plaster
12 Flooring
40 mm. thick marble chips flooring rubbed and polished to granolithic finish
under layer 34 mm thick cement concrete 1:2:4 (1 cement: 2 coarse sand: 4
graded basaltic or ganitic stone aggregate 12.5 mm nominal size) and top layer
6 mm thick white black or white and black marble chips of sizes from 1MM to 4
mm nominal size laid in cement marble powder mix 3:1 (3 cement: 1 marble
powder by weight in proportion of 4:7 (4 cement marble powder mix: 7 marble
chips by volume).
14 Skirting
Marble chips skirting (upto 30 cm height) rubbed and polished to granolithic
finish top layer 6 mm thick with white black or white and black marble chips of
sizes from smallest to 40 mm nominal size laid in cement marble powder mix
3: (3 cement : 1 marble powder ) by weight in proportion of 4 : 7 (4 cement
marble powder mix : 7 marble chips ) by volume 18 mm thick under layer 12
mm thick cement plaster 1:3 (1 cement) 3 coarse sand)
Providing water proofing treatment over the new RCC roofs, terrace by speading
cement slurry over the RCC slab and laying of 10cms. Average laterite stone
ballast coba with the necessary gradient for easy flow of rain water and the
coba in covered with damp proof of hindustan water proofing co. or equivalent
jointless water proofing plaster of mix 1:3 (1 cement:3 fine sand), finished
smooth with wooden trowel with false marking of 30 cms square.NOTE: cement
consumption 25kg/sqm.
ABSTRACT SHEET
Item No.
17 Painting
Description
Painting three or more coats with acryllic exterior paint of approved brand and
manufacture including applying one coat of cement primer aand onecoat of
surface treatment etc. complete
Finishing wall with superior quality waterproofing cement paint of required
shade on new work (three or more coats) to give an even shade
Wall painting with superior plastic emulsion paintof approved brand and
manufacture on new work (three or more coats) to give an even shade
White wasing with whiting on new work (three or more coats) to give an even
shade
18 Door , window and ventilator frames
Providing woodwork in frames of doors, windows, ventilators & other frames
wrought framed and fixed in positon.
19 Door , window and ventilator shutters
Providing and fixing in position single shuttered 35 mm thick solid core fiber
reinforced plastic (FRP) flush door shutter, providing grooves, mouldings,
beadings TW lipping etc. complete as per drawing and as directed and including
all fixtures
dential Bunglow
eering- Farmagudi
ET
GSR No.
Units
Total Qty.
Rate
Amount
4005
m3
31.16
146
4549.36
5035
m3
841
841
6002
m3
7.9
3798
30004.2
4017
m3
32.453
386
12526.858
GSR No.
Units
Total Qty.
Rate
Amount
5035
m3
21.64
841
18199.24
6001
m3
10.82
4372
47305.04
ET
5045
m3
49.81
2962
147537.22
5047
m3
49.81
388
TOTAL
19326.28
166863.5
5038
m3
0.43
2437
1047.91
12.44
4673
58132.12
8.41
4966
41764.06
m3
85.07
5015
426626.05
6031
ET
GSR No.
Units
Total Qty.
Rate
Amount
6053
kg
8094
58
469452
6012
m3
356
242
86152
11012
m2
253
155
39215
11004
554.96
106
58825.76
11016
m2
213.75
71
15176.25
9014
m2
193.73
500
96865
9068
m2
15.64
914
14294.96
GSR No.
Units
Total Qty.
Rate
Amount
6019
m2
14.10663
151
2130.100375
9017
m2
32.07
475
15233.25
9045
m2
33.89
814
27586.46
ET
10081
m2
165.44
650
107536
GSR No.
Units
Total Qty.
Rate
Amount
11117
m2
158.447
132
20915.004
11068
m2
127.66
60
7659.6
11097
m2
330.81
66
21833.46
11053
m2
305.29
28
8548.12
1.13778
47.2275
ET
TOTAL
cost of plumbing 7%
cost of Electicals 7%
water charges 2 %
cost of Contigency 3 %
1799282.3024
125949.76117
125949.76117
35985.646048
53978.469071
2141146