Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Installation Specifications

E-Line Pull Up & Dip Station


Product #: ePDIP Version 2009-2a
178 S. 4th Street, Suite 101,
Grover Beach, CA 93433
Toll Free: 800.587.4228
Local: 805. 595.1005
www.triactiveamerica.com
staff@triactiveamerica.com

This equipment offered in the E-Line and TriActive Fitness Line products.

Before you start the installation process, please read these Installation
Specifications carefully and contact us with any questions. Maintenance
includes applying paint over any chipped powder coating. Actual equipment
may be different than shown due to frequent design upgrades. This equipment is designed for individuals weighing up to 330lbs..
Parts and materials include:
e-coated then powder-coated steel
stainless steel hardware
galvanized foundation hardware
plastic safety covers
rubber hand grips
Tools needed:
crescent wrench or socket wrench set
Weight = 191 lbs.

Label:

Installed Dimensions
Length
3 8
(1.12m)

Width
Height*
3 5
7 0
(1.04m)
(2.14m)
* excludes surface material thickness
QR Code for Smart Phone

Rev. 9/12

General Installation Instructions:

Foundation Bolt Assembly

1. Dig foundation holes according to the dimensions shown below.


2. Position equipment above the holes.
3. Connect the foundation bolts and hardware to the frame, then pour concrete into holes:
Option A: Assemble bolts onto frame then pour concrete into holes.
Option B: For existing concrete, drill into the pad, use redhead bolts, expansion bolts,
epoxy/bolt combinations, or use your own means and methods to secure the
equipment to the pad. If you do use your own method, TriActive America is not
responsible for installation defects or damage/theft to the equipment.
4. Level equipment, secure it in place, clean off equipment and area, allow concrete to set.

Plastic security cap


Nut
Lock washer
Flat washer
Plastic security base
Equipment
foundation
tab or frame

For installation options with alternative surfacing, concrete pads, or other conditions, please
contact TriActive America or our local Sales Partners. This specification sheet shows the
minimum requirements for installation. If you have questions, discrepancies with the
equipment, or these specifications, or difficulties with the installation, immediately contact us at
1-800-587-4228.

3/8 J-shaped bolt

Foundation Cross-Section

Foundation Top View


3 2

Allow 1/2 of bolt threads to extend above the foundation tab, or frame
for plastic caps to fit.

3
2-1/4

Foundation
hole depth

1 0

Equipment foundation tab


or frame

5-1/4
7-1/2

2 Concrete Footers

1 7-1/2

12

Surface grade
Subsurface material
Concrete
Bolt

Frame

Bolt location

3 2-1/4

**Drawings not to scale


All dimensions are approximate. After
opening and assembling the equipment
please make your own measurements,
verfying the location of the holes for the
J-bolts.

ePDIP-2a

You might also like