POONA
DETAILS OF DRAWINGS FOR APPROVAL OF FIRE PREVENTION AND EXTINGUISHING
SYSTEM BY NITROGEN INJECTION METHOD FOR 2 x 315MVA, 400/138/34.5 kV
AUTO TRANSFORMER FOR CROMPTON GREAVES LIMITED, MUMBAI
A/C TATA STEEL LTD.JAMSHEDPUR (W.O.NO. T09849)
(CONSULTANT: TATA CONSULTING ENGINEERS LIMITED)
SR.
NR.
DRAWING
NUMBER
FS 3743 A3 01
FS 1940 A4 01
FS 1935 A4 01
FS 1936 A4 01
FS 1957 A4 00
FS 1960 A4 04
FS 1961 A4 00
FS 1939 A4 02
FS 1934 A4 01
10
FS 1966 A3 02
11
FS 1946 A3 02
12
FS 2527 A4 01
13
---
14
---
FUNCTIONAL DISCRIPTION
15
---
16
FS 3791 A3 00
17
FS 3792 A4 00
TITLE
DETAILS OF
PNT
FIRE
TATA STEEL
DETAILS OF
SYSTEM 220
REMARKS
INTERCONNECTION DIAGRAM OF
SYSTEM 220 VDC FOR CGL A/C
LIMITED
CONTROL BOX OF PNT FIRE
VDC
FOR REFERENCE
1
---
PREPARED
CHECKED
APPROVED
BY:OFA (FS4) BY:SAPM(FS) BY:VP3
Initials
DMJ:dmj
DMJ
VKW
Date
31.01.2011
31.01.2011
31.01.2011
CC:MKM(FS) - 1 SET +
1 SOFT COPY FOR CUSTOMER
:DEA(FS3) --- 1 SET
1600X600X1800+100(Base)
4.2 Weight
550 kg Maximum
150kg/cm2 Maximum
5 meters or place next to fire wall if fire
fighting wall exists.
Floor
4.10
4.11
4.12
4.13
4.14
Pressure Regulator
Oil Release Unit
Gas release unit
Oil drain assembly
Pressure /limit switches
OSWAL/LEADER/MANIXON/NEO/EQUIVALENT
Gun metal, Lockable, Stem rising
25NB
Yes
..2..
..2..
4.26 Size
125NB
4.27 Length
Control Box
5.1 Dimensions
(LXBXH) mm
500x270x700
5.2 Weight
45 Kg Maximum
220 VDC
Wall
6.1 Make
6.2 Type
CTR
Operating mechanically of Transformer oil
flow rate with visual position indicator.
6.3 Location
1NO
YES
Fire Detectors
Make
Type
Quantity required
CTR
Quartz bulb, Heat sensing.
Depending upon transformner top cover area.
141C
2 NO
After operation
Yes
..3..
..3..
FEC (lighting)
Extinction period
On system activation
Oncommencement of Nitrogen
injection
11 FEC suitable for capacity
11.1 Dimensions (LXBXH) mm
11.2 Weight
11.3 Nitrogen cylinder capacity
12
12.1
12.2
13
13.1
13.2
Control Box
Dimensions (LXBXH) mm
Weight
Fire Detectors
Heat sensing temperature
Time of operation
230VAC
Maximum 3 minutes
Maximum 3 minutes
Maximum 30 Seconds
Transformer : 315 MVA
1600X600X1800+100(Base)
550 kg Maximum
2X10 Cubic Meter 150 kg/ sq.cm. Pressure,
68 Litre water capacity
500x270x700
45 kg Maximum
141C
Transformer Tank
Explosion Prevention
Fire Extinction
Maximum 50
Milliseconds
Maximum 100
Milliseconds
Maximum 730
Milliseconds
Maximum 730
Milliseconds
DMJ:smp
16.11.2010
1/2
shall
be
an
essential
pre-condition
for
A.2
B.
2/2
Operation under extinction mode:
During transformer fire, Pre-stressed non return valve operates
and isolates the conservator oil to prevent further aggravation
and spreading of fire. Before rupture of tank, Pressure relief
valve and / or buchholz relay operates due to pressurization of
transformer tank. Due to fire on transformer, Fire detector will
operate. After receipt of these signals predetermined quantity of
oil will be drained. Simultaneously nitrogen gas starts injecting
at predetermined flow and pressure from lower side of the
transformer tank to reduce temperature of top oil below flash
point and extinguishes the fire.
Remote manual
In case system failed to operate in Auto mode due to non
availability any one signal, operator shall operate system
manually by breaking window glass and operating extinction
release switch.
C.
Local Manual
In case system failed to operate in Auto mode / remote manual
mode due to non availability of either signal or failure of
power source, operator shall operate system manually from fire
extinguishing cubicle and extinguishes the fire.
VKE:dmj
20.04.2003
QTY PER
SYSTEM
1 NO
REMARKS
CONTROL BOX
1 NO
1 NO
FIRE RETARDANT LOW SMOKE (FRLS), 12CORE X 1.5 1200 MTR APPROXIMATE LENGTH *
SQ.MM, ARMOURED, COPPER
FIRE RETARDANT LOW SMOKE (FRLS), 4CORE X 1.5
200 MTR
SQ.MM, ARMOURED, COPPER
PIPES AND CONNECTION FITTINGS (TRANSFORMER1 SET
FEC-OIL PIT)
PLINTH FOR FIRE EXTINGUISHING CUBICLE
1 NO
NOT IN CTR SCOPE OF SUPPLY
10
OIL PIT
11
7
8
15 NOS
60 MTRS
1 NO
2 Nos.
3 Nos
1 set
1 set
* Cable length through trench between 1. FEC near transformer and Control room 2. CGL
Marshalling box near transformer and control room 3. Control room and control room. May
be calculated on receipt on cable trench layout in autocad 2004/2005 format.
CUSTOMER
CONSULTANT
END USER
RATING
Initials
Date
Checked
by : SAPM(FS)
DMJ
05.01.2011
05.01.2011
Approved
by : VP3
VKW
05.01.2011
CLOSE
CONTACT
..2..
Interlocks
Spare
Pressure
switch (P04)
Operating on differential pressure principle. Electrical
contact remain open (NO) under static pressure due to
transformer oil head. During draining of oil through oil
drain located in the fire Extinguishing Cubicle`NO
contact get closed and energize Lifting Magnet Y02.