Project Title: - Research Promoter

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Annex B.

Line Item Budget

Project title: ___________________________________________________________________


Research Promoter:______________________________________________________________
BUDGET ITEM
I. Materials/Supplies

PARTICULARS

ESTIMATED COST

2.1.1. _____________ (P1,000.00/pc. x 3)


2.1.2.
2.1.3. Etc.

0,000.00
0,000.00

II. Travel/ Transportation


2.1. Trip to ____ for data
gathering
2.2.

2.1.1. Jeepney fare (P.00/trip x 2 pax x 6 trips )


2.2.1.
0,000.00

III. Others
3.1.1.
3.2.1.
PROPOSED BUDGET

Note: The Line Item Budget is meant for the research team to have a realistic picture of the
research cost right from the start. If the budget is beyond the means of the team, the
project can be scaled down or even changed altogether.

0,000.00
0,000.00

You might also like