Professional Documents
Culture Documents
Set A Time 1h 15 Min
Set A Time 1h 15 Min
Set A Time 1h 15 Min
Time 1h 15 min
Discharge = 20m3/s, Depth of water 1.5m and FSL = 251.5m
1. Canal Data:
[8]
Drainage data: Discharge = 200m3/s, HFL = 250.7m. Bed Level = 248.5m and
Ground level = 250.0m
From above data, design following components of siphon aqueduct.
a) canal waterway b) drainage waterway c) afflux and head losses through
siphon barrel
2. Derive the expression for subsurface drainage spacing.
3.
Neatly sketch a guide bund and design the following components of a guide
bund for a river discharge of 4000m 3/s and silt factor 1.1. High flood depth =
5.0m. [6]
i) width of launching apron
ii) depth of launching apron
Set
Time 1h 15 min
3. Determine the length and thickness of launching apron for the straight portion of
a guide bund in a river: Design flood = 5000 m 3/s; av. dia. of bed material =
1mm; HFL = 225.00m; River bed level = 222.00m.
[6]
Set
Time 1h 15 min
Set
Time 1h 15 min
1. Design a fall for a canal having a discharge of 12 cumecs for the data given
below.
Full supply level u/s and d/s = 204 and 202.5
and 201
Bed width u/s and d/s = 8m
Side Slope of canal = 1:1
8``
[8]
2. Determine the location of closed tile drains below ground for the following
data: [6]
Root zone depth = 1.5m
capacity
0.11
3. Calculate the length of 3.5m thick launching apron of loosed stones at the
nose of guide fund at a bridge site of a river having design flood of 10,000
m3/s and flood depth of 5m. Assume that average diameter of river bed
material at flood time is 0.3mm.