Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

ZODIAC MARITIME AGENCIES LTD

CHECK LIST NUMBER 5 - BRIDGE

Form :
Issue
Date
Approved

: Checklist No. 5
: 001
: March 2005
: M.J.R

HEAVY WEATHER
1. Have The Following Been Informed:
The Master
The Engine Room
The Crew
2. Have All Moveable Objects Been Secured
On Deck
Below Decks
In Accommodation
3. Have Speed And Course Been Adjusted As Necessary
4. Has the engine room watchkeeping status been considered (unmanned/ manned).
5. Has The Crew Been Warned To Avoid Upper Deck Areas
6. Have Safety Lines/Handropes Been Rigged Where Necessary
7. Have Instructions Been Issued On The Following
Monitoring Weather Reports
Transmitting Weather Reports To The Appropriate Authorities
8. Has The Office And Metroute Been Informed Of Any Wind Increase Above Force 6

You might also like