Method Statement (SHR1 MES NAP ELV 00004 - 00)
Method Statement (SHR1 MES NAP ELV 00004 - 00)
: S14061
llffl'I
SHRl-MES-NAP-ELV-00004
REV-(00)
Dar al-Handasah
Engineer:
~ oc.::-:ts:E:::-:E?::...
Nesn1ao
dar al-handasah
6 P,...-,:r,ers
Date
11-Jun...:2..0 15
lo,1u i
p.a:,c::...1-"'!l
Transmittal of Document
--
~~
.Medical Buildings
Site Location/
Area
RECEIVED \;
..,\\.t
I 'I
--..;.: I
D Tests
Catalogues
D Schedules
Manuals
i; <,
I "~
Others
2. Subject Description
METHOD STATEMENT FOR FIRE ALARM SYSTEM INSALLATION
3. Submittal details
Item Ref
Rev
Nesma/MS/ELVOO 1
Date
11-Jun- 2015
Set
Description
Your information
QA/QC: I t
...lUH
, ...... ,
Approval
PM:
D Checking
3ee_ AitOLCM~lA
~
Sign :
Eng Signature
..l \.I
'
Date:
~~rm,
'~\........ ~\
(:fl
.......
---
1. Document Type
~_
.
--
~~:~V\'D
Approved
Approved as noted
Revise and
Resubmit
Reiected
Date:
Date:
221'1 IZ
Approval shall not relieve Contract or of his liabilities under the Contract or constitute authorization of any change to Contract Documents.
\5
~'\i
-.l
~ D A61--02~
R
(. .
- T a i f Specialized Hospitals
-\ i i/7?r,..._
-~ =
Engineer:
Dar al-Handasah
SHRl-MES-NAP-ELV-00004
.';"C::c..,,c;..::-; .,
REV- (00)
Nessna o
dar al-handasah
&
shair an d p artne r s
p,.;:
rs
0,,1
Date
11-Jun-2015
P-=-'=>,....;
Transmittal of Document
- T a i f - Specialized Hospitals
1. Document Type
D Catalogues
D Tests
D Schedules
D Manuals
Others
2. Subject Description
METHOD STATEMENT FOR FIRE ALARM SYSTEM INSALLATION
3. Submittal details
Item Ref
Rev
Nesma/MS/ELV-001
'
Date
11-Jun-2015
Set
Descriotion
Your information
Approval
QA/QC:
~I 11 lUUA.
,. ,1,, .
::J
Checking
\\4 ~r~h~~,.,~..~~
PM :
Date:
\
3. Engineer's Representative comments
Si gn :
D
D
D
D
Aooroved
Aooroved as noted
Revise and
Resubmit
Rejected
Date:
Date: 20/07/2015
Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change t o Contract Documents.
-~ =
Engineer:
Dar al-Handasah
SHRl-MES-NAP-ELV-00004
.';"C::c..,,c;..::-; .,
REV- (00)
Nessna o
dar al-handasah
&
shair an d p artne r s
p,.;:
rs
0,,1
Date
11-Jun-2015
P-=-'=>,....;
Transmittal of Document
- T a i f - Specialized Hospitals
1. Document Type
D Catalogues
D Tests
D Schedules
D Manuals
Others
2. Subject Description
METHOD STATEMENT FOR FIRE ALARM SYSTEM INSALLATION
3. Submittal details
Item Ref
Rev
Nesma/MS/ELV-001
'
Date
11-Jun-2015
Set
Descriotion
Your information
Approval
QA/QC:
~I 11 lUUA.
,. ,1,, .
::J
Checking
\\4 ~r~h~~,.,~..~~
PM :
Date:
\
3. Engineer's Representative comments
D
D
D
--
Aooroved
Aooroved as noted
Revise and
Resubmit
Rejected
Si gn :
Date:
Date:
Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change t o Contract Documents.
Nesma o
.. p
.. ,
lall.LJ
~.t -
METHOD STATEMENT
FOR
Process Owner
(Nesma)
Name
Reviewed by
Unit Head Electrical
Anas Al Athamneh
Reviewed by
Sr. E LV E ngineer
A0{6()f5
Reviewed by
ICT Manager
Simon Osenieks
ieft/f 5
Reviewed by
Sr. Q A/QC Manage r
D.K Jaikumar
Io. o~.u:
Approved By
Technical Director
Jay Jacoby
Revision
Date
Date
\l)
Signature
-W--
t/17
ii .od (G
N esm a
r
.0..11 , J
,...,. .-
INDEX
1. SCOPE
2. REFERENCES
3. RESPONSIBI LITIES
4. TOOLS AND EQU IPMENT
5. MATERIALS
6. HANDLING AND STORAGE
7. SAFETY REQUIREMENTS
8. INSTALLATION REQUIREMENTS
8.1 PRE-INSTALLATION
8.2 DURING IN STALLATION
8.3 POST-INSTALLATION
9. RISK ASSESSMENT
10. ATTACHMENTS
21 10
N esm o
"-..
,...
Q t.a...c.c i.....J
,: ... f'"
.. .. ,_
1.
SCOPE
This document serves as a practica l and procedural guideline to the Fire Alarm System
(FAS} insta llation activities carried out in the National Gua rd Healt h Affa irs (NGHA)
Specia lized Hospita ls project. In addition, the purpose of this document is to identify health
and safety risks and to outline the appropriate control methods to minimize these risks for
the herein described job. The job must be executed in compliance to the below mentioned
specifications and all requirements shall be taken into account to ensure a satisfactory
result.
2.
REFERENCES
Number
Description
16701
13851
16130
16140
Wiring Devices
NFPA 72
Latest approved Shop Drawings
Latest approved Materia l Submitta l
Nesma & Partners Qua lity Control
Procedure
Nesma & Partners Project Qua lity Plan
Nesma & Partners Project Safety Plan
3.
RESPONSIBILITIES
Entity
Project Director
Construction Manager
Engineer In Charge
Description
3 110
N esm a
s.:. J
,..
..
Q
.
La 1u.....J
,..
't
.....
Site Engineer
Site Supervisor
QC Engineer
Safety Officer
4.
5.
Basic Toolkit
Spirit Level
Level Threads
Ladd ers
Labe l Printer
Multi-meter
MATERIALS
Fire Al arm Contro l Panels (FACP) shall be in line with the approved material
4 I 10
Nes m a
,.,. r ,rt, ,. .
La ., u ....J
l'U" "" ... -t- ,..
Control & Monitors modu les shall be in line with the approved material
Note
A Material Inspection Requ est {M IR) must be submitted for rece ived material and approved
submitta l compliance.
6.
Upon receipt of th e FAS Communication and Power cables on site, necessary preca utions
must be t aken as per manufacturer recommendations for storage and handling activities.
Materials must be carefully hand led to avoid breakage, de nting and scoring
finishes
M ateria ls reaching the site shall be identified as per pac kage list
5 110
N esm a
6
f'
'>r,
(<'
.a .J....i
J','IH , , ..,.,
Any material found not suitable for site use must be rem oved from the site
immediately
D
D
7.
SAFETY REQUIREMENTS
6 I 10
Nesm.:,
J:..
"
lo u.,,J
, "' - ,
8.
INSTALLATION REQUIREMENTS
8.1
PRE-INSTALLATION
Make sure that all civil works related to the installation work area are
completed
Make sure that the installation work area is clean and safe
Obtain the latest approved Shop Drawings for insta llation works reference
D
D
8.2
The insta llation methods described in the Shop Drawings must be approved
by the supplier
Review Shop Drawings and Fire Life Safety Drawings against NFPA
requirements before proceeding with the installation works in the zone
Ceiling access panels shall be provided as per the approved Shop Drawings
DURING INSTALLATION
8.2.1
CONTAINMENT INSTALLATION
Using marking threads, line out the FA cable route as per the approved
Shop Drawings
Pull boxes must be installed on the ceiling for FAS in-wall drop cable
7 I 10
Nesma o
f". Portr
lou..c i
p.n ~ , , -
D
D
D
D
D
D
D
D
D
D
D
In gypsum wa lls, EMT Conduits must be used to route the FAS drop cable
from the Pull Box to the wa ll mounted device
In concrete wa lls, PVC Conduits must be used to route the FAS drop cable
from the Pull Box to the wa ll mounted device
Rigid Stee l Conduits must be used in Mechanical & Electrica l Rooms
In case of expa nsion joints crossings, EMT boxes & flexible EMT Conduits
shall be insta lled as per the approved Deta il Drawings
Where applicable, EMT & RGS Cond uits must be installed accurately in li ne
and leve l
All type of conduits must be clean and interna lly dry prior to cable pulling
The FAS cables insta llation must carri ed out in a proper manner and as per
the applicable standards without damaging the cables
The correct type of back-boxes for all field devices sha ll be instal led as per
the approved Shop Drawings
The junctions boxes height sha ll be verified against t he approved Shop
Drawings
Conduits installation works must be approved by the consultant prior to
pulling the FA cables
The size and type of FAS cables shall be identified and cut to the req uired
length
Ea rth cables to all fi eld devices sha ll be properly terminated with earth
sleeves in the appropriate terminal in order to avoid any earth fault in the
loop
Adequate add it iona l cable lengths sha ll be provid ed for the above fa lse
ceiling detectors
In sta ll at least two vertica l cable risers for the FAS in close proxim ity to
each other w ith a minimum of one hour fire rated wall separating them so
that the loss of one rise r does not prevent the rece ipt or the transmission
of the signal from the other floors or zones
Openings in fire-rated wa ll s, flo ors and ceilings shall be properly fire
sto pped
8 110
N esm a
l:'..
r..
Q ta
1...u...J
I""-.--
8.2 .2
EQUIPMENT INSTALLATION
Make sure to use the appropriate termination materials {lugs, glands &
ferrules)
Make sure that the FAS and accessories installation wor ks are ca rried out in
accordance to the manufacturer installation recommendations and as per
the local authority requirements
FACPs, Satellite FACPs, Repeater Panels shall be installed as per the
approved Shop Drawings
All field devices shall be installed as per the approved Shop Drawings and
manufacturer recommendations
Linear Heat Detectors shall not be installed in such area where the
temperature may increase beyond ambient temperature which can
damage the sensor cable
Beam Detectors shall be installed 500 mm below the false ceiling level
8.3
D
D
D
D
POST-INSTALLATION
FAS cables must be labeled as per the approved Label ing Scheme
FAS cables must be properly identified at the Fire Alarm Control Panel prior
to cable termination
All Smoke Detectors shall be covered after installation and before handing
over of the area in order to avoid any physical damage and accumulation of
dust within the detector
During Smoke & Hear Detectors termination wo rks, make sure to isolate
the copper conductor from other terminals in t he device
Boxes and accessories must be water tight
Touch up scratches and marred finish es to match original finish
9 I 10
9.
ATIACHMENTS
J>
..
10 110
f\lesma
For
Date: 30/May/2015
Discipline :
Electrical - Low
Voltage (ELV)
Systems
Item
Activity
Acceptance Criteria
Prepared by :
QA/QC
Verification Doc.
Nesma I DAR
DOCUMENT SUBMITIALS
a)
Project Specification
(Division 13, Section
13851 , Clauses 1.5.B.1 &
2 and 1.5.C, Page No. 3
of 25
Procurement Engineer
I Project Engineer I EL V
QC Engineer.
Project Specification
(Division 13 Section
13851, Para 2.3 to 2.18 ,
Page Nos. 10 to 21 of 25.
MATERIAL SUBMITIALS
a.
R/ V
Material Submittal I
Method Statement
submittals.
R /V
Pa_g_e 1 of 6
INSPECTION TYPE :
SR = SURVEILLANCE
R = REVIEW
W=WITNESS
V= VERIFICATION
A = APPROVAL
DOC/CON/008-ISSUE 0
rvesma
l_n llA j
& P.1rtners
,am Lf-~'--
MATERIAL CONTROL:
a.
b.
C.
d.
e.
f.
Manual Stations
g.
h.
For
Project Specification
( Division 13 Section 13851 ,
Paras 2.18. A,B & C Page
No. 21 of 25).
Project Specification
(Division 16, Section 16130,
Para 2.3, Clauses A to E,
Page No. 3 of 15).
Project Specification
(Division 16, Section 161 30,
Para 2.4, Clauses A to E,
Paqe No. 3 of 15
Project Specification
(Division 16, Section 16130,
Para 2.7, Clauses A to E,
Page Nos. 4 & 5 of 15)
Project Specification
(Division 16, Section 16130,
Para 2.13, 2,14 & 2.15 Page
No.8of15
Project Specification
(Division 13, Section 13851,
Paras 2.3. A.1 to 5, Page No.
10 of 25
Project Specification
(Division 13, Section 13851,
Paras 2.4. A - H , Page
Nos. 11 & 12 of 25.
Project Specification
(Division 13, Section 13851 ,
Paras 2.5. A & B , Page
Nos.12 & 13 of 25
Date: 30/May/20 15
Approved Material
Submittal
Approved Material
Submittal
Approved Material
Submittal
Approved Material
Submittal
Approved Material
Submittal
Approved Materia l
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer
Pa_ge 2 of 6
INSPECTION TYPE :
H = HO LD POINT _{!__~_DAR)
SR= SURVEILLANCE
R = REVIEW
W=WITNESS
V= VERIFICATION
A=APPROVAL
DOC/CON/008-ISSUE 0
Nesma
lo ,J.J....J
p.Lbl...:
Date: 30/May/2015
Project Specification
(Division 13, Section 13851,
Para 2. 5. C, 1 to 5 Page No.
13 of 25
Proj ect Specification
(Division 13, Section 13851,
Paras 2.6. A & C Page No.
13 of 25
Project Specification
(Division 13, Sect ion 1385 1,
Para 2.6.B.1 to 4 Page No.
13 of 25
Project Specification
(Division 13, Section 13851,
Paras 2.6. 0 & E Page No.
14 of 25.
Project Specification
(Division 13, Section 13851,
Paras 2.7.A, B & C Page
No. 14 of 25
Project Specification
(Division 13, Section 1385 1,
Paras 2.8.A & B Page No.
14 of 25
Approved Materia l
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer
Approved Material
Subm ittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacture
Approved Material
Submitta l & T est
Certificates from the
manufacturer
Project Specification
(Division 13, Section 13851,
Paras 2.9.A to K Page
Nos. 15 & 16 of 25.
Project Specification
(Division 13, Section 13851,
Paras 2.1 O.A to D Page
Nos, 16 & 17 of 25.
i.
Flame Detectors
j.
k.
I.
n.
0.
p.
For
Approved Material
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer
Pa_g_e 3 of 6
INSPECTION TYPE :
SR = SURVEILLANCE
R = REVIEW
W = WITNESS
V= VERIFl CATION
A=APPROVAL
DOC/CON/008-ISSUE 0
Nesma
la111i
& PHrtners
fl(bt. ,
For
Date: 30/May/20 15
Project Specification
(Division 13, Section 13851,
Para 2.16, Page No,2 1 of 25
Project Specification
(Division 13, Section 13851 ,
Para 2.17, Page No,21 of 25
-- - -
Project Specification
( Division 16, Section 16130,
Sub section 3.2 , Clauses A
to N, Page Nos. 9 & 10 of
15).
q.
r.
s.
t.
u.
V.
Project Specification
(Division 13, Section 13851,
Para 2.11 , Page No, 17 of 25
Project Specification
(Division 13, Section 13851,
Para 2.13, Page No,20 of
25.
Project Specification
(Division 13, Section 13851 ,
Para 2.14, Page No,20 of
25.
Project Specification
(Division 13, Section 13851,
Para 2.15, Page Nos,20 & 21
of25
INSTALLATION:
a)
Pa_ge 4 of 6
INSPECTION TYPE :
SR = SURVEILLANCE
R = REVIEW
W=WJTNESS
V= VERJFICA TION
A = APPROVAL
DOC/CON/008-ISSUE 0
Nesma
~
Partners
l.a ,Lil
,l!LDL"
j
~
b)
c)
d)
e)
f)
g)
h)
i)
For
Date: 30/May/2015
Project Specification
(Division 16, Section 16130,
Sub section 3.3, Clauses A
to II , Page Nos. 10, 11 & 12
of 15).
Project Specification
(Division 16, Section 16130,
Sub section 3.6, Clauses A
to E, Page Nos. 13 & 14 of
15).
Project Specification
(Division 16, Section 16130,
Sub section
3.7, C1auses A to G, Page
No, 14of15).
Project Specification
( Division 16, Section 16130,
Sub section 2.13, Clauses A
to C, Paqe No. 8 of 15)
Project Specification
(Division 16, Section 16130,
Sub section 2.14, Clauses A
to F, Page No. 8 of 15)
Project Specification
(Division 16, Section 16130,
Sub section 2.14, Clauses A
to F, PaQe No. 8 of 15)
Project Specification
(Division 13, Section 13851,
Sub section 3.2, Clauses A
to F, Page No. 23 of 25).
Approved Shop
Drawings & QC
Inspection Checklist CL
- EL V - 001 Rev 0
Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV-00 1 RevO
Approved Shop
Drawings & QC
Inspection Checklist CL
- ELV - 001 Rev 0
Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV-001 RevO
Approved Shop
Drawings & QC
Inspection Checklist CL
- EL V - 00 1 Rev 0
Project Specification
(Division 13, Section 13851 ,
Approved Shop
Drawings & QC
Approved Shop
Drawings & QC
Inspection Checklist CL
- EL V - 001 Rev 0
Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV-001 Rev O
Page 5 of 6
INSPECTION TYPE :
SR= SURVEILLANCE
R = REVIEW
W=WITNESS
V= VERIFICATION
A=APPROVAL
DOC/CON/008-ISSUE 0
Nesmao ) Lcu.u.i
F,. P 8 rtn e rs
For
INSTALLATION OF FIRE ALARM SYSTEM (FAS)
& CONTAINMENT WORKS
Rev No: 0
Inspection Checklist CL
-ELV-001 RevO
Approved Shop
Drawings & QC
Inspection Checklist CL
- ELV-001 RevO
Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV - 001 RevO
Project Specification
(Division 13,
Section 13851 , Para 3.1 ,
Clauses A to P, Page Nos.22
& 23 of 25).
Commissioning
Engineer. I QAQC
Engineer
Project Specification
( Division 16 Section 16120)
and Approved shop drawings
j)
k)
a.
b.
C.
d.
e.
Date: 30/May/20 15
Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV -001 RevO
and Cable Insulation
Test (Meggering Test)
report
Page 6 of 6
lN~PECTION TYPE :
SR= SURVEILLANCE
R = REVIEW
W=WITNESS
V= VERIFICATION
A=APPROVAL
DOC/CON/008-IS SUE 0
Nesma,( ) l a.uU
IR REF. NO.
& Partners
~ b pig
Location:
Area Location:
Description:
Equipment No.
To:
From:
Item
No.
Description
Nesma
1.2 Proper alignment, Support and level of the cable routes, pull boxes, room
penetration EMT Conduit sleeves , Junction Boxes, drop down EMT conduits for
the FAS Device Cables, Manual Stations, Smoke Detectors, Heat Detectors,
flame detectors, Homs, Xenon Strobe Lights, Voice Evacuation Speakers, Fire
Fighters' Telephones, Magnetic Door Holders, Main Fire Alann Control Panel
(MFACP), Other FACPs, Fire Alarm Work Station, Network Reporting Terminal,
Emergency Power Supply, Addressable Interface Device, Auto Dialer, System
Printer, Welded Wire Mesh guards for the (manual station, smoke detectors &
gong) are in their respective locations and as per the final approved shop
drawings.
1.0
1.3 Ensure that the locations on the false ceiling are co ordinated as per the latest
reflected ceiling layout.
2.0
a)
1) Correct material types & Sizes for the FAS cables, Junction Boxes, EMT
Conduits & pull boxes are available as per the approved material submittals.
2) Cables are new undamaged & without ioints.
3) Cable Containment shall be free of burrs, sharp edges or the projections that
can damage the cable insulation.
4) Make sure that the pull ropes have been provided inside the concrete encased
PVC Conduits, Device Drop down EMT Conduits & Room Penetration EMT
Sleeves which in tum must be dry & clean without any block during the cable
pulling.
5) Make sure that the cable containment installation works are completed in all
the aspects .
b)
DAR
Nesma::~~~ la.ULi
IR REF.NO.
& Partners }
-1 pml=::i_ri'.iig .
Location:
Area Location:
Description :
Equipment No.
To:
From:
Item
No.
Description
4) Ensure that there are no Hazards from moving parts, hot surfaces etc
throughout the installation path & nearby areas.
1
2
FAS Cables are cut to the required lengths as decided by the route run.
The splicing of the cables, if applicable, must be done only with the prior
approval of the owner's representative and is done only at the building block units
and not at the other places.
The Cable shields are physically and electrically continuous by proper jointing at
the splice locations, if the splices are pennitted by the owner . representative.
Under no circumstances, the joints between the two field devices are allowed.
UTP CAT 6A Copper Data Cables for the back bone transmission over the
Ethernet VLAN are routed as per the latest approved shop drawings ( as part of the
SCS Cabling).
All the cable fittings and the connectors are of correct types and proper fit for the
purpose.
10
11
The recommended bending radius and the cable pulling tension are maintained as
per the manufacturer recommendations for the different types of cables.
The supports of the cables including cable clips & ties are adequate & at the
required spacing as per the specifications.
FAS Cables are properly identified at the F ACPs & MFACPs prior to their
tenninations ..
12
13
Earthing cables are tenninated with proper sleeves for all the field devices in the
appropriate tenninals to avoid the undesirable earth fault in the loops.
14
EMT Conduits & sleeves are installed directly on the ceiling surfaces for the
room penetrations & the device drop down cable locations.
15
Wherever gypsum boards are installed for the wall panels, EMT Conduits are
used in those areas to route the FAS Cables.
16
17
In the concrete block walls, encased PVC Conduits are used to route the FAS
Device Cables.
For the expansion joints crossings, flexible EMT Conduits are installed.
Nesma
DAR
Nesma,( ) la.wJ
IR REF.NO.
& Partners
pmb}'llg
Location:
Area Location:
Description:
Equipment No.
To:
From:
Item
No.
Description
19
Rigid Steel Conduits (RSC) are installed inside the Mechanical and Electrical
rooms to route the FAS Device Cables through them.
Cables, Conduit and stability of their supports are good.
20
The raceways foe the FAS are not shared by power or any other electrical wiring.
18
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Install at least two vertical cable risers for the FAS in close proximity to each
other with a minimum of one hour fire rated wall separating them so that the loss
of one riser does not prevent the receipt or the transmission of the signal from the
other floors or zones.
The junction boxes are installed as per the latest approved shop drawings
The junction boxes are equipped with the oil resistant and adhesive gasket.
Proper Fixing bolts and nuts are installed for the Junction Boxes
Backboxes are installed as per the latest approved shop drawings.
Ensure that a 11 the FAS Enclosures, boxes & their accessories are water tight.
Emergency Power Supply and the Batteries are installed as per the latest approved
shop drawings and manufacturer reco1mnendations.
Manual Stations are installed indoors and outdoors as required with the
corresponding protective guard shields & the integral addressable Modules as per
the latest approved shop drawings and the manufacturer recommendations.
Smoke detectors are installed with the corresponding protective guard shield as
per the latest approved shop drawings and the manufacturer recommendations to
prevent the accumulation of dust inside the detector.
Heat detectors are installed as per the latest approved shop drawings and the
manufacturer recommendations.
Flame detectors are installed as per the latest approved shop drawings and the
manufacturer recommendations.
Homs are installed as per the latest approved shop drawings and the manufacturer
recommendations.
Xenon Strobe Lights are installed as per the latest approved shop drawings and
the manufacturer recommendations.
Voice Evacuation Speakers are installed as per the latest approved shop drawings
and the manufacturer recolllinendations.
Fire Fighters' telephones are installed as per the latest approved shop drawings
and the manufacturer recommendations.
Magnetic Door Holders are installed as per the latest approved shop drawings and
the manufacturer recommendations.
Nesma
DAR
Nesma,( ) l a.w..i
IR REF.NO.
& Partners
pmb_pllg
Location:
Area Location:
Description:
Equipment No.
To:
From:
Item
No.
37
38
39
40
41
42
43
Description
Nesma
DAR
MFACP I FACPs are installed as per the latest approved shop drawings and the
manufacturer recommendations.
Fire Alann Work Station is installed as per the latest approved shop drawings and
the manufacturer recommendations.
The network reporting tenninal is installed as per the latest approved shop
drawings and the manufacturer recommendations.
Addressable Interface Devices for the corresponding functional modules of the
FAS System are installed as per the latest approved shop drawings and the
manufacturer recommendations.
Fully Programmable Multi - input, multi number auto dialer and digital
announcer units are installed as per the latest approved shop drawings and the
manufacturer recommendations.
System Printer is installed on the assigned enclosure inside the MFACP as per
the latest approved shop drawings and the manufacturer recommendations.
All the required Accessories & enclosures are installed
44
All the installation materials such as crimps, lugs, tenninals & ferrules comply
with the approved shop drawings & area classification requirements.
45
Overall installation is completed as per the approved shop drawings, Fire Life
Safety Drawings, NFPA Requirements & Local authority requirements.
C) POST INSTALLATION CHECKS AND ACTIVITIES (PRIOR TO THE ENERGIZATION OF FAS)
The whole cable & conduit installations are accessible for easy maintenance.
4
5
FAS Equipments & Devices, Cables, Conduits, junction boxes & panels are
labeled as per the approved labeling scheme.
Touch up the marred finishes and scratches (if any found during the installation)
to match the original finish.
Accepted by:
Name
Signature
Date