Professional Documents
Culture Documents
DPR Rate Estimate
DPR Rate Estimate
in Arunachal Pradesh
S.No.
MoRT&H
Ref No.
Description of Item
Unit
21114
180.00
3800487.60
8225
113.00
929425.00
8859
500.00
4429500.00
1500,1700 & Providing and laying in position Plain Cement Plump Concrete of Grade
2100
M 15 in R and Breast Wall all complete as per Drawings & Technical
Specifiactions Section 1500,1700 and 2101
Rate For the Year 2016-17 (8% Price Enhanchment For Each Year on Base
Rate 2010) = P*(1+R/100)^N
Providing Weep Holes in Brick Masonary/Plain/Reinforced Concrete
Abutment, Wing Wall/Return Wall with 100 mm dia PVC Pipe (HSD)
,extending through the full width of the structure with slope of IV:20H
towards dropping face,complete as per Drawings & Technical
Specifications
Rate For the Year 2016-17 (8% Price Enhanchment For Each Year on Base
Rate 2010) = P*(1+R/100)^N
13
Cum
73.8
Cum
1729.65
6968.01
514238.87
6211.79
10744220.22
124.00
Nos
72
Providing and Laying Filter Media for Chimney drain complete as per
Drawings & Technical Specifications Section 305 and 2500
5601
Providing & Laying PCC M-20 Grade Concrete in side wall and bottom slab
of open Lined Drain (Catch Water Drain) complete as per Drawing and
Technical Specifications 1500,1700 and 2200
Rate For the Year 2016-17 (8% Price Enhanchment For Each Year on Base
Rate 2010) = P*(1+R/100)^N
7.5(3102) Assembling, joining and laying of reinforcing elements (Soil
reinforcement 200 KN/M) with synthetic geogrids as per clause 3102.8
and approved design and specifications.
( Geogrid - Supply &
Installation) (Excluding boulders)
128127863.51
4025.00
1708.5
Rate For the Year 2016-17 (8% Price Enhanchment For Each Year on Base
Rate 2010) = P*(1+R/100)^N
Providing and laying of 300 mm Dia Perforated HDPE Pipe @ 6Kgf/Cm2
at different level behind Breast Wall on earth fill (Granular Material) side
and longitudinally along the chimney drain completely wrapped with GeoTextile Sheet all complete as per Drawing and as instructed by Engineers
1700.72
4515.00
Providing and Laying Filter Media behind Breast Wall complete as per
Drawings & Technical Specifications Section 305 and 2500
Total
12
691766.08
1102.00
1500,1700 & Providing and laying in position Plain Cement Concrete of Grade M 15 in
2100
levelling course below foundations,Toe Wall,Parafet Wall,Graud Wall and
Curtain Wall complete as per Drawings & Technical Specifiactions Section
1500,1700 and 2100
2504
83.34
Sqm
Rate For the Year 2016-17 (8% Price Enhanchment For Each Year on Base
Rate 2010) = P*(1+R/100)^N
11
8300.7
Chimney Drain Part as per clause 7.2 (702) including providing & laying of
(Filter fabric only - Supply & Installation)
10
Cum
75338
(in
75106602.00
Cum
2706
8478.00
Amount
INR)
Rate For the Year 2016-17 (8% Price Enhanchment For Each Year on Base
Rate 2010) = P*(1+R/100)^N
Rate
(in INR)
54.00
8859
Rate For the Year 2016-17 (7.5% Price Enhanchment For Each Year on
Base Rate 2010) = P*(1+R/100)^N
Quantity
Rate As Per
DPR (Base
Rate of SoR
2010
191.37
Cum
7309
650.00
Cum
7309
1003.15
Runing meter
1275
13778.60
7332014.12
300.00
382530.00
5710.00
Cum
213
sqm
11090
8812.25
1877009.61
200.00
2218000.00
Budgetary Estimate of proposed widening of road from 20+200 km to 20+500 km (Kalamati Landslide Zone) in Pasighat to Pangin (Package-I) Project in Arunachal Pradesh
S.No.
14
MoRT&H
Ref No.
Description of Item
Unit
Quantity
sqm
8790
Rate As Per
DPR (Base
Rate of SoR
2010
Rate
(in INR)
Amount
INR)
158.00
Gross Total
1388820.00
237556256
Deduct the Value of Formation Cutting for the stretch for a length of 300 mtr (km 20+200-km 20+500 ) in re-alignmnet section on
prorata basis (@ Rs 2.22 Crore/KM as per Schedule-H )
6660000
Deduct the Value of Protection Work (Breast wall) for the stretch for a length of 150 mtr (km 20+200-km 20+350 ) in re-alignmnet
section on prorata basis (@ Rs 48222/Mtr as per Schedule-H )
7233300
Deduct the Value of Geo-Textile material for the stretch for a length of 300 mtr (km 20+200-km 20+500 )
900000
222762956
Ruppes Tweenty Two Crore Tweenty Seven Lakh Sixty thousand Only
Consider 7.5% Price Enhanchment Per Year
(in
22.276