Design and Quality Management Department, Technical Division

Site Visit Report of Sheltech Mozendra


By: Engr. S.M. Morsed Al Mamun (P.E.)
Visit Date: July 28, 2016
---------------------------------------------------------------------------------------------------------------------------------------------1. Conforming Observations:

Beam rebar fabrication work at level-3 is checked, wherea) Straight top and bottom bar dia and nos is found ok.
b) Extra top bar dia, nos and length is found ok.
c) Face bar dia, nos & location is found ok.
d) Lap length is found ok.
e) Hoops at lap location are found ok.
f) Stirrup size and spacing is found ok.
g) Stirrup leg nos and hook size is found ok.
h) Hanger bar placement is found ok.
i) Development length is found ok.
j) Separator placement is found ok.
k) Three nos the bar placement at beam column joint is found ok.

2. Nonconforming Observations:

No nonconforming observations.

3. Instructions:

No instruction.

4. Feedback report Previously Observed Nonconforming Observations:

No nonconforming observations were found at last visit.

5. Safety observations:

No safety violations are found.