Consultancy Proposal For Building at B-104 Shalimar Bagh

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

ARCHITECTURAL & INTERIOR DESIG

SCOPE OF WORK

We shall provide Design consultancy services in respect of the following


Architectural space planning
Site development
Structural Drawings
Drawings for Drainage, Water supply and Sewerage work.

Drawings for Electrical (UPS, EPABX, Voice/Data Cabling & Controls, St


Drawings for HVAC (Heating, Ventilation and Air-conditioning)
Interior Drawings
Interiors for 4 Floors
External 3D Views
Interiors 3D Views
Site Coordinator Visit Once a Week
Project Manager Visit Once in Two weeks
Contractors Bills/ Running payments

ARCHITECTS ROLE & RESPONSIBILITIES:

We shall keep the Owner informed about the progress of work in their
We shall appoint specialized consultants if necessary.

We shall be responsible for the direction and integration of the consu


the work entrusted to them.

OWNER'S ROLE AND RESPONSIBILITIES:


The Owner shall discharge all his obligations connected with the project
Owner shall provide detailed requirements of the project.
Owner shall provide property lease/ ownership documents.

Owner to provide a site plan, to a suitable scale, showing boundaries, co


and such lines to which the proposed service can be connected. In case
Owner shall furnish reports on soil conditions and test as required by the

Owner shall furnish specific conditions/ statutory stipulations/ Codes of P

Owner shall pay all the fees, levies, security deposits and expenses in re

Owner shall give effect to the professional advice of the Architect and ca
Owner shall honor Architect's bills within one week of its submission.

Owner shall appoint a Construction Manager (Clerk of Works/ Site Super

FEE STRUCTURE

vWe propose to charge a fees of Rs.4,00,000/- for Architecture and Int


(Four Lakh Only)

Owner

Satish Kumar

Vaibhav Babbar

(Architect)

(Architect)

Amit Chauhan

(Interior Design

Payment Schedule For Project: BP-104 Shalimar B


Stage No.
1.1
Design Section
1
2
3
4
5
Execution Section
S1
S2
S3
S4
S5
S6
S7
S8
S9

Payment Schedule For Project: BP-104 Shalimar Bagh


Stage
Advance
On Complition of Intial Plans & Elevation
On Complition Of Detailed Architectural Working Drawings
On Completion of Interior Concept Stage
On Completion of Toilet & Kitchen Drawings Stage
On Completion of Detailed Interior Drawings

n Section
On Casting of Stilt Roof
On Casting of Ground floor Roof
On Casting of First floor Roof
On Casting of Second floor Roof
On Casting of Third floor Roof
On Completion of Electrical, Plumbing, Ac, Internal Plaster Work
On Completion of POP, Stone Flooring, Toilet wall clading
On Completion of Woodwork
On completion of the Project
Total

Percentage

Amount

10%

40,000

10%

40,000

10%

40,000

10%

40,000

5%

20,000

10%

40,000

5%

20,000

5%

20,000

5%

20,000

5%

20,000

5%

20,000

5%

20,000

5%

20,000

5%

20,000

5%

20,000

100%

400,000