132/1 1kV, 32/40 MVA POWER TRANSFORMER
SITE ACCEPTANCE TEST FORMAT.
i
ee {TAR POWER TRANSMISSION SYSTEM EXPANSION PHASE10
i CONTRACT NO: GTC 3714/2010
| ONTAR GENERAL FLNCrMICTTY &
cuiewr | cossu
Low Waren conronartoy CoNMHTANT 0 RARER ccore
TATION NAME | 1az0iKvLoaistic viiAGe | peaWiNG wo Puente ise
[mayne] Deane vounecteve | aw | pace _
| eQUIPMENT 1321kV3240MVA POWER CHAPTER NO | A
i icine en
9. MAGNETIC BALANCE MEASUREMENT. (TEC-60076-8-2:1997)
[Test Set Up
! 3 POLE
WCE toa
HY Lv
ni Dr RR b
° R
I a
i {
¥ : }
dPobac Het eee ee fae EOE | ommn __Y,
SUPPLY |
|
I |
R ia seo J OOD : 4 |
| rena 0
{ — |
Test procedure
1, Isolate primary/secondary/neutral earth,
2. Select the normal tap, Apply single phase voltage between R & Y.
3. Measure the voltages r &n,y &n,b& n, Y & Band B&R
4. Repeat the same procedures for the all other sequences in both primary and secondary of the
transformer,
‘Test Result 36 sc
Ambient Temp
AV SIDE. LY SIDE
Roy Y-B BeR[ ree | y-0. | b-n
(233-0 Tah (S96 2324 | 114-3 SS-AB
I96-2 233 BGO | Nes 932-9 HES |
igo | 17-3 433-0 | §6-96 74 3-6 |
this Transformer
‘The measured values should in conformance to the values in the factory Acceptance report of
WITNESSEDIVERIFED
k
AHBAMAA/PARSONS BRINCKERIOFF
sonar we PH |
[sane MeariKerclen |
Vara