Bailey Bridge Calcs

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

BAILEY BRIDGE SPAN LENGTH ESTIMATION

1.0

2.0

3.0

Abutment to Abutment Length Measured on Site

Ls (m)

Minor Bank Height,

d1 (m)

Major Bank Height

d2 (m)

SAFETY SETBACK
Unprepared Abutment Safety Setback 1

SSB 1 (m)

Unprepared Abutment Safety Setback 2

SSB 2 (m)

Foctor of Safety on Safety Setback

FOSss (m)

INITIAL ROLLER CLEARANCE


Initial Roller Clearance (Constant )

IRC (m)

INITIAL BRIDGE LENGTH

IBL (m)

35
3
3

4.5
4.5
1.07

0.76
45.83

BAILEY BRIDGE SPAN LENGTH ESTIMATION


1.0

2.0

3.0

Abutment to Abutment Length Measured on Site

Ls (m)

Minor Bank Height,

d1 (m)

Major Bank Height

d2 (m)

SAFETY SETBACK
Prepared Abutment Safety Setback 1

SSB 1 (m)

Prepared Abutment Safety Setback 2

SSB 2 (m)

Foctor of Safety on Safety Setback

FOSss (m)

INITIAL ROLLER CLEARANCE


Initial Roller Clearance (Constant )

IRC (m)

INITIAL BRIDGE LENGTH

IBL (m)

30
0
0

NO NEED TO USE THIS DATA AS THE GAP IS


FIXED WITH NO DANGER OF COLLAPSE OF
FACE WALL
0
0
1.07

0.76
33.66

BAILEY BRIDGE SPAN LENGTH ESTIMATION


1.0

2.0

3.0

Abutment to Abutment Length Measured on Site

Ls (m)

Minor Bank Height,

d1 (m)

Major Bank Height

d2 (m)

SAFETY SETBACK
Prepared Abutment Safety Setback 1

SSB 1 (m)

Prepared Abutment Safety Setback 2

SSB 2 (m)

Foctor of Safety on Safety Setback

FOSss (m)

INITIAL ROLLER CLEARANCE


Initial Roller Clearance (Constant )

IRC (m)

INITIAL BRIDGE LENGTH

IBL (m)

30
0
3.048

NO NEED TO USE THIS DATA AS THE GAP IS


FIXED WITH NO DANGER OF COLLAPSE OF
FACE WALL
0
4.572
1.07

0.76
38.23