SANITASIonline

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 63

PASWORD =

*
.
.
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******

****************** *******
297,000,000.00 *******
****************** ******* ******* ******* *******
Dua ratus sembilan puluh tujuh juta rupiah.
****************** ******* ******* ******* *******
satu dua
tiga empat lima enam
***
ribu juta milyar
***
000297000000
***
****************** ******* ******* ******* *******
000
1
***
0
***
sepuluh
***
0
***
0
***
***
***
***
***
000
2
***
0
***
sepuluh
***
0
***
0
***
***
***
***
***
297
3
***
2 sembilan puluh
***
dua ratus
tujuh belas
***
9 tujuh
***
7 sembilan puluh tujuh
***
sembilan puluh tujusembilan puluh tujuh
***
dua ratus sembilan puluh tujuh juta
***
***
***
000
4
***
0
***
sepuluh
***
0
***
0
***
***

==
==
==

*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******
*******

***
***
000
1
***
0
***
sepuluh
***
0
****
0
***
***
***
***
****************** ******* ******* ******* *******
rupiah
42 00
dua ratus sembilandua ratus sembilan puluh tujuh juta
dua ratus sembilan puluh tujuh juta rupiah
Dua ratus sembilan puluh tujuh juta rupiah.
****************** ******* ******* ******* *******

BADAN PENGUSAHAAN KAWASAN


PERDAGANGAN BEBAS DAN PELABUHAN BEBAS
SABANG
SATUAN KERJA
PENGEMBANGAN KAWASAN PERDAGANGAN BEBAS
DAN PELABUHAN BEBAS SABANG
PROGRAM PENANGANAN DAERAH KHUSUS

KEGIATAN PENGEMBANGAN KAWASAN


PERDAGANGAN BEBAS DAN PELABUHAN BEBAS SABANG
TAHUN 2011
HARGA PERKIRAAN SENDIRI

KODE

: 4070.07

KEGIATAN

: PEMBANGUNAN/ PENGADAAN/ PENINGKATAN


SARANA DAN PRASARANA

SUB KEGIATAN

: PENGEMBANGAN KAWASAN WISATA

RINCIAN
KEGIATAN

: PEMBANGUNAN FASILITAS SANITASI


KAWASAN GAPANG - IBOIH

HARGA

: Rp.297,000,000.00

WAKTU

: 150 (seratus lima puluh)

Sabang,

hari

Desember 2010

REKAPITULASI
NAMA PROYEK

LOKASI PEKERJAAN

PROPINSI

PROPINSI

NO.

II

PEMBANGUNAN FASILITAS SANITASI KAWASAN GAPANG - IBOIH

URAIAN PEKERJAAN

PEKERJAAN KAMAR MANDI

VOL

SAT

4.00

Bh

(A)

4
Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan
)

(B)

Pajak Pertambahan Nilai ( PPN ) = 10% x (A)

(C)

JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)

HARGA SATUAN
( Rp. )

67,604,974.33

(D) PEMBULATAN
Terbilang : Dua ratus sembilan puluh tujuh juta rupiah.

REKAPITULASI

MBANGUNAN FASILITAS SANITASI KAWASAN GAPANG - IBOIH

JUMLAH HARGA
( Rp. )

270,419,897.32

270,419,897.32
27,041,989.73
297,460,000.00
297,000,000.00
: Dua ratus sembilan puluh tujuh juta rupiah.

REKAPITULASI
NAMA PROYEK

PEMBANGUNAN FASILITAS SANITASI KAWASAN GAPANG - IBOIH

LOKASI PEKERJAAN

KAWASAN GAPANG - IBOIH

PROPINSI

PROPINSI

NO.

URAIAN PEKERJAAN

II

PEKERJAAN KAMAR MANDI

PEKERJAAN PERSIAPAN
1 1 M' Pengukuran dan Pemasangan Bouwplank
2 Papan Nama Proyek

VOL

SAT

HARGA SATUAN
( Rp. )

40.04

m2

50,555.08

1.00

Ls

500,000.00

40.04

5,955.00

1 Galian Tanah

29.90

m3

46,015.00

2 Pembuangan Galian

12.81

3 Urugan Tanah Kembali

17.16

3 Membersihkan lapangan dan perataan


SUB TOTAL
2

PEKERJAAN TANAH

4 Urugan Pasir di Bawah Lantai & Pondasi

1,895.50

7,267.90

3.38

75,931.00

17.16

18,955.00

1 Beton 20/20 (Kolom Struktur) K 175

0.48

m3

5,317,799.22

2 Beton 15/15 (Kolom Praktis) K 175

0.41

m3

4,387,408.44

3 Beton 20/25 (Ring Balk) K 175

0.83

m3

4,991,565.39

4 Beton 20/25 (Sloof) K 175

1.15

m3

3,178,303.21

5 Pek. Pemadatan Tanah Setiap 20 cm


SUB TOTAL
3

PEKERJAAN BETON

SUB TOTAL

PEKERJAAN BATU
1 Pasangan Aanstamping

1.88

m3

163,274.70

2 Pasangan Batu Belah 1 : 4

9.99

602,132.70

1 Dinding Keramik (20/20) KM/WC

17.05

m2

232,894.55

2 Lantai Keramik (20/20) KM/WC

11.27

237,858.95

1 Pasangan Bata Merah 1 : 5

34.90

m2

148,797.70

2 Pasangan Bata Merah 1 : 3

20.92

m2

167,044.23

3 Pasangan Rooster 1 : 5

2.22

m2

89,720.50

4 Plesteran 1 : 5 + Acian

65.00

m2

22,788.20

5 Plesteran 1 : 3 + Acian

34.83

31,553.70

1 Pengecatan Dinding Dengan Sanlex

65.00

m2

15,683.21

2 Pengecatan Plafond Dengan Sanlex

20.00

19,846.65

3 Plituran Daun Pintu

18.00

25,905.00

4 Cat Solignum Rangka Atap

31.62

13,569.80

1 Pek. Rangka Plafond Kayu Gunung Lokal + Pelat Asbes

30.25

m2

103,726.60

2 Pas. List Plafond 1/4 Kayu Gunung Lokal

60.30

m1

9,074.80

1 Pek. Kusen Kayu Gunung Lokal

0.30

m3

3,960,030.00

2 Pasang Pintu allumunium

2.94

578,962.32

10.00

87,906.08

SUB TOTAL
5

PEKERJAAN LANTAI DAN KERAMIK

SUB TOTAL
6

PEKERJAAN BATA DAN PLESTERAN

SUB TOTAL
7

PEKERJAAN PENGECATAN
2
2

SUB TOTAL
8

PEKERJAAN PLAFOND + RANGKA

SUB TOTAL
9

PEKERJAAN PINTU DAN JENDELA

3 Pekerjaan Kaca Polos 3 mm


SUB TOTAL

2
2

10 PEKERJAAN ATAP
0.41

m3

2 Pasang kaso + reng genteng beton kayu borneo

20.50

42,707.50

3 Pasang atap genteng metal

20.50

82,014.60

4 Pasang nok genteng metal

7.15

44,041.30

5 Pek. Listplank Kayu Gunung Lokal

18.30

32,225.00

6 Besi Beugel Kuda-kuda + Baut Mur

5.30

kg

6,500.00

1 Pekerjaan Pasangan Kunci Tanam 2 Slaag Sekualitas "KUDA

2.00

bh

99,273.75

2 Pekerjaan Pasangan Engsel Pintu 4" Sekualitas "UNILON"

6.00

bh

26,786.08

1 Instalasi Penerangan

5.00

ttk

99,400.00

2 Lampu Pijar 25-40 Watt

5.00

bh

87,000.00

3 Stop Kontak + Instalasi

4.00

bh

104,800.00

4 Box Zekering kas 2 grup biasa

1.00

bh

87,300.00

1 Kuda-kuda Kayu Gunung Lokal

2
2
1

3,413,780.00

SUB TOTAL
11 PEKERJAAN GANTUNGAN DAN KUNCI

SUB TOTAL
12 PEKERJAAN INSTALASI LISTRIK

SUB TOTAL
13 PEKERJAAN SANITASI DAN SALURAN
1 Septictank 2,5 X 1,5 X 2,0 m + Rembesan

1.00

Unit

2,477,783.81

2 Pemasangan Kloset Jongkok

2.00

bh

399,879.50

3 Pemasangan Pipa PVC f 0,5"

15.00

38,661.58

4 Pemasangan Pipa PVC f 4"

15.00

203,047.51

5 Pemasangan Kran

7.00

bh

28,967.50

6 Floor Drain

2.00

bh

21,507.50

7 Bak Mandi

2.00

bh

1,307,753.00

SUB TOTAL

JUMLAH HARGA
( Rp. )
67,604,974.33
2,024,225.54
500,000.00
238,438.20
2,762,663.74
1,375,848.50
24,276.62
124,680.82
256,456.95
325,173.03
2,106,435.92
2,552,543.63
1,776,900.42
4,118,041.45
3,639,157.18
12,086,642.68

306,956.44
6,013,800.34
6,320,756.78

3,970,852.08
2,680,075.72
6,650,927.80

5,192,295.74
3,493,729.97
199,179.51
1,481,233.00
1,099,015.37
11,465,453.59

1,019,408.65
396,933.00
466,290.00
429,022.80
2,311,654.45

3,138,144.56
547,210.44
3,685,355.00

1,176,128.91
1,702,149.22
879,060.75
3,757,338.88

1,399,649.80
875,503.75
1,681,299.30
314,895.30
589,717.50
34,443.26
4,895,508.90

198,547.50
160,716.45
359,263.95

497,000.00
435,000.00
419,200.00
87,300.00
1,438,500.00

2,477,783.81
799,759.00
579,923.70
3,045,712.65
202,772.50
43,015.00
2,615,506.00
9,764,472.66

DAFTAR ANALISA HARGA SATUAN


1

Untuk 1 m Membersihkan lapangan dan perataan


0.100
OH Pekerja
0.050
OH Mandor
1 M' Pengukuran dan Pemasangan Bouwplank
0.012
M3 Kayu 5/7 Kelas III
0.020
Kg Paku biasa 2" - 5"
0.007
M3 Kayu papan 3/20 Kelas III
0.100
0.100
0.010
0.005

1 m3 Galian Tanah Biasa


0.750
0.400

0rg/hr
0rg/hr
0rg/hr
0rg/hr

OH
OH

Rp
Rp
Jumlah
Rp
Rp
Rp

32,500.00
54,100.00

2,330,000.00
8,900.00
1,952,083.33

Tukang kayu
Pekerja
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp
Jumlah

46,800.00
32,500.00
55,200.00
54,100.00

Pekerja
Mandor

Rp
Rp
Jumlah

32,500.00
54,100.00

Rp
Rp
Jumlah

32,500.00
54,100.00

1 m3 Pembuangan tanah sejauh 150 meter


0.050
OH Pekerja
0.005
OH Mandor

1 m3 Urugan kembali
0.192
0.019

OH
OH

Pekerja
Mandor

Rp
Rp
Jumlah

32,500.00
54,100.00

0.500
0.050

OH
OH

Pekerja
Mandor

Rp
Rp
Jumlah

32,500.00
54,100.00

1.200
0.010
0.300

m3
OH
OH

Pasir urug
Mandor
Pekerja

Rp
Rp
Rp
Jumlah

54,700.00
54,100.00
32,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

82,500.00
55,500.00
86,600.00
46,800.00
55,200.00
32,500.00
54,100.00

1 m Pemadatan Tanah

1 m3 Urugan Pasir

1 m3 Pekerjaan pasang Batu Belah 1 Pc : 4 Ps


1.200
m3 Batu belah
3.257
Zak Semen
0.522
m3 Pasir pasang
1.200
OH Tukang batu
0.120
OH Kepala tukang
3.600
OH Pekerja
1.800
OH Mandor

1 m3 Pekerjaan Pasangan Aanstamping


1.200
m3 Batu belah 15/20 cm
0.300
m3 Pasir urug

Rp
Rp

82,500.00
54,700.00

0.390
0.039
0.780
0.039

OH
OH
OH
OH

Tukang batu
Kepala tukang
Pekerja
Mandor

Rp
Rp
Rp
Rp
Jumlah

46,800.00
55,200.00
32,500.00
54,100.00

10 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5 Ps


140.000
22.200
0.102
0.650
0.200
0.020
0.030

Bh Bata merah 5 x 11 x 22 cm
Kg Semen Portland
M3 Pasir pasang
0rg/hr Pekerja
0rg/hr Tukang batu
0rg/hr Kepala tukang
0rg/hr Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

542.50
1,387.50
86,600.00
32,500.00
46,800.00
55,200.00
54,100.00

11 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Ps


140.000
32.950
0.091
0.650
0.200
0.020
0.030

Bh Bata merah 5 x 11 x 22 cm
Kg Semen Portland
M3 Pasir pasang
0rg/hr Pekerja
0rg/hr Tukang batu
0rg/hr Kepala tukang
0rg/hr Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

542.50
1,517.50
86,600.00
32,500.00
46,800.00
55,200.00
54,100.00

12 Pasangan Rooster 1 : 5
36.000
12.800
0.035
0.300
0.100
0.010
0.015

Bh Roster/terawang
Kg Semen portland
M3 Pasir pasang
0rg/hr Pekerja
0rg/hr Tukang batu
0rg/hr Kepala tukang
0rg/hr Mandor

13 1 m2 Pekerjaan plesteran 1 pc : 5 ps + acian


4.320
Kg Semen
0.022
m3 Pasir pasang
0.150
OH Tukang batu
0.015
OH Kelapa tukang
0.200
OH Pekerja
0.010
OH Mandor

14 1 m2 Pekerjaan plesteran 1 pc : 3 ps + acian


6.480
Kg Semen portland
0.019
m3 Pasir pasang
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.300
OH Pekerja
0.013
OH Mandor

Rp
Rp
Rp

1,500.00
1,320.00
86,600.00

Rp
Rp
Rp
Rp
Jumlah

32,500.00
46,800.00
55,200.00
54,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

1,387.50
86,600.00
46,800.00
55,200.00
32,500.00
54,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

1,387.50
86,600.00
46,800.00
55,200.00
32,500.00
54,100.00

15 1 m2 Acian
0.040

Zak

Semen

Rp

55,500.00

0.030
0.002
0.120
0.012

OH
OH
OH
OH

Tukang batu
Kepala tukang
Pekerja
Mandor

Rp
Rp
Rp
Rp
Jumlah

46,800.00
55,200.00
32,500.00
54,100.00

16 1 m2 Pasang konstruksi kuda-kuda kayu borneo


1.100
Kayu borneo, balok
M
15.000
Besi strip
Kg
0.800
Paku biasa 2" - 5"
Kg
12.000
OH Tukang kayu
1.200
OH Kepala tukang
4.000
OH Pekerja
0.200
OH Mandor

17 1 m2 Pasang kaso + reng genteng beton kayu borneo


0.014
Kayu borneo, balok
M
0.150
Paku biasa 2" - 5"
Kg
0.100
OH Tukang kayu
0.010
OH Kepala tukang
0.100
OH Pekerja
0.005
OH Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

2,330,000.00
5,000.00
8,900.00
46,800.00
55,200.00
32,500.00
54,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

2,330,000.00
8,900.00
46,800.00
55,200.00
32,500.00
54,100.00

18 1 m2 Pasang atap genteng metal


1.020
Lbr
0.200
Kg
0.060
OH
0.006
OH
0.150
OH
0.008
OH

Genteng metal
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang
Pekerja
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

70,380.00
8,900.00
46,800.00
55,200.00
32,500.00
54,100.00

19 1 m' Pasang nok genteng metal


1.100
0.050
0.150
0.015
0.250
0.013

Genteng decra bond


Paku biasa " - 1"
Tukang kayu
Kepala tukang
Pekerja
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

22,750.00
46,800.00
46,800.00
55,200.00
32,500.00
54,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

2,330,000.00
8,900.00
46,800.00
55,200.00
32,500.00
54,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

2,330,000.00
8,900.00
46,800.00
55,200.00
32,500.00
54,100.00

Bh

OH
OH
OH
OH
OH

20 1 m' Pasang lisplang ukuran 2x(2 x 20) cm, kayu borneo


0.009
0.060
0.100
0.010
0.100
0.050

M
Kg

OH
OH
OH
OH

Kayu borneo, papan


Paku biasa 2" - 5"
Tukang kayu
Kepala tukang
Pekerja
Mandor

21 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu borneo


0.012
Kayu borneo, balok
M
0.100
Paku biasa 2" - 5"
Kg
0.250
OH Tukang batu
0.025
OH Kelapa tukang
0.150
OH Pekerja
0.075
OH Mandor
(A)

22 1 m2 Pasang Langit-langit asbes (1.00 x 1.00) m, tebal 3.5 mm


0.012
Pelat asbes tebal 3.5 mm
M
0.100
Paku
Kg
0.250
OH Tukang batu
0.025
OH Kepala tukang
0.150
OH Pekerja
0.075
OH Mandor
(B)

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

60,900.00
16,600.00
46,800.00
55,200.00
32,500.00
54,100.00

23 1 m2 Pek. Rangka Plafond Kayu Gunung Lokal + Pelat Asbes


(A)
(B)
Jumlah
I m' Pasang list plafond - kayu profil
1.050
M'
0.021
OH
0.002
OH
0.021
OH
0.001
OH

24 1 m2 Pekerjaan pasang paving block


1.100
m2
0.050
m3
0.300
OH
0.015
OH
0.200
OH
0.010
OH

Kayu profil
Tukang batu
Kepala tukang
Pekerja
Mandor

Rp
Rp
Rp
Rp
Rp
Jumlah

6,900.00
46,800.00
55,200.00
32,500.00
54,100.00

Paving block
Pasir pasang
Tukang batu
Kepala tukang
Pekerja
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

30,000.00
86,600.00
46,800.00
55,200.00
32,500.00
54,100.00

25 Pekerjaan Beton
1 m3 beton 1 : 2 : 3
0.780
0.520
232.000
0.025
0.250
1.650
0.080

m3
m3
Kg
OH
OH
OH
OH

Batu Pecah
Pasir Beton
PC
Kepala tukang batu
Tukang batu
Pekerja
Mandor
(A)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

282,100.00
89,600.00
1,387.50
55,200.00
46,800.00
32,500.00
54,100.00

26 100 kg Pekerjaan Pembesian


110.000
2.000
2.250
6.750
6.750

kg
kg
OH
OH
OH

Besi beton
Kawat
Kepala tukang
Tukang besi
Pekerja
(B)
Untuk 1Kg Besi x (0,01)

Rp
Rp
Rp
Rp
Rp
Jumlah
Jumlah

7,030.00
11,000.00
55,200.00
46,800.00
32,500.00

27 1 m2 Begisting Saluran Beton


0.020
0.002
0.200
0.025

m3
m3
Kg
OH

Papan begisting
Kasau
Paku Usuk
Kepala tukang kayu

Rp
Rp
Rp
Rp

1,963,000.00
1,804,200.00
8,900.00
55,200.00

0.005
0.250
0.100

OH
OH
OH

28 1 m2 Begisting Penutup Saluran


0.020
m3
0.200
Kg
0.025
OH
0.005
OH
0.250
OH
0.100
OH

Mandor
Tukang kayu
Pekerja
(C)

Rp
Rp
Rp
Jumlah

54,100.00
46,800.00
32,500.00

Papan begisting
Paku usuk
Kepala tukang kayu
Mandor
Tukang kayu
Pekerja
(D)

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

1,963,000.00
8,900.00
55,200.00
54,100.00
46,800.00
32,500.00

29 10 M2 Cetakan Beton
0.400
4.000
0.500
0.100
5.000
2.000

m3
Kg
OH
OH
OH
OH

Papan Bekisting
Paku
Kepala tukang kayu
Mandor
Tukang kayu
Pekerja
Untuk Tiap 1 M2 (x 0,1)

30 1 m3 Pekerjaan Saluran Beton


Sub

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Jumlah

1,963,000.00
8,900.00
55,200.00
54,100.00
46,800.00
32,500.00

(A)
Jumlah

31 1 m3 Pekerjaan Beton Penutup Saluran


Sub
(A)
Sub
(B)
Jumlah
32 1 M3 Membuat Kolom Beton Bertulang
0.400
M3 Papan + Kayu terentang Kls III
4.000
Kg Paku biasa 2 " - 5"
2.000
Lt Minyak bekisting
100.000
Kg Besi beton polos
4.500
Kg Kawat beton
323.000
Kg Semen portland
0.520
M3 Pasir beton
0.780
M3 Koral beton
0.150
M3 Balok Kayu Kayu Kelas III
7.300 0rg/hr Pekerja
0.350 0rg/hr Tukang batu
3.300 0rg/hr Tukang kayu
2.100 0rg/hr Tukang besi
0.570 0rg/hr Kepala tukang
0.250 0rg/hr Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

2,330,000.00
8,900.00
28,680.00
7,030.00
11,000.00
1,387.50
89,600.00
80,900.00
2,330,000.00
32,500.00
46,800.00
46,800.00
46,800.00
55,200.00
54,100.00

33 1 bh Pekerjaan Suling-suling
0.0750
1.0000
0.0180
0.0025

m2
Is
OH
OH

Pipa PVC 2"


Ijuk
Pekerja
Mandor

Rp
Rp
Rp
Rp
Jumlah

104,900.00
18,800.00
32,500.00
54,100.00

34 Pekerjaan Saluran
1 m' Pekerjaan Saluran Beton
0.567
0.054
0.257
1.900
1.600
0.032

m3
m3
m3
m2
m2
m3

Galian Tanah
Urugan Pasir
Pek. Saluran Beton
Acian
Begisiting Saluran
Beton Penutup Saluran

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

46,015.00
75,931.00
659,563.00
8,283.60
61,248.90
2,114,338.00

35 1 m' Pekerjaan Saluran Beton


0.595
0.070

m3
m3

Galian Tanah
Urugan Pasir

Rp
Rp

46,015.00
75,931.00

0.285
1.600
0.032

m3
m2
m2

Pek. Saluran Beton


Acian
Begisiting Saluran

Rp
Rp
Rp
Jumlah

659,563.00
8,283.60
61,248.90

36 1 m3 Beton Bertulang Kolom 20/20


1.000
M3
147.969
Kg
20.000
M2
1.000

Beton Cor 1 : 2 : 3
Rp
Pekerjaan Besi Beton Polos
Rp
Cetakan/Bekiting
Rp
Membongkar Cetakan/Menyiram Beton Rp
Jumlah

659,563.00
14,547.75
115,281.00
200,000.00

37 Beton 15/15 (Kolom Praktis)


1.000
123.636
15.000
1.000

M3
Kg
M2

Beton Cor 1 : 2 : 3
Rp
Pekerjaan Besi Beton Polos
Rp
Cetakan/Bekiting
Rp
Membongkar Cetakan/Menyiram Beton Rp
Jumlah

659,563.00
14,547.75
115,281.00
200,000.00

38 Beton 20/25 (Ring Balk) K 175


1.000
141.393
18.000
1.000

M3
Kg
M2

Beton Cor 1 : 2 : 3
Rp
Pekerjaan Besi Beton Polos
Rp
Cetakan/Bekiting
Rp
Membongkar Cetakan/Menyiram Beton Rp
Jumlah

659,563.00
14,547.75
115,281.00
200,000.00

39 Beton 20/25 (Sloof) K 175


1.000
101.277
7.333
1.000

M3
Kg
M2

Beton Cor 1 : 2 : 3
Rp
Pekerjaan Besi Beton Polos
Rp
Cetakan/Bekiting
Rp
Membongkar Cetakan/Menyiram Beton Rp
Jumlah

659,563.00
14,547.75
115,281.00
200,000.00

40 1 m Pasang Dinding Keramik (20/20) KM/WC


25.000
9.300
0.018
1.500
0.600
0.450
0.045
0.030

41 Lantai Keramik (20/20) KM/WC


25.000
11.380
0.042
1.500
0.600
0.450
0.045
0.030

Bh
Kg
M
Kg
Oh
Oh
Oh
Oh

Keramik 20 x 20 cm
Semen abu-abu
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

6,800.00
1,387.50
86,600.00
2,510.00
32,500.00
46,800.00
55,200.00
54,100.00

Bh
Kg
M
Kg
Oh
Oh
Oh
Oh

Ubin keramik 20 x 20 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

6,800.00
1,387.50
86,600.00
2,510.00
32,500.00
46,800.00
55,200.00
54,100.00

42 1 m pengecatan tembok baru (1 lapis plamir , 1 lapis cat dasar 2 lapis cat penutup)
0.100
Kg Plamir
Rp
0.100
Kg Cat dasar
Rp
0.260
Kg Cat penutup 2 kali
Rp
0.020
Oh Pekerja
Rp
0.063
Oh Tukang batu
Rp

30,900.00
15,490.00
26,780.00
32,500.00
46,800.00

0.006
0.003

Oh
Oh

Kepala tukang
Mandor

Rp
Rp
Jumlah

55,200.00
54,100.00

43 1 m pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar 2 lapis cat penutup)
0.150
Kg Plamir
Rp
0.170
Kg Cat Dasar
Rp
0.170
Kg Cat Penutup
Rp
0.070
Oh Pekerja
Rp
0.075
Oh Tukang batu
Rp
0.008
Oh Kepala tukang
Rp
0.003
Oh Mandor
Rp
Jumlah

30,900.00
21,210.00
31,010.00
32,500.00
46,800.00
55,200.00
54,100.00

44 1 m Plituran Daun Pintu


0.030
0.200
0.350
0.020
0.010
0.100
0.200
0.010
0.200
0.100
0.250
0.285
0.040
0.020

kg
kg
kg
kg
kg
kg
kg
bh
ltr
lbr
Oh
Oh
Oh
Oh

Dempul Plitur
Dempul Halus (Wood Filler)
Melamik
Oker Putih
Oker Coklat Warna
Batu Apung
Sirlak Ex. India
Kwas 3"
Spirtus
Ampelas
Pekerja Setengah Terampil
Tukang Cat/Pelitur Setengah Terampil
Kepala Tukang Cat/Pelitur
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

14,920.00
40,250.00
51,250.00
16,000.00
16,000.00
27,900.00
117,000.00
5,600.00
3,280.00
4,400.00
32,500.00
46,800.00
55,200.00
54,100.00

45 1 m Cat Solignum Rangka Atap


0.330
0.020
0.030
0.015
0.020
0.001

kg
bh
Oh
Oh
Oh
Oh

Cat Solignum
Kwas 3"
Pekerja Setengah Terampil
Tukang Cat/Pelitur Setengah Terampil
Kepala Tukang Cat/Pelitur
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

32,190.00
5,600.00
32,500.00
46,800.00
55,200.00
54,100.00

46 1 m Pasang kusen pintu dan jendela kayu borneo.


1.200
6.000
18.000
2.000
0.300

M
Oh
Oh
Oh
Oh

Kayu borneo damar laut, balok


Pekerja
Tukang kayu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Jumlah

2,330,000.00
32,500.00
46,800.00
55,200.00
54,100.00

47 1 m Pasang Pintu allumunium


1.000
1.050
1.050
0.105
0.005

M
Oh
Oh
Oh
Oh

Pintu Alumunium
Pekerja
Tukang kayu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Jumlah

489,620.00
32,500.00
46,800.00
55,200.00
54,100.00

48 1 m pasang kaca, tebal 5 mm


1.100

Kaca

Rp

72,300.00

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Jumlah

32,500.00
46,800.00
55,200.00
54,100.00

49 1 Buah pasang kunci tanam kamar mandi


1.000
Bh Kunci tanam kamar mandi
0.005
Oh Pekerja
0.500
Oh Tukang kayu
0.005
Oh Kepala tukang
0.003
Oh Mandor

50 1 Buah pasang engsel pintu


1.000
0.015
0.150
0.015
0.001

Bh
Oh
Oh
Oh
Oh

Engsel pintu
Pekerja
Tukang kayu
Kepala tukang
Mandor

51 Memasang 1 buah kloset jongkok teraso


1.000
Bh Kloset jongkok teraso
7.000
Bh Bata merah 5x11x22 cm
6.000
Kg Semen portland
0.010
M
Pasir pasang
1.000
Oh Pekerja
1.500
Oh Tukang kayu
0.300
Oh Kepala tukang
0.110
Oh Mandor

52 1 Unit SEPTIC TANK 2,5 X 1,5 X 2,0 m + REMBESAN


13.125
m3 Galian Tanah
0.357
m3 Pasir Urug
3.750
m2 Urugan Pasir
25.000
m3 Pasangan Batu Bata
19.750
m2 Plesteran 1 : 3 + acian
0.500
m'
Cor Beton 1 : 2 : 3
9.000
m'
Pipa PVC f 4"
2.000
bt
Pipa GIP Medium f 1 1/2"
9.000
m3 Ijuk
1.750
m3 Kerikil "SPLIT"
1.875
m3 Urugan Tanah Kembali
1.000
ls
Upah Kerja

53 Memasang 1 buah bak mandi Fibreglass volume 0,30 m


1.000
Bh Bak Fibreglass
Perlengkapan (Koef 18 % harga fibreg
1.800
Oh Pekerja
2.700
Oh Tukang kayu
0.540
Oh Kepala tukang
0.110
Oh Mandor

54 Memasang 1m' pipa PVC tipe AW diameter 1/2"


1.200
M'
Pipa PVC
Perlengkapan (35 % dari harga bahan)
0.036
Oh Pekerja
0.060
Oh Tukang batu
0.006
Oh Kepala tukang

Rp
Rp
Rp
Rp
Rp
Jumlah

75,300.00
32,500.00
46,800.00
55,200.00
54,100.00

Rp
Rp
Rp
Rp
Rp
Jumlah

18,410.00
32,500.00
46,800.00
55,200.00
54,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

261,680.00
542.50
1,387.50
86,600.00
32,500.00
46,800.00
55,200.00
54,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

46,015.00
54,700.00
75,931.00
167,044.23
31,553.70
659,563.00
124,600.00
150,050.00
18,800.00
282,100.00
7,267.90
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

921,300.00
165,834.00
32,500.00
46,800.00
55,200.00
54,100.00

Rp
Rp
Rp
Rp
Rp

22,100.00
7,735.00
32,500.00
46,800.00
55,200.00

0.002

Oh

Mandor

Rp
Jumlah

54,100.00

55 Memasang 1 m' pipa PVC tipe AW diameter 4"


1.200
M'
Pipa PVC
Perlengkapan (35% dari harga bahan)
0.081
Oh Pekerja
0.135
Oh Tukang batu
0.014
Oh Kepala tukang
0.004
Oh Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

124,600.00
43,610.00
32,500.00
46,800.00
55,200.00
54,100.00

56 Memasang 1 bh Floor drain


1.000
0.010
0.100
0.010
0.005

Bh
Oh
Oh
Oh
Oh

Floor drain
Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Jumlah

15,680.00
32,500.00
46,800.00
55,200.00
54,100.00

57 kran diameter " atau "


1.000
0.025
0.010
0.100
0.010
0.005

Bh
Bh
Oh
Oh
Oh
Oh

Kran Air
Seal tape
Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

23,000.00
5,600.00
32,500.00
46,800.00
55,200.00
54,100.00

Cat dasar
Cat antara
Cat penutup
Pekerja
Tukang Cat
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

21,210.00
32,190.00
32,190.00
32,500.00
46,800.00
55,200.00
54,100.00

Besi Baja Siku


Kawat Las
Mesin Las
Blender Potong (gas + O2)
Pekerja
Tukang
Kepala Tukang

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Jumlah

9,900.00
15,000.00
100,000.00
55,000.00
32,500.00
46,800.00
55,200.00

58 1 m Pengecatan permukaan baja lapis seng (galbani) secara manual


sistem 3 lapis cat konvensional dengan tebal 200 um
0.110
0.170
0.080
0.500
0.800
0.300
0.200

Kg
Kg
Kg
Oh
Oh
Oh
Oh

59 100 kg Pekerjaan Rangka Baja Profil


110.000
kg
1.500
kg
1.152
hari
1.152
hari
6.750
Oh
6.750
Oh
2.250
Oh

1 kg Pekerjaan Rangka baja Profil I2.A2 / 100


60 Memasang 1m' pipa galvanis diameter 1/2 "
1.200
M'
Pipa galvanis
Perlengkapan (35 % dari harga bahan)
0.054
Oh Pekerja
0.090
Oh Tukang
0.009
Oh Kepala Tukang
0.027
Oh Mandor

Rp
Rp
Rp
Rp
Rp
Jumlah

57,400.00
32,500.00
46,800.00
55,200.00
54,100.00

Rp
Rp
Rp

3,250.00
2,705.00
5,955.00

Rp
Rp
Rp

27,960.00
178.00
13,664.58

Rp
Rp
Rp
Rp
Rp

4,680.00
3,250.00
552.00
270.50
50,555.08

Rp
Rp
Rp

24,375.00
21,640.00
46,015.00

Rp
Rp
Rp

1,625.00
270.50
1,895.50

Rp
Rp
Rp

6,240.00
1,027.90
7,267.90

Rp
Rp
Rp

16,250.00
2,705.00
18,955.00

Rp
Rp
Rp
Rp

65,640.00
541.00
9,750.00
75,931.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

99,000.00
180,763.50
45,205.20
56,160.00
6,624.00
117,000.00
97,380.00
602,132.70

Rp
Rp

99,000.00
16,410.00

Rp
Rp
Rp
Rp
Rp

18,252.00
2,152.80
25,350.00
2,109.90
163,274.70

Rp
Rp
Rp

75,950.00
30,802.50
8,833.20

Rp
Rp
Rp
Rp
Rp

21,125.00
9,360.00
1,104.00
1,623.00
148,797.70

Rp
Rp
Rp

75,950.00
50,001.63
7,880.60

Rp
Rp
Rp
Rp
Rp

21,125.00
9,360.00
1,104.00
1,623.00
167,044.23

Rp
Rp
Rp

54,000.00
16,896.00
3,031.00

Rp
Rp
Rp
Rp
Rp

9,750.00
4,680.00
552.00
811.50
89,720.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,994.00
1,905.20
7,020.00
828.00
6,500.00
541.00
22,788.20

Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,991.00
1,645.40
9,360.00
1,104.00
9,750.00
703.30
31,553.70

Rp

2,220.00

Rp
Rp
Rp
Rp
Rp

1,404.00
110.40
3,900.00
649.20
8,283.60

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,563,000.00
75,000.00
7,120.00
561,600.00
66,240.00
130,000.00
10,820.00
3,413,780.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,620.00
1,335.00
4,680.00
552.00
3,250.00
270.50
42,707.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

71,787.60
1,780.00
2,808.00
331.20
4,875.00
432.80
82,014.60

Rp
Rp
Rp
Rp
Rp
Rp
Rp

25,025.00
2,340.00
7,020.00
828.00
8,125.00
703.30
44,041.30

Rp
Rp
Rp
Rp
Rp
Rp
Rp

20,504.00
534.00
4,680.00
552.00
3,250.00
2,705.00
32,225.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

27,960.00
890.00
11,700.00
1,380.00
4,875.00
4,057.50
50,862.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.80
1,660.00
11,700.00
1,380.00
4,875.00
4,057.50
24,403.30

Rp
Rp
Rp

50,862.50
24,403.30
103,726.60

Rp
Rp
Rp
Rp
Rp
Rp

7,245.00
982.80
110.40
682.50
54.10
9,074.80

Rp
Rp
Rp
Rp
Rp
Rp
Rp

33,000.00
4,330.00
14,040.00
828.00
6,500.00
541.00
59,239.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

220,038.00
46,592.00
321,900.00
1,380.00
11,700.00
53,625.00
4,328.00
659,563.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

773,300.00
22,000.00
124,200.00
315,900.00
219,375.00
1,454,775.00
14,547.75

Rp
Rp
Rp
Rp

39,260.00
3,608.40
1,780.00
1,380.00

Rp
Rp
Rp
Rp

270.50
11,700.00
3,250.00
61,248.90

Rp
Rp
Rp
Rp
Rp
Rp
Rp

39,260.00
1,780.00
1,380.00
270.50
11,700.00
3,250.00
57,640.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

785,200.00
35,600.00
27,600.00
5,410.00
234,000.00
65,000.00
1,152,810.00
115,281.00

Rp
Rp

659,563.00
659,563.00

Rp
Rp
Rp

659,563.00
1,454,775.00
2,114,338.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

932,000.00
35,600.00
57,360.00
703,000.00
49,500.00
448,162.50
46,592.00
63,102.00
349,500.00
237,250.00
16,380.00
154,440.00
98,280.00
31,464.00
13,525.00
3,236,155.50

Rp
Rp
Rp
Rp
Rp

7,867.50
18,800.00
585.00
135.25
27,387.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,090.51
4,100.27
169,507.69
15,738.84
97,998.24
67,658.82
381,094.37

Rp
Rp

27,378.93
5,315.17

Rp
Rp
Rp
Rp

187,975.46
13,253.76
1,959.96
235,883.27

Rp
Rp
Rp
Rp
Rp

659,563.00
2,152,616.22
2,305,620.00
200,000.00
5,317,799.22

Rp
Rp
Rp
Rp
Rp

659,563.00
1,798,630.44
1,729,215.00
200,000.00
4,387,408.44

Rp
Rp
Rp
Rp
Rp

659,563.00
2,056,944.39
2,075,058.00
200,000.00
4,991,565.39

Rp
Rp
Rp
Rp
Rp

659,563.00
1,473,346.21
845,394.00
200,000.00
3,178,303.21

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

170,000.00
12,903.75
1,558.80
3,765.00
19,500.00
21,060.00
2,484.00
1,623.00
232,894.55

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

170,000.00
15,789.75
3,637.20
3,765.00
19,500.00
21,060.00
2,484.00
1,623.00
237,858.95

Rp
Rp
Rp
Rp
Rp

3,090.00
1,549.00
6,962.80
650.00
2,948.40

Rp
Rp
Rp

347.76
135.25
15,683.21

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,635.00
3,605.70
5,271.70
2,275.00
3,510.00
414.00
135.25
19,846.65

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

447.60
8,050.00
17,937.50
320.00
160.00
2,790.00
23,400.00
56.00
656.00
440.00
8,125.00
13,338.00
2,208.00
1,082.00
25,905.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,622.70
112.00
975.00
702.00
1,104.00
54.10
13,569.80

Rp
Rp
Rp
Rp
Rp
Rp

2,796,000.00
195,000.00
842,400.00
110,400.00
16,230.00
3,960,030.00

Rp
Rp
Rp
Rp
Rp
Rp

489,620.00
34,125.00
49,140.00
5,796.00
281.32
578,962.32

Rp

79,530.00

Rp
Rp
Rp
Rp
Rp

487.50
7,020.00
828.00
40.58
87,906.08

Rp
Rp
Rp
Rp
Rp
Rp

75,300.00
162.50
23,400.00
276.00
135.25
99,273.75

Rp
Rp
Rp
Rp
Rp
Rp

18,410.00
487.50
7,020.00
828.00
40.58
26,786.08

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

261,680.00
3,797.50
8,325.00
866.00
32,500.00
70,200.00
16,560.00
5,951.00
399,879.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

603,946.88
19,527.90
284,741.25
4,176,105.63
623,185.58
329,781.50
1,121,400.00
300,100.00
169,200.00
493,675.00
13,627.31
50,000.00
2,477,783.81

Rp
Rp
Rp
Rp
Rp
Rp
Rp

921,300.00
165,834.00
58,500.00
126,360.00
29,808.00
5,951.00
1,307,753.00

Rp
Rp
Rp
Rp
Rp

26,520.00
7,735.00
1,170.00
2,808.00
331.20

Rp
Rp

97.38
38,661.58

Rp
Rp
Rp
Rp
Rp
Rp
Rp

149,520.00
43,610.00
2,632.50
6,318.00
745.20
221.81
203,047.51

Rp
Rp
Rp
Rp
Rp
Rp

15,680.00
325.00
4,680.00
552.00
270.50
21,507.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

23,000.00
140.00
325.00
4,680.00
552.00
270.50
28,967.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,333.10
5,472.30
2,575.20
16,250.00
37,440.00
16,560.00
10,820.00
91,450.60

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,089,000.00
22,500.00
115,240.00
63,382.00
219,375.00
315,900.00
124,200.00
1,949,597.00
19,495.97

Rp
Rp
Rp
Rp
Rp
Rp
Rp

68,880.00
20,090.00
1,755.00
4,212.00
496.80
1,460.70
95,433.80

DAFTAR HARGA BAHAN

Harga
No.

Nama dan Jenis Barang

Satuan
(Rp.)

BAHAN

Acustic 30 x 30

Lembar

Rp

75,720.00

Acustic 30 x 60

Lembar

Rp

109,200.00

Acustic 60 x 120

Lembar

Rp

205,200.00

Alang-alang

Ikat

Rp

2,350.00

Almunium B

Kg

Rp

Almunium C

Kg

Rp

Agregat Halus

Rp

76,600.00

Agregat Kasar

Rp

82,100.00

Arang

Kg

Rp

3,810.00

Asbes Gelombang Besar

Lembar

Rp

49,700.00

Asbes Gelombang Kecil

Lembar

Rp

43,200.00

Asbes Quality 1 x 1 m

Lembar

Rp

12,300.00

Asphalt

Kg

Rp

4,870.00

Asphalt Semen Pen. 60/70 atau Pen. 80/100

Kg

Rp

5,420.00

Atap Harflek

Lembar

Rp

48,700.00

Atap Multiroof / Emeral

Lembar

Rp

92,700.00

Atap Sirap

Lembar

Rp

990.00

10

Baja Profil

Kg

Rp

19,900.00

10

Bak Cuci Piring Logam

Buah

Rp

686,900.00

11

Bak Cuci Piring Teraso

Buah

Rp

728,500.00

11

Bak Cuci Tangan / Wastafel Keramik

Buah

Rp

565,400.00

12

Bak Mandi Fiber

Buah

Rp

921,300.00

12

Bak Mandi Plastik

Buah

Rp

752,000.00

13

Bak Mandi Porselin

Buah

Rp

1,379,200.00

13

Bak Mandi Teraso

Buah

Rp

688,900.00

14

Balok (0,15 x 0,15 x 5 m) Kualitas I Semantok

Batang

Rp

236,900.00

14

Bambu

Batang

Rp

13,500.00

15

Batacote

Buah

Rp

15,500.00

15

Bataco

Buah

Rp

2,410.00

16

Batu Apung

Kg

Rp

2,210.00

16

Batu ( 1000 - 1500 ) Kg

Rp

140,650.00

17

Batu ( 250 - 400 ) Kg

Rp

130,420.00

17

Batu ( 5 - 50 ) Kg

Rp

124,050.00

18

Batu Bata

Buah

Rp

542.50

18

Batu Kali / Batu Belah (Sungai / Gunung )

Rp

82,500.00

19

Batu Pecah 2 - 3 cm

Rp

282,100.00

19

Batu Paros

Rp

282,100.00

20

Batu Tempel

Rp

147,000.00

20

Baut Kap 1/2" - 8

Buah

Rp

3,800.00

21

Baut Spandek

Buah

Rp

1,325.00

21

BBM

Liter

Rp

5,650.00

22

Besi Beton Polos

Kg

Rp

7,030.00

22

Besi Beton Ulir

Kg

Rp

9,840.00

23

Besi Bout ( Kuda-Kuda ) 5/8" - 10

Buah

Rp

4,900.00

23

Besi jaring kawat baja

Buah

24

Besi strip

Kg

Rp

5,000.00

24

Besi presstressed polos

Kg

Rp

25

Beton Roster / Kerawang

Buah

Rp

8,050.00

25

Beton Tumbuk

Rp

707,320.00

26

Bubungan Genteng

M'

Rp

28,670.00

26

Bubungan Genteng Metal

M'

Rp

29,140.00

27

Bubungan Seng

M'

Rp

20,080.00

27

Bubungan Spandek

Lbr

Rp

31,660.00

28

Buis Beton 10 cm

Buah

Rp

21,290.00

28

Buis Beton 20 cm

Buah

Rp

28,670.00

29

Buis Beton 30 cm

Buah

Rp

41,050.00

29

Buis Tanah 10 cm

Buah

Rp

18,640.00

30

Buis Tanah 20 cm

Buah

Rp

24,940.00

30

Cat Besi

Kg

Rp

32,190.00

31

Cat Dasar Kayu

Kg

Rp

21,210.00

31

Cat Kayu Mengkilat

Kg

Rp

31,010.00

32

Cat Menie

Kg

Rp

15,490.00

32

Cat Tembok

Kg/ 5 Kg

Rp

26,780.00

33

Dempul Kayu

Kg

Rp

14,920.00

33

Dempul Jadi

Kg

Rp

14,920.00

34

Door closer

Bh

Rp

136,420.00

34

Door holder

Bh

Rp

136,420.00

35

Dynabolt/ ramset

Bh

Rp

6,120.00

35

Engsel Jendela

Pasang

Rp

10,725.00

36

Engsel Pintu

Pasang

Rp

18,410.00

36

Espagnolet

Buah

Rp

89,630.00

37

Floor Drain

Buah

Rp

15,680.00

37

Fellex 100% wool-T-21

Rp

80,680.00

38

Genteng Beton

Buah

Rp

5,120.00

38

Genteng decra bond

Buah

Rp

22,750.00

39

Genteng Flam

Buah

Rp

5,540.00

39

Genteng Keramik

Buah

Rp

8,720.00

40

Genteng Kodok

Buah

Rp

3,280.00

40

Genteng palentong kecil

Buah

Rp

2,700.00

41

Genteng palentong super / besar

Buah

Rp

2,980.00

41

Genteng Seng/Metal

Rp

70,380.00

42

Gip Sum

Buah

Rp

69,550.00

42

Grendel Jemdela / Pintu

Buah

Rp

7,800.00

43

Hak Angin

Buah

Rp

10,000.00

43

Hardener ferrovax

Kg

Rp

10,000.00

44

Ijuk

Kg

Rp

18,800.00

44

Interval cive artistik (5 x 5 x 20) cm

Bh

Rp

45

Kaca Bening Uk. 3 mm

Rp

57,300.00

45

Kaca Bening Uk. 5 mm

Rp

72,300.00

46

Kaca Bening Uk. 8 mm

Rp

82,300.00

46

Kaca Buram Uk. 12 mm

Rp

92,300.00

47

Kaca Rayband Uk. 5 mm

Rp

89,200.00

47

Kaca Cermin Uk. 5 mm

Rp

72,300.00

48

Kaca Cermin Uk. 6 mm

Rp

72,300.00

48

Kaca Cermin Uk. 8 mm

Rp

72,300.00

49

Kaca wireglass

Rp

72,300.00

49

Kaca Patri

Rp

72,300.00

50

Kalkarium

Kg

Rp

62,300.00

50

Kapur Batu

Rp

595,100.00

51

Kapur Sirih

Rp

643,700.00

51

Karpet 80% wool, 20% nylon

Rp

643,700.00

52

Karpus Asbes Gelombang Besar

M'

Rp

58,300.00

52

Karpus Asbes Gelombang Kecil

M'

Rp

49,600.00

53

Karpus Genteng Beton

M'

Rp

34,300.00

53

Karpus Genteng Flam

M'

Rp

43,100.00

54

Karpus Genteng Keramik

M'

Rp

55,300.00

54

Karpus Genteng Kodok

M'

Rp

31,000.00

55

Kawat Beton

Kg

Rp

11,000.00

55

Kawat Bronjong 3 mm

Kg

Rp

8,800.00

56

Kawat Bronjong 4 mm

Kg

Rp

9,900.00

56

Kawat Bronjong 5 mm

Kg

Rp

12,200.00

57

Kawat Bronjong Pabrikan Ukr. ( 1,5 x 1 x 1 )

Unit

Rp

247,500.00

57

Kawat Bronjong Pabrikan Ukr. ( 2 x 1 x 1 )

Unit

Rp

302,500.00

58

Kawat Bronjong Pabrikan Ukr. ( 3 x 1 x 0,5 )

Unit

Rp

247,500.00

58

Kawat Duri

Rol

Rp

134,400.00

59

Kawat Jaring

Lbr

Rp

122,400.00

59

Kawat Harmonika

Rp

22,100.00

60

Kawat Nyamuk / Kasa Logam

Rp

30,900.00

60

Kawat Nyamuk / Kasa Plastik

Rp

7,800.00

61

Kayu Bahan Pintu

Rp

2,875,000.00

61

Kayu Bakar

Rp

394,800.00

62

Kayu Bakau 10 cm

Batang

Rp

33,000.00

62

Kayu Beukesting Kelas III

Rp

1,963,000.00

63

Kayu Dolken / Tiang Perancah

Batang

Rp

1,804,200.00

63

Kayu Formika

Rp

13,180.00

64

Kayu Gelagar Uk. 8/15 - 4 m

Rp

1,952,083.33

64

Kayu Klass I ( Seumantok / Ulin / dll )

Rp

4,096,700.00

65

Kayu Klass II ( Kamper / Kruing / dll )

Rp

2,916,500.00

65

Kayu Klass III ( Borneo / dll )

Rp

2,330,000.00

66

Kayu Klass IV ( Sengon / dll )

Rp

1,945,000.00

66

Kayu Rangka / Bouwplank

Rp

1,940,900.00

67

Kayu Rangka Plafond

Rp

1,974,800.00

67

Kayu Reng Uk. 2/3 - 4 m

M'

Rp

6,900.00

68

Keramik Sisi Kulit Jeruk 20 x 20 cm

Rp

10,700.00

68

Keramik Uk. 40 x 40 cm

Buah

Rp

10,100.00

69

Keramik Uk. 40 x 40 cm (Anti Slip)

Buah

Rp

11,200.00

69

Keramik Uk. 33 x 33 cm

Buah

Rp

8,400.00

70

Keramik Uk. 33 x 33 cm (Anti Slip)

Buah

Rp

9,900.00

70

Keramik Uk. 30 x 30 cm

Buah

Rp

7,900.00

71

Keramik Uk. 25 x 25 cm

Buah

Rp

6,800.00

71

Keramik Uk. 20 x 20 cm

Buah

Rp

6,800.00

72

Keramik Uk. 15 x 15 cm

Buah

Rp

5,700.00

72

Keramik Uk. 30 x 33 cm

Buah

Rp

7,900.00

73

Keramik Uk. 15 x 25 cm

Buah

Rp

6,800.00

73

Keramik Uk. 10 x 33 cm

Buah

Rp

5,700.00

74

Keramik Uk. 10 x 20 cm

Buah

Rp

5,700.00

74

Kertas Amplas

Lembar

Rp

4,400.00

75

Kloset Duduk Keramik ( Setara KIA )

Buah

Rp

1,845,100.00

75

Kloset Jongkok

Buah

Rp

183,750.00

76

Kloset Jongkok Keramik ( Setara KIA )

Buah

Rp

261,680.00

76

Kloset Monoblok Lokal

Buah

Rp

111,900.00

77

Koral Beton

Rp

80,900.00

77

Kolom pracetak

Btng

Rp

220,000.00

78

Kran Leiding

Buah

Rp

23,000.00

78

Kuas

Buah

Rp

6,800.00

79

Kuda-Kuda Kayu

Rp

4,015,000.00

79

Kunci - Kunci Lokal

Bh

Rp

72,300.00

80

Kunci Lemari

Bh

Rp

48,300.00

80

Kunci tanam antik

Bh

Rp

135,300.00

81

Kunci tanam kamar mandi

Bh

Rp

75,300.00

81

Kunci Silender

Bh

Rp

105,300.00

82

Kunci Selot

Bh

Rp

105,300.00

82

Lampu Philips 18 Watt

Buah

Rp

92,000.00

83

Lampu Pijar 40 Watt

Buah

Rp

6,600.00

83

Lampu TL 20 Watt

Buah

Rp

87,000.00

84

Lampu TL 40 Watt

Buah

Rp

118,100.00

84

Lem Aibon

Buah

Rp

15,500.00

85

Lem vinyl

Kg

Rp

15,500.00

85

Lempangan Rumput

Rp

20,400.00

86

List eternit

M'

Rp

4,900.00

86

List kayu profil

Rp

7,900.00

87

Marmer

Rp

341,000.00

87

Meja Dapur

Buah

Rp

3,715,800.00

88

Meni Besi

Kg

Rp

19,500.00

88

Meni (read lead) A

Kg

Rp

89

Meni (read lead) B

Kg

Rp

89

Minyak Cat

Liter

Rp

12,200.00

90

Multipleks 3 mm

Lembar

Rp

46,400.00

90

Multipleks 4 mm

Lembar

Rp

62,300.00

91

Multipleks 6 mm

Lembar

Rp

73,000.00

91

Multipleks 9 mm

Lembar

Rp

122,700.00

92

N a c o ( Kerang + Daun )

Rp

185,900.00

92

Nok / Rabung Seng 0,35 Cat Pabrik

Lembar

Rp

43,300.00

93

Nok / Rabung Seng 0,35 Tidak Dicat

Lembar

Rp

31,000.00

93

Oksigen

M3

Rp

247,500.00

94

Paku Asbes

Kg

Rp

16,600.00

94

Paku Beton 2,5 cm

Kotak

Rp

11,050.00

95

Paku Beton 4 cm

Kotak

Rp

12,680.00

95

Paku Beton 5 cm

Kotak

Rp

14,300.00

96

Paku Beton 7 cm

Kotak

Rp

17,800.00

96

Paku Beton 8 cm

Kotak

Rp

19,250.00

97

Paku Beton 10 cm

Kotak

Rp

21,100.00

97

Paku Kait

Buah

Rp

1,100.00

98

Paku Kayu

Kg

Rp

8,900.00

98

Paku Reng

Kg

Rp

8,900.00

99

Paku Seng

Kg

Rp

30,900.00

99

Paku Sumbat

Buah

Rp

1,100.00

100

Paku Ulir Primadek

Buah

Rp

1,200.00

100

Panel Beton

Lbr

Rp

276,000.00

101

Papan Bakesting

Rp

1,962,900.00

101

Papan Kayu Bouwplank

Rp

1,948,800.00

102

Papan Kayu Klass I ( Seumantok / Ulin / dll )

Rp

4,015,000.00

102

Papan Kayu Klass II ( Meranti / Kruing / dll )

Rp

2,875,000.00

103

Papan Kayu Klass III ( Berneo )

Rp

2,345,000.00

103

Papan Lisplank semantok 3/30 cm

M'

Rp

23,200.00

104

Papan Rider

Lbr

Rp

59,900.00

104

Pasir Beton / Kerikil

Rp

89,600.00

105

Pasir Pasang

Rp

86,600.00

105

Pasir Urug

Rp

54,700.00

106

Pasir Silika

Kg

Rp

24,700.00

106

Paving Block

Rp

65,200.00

107

Penutup Atap Spandek

Rp

92,400.00

107

Penutup Atap Prima Deck

Lbr

Rp

49,620.00

108

Pintu Besi Baja

Rp

389,620.00

108

Pintu gulung besi

Rp

589,620.00

109

Pintu lipat

Rp

389,620.00

109

Pintu Sunscreen allumunium

Rp

389,620.00

110

Pintu Alumunium

Rp

489,620.00

110

Pipa GIP 100 mm

M'

Rp

71,320.00

111

Pipa GIP 150 mm

M'

Rp

133,250.00

111

Pipa GIP 200 mm

M'

Rp

150,050.00

112

Pipa GIP 50 mm

M'

Rp

37,470.00

112

Pipa GIP 75 mm

M'

Rp

53,500.00

113

Pipa Leiding 1" Galvanis

Batang

Rp

100,500.00

113

Pipa Leiding 1/2" Galvanis

Batang

Rp

57,400.00

114

Pipa Leiding 1 1/12" Galvanis

Batang

Rp

130,600.00

114

Pipa Leiding 2" Galvanis

Batang

Rp

177,000.00

115

Pipa Leiding 3/4" Galvanis

Batang

Rp

80,800.00

115

Pipa Leiding 23" Galvanis

Batang

Rp

387,000.00

116

Pipa Leiding 4" Galvanis

Batang

Rp

1,532,800.00

116

Pipa PVC 1"

Batang

Rp

36,400.00

117

Pipa PVC 1/2" Kualitas AWE (United)

Batang

Rp

22,100.00

117

Pipa PVC 1 1/2"

Batang

Rp

97,000.00

118

Pipa PVC 2"

Batang

Rp

104,900.00

118

Pipa PVC 2 1/2"

Batang

Rp

116,000.00

119

Pipa PVC 3"

Batang

Rp

119,000.00

119

Pipa PVC 3/4"

Batang

Rp

26,400.00

120

Pipa PVC 4"

Batang

Rp

124,600.00

120

Plamur Tembok

Kg

Rp

30,900.00

121

Pelat asbes tebal 5 mm

Lbr

Rp

70,900.00

121

Pelat asbes tebal 4 mm

Lbr

Rp

61,200.00

122

Pelat asbes tebal 3.5 mm

Lbr

Rp

60,900.00

122

Perekat

Kg

Rp

30,900.00

123

Plint Keramik 15 x 20 cm

Buah

Rp

9,900.00

123

Plint Ubin Abu-Abu 15 x 20 cm

Buah

Rp

1,100.00

124

Plint Ubin Abu-Abu 10 x 30 cm

Buah

Rp

3,300.00

124

Plint Ubin Abu-Abu 10 x 40 cm

Buah

Rp

3,300.00

125

Plint Ubin Berwarna 15 x 20 cm

Buah

Rp

2,200.00

125

Plint Ubin Berwarna 10 x 30 cm

Buah

Rp

3,300.00

126

Plint Ubin Berwarna 10 x 40 cm

Buah

Rp

3,300.00

126

Plint Ubin Teraso 10 x 30 cm

Buah

Rp

3,300.00

127

Plint Ubin Teraso 10 x 40 cm

Buah

Rp

3,300.00

127

Plint Ubin Granito 10 x 30 cm

Buah

Rp

3,300.00

128

Plint Ubin Granito 10 x 40 cm

Buah

Rp

3,300.00

128

Plint Ubin teralux kerang 10 x 30 cm

Buah

Rp

3,300.00

129

Plint Ubin teralux kerang 10 x 40 cm

Buah

Rp

3,300.00

129

Plint Ubin teralux marmer 10 x 30 cm

Buah

Rp

3,300.00

130

Plint Ubin teralux marmer 10 x 40 cm

Buah

Rp

3,300.00

130

Plint Ubin teralux marmer 10 x 60 cm

Buah

Rp

3,300.00

131

Plywood 3 mm

Lembar

Rp

46,600.00

131

Plywood 4 mm

Lembar

Rp

66,600.00

132

Plywood 6 mm

Lembar

Rp

80,600.00

132

Politur

Ltr

Rp

80,600.00

133

Politur Jadi

Ltr

Rp

80,600.00

133

Porselin 10 x 15 cm

Rp

89,400.00

134

Porselin 11 x 11 cm

Rp

89,400.00

134

Porselin 15 x 15 cm

Rp

89,400.00

135

Porselin 20 x 20 cm

Rp

48,500.00

135

Profil Alluminium "T"

M'

Rp

38,500.00

136

Rel Pintu Dorong

Bh

Rp

4,500.00

136

Residu

Liter

Rp

4,500.00

137

Reservoir Air Rangka Baja 0,5 m

Buah

Rp

8,679,800.00

137

Reservoir Air Rangka Baja 1 m

Buah

Rp

12,471,700.00

138

Rolling Door Besi

Rp

939,800.00

138

Roof light fibreglass ( 180 x 90 ) cm

Lbr

Rp

93,700.00

139

Sabun

Kg

Rp

10,200.00

139

Schakelar Merk Braco

Buah

Rp

15,500.00

140

Seal Tape

Lbr

Rp

5,600.00

140

Semen PC @ 40 Kg

Zak

Rp

55,500.00

141

Semen Padang / Cibonong @ 50 Kg

Zak

Rp

63,500.00

141

Semen Tahan Asam @ 40 Kg

Zak

Rp

73,900.00

142

Semen Merah

Zak

Rp

74,900.00

142

Semen Putih

Zak

Rp

100,400.00

143

Seng BJLS 0,20 8"

Lembar

Rp

78,400.00

143

Seng BJLS 0,20 Cat Pabrik 8"

Lembar

Rp

96,500.00

144

Seng Gelombang BJLS 30 8"

Lembar

Rp

99,600.00

144

Seng Gelombang BJLS 30 Cat Pabrik 8"

Lembar

Rp

98,400.00

145

Seng Plat BJLS 20

Lembar

Rp

44,200.00

145

Seng Plat BJLS 24

Lembar

Rp

44,200.00

146

Seng Plat BJLS 28

Lembar

Rp

44,200.00

146

Seng Plat BJLS 30

Lembar

Rp

60,700.00

147

Septictank dan Rembesan 1 m

Buah

Rp

4,350,400.00

147

Septictank dan Rembesan 1,5 m

148

Buah

Rp

7,150,900.00

Septictank dan Rembesan 2 m

Buah

Rp

10,939,900.00

148

Septictank dan Rembesan 6 m

Buah

Rp

19,806,000.00

149

Sisalation / alluminium foil

Rp

104,800.00

149

Soda Api

Rp

23,200.00

150

Soft board 4 mm

Lbr

Rp

74,800.00

150

Spring Knips

Bh

Rp

74,800.00

151

Stop Kontak + Instalasi

Titik

Rp

104,800.00

151

Stut Werk

Rp

1,962,900.00

152

Sumur Pompa Tangan Terpasang

Buah

Rp

743,300.00

152

Talang Plastik

M'

Rp

52,800.00

153

Tanah Timbun

Rp

43,400.00

153

Teak Oil

Ltr

Rp

28,680.00

154

Tegel Abu-Abu 30 x 30 cm

Buah

Rp

3,965.00

154

Tegel Sisik Badak

Buah

Rp

7,700.00

155

Teralis Besi Plat / Siku

Rp

233,400.00

155

Teralis Besi Plat / Siku tahan api

Rp

333,400.00

156

Thinner

Ltr

Rp

20,500.00

156

Titik Lampu + Instalasi

Titik

Rp

99,400.00

157

Ubin Abu-Abu 20 x 20 cm

Bh

Rp

3,950.00

157

Ubin Abu-Abu 30 x 30 cm

Bh

Rp

5,450.00

158

Ubin Abu-Abu 40 x 40 cm

Bh

Rp

6,450.00

158

Ubin Berwarna 20 x 20 cm

Bh

Rp

5,450.00

159

Ubin Berwarna 30 x 30 cm

Bh

Rp

6,450.00

159

Ubin Berwarna 40 x 40 cm

Bh

Rp

7,450.00

160

Ubin Keramik Artistik 10 x 10 cm

Bh

Rp

4,450.00

160

Ubin Keramik Artistik 10 x 20 cm

Bh

Rp

5,450.00

161

Ubin Keramik Artistik 5 x 20 cm

Bh

Rp

3,950.00

161

Ubin Teraso 20 x 20 cm

Bh

Rp

4,450.00

162

Ubin Teraso 30 x 30 cm

Bh

Rp

5,450.00

162

Ubin Teraso 40 x 40 cm

Bh

Rp

3,950.00

163

Ubin Granito 20 x 20 cm

Bh

Rp

4,450.00

163

Ubin Granito 30 x 30 cm

Bh

Rp

5,450.00

164

Ubin Granito 40 x 40 cm

Bh

Rp

6,450.00

164

Ubin Teralux kerang 40 x 40 cm

Bh

Rp

7,450.00

165

Ubin Teralux kerang 30 x 30 cm

Bh

Rp

6,450.00

165

Ubin Teralux Marmer 30 x 30 cm

Bh

Rp

6,450.00

166

Ubin Teralux Marmer 40 x 40 cm

Bh

Rp

6,450.00

166

Ubin Teralux Marmer 60 x 60 cm

Bh

Rp

6,450.00

167

Ubin Tahan Asam

Bh

Rp

6,450.00

167

Ubin Wafel 20 x 20 cm

Bh

Rp

4,450.00

168

Urinoir Keramik ( Setara KIA )

Buah

Rp

804,000.00

168

Urinoir Traso

Buah

Rp

558,300.00

169

Gravel Pack dia. 5 mm - 10 mm

M3

Rp

225,000.00

169

Grease

Kg

Rp

20,000.00

170

Bentonite

Kg

Rp

20,000.00

170

Minyak Solar

Ltr

Rp

6,000.00

171

Pelumas Gardan

Ltr

Rp

27,000.00

171

Pelumas Gear Box

Ltr

Rp

27,000.00

172

Pelumas Hydraulick

Ltr

Rp

27,000.00

172

Pelumas Mesin

Ltr

Rp

27,000.00

173

Pelumas Transmisi

Ltr

Rp

27,000.00

173

Pipa GIP dia. 200 mm

M'

Rp

960,000.00

174

Pipa GIP dia. 150 mm

M'

Rp

580,000.00

174

Pipa GIP dia. 75 mm

M'

Rp

145,000.00

175

Pipa GIP dia. 50 mm

M'

Rp

100,000.00

#REF!

Zekering Kast Lokal 1 Group

Buah

Rp

87,300.00

176

Zekering Kast Lokal 2 Group

Buah

Rp

111,500.00

177

Zekering Kast Lokal 3 Group

Buah

Rp

161,500.00

DAFTAR HARGA UPAH


Harga
No.

DESKRIPSI

Satuan
(Rp.)

II

U PAH

Mandor

Orang/Hari

Rp

54,100.00

Kepala Tukang Kayu / Cat

Orang/Hari

Rp

55,200.00

Tukang Kayu / Cat

Orang/Hari

Rp

46,800.00

Laden Tukan Kayu / Cat

Orang/Hari

Rp

37,800.00

Laden Tukang Batu / Besi

Orang/Hari

Rp

37,800.00

Kepala Tukang Batu / Besi

Orang/Hari

Rp

55,200.00

Tukang Kayu / Besi

Orang/Hari

Rp

46,800.00

Laden Tukang Kayu

Orang/Hari

Rp

37,800.00

Pekerja

Orang/Hari

Rp

32,500.00

10

Pekerja Galian Tanah

Orang/Hari

Rp

32,500.00

11

Penjaga Malam / Satpam

Orang/Hari

Rp

30,100.00

Driller

Orang/Hari

Rp

82,500.00

Mekanik

Orang/Hari

Rp

83,500.00

Welder

Orang/Hari

Rp

83,500.00

Driver / Operator

Orang/Hari

Rp

72,500.00

Ass. Driller

Orang/Hari

Rp

61,500.00

Tenaga Pembantu / Helper

Orang/Hari

Rp

34,450.00

#REF!

Sopir

Orang/Hari

Rp

64,500.00

#REF!

Operator

Orang/Hari

Rp

82,500.00

Keterangan

0.048
20.8333333333

11.1111111111
40,000.00

Keterangan

You might also like