Umm Al Houl Power Iwpp: Fabricated Spool Pipes Release Approval

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

UMM AL HOUL POWER IWPP

FABRICATED SPOOL PIPES RELEASE APPROVAL


Sub-Contractor

PIPING DIRECT TEAM

DOC NO.

UHP-SCT-P-FAB-0044

TYPE
DATE

16-Nov-16

Sandblasting and Painting Work-Carbon Steel

Item of Work :

Relevant Section & Page of Contract Document :

Paint System:

Others :

See the attachment

NOZ 6.1

For Blasting
For Primer Coat
For Intermediate Coat
For Final Coat

* Unless otherwise specified, samples are not submitted.


Compliance with Specification

Yes

SCT ACTION

No
Sub-CONTRACTOR ACTION

Prepared By :

Approved By :

Recieved By :

Date :

Date :

Date :

16-Nov-16
REQ NO : 044

FOR SANDBLASTING AND PAINTING


SR. No.

LINE NUMBER

SHEET NO.

Description
ITEM

Mat'l

SIZE

WEIGHT (KG)

TOTAL WEIGHT

CLASS

PAINT SYSTEM

QUANTITY

REMARKS

1
2
3

H-BEAM
H-BEAM
STIFFENER PLATE

1
1
1

H-BEAM
H-BEAM
PLATE

CS
CS
CS

UC356X368X153
UC356X368X153
12T X 177 X 319

383.8
51.7
5.3

383.8
103.4
21.2

A36
A36
A36

NOZ 6.1
NOZ 6.1
NOZ 6.1

1
2
4

EA
EA
EA

L = 2510
L = 338

4
5
6

H-BEAM
H-BEAM
STIFFENER PLATE

1
1
1

H-BEAM
H-BEAM
PLATE

CS
CS
CS

UC356X368X153
UC356X368X153
12T X 177 X 319

348.6
51.7
5.3

348.6
103.4
21.2

A36
A36
A36

NOZ 6.1
NOZ 6.1
NOZ 6.1

1
2
4

EA
EA
EA

L = 2280
L = 338