DESCRIPTION
Project Name :Drawing No :-BE1601/2015/02
T.O :- MHM Aathif
Date :Take of List
Super Structre
1. Site Clearance
2. Top soil removal
3. Disposal of Top soil removal
4. Trench Excavation
5. Backfilling to Trench Excavation
6. Disposal of Dewatering
7. Earth Work Support
8.Compaction of bottom of excavation
9 . Blinding
10. Add Disposal
11. Ddt Backfilling
12. Poluthene sheet
13. Formwork to foundation
14. Concert to foundation
15 Add Disposal
16 Ddt Backfilling
17. Brick wall
18. Add Disposal
19. Ddt Backfilling
20. Hard core filling
21. Compaction of Hardcore
22. DPC
23. DPM
24. Concrete Bed
25. Trimming of site of Excavation

DESCRIPTION

DESCRIPTION

total External girth


15,150
15,150
6,075
6,075
42,450

DESCRIPTION

. 1/2 1.50.7
=0.525 ^2
4 wall

4.5m

Ddt
4/2/112.5 (900)
41550

228038

1/290051
9.62

2/51625
11250

2wall

4.5
-

900
hight

2,280.38

1/2brick
wall

2.8

1,275
4/1500
6000

hight 2.8 m

total
3000
4125
6000
13125

3 walls

ddt

3400
(2800)

hight 4.5m

600
add
support
100
(100)
700

42.45
4.50

191.03

5.63
4.50

50.67

13.13
2.80

36.76

1.50
0.70

2.10

0.90
2.28

4.10

DESCRIPTION

1 brick wall

21
/
2

1
/
2

0.90
0.52

3.00
4.50
3

1.28
2.80
1.50
0.70

0.47
285.13

13.50

1/2
10.75

3.15
27.40

brick wall

DESCRIPTION

DESCRIPTION

DESCRIPTION

DESCRIPTION

DESCRIPTION

DESCRIPTION

DESCRIPTION

DESCRIPTION

DESCRIPTION

DESCRIPTION

DESCRIPTION

BILL OF QUANTITIES FOR FOUNDATIONS-01

ITEM NO

DESCRIPTION

QUANTITY

UNIT

RATE

AMOUNT
Rs

Cts

00

18

BILL OF QUANTITIES FOR FOUNDATIONS-01

ITEM NO

DESCRIPTION

QUANTITY

19

UNIT

RATE

AMOUNT
Rs

Cts

ITEM NO

DESCRIPTION

QUANTITY

UNIT

RATE

AMOUNT
Rs

Cts