Super Structure
Super Structure
Super Structure
DESCRIPTION
Project Name :Drawing No :-BE1601/2015/02
T.O :- MHM Aathif
Date :Take of List
Super Structre
1. Site Clearance
2. Top soil removal
3. Disposal of Top soil removal
4. Trench Excavation
5. Backfilling to Trench Excavation
6. Disposal of Dewatering
7. Earth Work Support
8.Compaction of bottom of excavation
9 . Blinding
10. Add Disposal
11. Ddt Backfilling
12. Poluthene sheet
13. Formwork to foundation
14. Concert to foundation
15 Add Disposal
16 Ddt Backfilling
17. Brick wall
18. Add Disposal
19. Ddt Backfilling
20. Hard core filling
21. Compaction of Hardcore
22. DPC
23. DPM
24. Concrete Bed
25. Trimming of site of Excavation
DESCRIPTION
DESCRIPTION
DESCRIPTION
. 1/2 1.50.7
=0.525 ^2
4 wall
4.5m
Ddt
4/2/112.5 (900)
41550
228038
1/290051
9.62
2/51625
11250
2wall
4.5
-
900
hight
2,280.38
1/2brick
wall
2.8
1,275
4/1500
6000
hight 2.8 m
total
3000
4125
6000
13125
3 walls
ddt
3400
(2800)
hight 4.5m
600
add
support
100
(100)
700
42.45
4.50
191.03
5.63
4.50
50.67
13.13
2.80
36.76
1.50
0.70
2.10
0.90
2.28
4.10
DESCRIPTION
1 brick wall
21
/
2
1
/
2
0.90
0.52
3.00
4.50
3
1.28
2.80
1.50
0.70
0.47
285.13
13.50
1/2
10.75
3.15
27.40
brick wall
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
ITEM NO
DESCRIPTION
QUANTITY
UNIT
RATE
AMOUNT
Rs
Cts
00
18
ITEM NO
DESCRIPTION
QUANTITY
19
UNIT
RATE
AMOUNT
Rs
Cts
ITEM NO
DESCRIPTION
QUANTITY
UNIT
RATE
AMOUNT
Rs
Cts