Final To Matrix
Final To Matrix
Parts
A
After Construction
1 Substantial Completion
2 Completion
2.1 Retention
(per Tram Stop)
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
Wirerope
Glazing
Overhead
Contact Rail
Inspection
Snag
Taking Over
Certificate
Aprroved O&MM
Sec 16 Part 14
Warranties
Sec 25 Part 4
( General
Sec 16 Part 14 Sec 16 Part 14 warranty &
Sec 16 Part 14
Manufacturers
Warranty 10yr)
Spares
Training
As-built Drawing
Sec 16 Part 14
methods for
maintaining installed
products and
precautions against
cleaning
materials and
methods detrimental
to finishes and
performance
Main Frame
Glazing
Sliding Door
Column
Cladding
GFRG
Sec 16 Part
14 / Sec 25
Part 4
Sec 25 Part 4
Sec 25 Part 4
( General
warranty 5 yr
commencing
Sec 16 Part 14 Substantial
Completion
Date,
Manufacturers
Warranty 10yr)
Sec 24 Part 16
(Installation 1
Sec 25 Part 4 Sec 25 Part 4
yr, Material 5
( General
( General
years
warranty &
warranty &
commencing
Manufacturers Manufacturers
Substantial
Warranty 10yr) Warranty 10yr)
Completion
Date)
Sec 25 Part 4
Sec 25 Part 4
ITP-0136 (Paint
Arch Exposed
SS)
Site Fixture
General
Sec 27 Part 9
Sec 27 Part 9
Sec 27 Part 9
Sec 16 Part 11
(warranty from
the paint
manufacturer)
Waiting RoomGlass
Enclosure
DOCUMENT NO.
SN
DESCRIPTION / TITLE
SPECIFICATION
1874C-03SG-MT-0200
0200
1874C-02CG-MT-0202
0202
1874C-02CG-MT-0203
0203
1874C-03SG-MT-0201
0201
1874C-01AR-MT-0254
0254
1874C-01CW-MT-0252
0252
1874C-03SG-MT-0208
0208
1874C-03SG-MT-0309
0309
1874C-03SG-MT-0310
0310
1874C-01AR-MT-0359
0359
1874C-01AR-MT-0253
0253
1874C-03SG-MT-0199
0199
Material Transmittal for Tramstop Canopy Tension Rod 80mm Dia., Fork Heads and
Cap Nuts
1874C-01CW-MT-0212
0212
1874C-01AR-MT-0204
0204
1874C-02CG-MT-0225
0225
1874C-01AR-MT-0255
0255
1874C-03SG-MT-0198
0198
1874C-01CW-MT-0251
0251
1874C-01CW-MT-0274
0274
1874C-01CW-MT-0311
0311
1874C-01AR-MT-0312
0312
Sec 24 Part 16
1874C-01CW-MT-0250
0250
1874C-01CW-MT-0207
0207
1874C-01AR-MT-0406
0406
Material Transmittal - Totems FE-103 & FE105 and Signage S8, S-10A
1874C-03SG-MT-0408
0408
1874C-03SG-MT-0409
0409
1874C-01AR-MT-0313
0313
1874C-03SG-MT-0410
0410
1874C-03SG-MT-0411
0411
1874C-01AR-MT-0414
0414
1874C-03SG-MT-0421
0421
Sec 25 Part 4
SPECIFICATION
ITP
MDS-0577
MDS-0596
MDS-0448, 0459, 0502, 0521, 0554, 0555, 0665, 0701, 0722, 0808, 0819, 083
MDS-0710, 0798, 0867
MDS-0916, 0989
MDS-0585, 0568, 0613, 0674
MDS-0556, 0569, 0629, 0669, 0842
MDS-0462, 0510, 0522, 0552, 0557, 0662, 0720, 0927
MDS-0630, 0670
MDS-0444, 0449, 0455, 0624, 0456, 0457, 0458, 0462, 0500, 0501, 0510, 052
MDS-0454, 0584, 0664
MDS-0678, 0711, 0773, 0781, 0832, 0874, 0928, 0982, 0999,1004
MDS-0586
Sec 5 Part 6.2.5
MDS-0373
MDS-0544, 0553, 0566, 0567, 0623, 0671, 0723, 0783, 0858
MDS-0541, 0549, 0550, 0551, 0564, 0588, 0608, 0663, 0721, 0923, 0994
MDS-0951, 0961, 1005
MDS-0596
Sec 25 Part 4.5.8
MDS-0924
MDS-0813
MDS-0814, 0840, 0975
462, 0500, 0501, 0510, 0520, 0522, 0538, 0540, 0557, 0558, 0559, 0576, 0643, 0661, 0694, 0695, 0700, 0712,
982, 0999,1004
783, 0858
4, 0695, 0700, 0712, 0713, 0724, 0725, 0727, 0784, 0785, 0797, 0805, 0806, 0818, 0820, 0831, 0838, 0843, 0
A. Substantial Completion
Canopy
Super
Structure
Inspection &
Doc Review
Snag
Wirerope
Reinspection
Inspection &
Doc Review
Yes
Snag
No
B. Completion
Reinspection
Yes
No
Overhead
Contact Rail
Glazing
Inspection &
Doc Review
Snag
Reinspection
Yes
No
Inspection &
Doc Review
Snag
Main Frame
Reinspection
Yes
No
Inspection &
Doc Review
Snag
Reinspection
Yes
No
Glazing
Reinspection
Inspection &
Doc Review
Snag
Column
Cladding
Sliding Door
Reinspection
Yes
No
Inspection &
Doc Review
Snag
Reinspection
Yes
No
Inspection &
Doc Review
Snag
GFRG
Reinspection
Yes
No
Inspection &
Doc Review
Snag
Site Fixture
Reinspection
Yes
No
Inspection &
Doc Review
Snag
Reinspection
Yes
No
Item
System
Parts
Final Inspection
Snag
Final Inspection
Report
Taking Over
Certificate
Canopy Super
Structure
Document
Review
Client's comment
Wirerope
Glazing
Overhead
Contact Rail
Main Frame
Each TRAM STOP
Glazing
Site inspection
of the
completed
activities.
Final Inspection
Reports has
been signed by
all Parties
Taking over
Certificate
issued for each
Tram Stop
Sliding Door
Column
Cladding
GFRG
Site Fixture
B)
Project Documents
Item
System
Parts
Taking Over
Certificate
Aprroved O&MM
Warranties
Training
As-built Drawing
Canopy Super
Structure
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
Column
Cladding
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
GFRG
N/A
SP-0200-4, Sec
24 Part 16
N/A
N/A
Site Fixture
SP-0200-4, Sec
27 Part 9
SP-0200-4, Sec
27 Part 9
SP-0200-4, Sec
27 Part 9
SP-0200-4, Sec
27 Part 9
Wirerope
Glazing
Overhead
Contact Rail
Main Frame
Each AREA
(North - TS21-25;
Loop - TS2, 4-9;
South - TS10-11,
13-14, 16)
Glazing
Sliding Door
Tram Stop Waiting
Room (ITP-0135, ITP0136, ITP-1001)
FINAL TURNOVER
DOCUMENTS
Item
System
Parts
Document
Review
Final Inspection
Wirerope
(Cable Net)
Type of Snag:
Cat A - before
operation.
Cat B - after
operation
Overhead
Contact Rail
(OCR)
Site inspection
of the
completed
activities.
Snag:
Category A
Glazing
Taking Over
Certificate
Glazing
Main Frame
Final Inspection
Report
With comment
Canopy Super
Structure
Snag
Final Inspection
Reports has
been signed by
all Parties
Taking over
Certificate
issued for each
Tram Stop
Sliding Door
Snag:
Category A
Column
Cladding
GFRG
Site Fixture
(Bench, Totem)
B)
Without comment
Project Documents
Item
System
Parts
Aprroved O&MM
Warranties
Training
As-built Drawing
Canopy Super
Structure
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
N/A
SP-0200-4, Sec
16 Part 14
Wirerope
(Cable Net)
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
N/A
SP-0200-4, Sec
16 Part 14
Glazing
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
N/A
SP-0200-4, Sec
25 Part 4
Overhead
Contact Rail
(OCR)
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
N/A
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
N/A
SP-0200-4, Sec
16 Part 14
Glazing
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
N/A
SP-0200-4, Sec
25 Part 4
Sliding Door
SP-0200-4, Sec
25 Part 4
SP-0200-4, Sec
25 Part 4
N/A
SP-0200-4, Sec
25 Part 4
Column
Cladding
SP-0200-4, Sec
16 Part 14
SP-0200-4, Sec
16 Part 14
N/A
SP-0200-4, Sec
16 Part 14
GFRG
N/A
SP-0200-4, Sec
24 Part 16
N/A
N/A
SP-0200-4, Sec
27 Part 9
SP-0200-4, Sec
27 Part 9
SP-0200-4, Sec
27 Part 9
SP-0200-4, Sec
27 Part 9
Main Frame
Each AREA
(North - TS21-25;
Loop - TS2, 4-9;
South - TS10-11,
13-14, 16)
Taking Over
Certificate
Site Fixture
(Bench, Totem)
FINAL TURNOVER
DOCUMENTS
Title
Taking over certificate (Each Area / Each Tram Stop)
Sub-section
no
Description
1.1
1.2
ITP
1.3
1.4
2.1
2.2
2.3
2.4
Operation
2.5
Maintenance
2.6
Troubleshooting
2.7
Disposal Instruction
2.8
2.9
Warranties (General)
2.10
Emergency Information
2.11
Manufacturer's Literature
2.12
2.13
3.1
List of Warranties
3.2
4.1
List of Training
4.2
Training Manual
4.3
Training Certificate
5.1
5.2
As-built Drawing
Training (General)
Tegula
Angle bar
Remark
53
15
71
120
sqm
pc
pc
pc
53
5
23.66667
40
121.6667
42500
Note:
1) Based on Subcontract Agreement, NOSC-3470-TS-004
Clause 14 Outstanding Works and Defects (Taking Over Certificate for Main Work or Sectio
Clause 16 Payment of Retention Money
Clause 16.4.1 (a) Taking Over Certificate with respect to the whole of the Main Works
(b) Furnishing of all documentation (Approved O&MM, Warranties, Spares,
Clause 16.4.2 (a) issuance of Performance Certificate