Key Slurry Parameters
Key Slurry Parameters
Key Slurry Parameters
Slurry gradient
Unit
ppg
Pumpability time
minutes
Thickening time
Compressive strength psi
cc/30 min
Fann VG Meter
Readings
Rheology
Notes:
* The pumpable time of the slurry must exceed the planned job time, including mixing, by a contin
any problems which may be experienced. As a general guide, one hour contingency should be used
cementations and half an hour for plug-back cementations.
* The final strength of cement typically used for primary cementations must be greater than 3 000
around the shoe
Test Details
Pan Am consistometer test measured at
Bottom Hole Circulating Temperature (API
tables)
must exceed the planned job time, including mixing, by a contingency time to allow for
nced. As a general guide, one hour contingency should be used for casing
lug-back cementations.
ally used for primary cementations must be greater than 3 000 psi with higher strength