Palm Valley (Plot B)

#
1
2

Activity Name

Original Start
Duration

915-1 Palm Valley (Plot B)


915-1.1 Project Milestone

18

October 2016
25

02

09

16

November 2016
23

30

06

13

20

December 2016
27

04

11

18

uary 2017

January 2017
25

01

08

15

22

01-Jan-17

01-Jan-17, 915-1.1 Project Milestone

0 08-Sep-16
0

Project Start

0 01-Sep-16

Project Finish,
Project Start, 01-Sep-16

92 01-Sep-16

01-Jan-17

01-Jan-17, 915-1.2 Management

92 01-Sep-16

01-Jan-17

Management

915-1.3 General

92 01-Sep-16

01-Jan-17

01-Jan-17, 915-1.3 General

External Meetings

92 01-Sep-16

01-Jan-17

External Meetings

10

Internal Meetings

92 01-Sep-16

01-Jan-17

29 01-Sep-16

10-Oct-16

10-Oct-16, 915-1.4 Concept Design and BODR

29 01-Sep-16

10-Oct-16

10-Oct-16, 915-1.4.1 Architectural

29 01-Sep-16

10-Oct-16

Architectural BODR Preparation

12
13
14

915-1.4 Concept Design and BODR


915-1.4.1 Architectural
Architectural BODR Preparation

915-1.4.2 Structural

Internal Meetings

29 01-Sep-16

10-Oct-16

10-Oct-16, 915-1.4.2 Structural

15

Structural BODR Preparation

29 01-Sep-16

10-Oct-16

Structural BODR Preparation

16

915-1.4.3 Electro - Mechanical

29 01-Sep-16

10-Oct-16

10-Oct-16, 915-1.4.3 Electro - Mechanical

17

Electro - Mechanical

29 01-Sep-16

10-Oct-16

Electro - Mechanical

18

915-1.4.4 Submission

0 10-Oct-16

10-Oct-16

10-Oct-16, 915-1.4.4 Submission

19

Submission of BODR

10-Oct-16

Submission of BODR,

0 10-Oct-16

10-Oct-16

10-Oct-16, 915-1.4.5 Client Review and Approval

10-Oct-16

Client Review and Appr,

0 10-Oct-16

10-Oct-16

10-Oct-16, 915-1.4.6 Invoice

10-Oct-16

Invoice (1),

20
21
22
23
24

915-1.4.5 Client Review and Approval


Client Review and Appr

915-1.4.6 Invoice
Invoice (1)

915-1.7 Plot B Permit Package

13 10-Oct-16

25-Oct-16

25-Oct-16, 915-1.7 Plot B Permit Package

25

Architectural

13 10-Oct-16*

25-Oct-16

Architectural

26

Structural

13 10-Oct-16*

25-Oct-16

Structural

24 10-Nov-16

12-Dec-16

12-Dec-16, 915-1.5 Detailed Design (Draft) - 50 %

24 10-Nov-16

12-Dec-16

12-Dec-16, 915-1.5.1 Architectural

24 10-Nov-16*

12-Dec-16

Architectural Detailed Design Drawings

24 10-Nov-16

12-Dec-16

12-Dec-16, 915-1.5.2 Structural

24 10-Nov-16*

12-Dec-16

Structural Detailed Design Drawings

24 10-Nov-16

12-Dec-16

12-Dec-16, 915-1.5.3 Plumbing / Fire Fighting

24 10-Nov-16*

12-Dec-16

Plumbing / Fire Fighting Detailed Design Drawings

24 10-Nov-16

12-Dec-16

12-Dec-16, 915-1.5.4 HVAC

24 10-Nov-16*

12-Dec-16

HVAC Detailed Design Drawings

24 10-Nov-16

12-Dec-16

12-Dec-16, 915-1.5.5 Electrical

24 10-Nov-16*

12-Dec-16

Electrical Detailed Design Drawings

24 10-Nov-16

12-Dec-16

12-Dec-16, 915-1.5.6 Infrastructure

24 10-Nov-16*

12-Dec-16

Infrastructure Design Detailed Drawings

24 10-Nov-16

12-Dec-16

12-Dec-16, 915-1.5.7 Roads

24 10-Nov-16*

12-Dec-16

Roads Detailed Design Drawings

0 12-Dec-16

12-Dec-16

12-Dec-16, 915-1.5.8 Submission

12-Dec-16

Submission of Detailed Design,

0 12-Dec-16

12-Dec-16

12-Dec-16, 915-1.5.9 Client Review and Approval

12-Dec-16

Detailed Design Client Review and Appr,

0 12-Dec-16

12-Dec-16

12-Dec-16, 915-1.5.10 Invoice

12-Dec-16

Invoice (2),

27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

915-1.5 Detailed Design (Draft) - 50 %


915-1.5.1 Architectural
Architectural Detailed Design Drawings

915-1.5.2 Structural
Structural Detailed Design Drawings

915-1.5.3 Plumbing / Fire Fighting


Plumbing / Fire Fighting Detailed Design Drawings

915-1.5.4 HVAC
HVAC Detailed Design Drawings

915-1.5.5 Electrical
Electrical Detailed Design Drawings

915-1.5.6 Infrastructure
Infrastructure Design Detailed Drawings

915-1.5.7 Roads
Roads Detailed Design Drawings

915-1.5.8 Submission
Submission of Detailed Design

915-1.5.9 Client Review and Approval


Detailed Design Client Review and Appr

915-1.5.10 Invoice
Invoice (2)

915-1.11 Final Detailed Design


915-1.11.1 Architectural
Remaining Level of Effort

Remaining Work

Actual Level of Effort

Critical Remaining Work

Actual Work

Milestone

05

Early Excavation, 08-Sep-16


01-Jan-17

11

29

92 01-Sep-16

Project Finish

Management

11

01-Jan-17, 915-1 Palm Valley (Plot B)

Early Excavation

04

01-Jan-17

915-1.2 Management

September 2016
28

92 01-Sep-16

Finish

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11 Final Detailed Design

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11.1 Architectural

summary

Page 1 of 2
Proj No .915
Data Date 14-Nov-16

Date
11-Nov-16

Prepared by: Hassan Salem


Revision
01

Checked
Approved
Eng. Khaled M... Eng. Khaled Metw...

Palm Valley (Plot B)


#
50
51

Activity Name

Original Start
Duration
Architectural Detailed Design Drawings

915-1.11.2 Structural

Finish

September 2016
28

04

11

18

October 2016
25

02

09

16

November 2016
23

30

06

13

20

December 2016
27

04

11

18

uary 2017

January 2017
25

01

08

15

22

29

15 12-Dec-16*

01-Jan-17

Architectural Detailed Design Drawings

05

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11.2 Structural

52

Structural Detailed Design Drawings

15 12-Dec-16*

01-Jan-17

Structural Detailed Design Drawings

53

915-1.11.3 Plumbing / Fire Fighting

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11.3 Plumbing / Fire Fightin

15 12-Dec-16*

01-Jan-17

Plumbing / Fire Fighting Detailed Design Draw

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11.4 HVAC

15 12-Dec-16*

01-Jan-17

HVAC Detailed Design Drawings

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11.5 Electrical

15 12-Dec-16*

01-Jan-17

Electrical Detailed Design Drawings

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11.6 Infrastructure

15 12-Dec-16*

01-Jan-17

Infrastructure Design Detailed Design

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11.7 Roads

15 12-Dec-16*

01-Jan-17

Roads Detailed Design Drawings

15 12-Dec-16

01-Jan-17

01-Jan-17, 915-1.11.8 Technical Office / BOQ

15 12-Dec-16*

01-Jan-17
27-Dec-16

54
55
56
57
58
59
60
61
62
63
64

Plumbing / Fire Fighting Detailed Design Drawings

915-1.11.4 HVAC
HVAC Detailed Design Drawings

915-1.11.5 Electrical
Electrical Detailed Design Drawings

915-1.11.6 Infrastructure
Infrastructure Design Detailed Design

915-1.11.7 Roads
Roads Detailed Design Drawings

915-1.11.8 Technical Office / BOQ & CE


Detailed Design B.O.Q / Cost Estimate

65

915-1.11.9 TRC / Squad Check

2 25-Dec-16

66

Detailed Design Squad Check

0 25-Dec-16*

Detailed Design TRC

0 27-Dec-16*

67
68
69
70
71
72
73

915-1.11.10 Submission
Submission of Detailed Design

915-1.11.11 Client Review and Approval


Detailed Design Client Review and Appr

915-1.11.12 Invoice
Invoice (3)

Remaining Level of Effort

Remaining Work

Actual Level of Effort

Critical Remaining Work

Actual Work

Milestone

Detailed Design B.O.Q / Cost Estimate


27-Dec-16, 915-1.11.9 TRC / Squad Check
Detailed Design Squad Check, 25-Dec-16*
Detailed Design TRC, 27-Dec-16*

0 01-Jan-17

01-Jan-17

01-Jan-17, 915-1.11.10 Submission

01-Jan-17

Submission of Detailed Design,

0 01-Jan-17

01-Jan-17

01-Jan-17, 915-1.11.11 Client Review and Ap

01-Jan-17

Detailed Design Client Review and Appr,

0 01-Jan-17

01-Jan-17

01-Jan-17, 915-1.11.12 Invoice

01-Jan-17

Invoice (3),

summary

Page 2 of 2
Proj No .915
Data Date 14-Nov-16

Date
11-Nov-16

Prepared by: Hassan Salem


Revision
01

Checked
Approved
Eng. Khaled M... Eng. Khaled Metw...