ADDENDUM TO MIR NO:

DATE: .

SECTION:
During prototype inspection of tower.., rolling lines were observed in
section.
These were examined and following observations are recorded.
These lines are observed in some of the pieces for entire length of the piece.
Some of the pieces have engraved lines whereas in some cases, they are
embossed.
The depth is observed very less. The measurements show it as less than
0.1mm.
The thickness of section.
The photographs are attached.
Based on above and considering EN 10063 (Part 1 to 3 ????), it is understood
that these lines are acceptable as it is. Hence, the material is released
further for tower testing.

Tejas Shastri
Date : 07.05.2015
QA & INSP.