RECORD OF INITIAL OPERATION

Contract: FIRE PROTECTION, DETECTION AND ALARM SYSTEM


Contract Ref:
Contractor1. Description and Location of Plant:Hydrant Pump-4A (Location-Fire fighting pump house, near Jockey pump)
2. Initial Operation
The above plant completed its initial operation tests on 02-04-2013 in the presence of the
following witnesses. The defects and omissions noticed during this trial run that are to be
liquidated by the contractor are also attached.
For Erection Department
SL

DEPARTMENT

MECHANICAL

ELECTRICAL

C&I

NAME

SIGNATURE

NAME

SIGNATURE

NAME

SIGNATURE

For O&M Department


SL

DEPARTMENT

MECHANICAL

ELECTRICAL

C&I

For Contractor
SL

CONTRACTOR

1
2

3. Defects or Omissions found on initial operation

Page
1

Sl
1.
2.
3.
4.
5.
6.
7.

Defects or Omissions
Gate Valve at the discharge of pump is having
leakage.

Contract Ref:

NRV is not resting on support.


Support PS-3 is not as per drawing.
Recirculation gate valve is having minor leakage.
Space heater termination is broken.
Space heater cable termination is not done.

One no. motor lifting eye key is missing.


Note:
a) To be issued only after the issue of SRCC.
b) All the maintenance as well as the equipment lubrication of the plant under consideration
will be the responsibility of the contractor even after issue of this document. Defects and
omissions noticed during the test run should be liquidated by contractor.
c) This document should be issued after obtaining all operation and maintenance
volumes erections/FQA log sheets pertaining to the equipment under
consideration.
For Erection Department
SL
DEPARTMENT
1

MECHANICAL

ELECTRICAL

C&I

For O&M Department


SL
DEPARTMENT
1

MECHANICAL

ELECTRICAL

C&I

For Contractor
SL
CONTRACTOR

NAME

SIGNATURE

NAME

SIGNATURE

NAME

SIGNATURE

1
2